ip PDA073 632 Name Of Dam: BEDFORD RESERVOIR DAM V L Location: BEDFORD COUNTY, VIRGINIA Inventory Number: VA 01904 PHASE I INSPECTION REPORT NATIONAL DAM SAFETY .PROGRAM. Bedford Reservoir Dam, Inventory Number: VA-0I194, Bedford County, Virginia. Phase I Inspection Report. C-;) FC) inalret ~ ~ ~ D D C _____SEP 11 1919 DMRIBU1ION STATEMENT A Apoved im public !e1acQa Disdibution Unlivitsd A PREPARED BY NORFOLK DISTRICT CORPS OF ENGINEERS 803 FRONT STREET NORFOLK VIRGINIA 23510 / / JEB 79 79

PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

ip PDA073 632

Name Of Dam: BEDFORD RESERVOIR DAM V LLocation: BEDFORD COUNTY, VIRGINIAInventory Number: VA 01904

PHASE I INSPECTION REPORTNATIONAL DAM SAFETY .PROGRAM.

Bedford Reservoir Dam, Inventory Number:VA-0I194, Bedford County, Virginia.Phase I Inspection Report.

C-;) FC) inalret

~ ~ ~ D D C

_____SEP 11 1919DMRIBU1ION STATEMENT A

Apoved im public !e1acQaDisdibution Unlivitsd A

PREPARED BY

NORFOLK DISTRICT CORPS OF ENGINEERS

803 FRONT STREETNORFOLK VIRGINIA 23510

/ / JEB 79 79

Page 2: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

IF

DISCLAIMER NOTICE

THIS DOCUMENT IS BEST QUALITYPRACTICABLE. THE COPY FURNISHEDTO DDC CONTAINED A SIGNIFICANTNUMBER OF PAGES WHICH DO NOT

REPRODUCE LEGIBLY.

I

Page 3: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

SECURITY CLASSIFICATION OF THIS PAGE ("oien Dee Entered)

REPORT DOCUME N P E READ INSTRUCTIONSREPORT DOCUMENTATION PAGE BEFORE COMPLETING FORM

1. REPORT NUMBER .2. GOVT ACCESSION NO. 3. RECIPIENT S CATALOG NUMBER

VA 01904

4. TITLE (a Subtitle) S. TYPE OF REPORT A PERIOD COVEREDPhase I Inspection ReportNational Dam Safety Program FinalBedford Reservcir Dam 6. PERFORMING ORG. REPORT NUMBER

Bedford County, Virginia7. AUTHOR(s) 8. CONTiACT OR GRANT NUMBER(*)

NAO - James A. Walsh, P.E. NAO--------------------

9. PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT, PROJECT. TASKAREA & WORK UNIT NUMBERS

It. CONTROLLING OFFICE NAME AND ADDRESS 12. REPORT DATE

U. S. Army Engineering District, Norfolk /13. NUMBER OFPAGES

803 Front Street019?IfINfGEfIA'2IME A ADDRESS{It dtferent from' Contollin Office) IS. SECURITY CLASS. (of this report)

Unclassified

IS&. DECLASSIFICATION/DOWN GRADINGSCHEDULE

16. DISTRIBUTION STATEMENT (of this Report)

Approved for public release: distribution unlimited.

17. DISTRIBUTION STATEMENT (of the abetract entred in Block 20, if dilerent from Report)

I8. SUPPLEMENTARY NOTES

Copies are obtainable from National Technical Information Service,Springfield, Virginia 22151

IS. KEY WORDS (Continue on reverse side It necesary aid Identify by block numziber)

Dams - VANational Dam Safety Program Phase IDam SafetyDam Inspection

20. ABSTRACT (Cofin auen rever e sw It nMcawAAY md Ide itrf by block number)

(See reverse side)

DDJA 73 14 EDITION OF I NOV 6S IS OBSOLETE Unnl I+~ Pi i f mdSECURITY CLASSIFICATION OF THIS PAGE (W.'"n Date ntere

I A lII I I

Page 4: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

20. Abstract

Pursuant to Public Law 92-367, Phase I Inspection Reports are preparedunder guidance contained in the recommended guidelines for safetyinspection of dams, published by the Office of Chief of Engineers,Washington, D. C. 20314. The purpose of a Phase I investigation isto identify expeditiously those dams which may pose hazards to humanlife or property. The assessment of the general conditions of the damis based upon available data and visual inspections. Detailedinvestigation and analyses involving topographic mapping, subsurfaceinvestigations, testing, and detailed computational evaluations arebeyond the scope of a Phase I investigation; however, theinvestigation is intended to identify any need for such studies.

Based upon the field conditions at the time of the field inspectionand all available engineering data, the Phase I report addresses thehydraulic, hydrologic, geologic, geotechnic, and structural aspects ofthe dam. The engineering techniques employed give a reasonablyaccurate asses:mcnt of the conditions of the dam. It sho,,ld berealized that certain engineering aspects cannot be fully analyzeddurir- a Phase I inspection. Assessment and remedial measures in thereport include the requirements of additional indepth study whennecessary.

Phase I reports include project information of the dam andappurtenances, all existing engineering data, operational procedures,hydraulic/hydrologic data of the watershed, dam stability, visualinspection report and an assessment including required remedialmeasures.

/\4

Page 5: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

PREFACE

This report is prepared under guidance contained in the RecommendedGuidelines for Safety Inspection of Dams, for Phase I Investigations.Copies of these guidelines may be obtained from the Office of the Chiefof Engineers, Washington, D.C. 20314. The purpose of a Phase I investi-gation is to identify expeditiously those dams which may pose hazards tohuman life or property. The assessment of the general condition of thedam is based upon available data and visual inspections. Detailed in-vestigation and analyses involving topographic mapping, subsurfaceinvestigations testing, and detailed computational evaluations are beyondthe scope of a Phase I investigation; however, the investigation isintended to identify any need for such studies.

In reviewing this report, it should be realized that the reportedcondition of the dam is based on observations of field conditions at thetime of inspection along with data available to the inspection team, Incases where the reservoir was lowered or drained prior to inspection, suchaction, while improving the stability and safety of the dam, removes thenormal load on the structure and may obscure certain conditions whichmight otherwise be detectable if inspected under the normal operatingenvironment of the structure.

It is important to note that the condition of a dam depends onnumerous and constantly changing internal and external conditions, and isevolutionary in nature. It would be incorrect to assume that the presentcondition of the dam will continue to represent the condition of the damat some point in the future. Only through continued care and inspectioncan there be any chance that unsafe conditions be detected.

Phase I inspections are not intended to provide detailed hydrologicand hydraulic analyses. In accordance with the established guidelines,the spillway design flood is based on the estimated "Probable MaximumFlood" for the region (flood discharges that may be expected from themost severe combination of critical meteorologic and hydrologic conditionsthat are reasonably possible), or fractions thereof. Because of themagnitude and rarity of such a storm event, a finding that a spillwaywill not pass the design flood should not be interpreted as necessarilyposing a highly inadequate condition. The design flood provides ameasure of relative spillway capacity and serves as an aide indetermining the need for more detailed hydrologic and hydraulic studies,considering the size of the dam, its general condition and the downstreamdamage potential.

Page 6: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

F

TABLE OF CONTENTS

Preface .......... ........................... .

Brief Assessment of Dam ....... .................. .

Overview PhotoSection 1: Project Information. ................ .1-1Section 2: Engineering Data .... .............. .. 2-1Section 3: Visual Inspection ..... .............. 3-1Section 4: Operational Procedures ......... ... 4-1Section 5: Hydraulic/Hydrologic Design ........... .. 5-1Section 6: Dam Stability ..... ................ .6-1Section 7: Assessment/Remedial Measures . ........ 7-1

Appendix I: Maps and DrawingsAppendix II: PhotographsAppendix III: Field ObservationsAppendix IV: Preliminary Memorandum on Geological ConditionsAppendix V: Report on Earth Resistivity SurveysAppendix VI: Stability Analyses and Minimal Hydraulic/

Hydrologic Design CalculationsAppendix VII: References

44 *~on or

NTT's GAI

DDC TAB

Uno:1.no ed orJUstiIficat iony . . ..

U <

Page 7: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

PHASE I REPORT

NATIONAL DAM SAFETY PROGRAM

Name of Dam: Bedford Reservoir Dam, #VA 01904State: VirginiaCounty: Bedford CountyUSGS Quad Sheet: Peaks of OtterStream: Stony CreekDate of Inspection: 1 December 1978

Bedford Reservoir Dam is a zoned earthfill structure about 550 feet long and54 feet hijh. The dam is owned and operated by the city of BedfoJ,Virginia, and supplies water to the city of Bedford. The dam is classifiedas an intermediate size with a significant lazard classification. Theprincipal spillway consists of a 6-foot wide and 5-foot high concrete tunnelrunning through the dam at low level. The tunnel is served by three 16-inchintake lvels and a 30-inch by 30-inch drawdown sluice gate located in theupstream portion of the intake structure. Water passes into the tunnelthrough a 30-inch by 30-inch discharge sluice gate which remains partiallyopen. Water also flows through a 16-inch water supply pipe by means ofgravity to a filtration plant several miles downstream. The dam is locatedon Stony Creek about 3.4 miles upstream of Kelso Mill, Virginia.

Based on criteria established by the Department of the Army, Office of theChief of Engineers (OCE), the spillway is rated as adequate. The spillwaywill pass the Spillway Design Flood, which is considered the 1/2 PMF forthis dam, without overtopping the dam.

