Philip Rogers Elementary School
7345 N Washtenaw Ave Chicago, IL 60645
Facility Assessment SummaryThis report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors’ visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school’s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/About_CPS/Policies_and_guidelines/Pages/facilitystandards.aspx.
Condition Rankings and Descriptions
Rank 7: The item/system is new or in good condition and no work is required.
Rank 6: The item/system requires general cleaning and/or routine maintenance.
Rank 5: The item/system requires repairs and has not reached the end of its serviceable life.
Rank 4: The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs.
Rank 3: The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs.
Rank 2: The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs.
Rank 1: The item’s/system’s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹
Total Quantity
Unit
means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes.
Definitions
means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that Total Quantity, different portions may have different rankings.
means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement “EA” for “each.” Other items, like chimneys, are measured in terms of linear feet (“LF”). Still other items, like flooring, are generally measured in square feet (“SF”).
Cost
For the same reason, the Total Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features.
Total Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs.
EXTERIOR
CHIMNEY
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREBrick Chimney - Concrete/ Mortar Liner LF54 $07 54
$0
DOORS
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREExterior Steel Door EA7 $2,3126 7
GREExterior Wood Door EA9 $2,8886 9
GRETransom Lite EA4 $1,1336 4
$6,333
Assessment Date: 3/11/2013 Page 1 of 15
Philip Rogers Elementary School
7345 N Washtenaw Ave Chicago, IL 60645
ENTRANCE
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREConcrete Exterior Stairs LF498 $53,4116 498
GREConcrete Ramp LF126 $17,5686 126
GREEntrance Controls - Audio and Video EA1 $1,4306 1
GRERamp Handrails LF330 $06 330
GREStair Handrails LF185 $06 185
GRESteel or Aluminum Stairs LF6 $426 6
$72,451
FOUNDATION
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREConcrete Foundation LF1,258 $07 1,258
$0
LIGHTING
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREExterior Lights - Parapet or Roof Mounted EA10 $1,0016 82
GREExterior Lights - Wall Mounted EA19 $4,0766 19
$5,077
LINTELS
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GRELintels - Steel LF444 $07 444
GRELintels - Stone LF489 $07 489
$0
PARAPET
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GRECoping - Stone LF1,688 $07 1,688
GREParapet > 30" Height LF474 $07 474
GREParapet 16" to 30" Height LF1,214 $07 1,214
Assessment Date: 3/11/2013 Page 2 of 15
Philip Rogers Elementary School
7345 N Washtenaw Ave Chicago, IL 60645
$0
ROOF SYSTEM
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREInterior Downspouts LF575 $3,2186 54530
GREModified Bitumen Roof SF31,973 $07 31,973
GRERoof Structure: Steel with Clay Tile Arch SF31,973 $07 31,973
$3,218
SUPERSTRUCTURE
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREConcrete SF68,302 $07 68,302
$0
WALLS
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREBrick SF41,197 $07 41,197
GREStone - Cast SF2,516 $07 2,516
$0
WINDOWS
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GRECurtain wall - Insulated panel SF27 $07 27
GREWindow - Guards perforated SF3,422 $07 3,422
GREWindows - Casement Aluminum Double-pane SF1,740 $07 1,740
GREWindows - Decorative SF48 $07 48
GREWindows - Sash Aluminum Double-pane SF6,177 $07 6,177
$0
$87,077EXTERIOR Total
Assessment Date: 3/11/2013 Page 3 of 15
Philip Rogers Elementary School
7345 N Washtenaw Ave Chicago, IL 60645
