Upload
kamal-kant
View
229
Download
1
Embed Size (px)
Citation preview
7/30/2019 PGCIL Presentation Skeleton
1/21
2009 Wipro Ltd - Confidential
Title
Sub-text
Presenter's Name
7/30/2019 PGCIL Presentation Skeleton
2/21
2009 Wi ro Ltd - Confidential2
2009 Wipro Ltd - Confidential2
Team Introduction 5 Minutes. Introduction to Wipro 15 Minutes RBH
Introduction to SAP Practice 15 Minutes Delivery Head
Introduction to Utility Practice in Wipro 15 Minutes Utility Vertical
Head.
Demo 3 Hours.
Q&A 10 Minutes.
Internal Plan
7/30/2019 PGCIL Presentation Skeleton
3/21
2009 Wi ro Ltd - Confidential3
2009 Wipro Ltd - Confidential3
Click to edit Master text styles Second level
Third level
- Fourth level
Fifth level
Terminology & Abbreviations
7/30/2019 PGCIL Presentation Skeleton
4/21
2009 Wi ro Ltd - Confidential4
2009 Wipro Ltd - Confidential4
Agenda
3
4 jkl
1 PGCIL Organization Structure
2 Master Data
ghi
5 mno
7/30/2019 PGCIL Presentation Skeleton
5/21
Slide Separator
When > Where >How
7/30/2019 PGCIL Presentation Skeleton
6/21
Click to edit Master text styles Second level
Third level Fourth level
Fifth level
7/30/2019 PGCIL Presentation Skeleton
7/21
Master Data
When > Where >How
7/30/2019 PGCIL Presentation Skeleton
8/21
Screen Shot of the Users Created in SAP
Corporate OS User. OS User(Sub-Station): username ccossuser
One account for Corporate OS User(T/L): username ccostuser
One account for Corporate OS- GM: username ccosgm
One account for Corporate OS-ED : username ccosed
Corporate Viewer for Director Operation: username
ccosdo
Regional Operation Services User and Regional OS
Approver. Username : NR1Rosuser,SR2Rosuser and
NR1Rosapp,SR2Rosapp.
Finance User and Finance Approver Username : NR1Rfuser,SR2Rfuser.
One user for Operation, one for Maintenance ,one
for sub-station in-charge, one for sub-station contract,
one for sub-station finance, and one for line
Users
7/30/2019 PGCIL Presentation Skeleton
9/21
Screen Shot of Material List created forDemo as per the Script
For each of the 400/220 Kv Sub-Station,
define following equipment: 400/220k Auto Transformers
Circuit Breaker 400 Kv
Circuit Breaker 220 Kv
400 Kv Capacitive Voltage Transformer
220 Kv Capacitive Voltage Transformer
Current Transformer 400 Kv
Current Transformers 220 Kv
Isolator with E/S 400 Kv
Isolator with E/S 220 Kv
Wave Trap 400 Kv
Wave Trap 220 Kv
Surge Arrester 400 Kv Surge Arrester 220 Kv
Assets & Spares
7/30/2019 PGCIL Presentation Skeleton
10/21
Diagram given in Annexure 1 as stored inthe DMS.
DMS of the Diagram
7/30/2019 PGCIL Presentation Skeleton
11/21
Define following common Attributes foreach of the above assets:
Name
Eqpt Number Make
Model
Qty
Type Year of Commissioning
Supplier
Category
Volta e Level
Asset Equipment Master
7/30/2019 PGCIL Presentation Skeleton
12/21
Define following common Attributes foreach of the above assets:
Name
Eqpt Number Make
Model
Qty
Type Year of Commissioning
Supplier
Category
Volta e Level
Asset Equipment Master
7/30/2019 PGCIL Presentation Skeleton
13/21
Define Equipment Specific Attributes asprovided below 400/220 KV Auto
Trnsformers: Rating
Voltage Ratio Cooling Type
Phases
Maximum Temperature Winding
Maximum Temperature Oil
Max. Iron Loss
Max Copper Loss
Impedance Data
Positive Sequence between
HV and MV
HV and LV
MV and LV
Zero Sequence
Winding connection Type HV/MV/LV:
Type of Neutral Grounding
Vector Group
Tap Changer
Voltage Class
Tap Range
Normal Tap
SAP CA-CLASS
7/30/2019 PGCIL Presentation Skeleton
14/21
Define Equipment Specific Attributes asprovided below 400/220 KV Auto
Trnsformers: Rating
Voltage Ratio Cooling Type
Phases
Maximum Temperature Winding
Maximum Temperature Oil
Max. Iron Loss
Max Copper Loss
Impedance Data
Positive Sequence between
HV and MV
HV and LV
MV and LV
Zero Sequence
Winding connection Type HV/MV/LV:
Type of Neutral Grounding
Vector Group
Tap Changer
Voltage Class
Tap Range
Normal Tap
SAP CA-CLASS
7/30/2019 PGCIL Presentation Skeleton
15/21
Notification to Closure
ScenarioWhen > Where >How
7/30/2019 PGCIL Presentation Skeleton
16/21
7/30/2019 PGCIL Presentation Skeleton
17/21
Slide Separator
When > Where >How
7/30/2019 PGCIL Presentation Skeleton
18/21
Click to edit Master text styles Second level
Third level Fourth level
Fifth level
7/30/2019 PGCIL Presentation Skeleton
19/21
Slide Separator
When > Where >How
7/30/2019 PGCIL Presentation Skeleton
20/21
Click to edit Master text styles Second level
Third level Fourth level
Fifth level
7/30/2019 PGCIL Presentation Skeleton
21/21
Your NameDesignation
Thank You