The visual inspection revealed no apparent problems and there are noimmediate needs for remedial measures. It is recommended within 12 monthsthat stability analyses be performed on the upstream slope assuming aminimum drawdown from normal pool. It is also recommended that a regularmaintenance program be initiated to maintain the integrity of the structureand correct those minor deficiencies listed in Section 7.

Submitted By6 , 1 1 1na si.,'od b Approved By: 01i ' iced by:,

JA IES A . WALSH P g ,s'i L . alf lor

JAMES A. WALSH, P.E. DOUGLAS L. HALIERChief, Design Branch Colonel, Corps of Lngineers

District Engineer

Recommended By:

,ANL !A. CQODiVIN Date:ZANE M. GOODWIN, P.E.Chief, Engineering Divisioi.

ii

• w~ 1

Page 8: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

i r'f7tk

Page 9: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

SECTION I

PROJECT INFORMATION

1.1 General:

S .ece Authority: Public Law 92-367, 8 Aug 72, authorized the "

Secretary of the Argm-y , through the Corps of Engineers, to initiate anational program of safety inspections of dams throughout the UnitedStates. The Norfolk District has been assigned the responsibility ofsupervising the inspection of dams in the Commonwealth of Virginia.

1.1.2 Purpose of Inspection: The purpose is to conduct a Phase Iinspection according to the Recommended Guidelines for Safety Inspectionof Dams (Appendix VII, Reference 4). The main responsibility is toexpeditiously identify those dams which may be a potential hazard tohuman life or property.

1.2 Project Description: M

1.2.1 Dam and Appurtenances: Bedford Reservoir Dam is an earthembankment dam about 550 feet long and 54 feet high. The top of the damis 20 feet wide with an elevation of 1378.0 feet m.s.l. The upstreamslope has 1 vertical to 3 horizontal (1:3) slope with riprap protectionfrom elevation 1358.0 to 1371.0 feet m.s.l. The downstream slope has a(1:2.5) slope and is benched at elevations 1363.5, 1348.5, and 1333.5 toaccommodate a surface drainage system consisting of catch basins andunderground conduits.

The embankment has an impervious core keyed into foundation bedrockand an intricate foundation drainage system consisting of blanket and toedrains. Plan views and profiles of the embankment, with the surface andfoundation drains, are shown on Drawings 2 and 14, Appendix I,respectively.

The principal spillway consists of a 6-foot wide and 5-foot highconcrete tunnel running through he dam at low level. The tunnel isserved by three 16-inch intake levels (elevations 1360, 1347, 1334). Thetop two intakes are always open allowing water into the intakestructure. A 30-inch by 30-inch discharge sluice gate is partially openeddischarging into the tunnel from the intake structure to allow dischargeinto the stream below the dam. Water flows from the intake structure bygravity through a 16-inch water supply pipe located within the tunnel.This water flows to a filtration plant several miles downstream.

1-1

Page 10: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

The emergency spillway is a c:ncrete side-channel spillway located atthe right of the embankment. It has a bottom width of about 140 feet witha crest elevation 1369.0 (including 1 foot of wood flashboards) and sideslopes of 1:1. The approach channel is constructed of riprap that coversthe 40 feet adjoining the spillway crest. The 495-foot long dischargechannel is constructed of concrete with several 2.5 inch hydrostatic reliefplugs and one 14-inch drain that controls flow from areas to the right ofthe spilluzy.

A 30-inch by 30-inch sluice gate with the invert at elevation 1325.75is located on the upstream side of the intake structure. This intakeallows water to flow into the intake strilcture, then permits withdrawalof water from the bottom of the reservor if the 30-inch by 30-inch

2discharge sluice gate is open.

1.2.2 Location: Bedford Reservoir Dam is located on Stony Creek about3.4 miles upstream of Kelso Mill, Virginia. The reservoir formed by the damis known locally as Stony Creek Reservoir.

1.2.3 Size Classification: The dam is classified as an "intermediate"size structure because of height (54 feet).

1.2.4 Hazard Classification: The dam is located in a rural area andis therefore given a significant hazard classification in accordancewith guidelines contained in Section 2.1.2 of Reference 4, Appendix VII.The hazard classification used to categorize dams is a function of locationonly and has nothing to do with its stability or probability offailure.

1.2.5 Ownership: City of Bedford, Virginia.

1.2.6 Purpose: Water supply for the city of Bedford, Virginia.

1.2.7 Design and Construction History: The dam was designed by Wileyand Wilson, Inc. and constructed in 1958 by English Construction Company.Flashboards were placed in the ungated spillway in 1966 and concrete wasplaced adjacent to the flashboards on the discharge channel sido in 1975.

1.2.8 Normal Operational Procedures: Water is withdrawn from thereservoir through a three level intake system to supply the city ofBedford, Virginia. A 30-inch by 30-inch discharge sluice gate is partiallyopen to allow flow downstream. Otherwise, regulation of flows is largelyautomatic with water rising above the crest of the emergency spillwaypassing freely downstream.

1.3 Pertinent Data:

1.3.1 Drainage Area: The dam controls a drainage area of 6.02 squaremiles.

Page 11: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

1.3.2 Discharge at Dam Site:

Maximum Known Flood - approximately 1,000 c.f.s.

Emergency SpillwayPool Level at Top of Dam - 12,150 c.f.s.

1.3.3 Dam and Reservoir Data: Pertinent data on the dam andreservoir are shown in the follow table:

Table 1.1 DAM AND RESERVOIR DATA

Elevation ReservoirElevation C apcity

feet, Area, cre- Watershed, Length,Item m.3.i. acres feet inches miles

Top of dam 1378.0 40 760 2.4 .4

Emergency spillway crest 1369.0 28 455 1.4 .3

Streambed 1315+ - - - -

1-3

Am m •

m~

Page 12: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

SECTION 2

ENGINEERING DATA

2.1 Des in: Design data was provided by the owners and by the designers,Wiley and Wilson, Consulting Engineers, Lynchburg, Virginia. The datareviewed included the following:

a. As-built drawings indicating plans, elevations, and sections of the

dam and appurtenant structures. Also shown on the drawings are borrow pitand test boring locations (May 1, 1954).

b. "Preliminary Memorandum on Geological Conditions at a ProposedDam Site on Stony Creek, New Bedford, Virginia," by Byron N. Cooper,February 23, 1953, Appendix IV.

c. "Report on Earth Resistivity Surveys at Proposed Dam Site on StonyCreek, Near Bedford, Virginia," by Byron N. Cooper, Appendix V. This reportcovers the investigation and recomnendations for embankment materials.

d. Test boring logs in addition to those shown on the drawings, by

Farwell Well Corporation, April 8, 1954, Appendix V.

e. Hydrologic data, and hydraulic design calculations, Appendix VI forthe design of the emergency spillway.

f. Stability Analyses, Appendix VI. Copies of existing data are onfile with the Norfolk District for future references.

2.2 Construction: There are no available construction records.

2.3 Evaluations: The as-built drawings and design calculations wereadequate for review. No construction reports were available to evaluateconstruction methods or alterations. However, as-built drawing wereavailable during the inspection and external structures appear to be inaccordance to the drawings.

Page 13: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

SECTION 3

VISUAL INSPECTION

3.1 Findings:

3.1.1 General: The results of the 1 December 1978 inspection arerecorded in Appendix III. At the time of the inspection the pool elevationwas 1362.75, 6.25 feet below normal pool elevation. The outlet work wasreleasing a very small flow by way of a partially opened discharge sluicegate in the intake structure. Prior to the field inspection performed on1 December 1978, the only known inspection was an underwater inspection ofthe intake qtructure performed by Virginia State Police divers. Ingeneral, no obstructions or siltation problems were found.

3.1.2 Dam: The embankment is in good condition, but is thicklyvegetated with brush and 2-inch locus trees. No sloughing, erosion, ormisalignment was noted. Several of the catch basins on the dam wereblocked with debris.

3.1.3 Appurtenant Structures: Observations of the intake structurewere made from the emban1cment and no deterioration was noted. Thedischarge tunnel apppeared to be in good condition, but a 2-inch layer ofiron bacteria was noted on the floor of the tunnel.

3.1.4 Emergency Spillway: The spillway is in good condition except forthe following deficiencies: portions of the flashboards are missing nearthe right abutment, a tree is growing out of one joint, the riprappeddischarge channel hau eroded away on the left side, the right side isovergrown with vegetation, and debris has blocked the right wallsubsurface drain.

3.1.5 Reservoir Area: The reservoir area did not have any shorelineerosion or apparent slope failures.

3.1.6 Downstream Channel: No erosion was observed in the downstreamarea. No homes are in the flood plain. A 25-foot high concrete dam islocated approximately 2,000 feet downstream. Because of siltation thisdam has very little storage capacity.

3.2 Evaluation: Overall the dam appears to be in good condition. Theembankment should be trimmed of the brush and all trees cut at the trunk.The catch basins should be cleaned out. The tree in the emergency spillwayshould be removed. The erosion of the channel downstream of the spillwayshould be riprapped. Also, the vegetation and debris located in the rightside should be removed, and the right drain should be uncovered and allowedto flow freely. An annual maintenance and inspection program with recordsshould be initiated.