ELECTRICAL
EMERGENCY SYSTEM
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREEmergency Battery Packs - Corridors and Stairs EA22 $2,3606 22
GREEmergency Battery Packs - Lunchroom and Gym EA3 $3226 3
GREEmergency Battery Packs - Toilets EA10 $1,0736 10
GREExit Signs - Auditorium EA4 $9326 4
GREExit Signs - Corridors and Stairs EA22 $5,1286 22
GREExit Signs - Lunchroom - Gym - multipurpose rooms EA3 $6996 3
GREPublic Announcement System SF68,302 $41,0226 68,302
GRESecurity System - Intrusion detection SF68,302 $63,4876 68,302
$115,022
MAIN SERVICE
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
YELMain Electrical service 1000 A and below 120/208/3PH EA1 $96,0964 1
$96,096
POWER DISTRIBUTION
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GRELighting and power panels EA2 $07 2
GREMain distribution panels 400-600 amp EA1 $07 1
GREMain distribution panels less than 400 amp EA2 $07 2
GRETransformers 120/240-120/208 EA1 $07 1
GRETransformers 277/480-120/208 EA2 $07 2
$0
$211,118ELECTRICAL Total
Assessment Date: 3/11/2013 Page 4 of 15
Philip Rogers Elementary School
7345 N Washtenaw Ave Chicago, IL 60645
FIRE PROTECTION
FIRE ALARM
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
ORAFire Alarm Strobe Lights SF68,302 $144,5543 68,302
GREFire Alarm System SF49,098 $07 49,098
$144,554
$144,554FIRE PROTECTION Total
MECHANICAL
AIR CONDITIONING
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GRECondensing Unit - Roof Mounted less than 5 tons EA1 $07 1
GREWindow A/C Unit EA14 $3,0036 14
$3,003
AIR HANDLING SYSTEMS
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
YELAir Handling Unit Package - Single Zone - Steam 12,001 to 20,000 cfm EA1 $75,7904 1
YELAir Handling Unit Package - Single Zone - Steam less than 4,000 cfm EA1 $35,7504 1
GREAir Intake - Built Up Air Handling Unit EA3 $4,2906 3
BLUAir intake for all Air Handling Units except built up AHU EA1 $5,7205 1
BLUMulti Zone Built Up Air Handling Unit - Steam 15,001 to 25,000 cfm EA3 $115,5445 21
BLUMulti Zone Built Up Air Handling Unit Auxiliaries - Steam 15,001 to 25,000 cfm EA3 $38,6105 21
GREReheat Boxes With Steam Coils EA9 $9,3956 9
YELReturn Duct Work - Masonry and Ducts - Existing or Missing Exterior Shaft LF200 $529,1004 200
$814,199
BOILER SYSTEMS
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
YELBoiler Assembly - Steam - Low Pressure Scotch Marine Boiler 151 - 200 HP EA2 $331,7604 2
YELBoiler Auxiliary - Steam Boiler 151 - 200 HP EA2 $48,6204 2
Assessment Date: 3/11/2013 Page 5 of 15
Philip Rogers Elementary School
7345 N Washtenaw Ave Chicago, IL 60645
GREChemical Feed System (Steam Boilers) EA1 $2,1456 1
YELCombustion Dampers EA2 $11,1544 2
YELFeed Water Pumps and Tank - Steam Boilers EA1 $31,4604 1
$425,139
HEATING DEVICES
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
YELRadiators - Steam EA11 $15,4154 11
GREWall Heater - Electric EA15 $1,5446 15
$16,960
MECHANICAL PLUMBING
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GRECondensate Assembly - Pumps and Tank EA2 $1,4306 2
BLUPiping - Condensate - Steel or Galvanized LF1,200 $39,0395 1,200
BLUPiping - Steam - Steel or Galvanized LF1,200 $59,3745 1,200
BLUPumps - Vacuum EA3 $34,3205 21
$134,163
TEMPERATURE CONTROL
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREPneumatic System SF68,302 $07 68,302
BLUThermostats - Pneumatic EA46 $14,3005 3115
BLUZone Dampers EA46 $17,0895 3115
$31,389
VENTILATION
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
YELExhaust Fan - Indoor EA2 $11,1544 2
YELExhaust Fans - Roof Mounted 500 to 1,500 cfm EA3 $6,8644 3
GREType II Exhaust Hood - Warming Kitchen EA1 $9306 1
$18,948
Assessment Date: 3/11/2013 Page 6 of 15
Philip Rogers Elementary School
7345 N Washtenaw Ave Chicago, IL 60645
$1,443,800MECHANICAL Total
PLUMBING
HOT WATER
