Page 1: Phased-Array Feed Measurements at Green Bank Karl Warnick, Brian Jeffs Jonathan Landon, Mike Elmer Roger Norrod, Rick Fisher

Phased-Array Feed Measurements at Green Bank

Karl Warnick, Brian JeffsJonathan Landon, Mike Elmer

Roger Norrod, Rick Fisher

Page 2: Phased-Array Feed Measurements at Green Bank Karl Warnick, Brian Jeffs Jonathan Landon, Mike Elmer Roger Norrod, Rick Fisher

R&D Challenges

• Technical– Mutual coupling– Receiver/element noise– Calibration– Total bandwidth

• Cost Drivers– Receiver system complexity– Signal processing

Page 3: Phased-Array Feed Measurements at Green Bank Karl Warnick, Brian Jeffs Jonathan Landon, Mike Elmer Roger Norrod, Rick Fisher

20-Meter Experiments

• October 2007– Tsys ~150K

• July-August 2008– LNA Ta = 30K, Tsys ~65K– Sky noise measurements– Direct Control of 20-m

• ~1600 MHz, 0.5 MHz BW• 19 A/D samplers to disk• Software beam-forming

Page 4: Phased-Array Feed Measurements at Green Bank Karl Warnick, Brian Jeffs Jonathan Landon, Mike Elmer Roger Norrod, Rick Fisher

Mutual Coupling Effects

• Changes element impedances– Beam-dependent

• Couples amplifier noise• Changes element patterns• All frequency dependent

Matching network

0

Page 5: Phased-Array Feed Measurements at Green Bank Karl Warnick, Brian Jeffs Jonathan Landon, Mike Elmer Roger Norrod, Rick Fisher

Noise Budget

Measured Model

LNA Tmin 33 K 33 K

Noise coupling 20 K 23 K

Spillover 5 K 5 K

Sky 3 K 3 K

Loss 4 K --

Tsys: 65 K 64 K

Noise matching efficiency 60%Noise Matching Efficiency = 60%

---------- ----------

Page 6: Phased-Array Feed Measurements at Green Bank Karl Warnick, Brian Jeffs Jonathan Landon, Mike Elmer Roger Norrod, Rick Fisher

Calibration

• Optimize Ta/Tsys at each beam position in the FOV– Use strong radio source

– R = cross-correlation matrix of all elements on and off source– w = beam-forming complex weights– λmax = highest eigenvalue corresponding to the dominant eigenvector

of Roffw

• Experience thus far is that calibration is stable for hours and possibly days in the experimental setup.

• Calibration method does not distinguish between various noise and efficiency factors.

Page 7: Phased-Array Feed Measurements at Green Bank Karl Warnick, Brian Jeffs Jonathan Landon, Mike Elmer Roger Norrod, Rick Fisher

Cygnus-X Region Mosaic

Cross Elevation (Degrees)

Ele

vatio

n (

Deg

ree

s)

-4 -2 0 2 4-4

-2

0

2

4

0

50

100

150

Canadian Galactic Plane SurveyConvolved to 20-m Beam

Page 8: Phased-Array Feed Measurements at Green Bank Karl Warnick, Brian Jeffs Jonathan Landon, Mike Elmer Roger Norrod, Rick Fisher

RFI Cancellation with Array Processing

Page 9: Phased-Array Feed Measurements at Green Bank Karl Warnick, Brian Jeffs Jonathan Landon, Mike Elmer Roger Norrod, Rick Fisher

Steps Toward a Cooled PFA

May 2009 9

Page 10: Phased-Array Feed Measurements at Green Bank Karl Warnick, Brian Jeffs Jonathan Landon, Mike Elmer Roger Norrod, Rick Fisher

Cool the Element Antennas?

May 2009 10

Polystyrene cover – low loss, low k, and strong enough, but outgassed heavily.

Machined PTFE cover – low loss, moderate k, strong.

Page 11: Phased-Array Feed Measurements at Green Bank Karl Warnick, Brian Jeffs Jonathan Landon, Mike Elmer Roger Norrod, Rick Fisher

Cool the Antenna Elements?

May 2009 11

So, PTFE vacuum cover is probably workable but concerns remain: Radiation loading, scattering, loss, robustness, interface with ground plane.

Too thin cover after ~1mo under vacuum. PTFE creep.

Stress analysis

Page 12: Phased-Array Feed Measurements at Green Bank Karl Warnick, Brian Jeffs Jonathan Landon, Mike Elmer Roger Norrod, Rick Fisher

Noise Budget ~20cm

Item Noise Comment

MW Background 3 K

Atm 1

LNA 4 Balanced @ 15K

Spillover/Scatter 3-6 Antenna dependent

Subtotal 11-14 K We’re stuck with this!

Array Noise 3-6 ? Mutual coupling effects

Input Losses 3-6 ? Ohmic to LNA input

Total 17-26 K

May 2009 12

Page 13: Phased-Array Feed Measurements at Green Bank Karl Warnick, Brian Jeffs Jonathan Landon, Mike Elmer Roger Norrod, Rick Fisher

Warm Antenna Elements?

May 2009 13

Item Loss Temp Noise

Dipole Post 0.02 dB 300 K 1.4 K

Hermetic Bead 0.07 300 4.9 !!

SS Coax 0.09 150 3.1

SMA Conn 0.02 15 0.1

Subtotal 9.5 K

Page 14: Phased-Array Feed Measurements at Green Bank Karl Warnick, Brian Jeffs Jonathan Landon, Mike Elmer Roger Norrod, Rick Fisher

Test Facility

May 2009 14

New absorber in retractable roof, surveyed local obstacles and ground shield EM models for spillover estimation.

Summer ‘08