~3-1

Page 14: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

SECTION 4

OPERATIONAL PROCEDURES

4.1 Procedures: The maximum storage pool is elevation 1369.0, whichis the top of the flashboards, on the emergency spillway crest, Thereservoir provides the water supply for the city of Bedford, Virginia,approximately 7 miles downstream. Under normal flow conditions, thereservoir pool level is at the ungated spillway crest (elevation 1369.0).Three water intake elevations 1360, 1347, and 1334, of which the highertwo are always open, allow water to flow into the intake structure. Wateris withdrawn from the intake structure by means of one 16-inch water supplypipe and the partially opened diacharge sluice gate. A 30-inch by 30-inchdischarge sluice gate connects the intake structure to the dischargetunnel through the dam. The sluice gate is lcft partially opened to allowdischarge into the stream below the dam.

4.2 Maintenance: A routine maintenance program has not beenestablished for the Bedford Reservoir Dam, although periodic maintenancehas occurred. Twice a year copper sulfate is added to the reservoir,while until recent years, every 2 or 3 years ground maintenance wasperformed by che Public Works Department to control tree and vegetationgrowth on the embankment and in the spillway. A representative of the cityof Bedford visually checks the reservoir elevation and dischargecharacteristics at least once a week.

4.3 Warnin System: At the present time, there is no warning systemor evacuation plan in operation.

4.4 Evaluation: The dam does not require an elaborate operationaland maintenance procedure. However, an annual maintenance and inspectionprogram should be iniiated to help detect and control problems that mayoccur.

4-1

Page 15: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

SECTION 5

HYDRAULIC/HYDROLOGIC DES IGN

5,1 D g Design calculations for the dam and spillway are on file

at the owner-s-office.

5.2 Hydrologic Records: None were available.

5.3 Flood Experience: The maximum observed flood reacied wasapproximately t high in the ungated spillway or elevation 1370.0.

5,4 Flood Potential: The Probable Maximum Flood (PMF', i/2 PMW, and100-Year Flood were developed and routed through the rese-voir by use ofthe HEC-IDB computer program (Reference 1, Appendix VII) and appropriateunit hydrograph, precipitation, and storage-outflow data. Clark's Tc and Rcoefficients for the local drainage area were estimated from basincharacteristics. The rainfall applied to the developed snit hydrograph wasobtained from U.S. Weather Bureau Publications (Referenco 2 and 3, AppendixVII). Losses were estimated at an initial loss of 0.80 inch and a constantloss thereafter of 0.05 inch/hour.

5.5 Reservoir Regulation: Pertinent dam and reservoir data are shownin Table 171.

Regulation of flow from the reservoir has been set to allow water toenter the upper two 16-inch intakes and collect within the intakestructure. Flow occurs through a 16-inch water supply pipe to thefiltration plant and occurs through the partially open discharge sluicegate. Water also flows past the dam over the emergency spillway in theevent water in the reservoir rises above elevation 1369.0.

The storage curve supplied by the owners was extended above the top ofthe flashboards by use of U.S. Geological Survey Quadrangle Maps. Ratingcurves were developed for the emergency spillway, non-overflow section ofdam, and the drawdown outlet. In routing hydrographs through the reservoir,it was assumed that the initial pool level was at the emergency spillwaycrest (top of flashboards). Flow through water supply pipe was neglectedduring routing.

5.6 Overtopping Potential: The probable rise of the reservoir andother pertinent information on reservoir performance is shown in thefollowing table:

5-1

Page 16: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

Table 5.1 RESERVOIR PERFORMANCE

Normal HydrographItem Flow 100-Year d/ 1/2 PMF PMF2

Peak flow, c.f.s.Inflow 6 6,767 13,483 26,966Outflow 6 5,894 12,937 26,700

Maximum elevation,

ft., m.s.l. - 1374.4 1377.4 1381.1

Emergency spillway(el. 1369.0)Depth of flow,

ft. - 5.4 8.4 12.1Duration, hours - 16.5 73.0 79.0Velocity, f.p.s. - 7.0 8.7 10.4

Non-overflow section(el. 1378.0)Depth of flow,

ft. - 3.1Duration, hours - 2.5Velocity, f.p.s. - 5.4

Tailwater elevation,ft., m.s.1. 1316+ -

1/ The 100-Year Flood ( percent Exceedence Frequency Flood) hasI chancein 100 of being exceeded in any given year.

2/ The Probable Maximum Flood is an estimate of flood discharges thatmay be expected from the most severe combination of criticalmeteorologic and hydrologic conditions that are reasonablypossible in the region.

5.7 Reservoir Emptying Potential: A 30-inch by 30-inch gated outletand a 16-inch outlet at elevation 1325.25 is available for dewatering thereservoir. The low level openirg through the intake structure will permitwithdrawal of about 305 c.f.s. with the reservoir level at the crest of theemergency spillway and essentiaiy dewater the reservoir in less than 1 day.

5.8 Evaluation: Based on the size (intermediate) and hazardclassification (significant) the recomnended Spillway Design Flood is 1/2PMF. Based on the risk involved in this project, it is considered that 1/2PMF is appropriate as a Spillway Design Flood.

Conclusions pertain to present day conditions. The effect of futuredevelopment on the hydrology has not been considered.

5-2

Page 17: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

SECTION 6

DAM STABILITY

6.1 Foundation and Abutments: The preliminary memorandum by Bryon N.

Cooper, provided in Appendix IV, covers the area geology, including a summary

of the test borings shown on the drawings. Generally, the area geologyconsists of shallow residual soils overlying a massive dark-colored greenish-

gray bedrock. The bedrock is composed largely of hornblende and plagioclase

gneiss. However, there is a thick river deposit through the dam site

consisting of an imbricated mass of river cobbles attaining a maximumthickness of about 27 feet. The preliminary report includes specific

recommendations on keying impervious earth core into bedrock beneath the

cobble layer. The drawings provide a profile of the dam foundation and

ungated spillway on Drawings 9 and 7, Appendix I, respectively.

6.2 Embankment:

6.2.1 Materials: The embankment consists of three zones of materials.The impervious core is classified "Class A" with "Class B and C" as theupstream and downstream ballast, respectively. The earth resistivity surveyby Cooper provided in Appendix V covers the investigation and

recommendations for embankment materials. The test borings by Farwell Well

Corporation are believed to be some of the additional borings requested by

Cooper in his report. Available data does not specify the characteristics

of the classes of materials. Based on Cooper's survey report, the Class A

is probably a residual plastic clay and the Class B is the above soil, too

granular and rocky for use as in Class A clay. There is no reference in any

of the intormation as to the nature of the Class C soil.

6.2.2 Stability: The embankment stability was performed according to

Engineering For Dams, Volume III, by Justin, Hinds, and Cregor. Design

parameters of 0 = 240 and C a 0 were assumed for the core material. The

analyses were performed for the following loading conditions:

Condition Factor of Safety

1. Resisting Force AgainstHeadwater Pressure 3.8

2. Horizontal Shear inDownstream Portion

IV:2.5H Slope 1.49

3. Horizontal Shear inUpstream Portion (SuddenDrawdown, Worst Condition)

IV:3H Slope 1.0

LV:3.5H Slope 1.18

6-1

Page 18: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

Based on the analyses, an upstream slope of IV:3.5H and downstream slopeof 1V:2.5H were recommended for design. A copy of the calculations areprovided in Appendix VI.

6.2.3 Seismic Stability: The dam is located in Seismic Zone 2.Therefore, according to the Recommended Guidelines for Safety Inspectionof Dams, the dam is considered to have no hazard from earthquakes providedstatic stability conditions are satisfactory and conventional safetymargins exist.

6.3 Evaluation: There are no available soil testing records toverify the assumed soil parameters. Also, the dam has an upstream slopeof lV:3H which, based on the analyses, is not adequate according to therecommended design.

However, the visual inspection revealed no evidence of instability orstress of the embankment; therefore, the dam is considered stable andadequate for normal pool operations. But it is recommended that theupstream slope, according to state of the art practices, be checked forsudden drawdown conditions, assuming a minimum drawdown from normal pool.

6-2

Page 19: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

SECTION 7

ASSESSMENT, RECOMMENDATIONS/REMEDIAL MEASURES'7.1 Assessment: The inspection revealed no findings that prove the

dam to be unsound during normal pool operations. Available engineeringdata was adequate for review. The Spillway Design Flood (1/2 PMF) doesnot top the crest of the dam, therefore, the emergency spillway isconsidered adequate. The stability analyses indicate an adequate factorof safety on the downstream slope. But, the dam has an upstream slope oflV:3H which, according to the given design calculations, has a factor ofsafety of 1.0 for the sudden drawdown condition. Overall, the dam is inadequate condition and will not require urgent remedial treatment.

7.2 Recommended Remedial Measures: It is recommended within 12 monthsthat stability analyses be performed on the upstream slope assuming aminimum drawdown from normal pool. It is also recommended that an annualmaintenance program be initiated to maintain the integrity of thestructure. The inspection revealed the following maintenance items thatshould be scheduled by the owner during a regular maintenance period:

a. Trim the embankment of brush, cut all trees at the trunk, and

reseed the embankment.

b. Clean out all the catch basins on the dam.

c. Cut the tree growing in the emergency spillway.

d. Riprap the eroded area in the channel downstream of the ungatedspillway. V

e. Remove the vegetation and debris located on the right side of thedownstream channel of the emergency spillway. Also, uncover the rightsubsurface drain and allow it to flow freely.