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREHot Water Heater - Gas 150,000 -300,000 BTU/HR EA2 $07 2
$0
PIPING
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
YELDomestic Piping - Cold Water from Risers to Fixtures SF68,302 $22,4654 68,302
YELDomestic Piping - Cold Water Risers SF68,302 $43,9524 68,302
YELDomestic Piping - Hot Water from Riser to fixtures SF68,302 $14,6514 68,302
YELDomestic Piping - Hot Water Return Risers SF68,302 $31,2554 68,302
YELDomestic Piping - Hot Water Risers SF68,302 $37,1154 68,302
YELDomestic Piping Cold Water Horizontal lines SF68,302 $163,1124 68,302
YELDomestic Piping Hot Water Horizontal lines SF68,302 $134,7874 68,302
YELDomestic Piping Hot Water Return Lines SF68,302 $78,1374 68,302
BLUSanitary Piping SF68,302 $41,9995 68,302
BLUStorm Piping SF68,302 $32,2325 68,302
BLUVent Piping SF68,302 $24,4185 68,302
$624,123
PUMPS
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREDomestic Booster Pump duplex EA1 $07 1
GREEjector Pump EA1 $3,0036 1
GRESump Pump EA2 $2,7176 2
$5,720
$629,843PLUMBING Total
Assessment Date: 3/11/2013 Page 7 of 15
Philip Rogers Elementary School
7345 N Washtenaw Ave Chicago, IL 60645
INTERIOR
ADMINISTRATIVE SUITES
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GRECeiling - Exposed SF346 $6536 346
GRECeiling - Plaster/Drywall SF1,108 $2,0196 395713
GREFlooring - Carpet SF713 $1,0206 713
GREFlooring - Concrete SF346 $1,6336 346
GREFlooring - Tile/Sheet SF573 $8196 573
GRELighting - Pendant/Surface SF26 $146 620
GREWalls - Concrete Block SF747 $5866 542205
GREWalls - Plaster/Drywall SF3,054 $6,7226 2052,849
$13,466
AUDITORIUM - DEDICATED
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREMain Floor Seating EA260 $07 260
GRESound System EA1 $07 1
GREStage Curtains EA8 $90,6056 8
GREStage Lighting System EA1 $07 1
$90,605
DOORS
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREInterior Steel Doors incl hw EA31 $8,7776 31
BLUInterior Wood Doors incl hw EA155 $72,0125 6149
GRETransom Window SF360 $6,6926 360
$87,482
DRINKING FOUNTAINS
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREDouble Fountain EA6 $07 6
GRESingle Fountain EA4 $07 4
Assessment Date: 3/11/2013 Page 8 of 15
Philip Rogers Elementary School
7345 N Washtenaw Ave Chicago, IL 60645
$0
GYMNASIUM / AUDITORIUM
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GRECeiling - Lay-In SF2,399 $07 2,399
GREFlooring - Tile/Sheet SF2,399 $3,4316 2,399
GRELighting - Pendant/Surface EA20 $07 20
GREWalls - Concrete Block SF1,686 $07 1,686
GREWalls - Structural Glazed Tile SF1,686 $07 1,686
$3,431
KITCHEN
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GRECeiling - Plaster/Drywall SF605 $2,2846 605
GREFlooring - Tile Quarry SF605 $07 605
GRELighting - Pendant/Surface SF18 $07 18
GREWall - Plaster/Drywall SF502 $07 502
GREWall - Structural Glazed Tile SF502 $07 502
$2,284
LIBRARY
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GRECasework LF80 $2,4546 80
GREFlooring Carpet SF997 $1,4266 997
GRELighting - Pendant/ Surface SF20 $146 20
$3,894
LOCKER/SHOWER ROOM
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GRELockers EA4 $1966 4
$196
Assessment Date: 3/11/2013 Page 9 of 15
Philip Rogers Elementary School
7345 N Washtenaw Ave Chicago, IL 60645
LUNCHROOM
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREServing Line LF18 $07 18
$0
MDF/IDF
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREFinishes SF107 $07 107
GREVentilation and Cooling EA1 $07 1
$0
MECHANICAL/SERVICE ROOMS
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREAir Handling/ Mechanical Room SF796 $07 796
GREAir Tunnels SF1,470 $07 1,470
GREBoiler Room SF1,700 $07 1,700
GRECrawl Space - Unfinished SF18,360 $34,6566 18,360
GREJanitor's Closet SF3 $146 3
GREMechanical/Service Rooms SF3,854 $14,2896 8263,028
GREStorage Room SF2,895 $10,2126 7312,164
$59,172
STAFF RESTROOM
