PHENIX Run8 Summary
• d+Au was fantastic! - x30 over Run3• baseline for future A+A• new level of precision on intrinsic Cold Nuclear Matter physics• now p+p is the weakest part of baseline
• p+p was disappointing• polarization was very poor• a strong p+p run with ample beam/polarization development is a must for the future
• PHENIX efficiency for recording useful luminosity up from 50% in past to 68% now (33% in ±30 cm)
• DAQ developments continue to push to higher event rates• but tighter z-vertex requirements in the future will lower fraction of luminosity that is useful
THANKYOU to CA for a great (d+Au) Run!!
5/29/2008 1PHENIX - MJL
5/29/2008 2
80 nb-1 Run8 dAu:• 30x Run3• 140% of Run8 goal• 160 Billion Evts
dAu• peaks above 3 nb-1 per day• one day > total Run3 luminosity of 2.7 nb-1
Run Energy Long. Trans.
02 200 GeV 0.15 pb-1
03 200 GeV 0.35 pb-1
04 200 GeV 0.12 pb-1
05 200 GeV 3.4 pb-1 0.16 pb-1
06 200 GeV 7.5 pb-1 2.7 pb-1
06 62.4 GeV 0.08 pb-1 0.02 pb-1
08 200 GeV 5.2 pb-1
5.2 pb-1 200 GeV p+p Transverse Vertical luminosity recorded(1.1 pb-1 FOM)Peak luminosity per day ~0.37 pb-1
pp - almost no progress on luminosity & polarization development towards future
PHENIX - MJL
5/29/2008 3
73,000 J/
For all data
63 nb-1
6,000 J/ ee
from all data
59 nb-1
200 GeV d+Au
4.8 pb-1
13,000 J/ + - for all data
(22,000 in Run6)
200 GeV p+p
PHENIX J/’s from Run8
PHENIX - MJL
5/29/2008 4
200 GeV d+Au• Live Time – 89%• PHENIX up – 77%• Overall – 68%
200 GeV p+p• Live Time – 89%• PHENIX up – 69%• Overall – 62%(where 10% correction for loss due to CNI measurements is made)
PHENIX - MJL
Efficiency for Run8 d+Au and p+p
Black vertical lines are markers for Maintenance and/or APEX days
About 50% of CA delivered luminosity is useful luminosity within our ±30 cm vertex range
Given that, PHENIX efficiencies in Run7 were: d+Au
p+p
North arm HV Repairs (bad channels in yellow):•Almost All of North Arm Now Good except for one station-2 section (N222-6) • [N182-6 is actually ok even though it shows disabled (yellow) here]• problems fixed by removing AC coupling capacitors for (descoped) anode readoutend of 2008 Run
Now
8
MuTRGADTX
MuTRGMRG
Level 1TriggerBoard
DataCollectingModule
MuTrFEEB
2 plane
5%
95%
Trigger
LV1 Trig accept
IR Counting House
Optical
1.2Gbps
Amp/Discri.Transmit
DataMerge
PHENIX Muon trigger
8
LV1 Trig accept
Local DAQ
CNM Constraints from New Run8 d+Au J/ Data
expected accuracy
simulation
Expected improvement in CNM constraints (red) compared to Run3 (blue)
simulation
J/d+Au
J/
J/
5/27/2008 10Mike Leitch - LANL
1/23/2009 11Mike Leitch - LANL
PHENIX & STAR Preliminary p+p Cross Sections
1st Upsilons at RHIC
PHENIX 2005
STAR2006
PHENIX Preliminaryp+p QM05
Upsilons from Run8 d+Au?(online spectrum)
+-
±±