7-,

Page 20: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

APPENDIX I

MAPS AND DRAWINGS

Page 21: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

C:n Is -

//V,

on.r& 4I, \ ~ r~\jj, 4 B( 4

if-i -. FN.o -

S bsCo

onV )C

/ f~C. P~j A1<UNAIP ~ -.~. 7 / 1~C~'IL

'g()~'C. -A

h-K ~ BDFR REEVI \DAU iI~N~-:{(?' " 8~D );

1, .- QK 7 'A I ICS x 1 - - --,-\

oll rR-Vfl "-/7&>N 11)A (.)\

~~'1 x . ,' & - -, - /top. ,'~edfor

'~"' ( ' \\~Q , r~-$-~\ h ~ .

N-~(. 74 Nc )

Ni-, A

009'A2D<t. p

"4c

Page 22: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

ibI

Page 23: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

V

I

"I

~*1,5,.

I

Page 24: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

r

I

Page 25: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

. . . .. . . .. .

Page 26: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

.............. r* * O~ ~.4... .. e. , *..t.. .- ~ * . q~- S

41~*A1

F a

Atl.

letr ~ .~

WR. 5/*

'7 I

4-7hi - - 4% 4;4 '-

____ A ~ IVA

Page 27: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

L~~ts W,'

-f/ * Atk c,

IlkI

'. . W' ..z.71r

V.IT

.tc

'V .' .

Page 28: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

f40

4 v

4t4

4, a

Jia II '

7-, A Ta .

Page 29: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

-~~~ -4I

AQr

.44'N ,,

Page 30: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

4 4'0

R-' I- /l i"-"d

Q :t~', ' t 4'~&r *~44 jr 2 h. 7

A16

7 11

14 V4.

A '-7'-, .

Page 31: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

to, aa aa - a ~ t a aa ~ a a a

I'Vt~aa

~~IV,

:, ~ Y'a ~ ~40

a4'~ N1

aa~ ~ a~vq~2- a4~ a~a~ a' &aL* aaaBIV

_4$' ol ; xa~ a ~ 4a~~ a~<I , ~L~'~j~T

q -V

~4'(aa Lt

-aa~~a a'~'' 4a ~V i

a ~-aaaaaa~4 -a ~\ ~aal a-ah

ai~ ea~ aa'ae p

a. a

Page 32: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

I 4-4- - -

t . 4- 44 '

4 - + 4

T4' TI, r T

-44 1- -I T

TT - T4 4 -< I .

7 7-ITT L I ~ ~ -~

-T 4-1<,22

T7 T I- , -+,

4-4'- j1

I - '. 4V ~ 4~l~ir-1-I'-±fl-f1I

~~"'4* j'1ii~~ - t~~i7-r+frTv tK 9 -' - -

F' T 4 T 4 I4~ 1 t -

4,1

T± J

~~~~~~4 t .T- ~L...

Page 33: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

IM,

- 7~*1~T4 T-T

fttL

~~~1 4~ 1? v~:>

* 4-

17 1~ V 11 T Ii Ot71j~

4ti~4

t A

7~ L ____

Page 34: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

I- s L

-7$ -T .-

F 7 T1

I 1

am -t 4 i1rs t &-4

4-44-~'- -- -1 t 1 1 1 1 -

-7 -:4 H444

TT

-L4 7P 4 ,' r-~~4, 4- 7

r 1- 77 T.<-'- :.41

I-

* ~ ~~~ +1Zif ttiI t\' _ _ P 4c

TI Tt- N

J44 :L 111

44 x4t 4: jKtPfL4 ~ A

21,14 *y;V--- j-J.-T-I~T rimt tA7b~ ,i/

-47~-± F- 14-z '- rr . - - - -4! -T TV~r

4 - 't~14.4.,4 .1 i-f-.,, Cc+ 1 4F'

t -Kt't

+. 4 444 L. - '-

+ 4-

tL t;PL+4+ttf rnT4 44 247c~ 4 ~ '

Page 35: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

-I. 7

Lii~~iI~i~Iii24 ' T-f

+ 7r4 7

_i4 tI

7'1 t.1~ fill TLtf il

{a.*~j; -~ 74;. ii.I 1

I ,4I

X 'W"h

T It ILI -4I~n " V 1

11 I - -- r---7- -I '~' H--T

'- .......... . .,..

I - *-.4

I~~~~~_ f~* ~~T OK

4- 4 4E2M ,

Page 36: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

-~ ~~~F T'- L~4

1"4 1

-T T

4:4

4, f ' ,1T7T-- - --T-

4j 71''" 4.

Vi*71r-'''

KJ ,~f p.. -491 II

Page 37: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

"Av fI 17, 17 - .. ,

1

._____ -______.__._______________ :

1 . .,t :t 1 'lIf .- .,.

.. Ii

: i . IT,rM

:4L

'~ ~r&: "*~t~ .Y. i~t ," .

4. .. ' I! i

• .. _ I '' ," •, , , .. ' . , - t 4' , , .. . 4, .

:. ...I 'in-*

4.,i4.

44j4

ANE IIWOU- ti.,

-;OOVE *V .IM41f ~tN.

WIT

Page 38: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

'44

2q

J- nr

iit

I I

~t-r.9

E1 TI t_ _

Page 39: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

F 771

-Lsl 1 .iJ/.~l c Tt II

411-

4.-f~j.~-f4.+

7F -r.

i 'A I }~'~i ~KRWWWW lVA

Page 40: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

APPENDIX II

PHOTOGRAPHS

:iL

2"r

Page 41: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

1k

INTAKE STRUCTURE

OUTLET STRUCTURE

Page 42: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

TOP OF DM-THICK LOCUST GROWTH

54.

CREST' OF SPI LLWAY-MI SS ING FLASHlBOARDS

Page 43: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

FVI

IV

Ik

Page 44: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

CONSTRUCTION JOINT IN SPILLWAY-FILLED WITH COLD POUR

SOME. vI,'CE'VArION GROWING IN LEFT W4ING WALL

+

Page 45: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

APPENDIX III

FIELD OBSERVATIONS

Page 46: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

APPENDIX III

PHASE I - FIELD OBSERVATIONS

Name of Dam: Bedford Reservoir Dam (VA 01904)County: Bedford State: VirginiaCoordinates: Lat. 3726.6 T ong. 7933.0Date of Inspection: 1 December 1978Weather: FairTemperature: 450 FPool Elevation at Time of Inspection: 1362.75 m.s.l. 0Tailwater at Time of Inspection: 1316+ m.s.l.

Norfolk District Inspection Personnel:

Jim Rnbinson, HydrologyDave Pezza, SoilsRichard Klein, Trainee

Other attendees:

Neil Obsershain, State Water Control BoardWalter Kent, City of BedfordEverett Wood, City of BedfordTerry Dooley, City of Bedford

1. GENERAL: At the time of inspection, the level of the water in thereservoir was 6.25 feet below the normal pool level of elevation 1369.0.

2. EMBANKMENT

2.1 Surface Cracks: The slopes, crest, and abutment contacts wereinspected and no cracks were found. However, the face of the dam wascovered with thick vegetation inhibiting a thorough investigation. Thevegetation consisted of brush and locust trees up to 2 inches in diameter.

2.2 Unusual Movement: No unusual movement was noted on the dam. Thevegetation inhibited observations.

2.3 Sloughing or Erosion: No sloughing or erosion was noted.

2.4 Alijnment: The vertical and horizontal alignment of the dam didnot deviate from the as-built drawings.

2.5 Riprap: No riprap failures were found on the upstream face ofthe dam.

ill!-I

Page 47: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

2.6 Junctions: No problems were observed at the junctions of theembankment and left abutment, and spillway and dam.

2.7 Seepage: No seepage was observed.

2.8 Drains:

2.8.1 Surface Drains: Several of the drains were plugged with debris.

2.8.2 Foundation Drains: The drains were not observable during the A

investigation. It was noted from the drawings that the blanket drains drain ,into the surface drainage system. It is not clear where the toe drain empties.At the time of the inspection, the 12-inch and 15-inch pipes discharging intothe outlet works were submerged. The 12-inch pipe appeared to be flowing fulland flow was evident from the 15-inch pipe.

3. Water Works:

3.1 Intake Structure: There is no access to the intake structure fromthe dam. "Testructure is concrete and showed no visible signs of k:

deterioration. An inclosed structure sits on top the intake prohibiting P,observation of shafts used to operate sluice gates. No determinations of theintake structure could be made during the inspection. State Police diversfound no problems during inspection in the fall of 1977. 3

3.2 Outlet Works: A 30-inch by 30-inch sluice gate serves as theprincipal spillway by connecting the intake and the discharge tunnel. The I ,

gate is opened partially allowing flow downstream. The tunnel dimensions are6 feet wide and 5 feet high with a 30-inch by 30-inch opening in a brickedwall at the discharge end. Flow through a 16-inch water supply pipe could notbe determined. A wooden plug was missing from 16-inch outlet. There was a2-inch coating of iron bacteria in the outlet and downstream channel.

3.3 Outlet Channel: A discharge channel extends from the toe of che damto approximately 20 feet downstream. Wing walls and large boulders line thechannel which is approximately 3 feet deep near center of channel just belowthe exit channel of the discharge tunnel. The tailwater was approximately 0.5feet below the tunnel discharge invert. A large quantity of iron bacteria wasobserved in the discharge tunnel and in the downstream channel area.

4. Emergency Spillway: The spillway is a concrete side-channel locatedto the right of the earthen embankment. Flashboards were added in 1966 andconcrete reinforcement for the flashboards in 1975, which raised the normalpool elevation to 1369.0. Portions of the flashboards are missing near theright abutment. The concrete discharge channel appeared in good condition.

111-2

Page 48: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

9I

No spalling and scaling were evident and the expansion joints are sealedwith bituminous asphalt or cold pour. Several of the asphalt sealed jointshave light vegetation growing in them. There are several 2.5 inch diameterhydrostatic relief plugs in the channel. Alligator cracking was noted inthe concrete slab at station 7+00 with patching apparent. A tree isgrowing out of a joint in the left channel wall at about Station 2 + 90.The drain discharging into the channel at about Station 4 + 85 was flowingfreely with clear water. A pile of soil is resting in the right wall atabout Station 5 + 25. The left wall subsurface drain was flowing freelywith clear water. The right drain was not found. The riprapped downstreamchannel has eroded away on the left side. The right side is overgrown withheavy vegetation and debris has blocked the right drain.

5. Reservoir: The area surrounding the upstream reservoir consistsof mild to moderate sloping wooded mountain terrain. No observations ofsediment could be made. The water was clear and free of debris.

6. Downstream Channel: The channel immediately beyond the outlet hadmild slopes up to 12 feet in height, then steep slopes to the left and nochange in slope to the right. No erosion was observed in the downstreamarea. No homes are in the apparent flood plain.

7. Instrumentation: A staff gage was located on the intake structureto allow visual readings of elevation variances from normal pool elevation.

1

i

Page 49: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

APPENDIX IV

PRELIMINARY MEMORANDUM ON GEOLOGICAL CONDITIONS

Page 50: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

YoN N. COOP0CLO GlUT

*LACK GU .O, VsININ IA 4aIo #C 9' V. P, . 0*9,aeg I'00 CI uITgV Ct.LU Ojai

P8~ . 1130 C' d*V 8 %U 4 4Imosbt SKLT, alba so

Februa-y 23, 1953

PREL.hDARY ORANDUM ON GE=OGICAL CCDITIONS AT A

PROPOSD DAM STE O STONY CREZK, wAR BEDFC1D, VA.

On Thursday, February 19, 1953, the uriter in company with

Mr. R. W. Martin, Mr. 14oNutt, and Mfr. Dodl made a preliminary

study of pottbilities fr ipounding surface water for a now

scum of supply for the Toun of Bedford. The area investigated

Iles in the valley of Staq Creek a short distance upstream from

the Pesent iL1 reserver. Two ites wre discussed in tbe

fields am dam site is $ut uputream frcs the nortber bondary of

a tract owned by the Town and is situated on the Goss landl another

da site being co sidered would arose the valley at a point above

a sm ostea7 situatod alol the west side of the valley botton.

These be rer to, spectlve, a the loer and upper

sates.

Df SM dto.- Of the two locations considered, the upper site

is definitely the les desirable one. A dam across the valley at this

location would have to be about 600 feet long, cr about twice the length

required at the lower location. At the upper locatian, the possibilities

fo a suitable spilwa and for convenient anchoring of the stricture

seiast the valley walls are poor. The ajor objection to the upper

site is that its utilisation would entail costly excavation down through

the alluviated floor of the valley over a length of at least 600 feet,

Page 51: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

in a location where there is every indication of a thick and continuous

alluvial cover all the way across the valley. This material would, of

courso, have to be completely penetrated and cut off by a trench down

into the bedrock, in order to Insure again-st leakage from the propccd

reservoir. The considerable excavation that would be entailed by this

procedure would be costly.

The lover site.- The bedrock at the lower vita is a vawsive

dark-colored greenlsh-gray rock composed largely of hornblende and

plagloclass feldspar, which has been called Lynchburg gneiss. The

rock is sufficiently basic to weather down to a bright reddish-brown

soil which is relatively dense, plastic, and water-tight. Exposures

alog the east aide of the Stony Creek road indicate two major joint

patterns in the bedrock. On pattern or system follow the rift of

the rk and strikes 1. ' e 1. with a dip of 55-750 S1. The other system

of regular fractues strikes about .300 W. and is nearly vertical. The

seond system is not as woll developed as the first and joints in the

ifner syctes are offset by the rift joints. There Is some aino

evidene of horizontal or sheeting Joints in the rock in oe exposure

ugtrm from the lmr @ite. The rocky character of th east valley

val1 IUtcates beyd an questIon that bedrock is practicalny at the

nsfaoe, The sp Just vest of Stony Creek at the lower site does not

appear to be a hi composed of gravelly alluvium or loose blocks of

slid oak. The surface indications are lain that this hill has a core

of massive gneiss like that which is wel exposed along the east val of the

valley. The soil on this spur is definitely residual and muct grade

down within a few feet into gneiss. This condition is of major iwor-

tamoe in evaluating this particular site for a dam, because the spur

offers not only a suitable place for a spillway but also serves to

Page 52: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

but remained to be so deeply weathered---and this in an area whereso great topographic relief wo-ld be expected to so accelerate theflow of streams as to flush away all loose rock.

If the spur in which the west end of the dam is to be foundedwere an aggregation of fresh boulders, it would be a most unsuitable I,:

anchor for a dam, because the interstices between the boulders wouldbe unfilled with impervious clay. Such clay as does occur in theinterstices between the weathered boulders of the mantle composing thisspur could only have been formed where it now is. Indeed, the clayexhibits much of the texture of tie crystalline rocks from which it wasformed by chemical weathering. The conversion of the abundant calcicfeldspar in the boulders during weathering into clay has served toplug the voids that surely must have existed w!nen the boulder depositwas fresh.

For all practical purposes, the spur to be used as an anchor forthe west end of the dam is Just as suitable a tie-point for the pro-posed structure as if it were a normally derived, truly residual massformed from the chemical decay of the indigenous bedrock. This isone of the most important and critical conclusions drawn from tne borings.

The cobble-strmw flat stretching from the toe of the spur de-scribed above over to the road along the creek was shown by Hole 2and by subsequent excavations made with a "claa-shell" to be a neatlyimbricated mass of river cobbles attaining a maxima thickness of about27 feet. The bore hole and the excavation made with the "clan-shell"nhow that the boulders rest upon fresh bedrock with the deepest orthicklt point of the boulder deposit being at the approxmate locusof Hole 2. The high permeability and coarseness of the boulder depositmeans that the excavation for the dam most be carried down through thegravel-cobble deposit and into bedrock. The neat lubrication of therivwr stones belo creek level will facilitate excavation of the materialand permit ret ntion of a fairly well defined trench or cut-off ditchacross the deposit to be used for back-filling with clay of Class A grade.

The thick river deposit at the dam site is another anomalous aspectof the dam site and reservoir area. In a region of so ragged relief, itwould be expected that the surface stream would be actively eroding thebedrock. Ut so with Stony Creek. In former times, probably when theclimate was colder and there was more precipitation in its watershed, StonyCreek excavated a channel in the bedrock, but later with diminution inflow and lessening of its transporting capacity deposited in its oldchannel the deposit of boulders and cobbles encountered at Hole 2 andin the "clam-shell" excavations. Probably, when the present type ofclimate started to prevail, the deposition of boulders in the old, deeperchannel of the stream was rapidly effected.

To swuniarize, rigorous mechaniual weathering and mass-wastage ofthe crystalline rocks on the Peaks of Otter, which possibly existedd-iing some early part of the Great Ice Age, created a great colluvialderosit at the base of the mountains which gradually crowded Jtony Creek

Page 53: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

-4-

farther and farth-r southeastward ir.til the stream tbecane wedged against

the base of Suck Mountain. In this :osition, the stream gradually under-

cut 3uck Mountain, oversteepened the northwest slopes of that mointain,and thereby caused the ledge-rock tc slide in large chinks or pidces down

into the creek bed. These pi eces, lar.er than the stream coald possibly

move, W. have served as baffles promoting deposition of the boulders

composing the alluvial dyo.sit below stream level. The enormous mass of

slide rock off of the Leaks of Otter has undergone thorough chemicalweathering and has transformed the once permeable mass, or at least the

part involved in the yroosed reservoir and dam, into an impervious andmechanically stable fill which will serve effectively as a good and safetie point for the proposed structure.

iSuinary of Core Hole Data

Holes drilled into bedrock wall on luck Mountain side of valley.-

Holes 4 and 5 found tight and relatively joint-free impermeable bedrockat hole depths of 7 and 8 feet respectively. For Hole 5, this means thatback into the face of Swik Mountain lateral excavations to firm and tight

bedrock will have to be carried only 8 feet. Hole 4 indicates that the

sam type of bedrock will be ancot-tered at an elevation of about 5 feetbelow road level. The east end of the proposed dam, therefore, will beassured of a good rock anchor which will be too tight to allow appreciablepiydg of water around that end of the impounding structure.

hule 6 driLled an a 15-foot monolithic slab of rock, presumably derivedfrom a slide off Suck Mountain, penetrated the boulder at a depth of about

51 feet to encounter river cobbles down to about 25 feet where bedrockbegins. Hole 2 shove 27 feet of river cobbles resting on fresh bedrock.

Hole 8 near the eastern toe ' the spur in which the west and of the damwill be founded shows tight clay down to 23 feet. This clay includes

Dom soft crumbly residual boulders. The undisturbed material down to23J fe will be reasonably water-tight, but the lower 2j feet down towhere bedrock begins at 26 feet may represent a feather edge of the boulderdeposit underlying the valley flat. Excavation down to bedrock will be

necessary in order to explore this thin permeable zone and to cut it offwith a back-fill of Class A clay.

Holes 1, 3, and 7 higher on the spur show the thickness of weatheredcolluvial material to be as great as 51 feet. Dry samples of the soil

from Holes 7 and 8 indicate impermeable material resulting from thethorough chemical decay of the criginally colluvial deposit.

Cross section accompanying this revort indicates the types of nuiterialoccurring along the center line and the rrobable contour of the freshbedrock below the weathered boulder ,le jit and below the stream fill.

Page 54: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

-5-

Porrow Area For Class A ;.nd F ,'aterial

Investigation of the clay in the small open ravine to the west ofthe dam was done by hand auger. Thicknesses of f..-rly heavy, compactibledense clay appear to range up to about 11 or 12 feet, with -,verage thick-ness of about 7 feet. A representative sample of this clay, probablythe best grade present in the proposed borrow area, was iollected andsent to Froehling and obertson, Inc., for soil analysis. The borrowarea can be ex:.ected to show some boulders, and probably some exploratorydig.ng with a power shovel or scoops will be necessary to determine wherea large enough section can be worked as a unit to allow mechanized panningof the material. It should be anticipated that the area of borrow willhave to range up to 1800 feet away from the dam. A number of pits willhave to be used, certainly including some in the old orchard area just so..thwestof the main are^ w-r_ materia.l il bo borrowed.

In general, it can be expected that the best grade of material willdirectly underlie the top soil, with Class B material under the top 3 or4 feet of A material.

Spillway Section of Dam

The borings done near the proposed location of the spillway indi-cate that the spillw will have to oe founded on weathered boulder clayrather than on bedrock. The clayey nature of the material will requireconsi :eration in designing the spillway apron, and areas below the concreteslabs of the spillway will havo to be covered with coarse rip-rap toprer.ent ermsion.

Placing of Class A Clay

After the river-cobble deposit has been breached with a clam-shell,the bedrock surface should be roughened sufficiently to insure a goodbond )f the corewli clay with the rock. The same goes for the easternabatawt of the dam, except that some actual excavation into the bedrockwill be necessary to form an effective cut-off. Probably the bottom of thevalley can be excavated in tw sections in order to deal with the streameffectively. A modified well-point system may be useful in dewateringthe river-cobble deposit during excavation.

S.e dal care should be taken to carry the Class A material westwardinto the spur to such a point that any loose perviou material such asfound from 23J to 26 feet in Hole 8 is cut off, and in addition eitherClass A or the best grade of B material should be used for the entirewestern part of the B section of the dam which wraps around the toe of.h* spur and extends well back of the .:rojecting end of the sp Inthis section of the upstream fill, excavation down to bedrock shouldbe undertaken over a width of at least 30 feet. This excavation wouldnot disturb the toe of the spir but wculd flank the spar on the north.Sufficient material should be stripped off tht, north side of the spirto get down to tight clay which -ill bond reaiily wl th the fill of thebest grade of 3 -aterial.

Page 55: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

' i

2onclusions Ci The -Zxplortions

-:xploration and borings rinde after siai3%lon of the pre-liminary eological reoort indicote decidedly anus-ial ouar:'.ce o:-Jttions in the area -f the pro.%,scd ,tractire. Theos cordit.'laS inot vitiate the site to iny appreciable dee.ree, but thuy rather indi-cate that some extra care must be taken to insure a safe and effectivecut-off of circulation through the boulder d.;-,it below creek levelextending westward possibly onto the very tip end of the toe of thesrur in which the west end of the dam will be founded.

Theborrow material probably cannot be obtained withouit encounteringboulders, but these should not be io numernus as to caase serious troublein panniz4 the Class A and B material. Some searching eround in theexte@,sive area of proposed borrow may b, necessary to determine wherea reasonably large quantity of good material can be obtained readily.The fact that the Class A -iateri&a will e'.pectably overlie the B claywill Yuan that strip panning rather than shovel excavation of the claywill, be the more feasible.

In view of all the unexpected sit iations encountered, doubt may=dot in some quarters as to the suitability of the site explored. It t

mhould be be mphasized that no boring or otoer exploration work hasrevealed a codition that cannot be dealt with effectively and withoutany unusual axpense. The worst condition, namely, the boulder d; osutbelow creek level, is narrower at the provosed dam site than at anypoint farther upstream. Therefore, the amount of troublesome excavationw.'l be less at the proposed site than at any other that might be utili-zed farther upstream. The alternative site farther upstream wuld entailpenetration of river cobbles over a width of about 6 feet whereas atthe proposed site the width is barely 220 feet.

It is believed that every possible adverse condition has been thorou ;Klyinvestigated and the site found to be usable and the most desirable one irthe valley of Stony Creek.

e spectfully sbmitted,

April 10, 1954IL

In Triplicate

39.....

Page 56: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

APPENDIX V

REPORT ON EARTH RESISTIVITY SURVEYS

Page 57: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

wi

IYRON N. COOPECRGIOLOGINT

*4LaMesume. VmaGIiNA

V. P. . O 6 lF e 100 0GUNVrY l veE1 XT. 38I0 VaLapmakallPS

REPORT ON -AITH HESISTIVITY XRVYS AT POFPOS D DAM SITE

ON STOJEY CHEEK, NEAR BEDFCRD, VIRGINIA

Duaring three days in late November and early December, earth

resistivity survey lines were run along lines 1-25 left, 0 -50 left,

and the Base Line for the purpose of determining the depth and pro-

le of the contact between the soil and bedrock. Two additional

depth determination@ were made on the southwest side of the valley

investigated. The loc:.ions of stations and pmofiles to bedrock

are shown oan the accoap ing maps and sketches. The su'veys were

run along lines of the grid layout of the preliminary survey of

the dam site, and some of the lines were extended beyond the limits

, f the preliminay saurvey, in order to prospect a larger area as a

possible borrow area for Class A ar.A (Ilass B material.

The surveys Agest that in the area back of the old barn

as the hillside the.average depth to bedrock is about 12 foet,

of htbich the upper 6 feet is probably good plastic compactible clay

suitable for use in the core wall of the proposed dam. The lower

6 feet of the soil is probably too granular and rocky for use as

Class A clay but would probably be stisfactory for Class B material.

Considering the area prospected in this survey, approximately 18,000

cubic yards of Class A clay is believed to be recoverable from a tract

of approximately 2.1 acres back of the barn cn tht hillside. This

area could be enlarged westward to increase the yardage of clay to

perhape 25,000 yards, but probably not ma. ch more than this aniount.

Page 58: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

-2-1

An additional solirce of borrow material is situated approximately

300 feet south-south east of the upstream ead of the principal 2.1-acre

borrow area, on the opposite side of the valley just uphill from an old

orchard. Two depth determinations on thickness of the soil and mantle

rock were made in this area, which indicate api'roximately 10 feet to

bedrock.

The earth resistivity surveys do not, of course, determine the

precise physical characteristics of the clays on top of the bedrock.

Therefore it is auggested that three test pit& be dug to determine

the actual nature of the soil in critical parts oat the area surveyed,

as follows: (1) at 9-50 on line 0-50 left; (2) at 7-50 along line

1-50 left;and (3) at the ege of the orchard on the opposite side of

the valley frcs the principal borrow area. These test pits will give

a better understanding of the precise character of the clays in this

general area and the proportion of Class A material to the other grades

of material.

The tentative center line crosses the old lane at about 7-W0 and

frm 450 to 700, the center line follow$ the crown of the projecting

,wr of ground that is to be used for anchoring the proposed dam. In

this sector, i. s. downhill from the point where the centerline crosses

the old lane, the earth resistivity survey line corroborates the previous

inference I made that the spur is actutlly a hill of bedrock which makes

an ideal cut-off for anchoring the proposed dam. The measurements made

indicate thAt bedrock is within 6 to 14 feet of the surface. I bnlieve th,.t

the results of the survey are mfficiently 'efinite to take as -!ta bl-shed

fact withoit the necessity of core-drilling, but one core hole omewjere

along the centcrline as finally i-terrrined shotil! be pt own to ot- 'A.ine

Page 59: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

-3-

the nature and o~curence of joints in the bedrock ana the degree of

disintegration of the bedrock in the core of the proJecting spur on

which the dam will be located.

The occurrence of bedrock at stream level alung the present

tentative center line some sufficiently well established that it

need not be core-drilled. However, at least two and possibly three

horizontal core holes 3ho'tld be driven into the rock wall just to the

east of the road. As previously mentioned, there are two rather well-

developed systena of intersecting joints which conceivably could pipe

impounded water aowimd the east end of the dam if the sets were open

joints. I believe it wuld be reasonable to restrict the amount of

core drilling t@ 450 to 500 feet, in view of the considerable infor-

mation alroeay obtained.

It appears to me that the tentative center line should be rotated

so that the section wast of the creek is moved northward so as to lie

entirely to the north of the old lane. Whom the final determination

of the center lne is madej, it wmld be advisable to run an earth

reistivity survey line right up the spur all the way to the highest

prtjeted water level. This could aoily be done in one day's time.

As oo. as the test pits are dag. I think I should examine the clay

and collect samples for physical tests. It is possible that I am over-

estimating the quantity of lass A material, but the curves plotted

by the Moore's eimation method and the square roots of the individual

s mation points indicated a break in the resistivity curve at a depth

of 5 to 6 feet. This break is presumed to be the point of change frog

good clay down into granular residuum and weathered bedrock. If this

presuption is not borne out by *he sections exposed in the suR,:ested

++444- T ++ + ++++ ++ ++ ,' . . . ........ X

Page 60: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

-4-

test pits, some revision ill have to be made in the estimated quantities

of Class A material available in the 2.1-acre tract that was prospected.

The borrow areas are bound to contain a good many boulders of bedrock,

but I do not believe that these will be sufficiently numerous to interfere

with panning out the clay.

I did not anticipate that the work oatlined to you would involve

three days of work, but an additional day had to be spent in extending

sce of the lines a sufficient distance to outline that needed for

borrow. The second lay after Thanksgiving that Dr. Sears worked at the

dam site, the helper to be supplied by the town failed to show up for

Xwork, and the umreying could not be done as rapidly as usual. I wa

a little disappointed at the relatively shallow depth of the clay down

to the first break, i. s. the thickness of Clase A material, and felt

it advisable to go back to the area and map oat extensiona of the F

survey lines in order to explore a larger borrow area than we originally

conxmplated. Although I have not yet heard how such yardage will be

required for the entire job, I am fairly certain that the main borrow

area wi not meet all your needs. Thus I felt it advisable to explore

the aea back of the old orchard on the opposite side of the Valley.

Tha charges for the work done are enumerated on the accompanying

Abeet.

Respectfully sutaitted,

If

4t

Page 61: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

.. ........

-1 :... 1 -

* I........---.-..--Itj ___

~-r- n=17 -A.

S.,.4--. v .w......-.s.....

Page 62: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

AC iIma **AitT

- --4 L

As 31470

Page 63: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

ir " ifFALWELL WELL CORPORATION

CO-P--- wAYS WELL DRILLINGsox 007 PH44 3-7760 OTATR

313 CAP66-... AVUNU

L.VNCOMUO. VIRGINIA

April 8, 1954

Viley and WilsonChurch StreetLynchburg, VirginiaAttention: Mr. R.1. MeNutt, Jr. Re: Test Drilling - Proposed

Dan Site - Bedford, Virginia

Dear Mr. Mcutt:

10 completion of our core drilling at the new proposed dam site forthe town of Bedford we are below listing the formation encounteredin our drilling.

Test Rl

ar e to this as No. 1 as it was the first hole that weput down and is located half m) up the hill between the creek andthe top of the hill.)

Frm 5 ft. tolO ft. -- clayom10 ft. to 42 ft.- Sand and Bolders

Fromi 2 ft. to 45 ft.- Top of Ledge RockFrm 5 ft. to 50 ft.-- Ledge Rock

Test Role No 2IT5 Iee was drilled on the edge of the creek Itself and we foundthe following.)

re5 ft. to 27 ft.-- Sand and Bolders27 ft.--...... Top of 3 ft. Bolder30 ft. - . Botto of 3 ft. Bolder31 ft. - - - - - - - Small Bolder and Sand32 ft. to 38 ft.. Ledge Rock

Toot Kole No. ITMS hole was at the top of the hill and if you will recall this isthe hole that we took the wash samples on which were not satisfactoryand we moved off and we moved back and took tie spoon samples whichwere satisfactory to Dr. Cooper and others.)

Cont'd.

" str Mlfinia' Lardo Dri/ww'"

Page 64: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

rFALWELL WELL CORPORATION

COMPM-EU= WATGM WELL DR I LLI N G DIAMONo coma

e*eSwoMs CONNACONO

sox 4007 P"0144 2.77309708 CAMPOULL AVKIUU

LYNCHOUNG. VIRGINIA

Wiley and Wilson Page III April 8. 195h

Asyou know all of the spoon samples that we took were turned overto Dr. Cooper and he took these samples back to Blacksburg. Allof the rock core that we took on these jobs we now have in a corebox in our ware house here and we will keep them in a safe place.Of course, upon your request we can deliver these cores to you atany time. We are holding in our files the logs from day to day whichwere turned in by the driller and we can go into greater detailif you so request.

We regret very much that this job took considerably longer than wehad antleipated, however, an you know it was a rather difficult joband of cour8o it is Impossible to make as such time on a job of thiskind as we would like.

Trusting that the above mets with your approval and any time thatwe can be of further service to you please do not hesitate to call

Very truly yours,

FALWELU WLL CORPORATION

W. Calvin Falwell

WC1F/bt

-36

30

-,GenhzJ T/Uftima' Largenu DyiU.,"u"

Page 65: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

i1

i

APPENDIX VI

STABILITY ANALYSES AND MINIMAL HYDRAULIC/HYDROLOGICDESIGN CALCULATIONS

Page 66: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

.5.- c .Y l r - .

-1,0. e- T441

CI I

'A:1. 4 / 94 c ./.7

.,Z' rAir Lst'/.p~'~A wa 4 1~ ~ 'o & #, ~ ~ g- 1. A

-. ~~42r~ A ?. 4. ~ - - ~JVe, z / ~ c~ r /

n~ ~~ ~~ 7 gdd.4 ~', vc4 ~ . .-

Page 67: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

IL

I

At

t

777-. vcw --

Page 68: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

Old. - XAZ IV "i - i

!--I v1 I 1 .---- - --- -

I y,*

.. . ... . ..

a ...

-VTV

t I

.. .... - - .4-,)

- 10

7r,

Page 69: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

,i-iII .I !,

r I 4 .',

/, L c , . i -..., - S,, - I!

im ,

I t ' , .I 1111I 1! 'tt

S ] ., 1'

Page 70: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

/

_______ I~~'A ~ ~ wa"' ~ ' --

- t..J --. * J7~I'J...7.fT~~L

* , -~ 44.j -. 4

- .4 .- 4 . 4 - ~ ~

/5 A4 .4 -I

4 4

44,

1~444 .L ~ 44444.4

ti-4 I -

-.v.t..1-. II *h,4j4~ E~2..J. ~4 tee~g*a/ .. , 4,.

- -~-- +L~..4 ~ -~ . -

-4- [.4

r;7"T-r 4 I :..L..$ I -4.--.-- -

- .~ ..

-- -4

4..-- -~

4 4 4~~ii+Ijji.444 4 ..... 4...~.' --- 4-*--I ~ -- ~'1.I22~.. .4.~....*t.*" - .. 4..4.. ... 4..41 -4'.~44~

, . 4~4

4, ~ * I * 4-.~.

~1''!

~W444 - .4.....?..4....4......,... --

'' t .4 ~-- - i~4.. Z~7 4 -

* 4 -4*4~

* .... 4... 44.4~44.;4.~. . **.4.~ - ~ .*4444 *~ 4=**~ -- -. 4 . 4

.4-~r. ~ 7. I 44

.L~~22J 44 44 - 4

Page 71: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

, . ;to, , . ..

A '//. . . .. i . ; .- .

* . -. . 4 -.- I- -- '.- -'

..... =.... '- -- 4-\ ' . ' , . "i... .. .... ..... .. .. "

_ ,,_._ .. ... _4... - .. .

$- L .. -. ... ... ,.. ... . . 4 -; .. --

-- -- -- ..... , ' , - *... ] - .J- -t- 1- ..... -.. 4_.A.. ....... . .. . ... .. ..-

~~~~~..'.. ..... . . ....... ..... .....,o--".....

, . .¢ _ ... .. . . fL .J

jL

Page 72: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

4-4 C4w

,~ I

1 -1

I I - IKo

Page 73: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

.4,

T, '9E

alp/. I .'o - 4i 4e' t '0

~A'oo

Page 74: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

voa t4 ~~ ~ ~~14Tt11-..t4,

. 4 .4 / . i. " *-i : " t . . . - .. ..-

",..

A-

-'.s

-T

, Z'L: J

4,-.

* . 1 .1 4' ' +

4 7, ¢ ,: : ' i ' , , " ' , ,'

/T ., AI

,

4.4 . 9

. . . 4 ? , ! I I , -.

r, * " , I 4-,

. 4. 4 - - -. . - . € .... I . I '.,

i ' , i l i!4 , I t. , . ,/ " •

-- ,- -' . I : / , / / , t t I .

! A , . .!.4' .T - T-- t t -- -- -- -- +•- "

' V i~ ri~J

# , ...... .. -'--4 .... . .. .

l# t .= i- Tz . .I-,, ,. -.,.

awp

4.I , : ! , , , I . 4 " l . .

+- .I ,,

I ..

,, '4 * I ,'' f. . - -1 2T. .. ..9+ f . •

,- . .'4t + r

rn-!- ). -F-+ ' ,-+.,t.L ., l.ll.. ....J l ] .A

Page 75: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

' 1

er *

r h . I

. * . j

, ---,,' , , ., -l,! ,, .! I 4 ' "

.'v4 -- - -4 . . . . .. I

; . ' ! i ! 4 I , t " -- - i i 4t $ .4 ,

A .i. .. .. ... . . . '. 4 .. - , i , -

' - " - - ' ,' ! 4 (.. '

.W --- ' *41, 1,- - - -

• !-- , , , , [ ... , .../• ' ' , : ' : -" • ' - - x . ." , f _4

-' ' ; ' .,'4

.j -- , - . .. 4 .-" ,Ii.

Page 76: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

I ~ r-~--..-.. - - 71

A :~.

.9 ../1. . 9

.9

. 9 9 *

. . ~ . I

~ ~C /d/v. A ~rI~I1PV~

* 9 9 . 9 I . , 9 ,

A...,~7 ~ .-

* * I . . 9 9

9 9

9 I ii t.99

.nI 9 4 4 9 9

* , 99. a-..

I I* t

* i 1 * L I

*1~.-~. 4 * I 9 * -' - 4

I, III 9 9

I..

'-SI 9 9 9 9 9 9

.d ~ I.

99179 I

.9

I 9

9 * 9 9 I* ~ /(.7

1~ ~

/ -'9

-. -'.9

I

Page 77: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

ht4 4

.1*.~. 4.

- 4.'- ~ ~ 4

pm./

4/19 :.-T

Page 78: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

+i~~t+ 4~±~~2F~h- j---.4±w4--4-

Ir

4 . 4 -4 -I 4' -4

I . ' t * . I ,

" * I t " I I

/a t I ' 1i o.., ,,

) = )t CT '

° I I I-, ,Vt+ 44-.4-L 1 I i+ 4.4.;+

. . . . ' - ' * .I, + +

''/' ) ' .. . + [ l ': ' *

- +" I-, *4a "-o' I //frj . , | . ,4

,.f.

4.4 , , .. ,

-'- " -' I,,

7. 4 o" '-. - , . .) ,,

Page 79: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

7 " ' ! 7

I If

oi.5

1 1 4e 4 .4 t

9-lok

Page 80: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

i I

,

, . ..., -.> _ - ... _ - , ... /

4, ,/ l J ,.- ","-- ."., .. . . -. . % .~ ..r .

* * .

I I *

, , j ? t4'

, tt

4 $

Page 81: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

f ~

4 4

4 4j~** - A

-~

-. J' I -~ -,*-~ *~ v~ S

-

1' /3<

~.A-'.~ A - _ ~ ~A 2 ~ V

* 4 .

444 3'~t"4 4

4 4

I.

4 . 4 * , 4 4 9

4 4 ~ I

& I~ l~I 4 4

I I H K--i-'.4 -4 4-

4 4 4

* ? ~ ~ j

I. 4 1. i 1 4 *

t 1 ! t~

. , : I1~ 4$

4'.

Il

4 II V. I'44A 141111'jfj~) 1 ~ -4 ,t A r 4 4 4

14 4

L . * , * 1

ill

±'~iI f r~r ~44~44

44,/V-Fl -4.

4.4, I. 4 4 .4 -

4.

4

Page 82: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

"/ ". ,/"

... 4( .j . . .-...

* .- T... . . . . . . . . .... ..... ...

Ir t

-. :, . ... . - -- . .. "-- .... ........ .... - ... ...........

.,y

* .~~, j - J

* .1 . I I

J". . .. . ." 4 --- i-- .. . -,4- , .-. I4 ... . :.. .. .

;1*- . 4 -

' 2. ,' 4. *, .- .. ,1,. .,I

/ .s.

7 , ! l - ; 4-! : ' :. . .. . . . . .

Okii

OAi

Page 83: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

- 4..21 ,.. ;>b. iv

4*t .OX. .-

* j *- *-.-.. .. 4 . ".. .. ..

----T- * ,

-- 'I

'.b. - L I

... . ..... *,4 . ...,& ., ,,'*

, * , 4 .'" -- " . .. . *..-,, . ....

--- 4 .2 - ,2t .. .*- - -- ... ... . .. ... . ..

, C *

I I•

Page 84: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

I .. . ,. .. ...... .. .. .. ... 4........ . .~ +

~r 1

A4

-!I i l .¢ . '' :7 .-.. .... . .. .. ' .. ........

''N7

_8 p P I lI ii L

I _ Z ,, a~ ,,! t . -I I '.- ..

• . , i ~ . . I I i.! -... i ' )' , " " ,. "" - " ," "', " .... .. . - ,

I _ I7ia_ [_[ , -& ,l i-7 --} " r :--______i --. 7 " |. . - - "". .. '- .... '. ... 4. - .. .. C ... - .

!- I , ! I I ) ! [ j ! l _

-. -4" -* -- , - ""r l;. ,. '" - ... .

.- .- , ... .. - : . . . i...4 ,

... , . + q -.;t c/i-",.. *.

=a lb

"'- • - 4.. - 4 --. '- . . .

• . .. ,5 ,,.. ..' - .4 ,/ :/ .. ,; * .

Ii

) T.-,i-.-1 ' i 4 1 t.. . . . . . .. . . . . . . .... .... . . .... .. .. . . .

* . 5 . . .

Page 85: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

- 1* . -, ** * . ., , .. i

L 9,- . -t. . .....

S. . . . .. .* . . .* "**- J t. .. . . .

I 4y

IV --irUA

-,.4 4 -- = -.*- --. . .- ,

-- -' . - . - -, -

' _*+ . .......... W.

. . .. . 0 ..................................

11

, ,.- - - - -'

Page 86: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

rr 71"O

II

$ ~ ~ ~ .- , el, / ~ ; ~ .*~/ ~

Page 87: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

Z&~. r PA.' CAMvS !A 4 -

cizwve, 0 r 62slW

Ol M61rll 'A ZWA.

OVZJ~~~~ ~ vm e O*'Wik .0,6 f-U516&~oA~I~mc/ A' .9 /

-I~i r - .

-

7'- WO.I. 4X7 IN

.4-17 c-42.

Page 88: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

p, 4

7,7 fA 71a

. --p

.~.4 .. -4' 'J .)4\ . .. .. .,i5 ,Ott- +

42 2:S7 )

moo ,.K. .

i,+

+ +~~. -v ? . .- + . . .6& -+ 1 -+, ++ -- , <+-- . -., - • •"

" 'e ' . ..... s', .. .

4 41. . s...

.U-r .. :..., ...4 .... , , + ' -' +

4 t74 .. K~R/ Ai~j *-;..-, ..... ......... ............. .. +.................... .

IL

Page 89: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

4" I ( " .. . . . . ",

XAA .

:~ J a 4.4o o. 1.-r..,a14..

-. 41. 4

( & 1 -!j, , - . a

.1305o 44cZ + sc

. .. ... . ., . ,* (+ . +

*1 ri & kp - 44

< , , •, ''Z __iiIJ _

4 'A

_________ 1 4 or.Z

... ... .. .. ... ..... . . .... .. .+ _ . _ -. . .

• J+ +I- + + • + • -

.;. . .+++,+,+ , m + *" e , . : , , . 41.0 z

•-

Page 90: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

o"

°44

. ~C I,' .= C,,, w ,, ., 47'_sel ,z ,.;. Jr,/./,.4 .Zo o i4 7.

. . ..

4" I.* st, . " a, . ,7 ,i

, 0.L -

,- '*- .. . . . ... . . . . . -- . ... . . . .. . . . ..

a I

.. ,., -*/o - #z- f .....

.. . .. . . . . . . . . . .

- , <, - ., .. 7 ' -

" i

Page 91: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

Aomoovov. -r. new -

4-47

Page 92: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

,&.-- --Juur•

1.

- a!.0 .4(too)

I A "

.vO W

N . - , " , • . .I+ . . .. ,b..

r.0.-

:,- _,_____,._-,._..___

! ..! ' " + iI.; . : = , .I I , :

• * . . *. S,1 .

., ; I ; * -, ' I Zr,

,f I *

Page 93: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

,O,- " 0 + -. )2

. , ... - .- 'z < -'.d7-cl 7,C, 74 %.#

7. 4~ f 7.. 7fteq7/ A L

SI# ... . a-~ 34z - :3 =. Vs

I . . ..-.

t '' -! ll'7l!

"1 '

* , . . .. I4 "7

I I

r I-Al

4; f-'',

Page 94: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

4 e -

xss

i ~~f s #

2A6

245~ -S

zp

7 -- It

._ -,,ri- .. , 7... , .-

..-.... "i....., 7,- .. . . . - * ; .. . +-8 . .. ,, " .. 1--- . .. . . . .

-- . . ,. .:. . . . .X !l ' . __.

- ... .... __." __.. ____ .84, :-. ... -' -.. ... . ups ,._.i . .....

.. ... ..... ... .2.... _,= .... ... .. Z .5 , iZa4 ..4 :.

~~~~~....... ... - .,z..+.. .............. . 4 _.,lo ..--. 2 - .. -

i°........ ...... ... °. ••_• ..... 2, °?, S

< - : : -: "/5.O'Si

/ i

-01 3 7 "!

m ' ' _ -- - -- II I I I i l/

Page 95: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

.4 357. ',

.4.

'. 0 .L ._ 7. , -- k - --. _ '

.. .. ..... ( . -.. ..c?_.. \.:::. .. : 7 ,... .. . .

.... • : . .... :-(*0 -.. .s '"

- - .-"

s. _ L I

7.:, 4 ',

Page 96: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

V.A' 0 .3

T ..

z4---.3

Page 97: PHASE I INSPECTION REPORT NATIONAL DAM SAFETY … · report include the requirements of additional indepth study when necessary. Phase I reports include project information of the

APPENDIX VII

REFERENCES

1. EC-IDB Flood Hydrograph Package, (Hydrologic Engineering Center,U. S. Army Corps of Engineers, July 1978).

2. "Seasonal Variation of the Probable Maximum Precipitation East of the105th Meridian," ydromteerological-Report.No,-33, (U. S. Weather Bureau,April 1956).

3. "Rainfall Frequency Atlas of the United States," Teehnical-PaperN$.-40, (U. S. Weather Bureau, May 1961).

4. "Recomended Guidelines for Safety Inspection of Dam," Department ofthe Army, Office of the Chief of Engineers, Washington, D.C.

II II II I