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREAccessories SF2,489 $15,1896 5221,967
GRECeiling - Plaster/Drywall SF2,489 $1,8386 1,840649
GREFloor Drain EA10 $6016 82
GREFlooring - Terrazzo SF47 $2666 47
GREFlooring - Tile Ceramic/Porcelain SF2,282 $3,6606 8441,438
GREFlooring - Tile/Sheet SF160 $1896 28132
GREHand Dryer EA4 $4346 22
GRELavatory EA23 $2,2316 176
Assessment Date: 3/11/2013 Page 10 of 15
Philip Rogers Elementary School
7345 N Washtenaw Ave Chicago, IL 60645
GRELighting - Pendant/ Surface SF48 $86 3711
GREPartitions EA23 $5386 203
GREUrinals EA16 $2,2316 106
GREWall - Concrete Block SF160 $4586 160
GREWall - Plaster/Drywall SF4,060 $5,2076 1,8532,207
GREWall - Structural Glazed Tile SF4,794 $14,6866 2,7402,054
GREWater Closet EA34 $1,8596 295
$49,394
THEATER
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GRECeiling - Lay-In SF1,241 $07 1,241
GRECeiling - Plaster/Drywall SF1,241 $10,6126 1,241
GREFlooring - Concrete SF1,241 $07 1,241
GREFlooring - Tile/Sheet SF1,241 $07 1,241
GRELighting - Lay-In SF160 $07 160
GREStage SF633 $2,6886 633
GREWall - Plaster/Drywall SF2,537 $07 2,537
GREWall - Structural Glazed Tile SF2,537 $07 2,537
$13,301
VOCATIONAL SHOP
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREWork Sink EA14 $2,3176 86
$2,317
$325,541INTERIOR Total
ROOM
CASEWORK
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GRECasework LF453 $10,0466 172281
$10,046
Assessment Date: 3/11/2013 Page 11 of 15
Philip Rogers Elementary School
7345 N Washtenaw Ave Chicago, IL 60645
CEILING
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREPlaster/Drywall SF23,500 $40,4496 9,21414,286
$40,449
CHALK BOARD
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
YELChalk Board LF278 $31,0024 30248
$31,002
CORRIDORS
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREPendant/Surface EA11,829 $1,5496 9,6632,166
GREPlaster/Drywall SF19,684 $8,0816 16,2593,425
GREStair Handrails LF256 $06 256
GREStructural Glazed Tile SF3,425 $24,4896 3,425
GREStudent Lockers EA555 $79,3656 555
GRETerrazzo SF1,186 $6,7166 1,186
GRETile/Sheet Flooring SF10,155 $6,6686 5,4924,663
$126,868
CORRIDORS CEILING
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREPlaster/Drywall SF11,829 $17,9436 5,4926,337
$17,943
FLOOR
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GRECarpet SF304 $07 304
GRETile/Sheet SF17,236 $21,0146 2,54114,695
GREWood SF5,960 $45,0006 5,960
$66,014
Assessment Date: 3/11/2013 Page 12 of 15
Philip Rogers Elementary School
7345 N Washtenaw Ave Chicago, IL 60645
LIBRARY_CEILING
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREPlaster/Drywall SF997 $2,8236 997
$2,823
LIBRARY_WALL
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREPlaster/Drywall 1,661 $3,9196 1,661
$3,919
LIGHTING
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREPendant/Surface EA646 $28,2436 251395
$28,243
MARKER BOARD
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREMarker Board LF638 $11,0406 252386
$11,040
STAIRS
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GRETerrazzo SF120 $1,3596 120
$1,359
WALL
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREPlaster/Drywall SF36,668 $52,5796 14,38422,284
$52,579
$392,285ROOM Total
Assessment Date: 3/11/2013 Page 13 of 15
Philip Rogers Elementary School
7345 N Washtenaw Ave Chicago, IL 60645
SITE
CIVIL/DRAINAGE
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GRECatch Basin EA9 $07 9
GRESite Drain EA1 $07 1
GRESite Manhole EA13 $07 13
$0
FENCING
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREOrnamental Iron LF1,021 $19,2726 1,021
$19,272
LANDSCAPE
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREAsphalt Play Area/Hardscape SF21,659 $18,5836 21,659
GREBenches EA8 $07 8
GREGrass SF96,287 $07 96,287
GREIrrigation SF76,621 $07 76,621
GREParkway trees EA27 $07 27
GREPlanting Beds/ Areas SF4,302 $06 4,302
GRERetaining Wall - Concrete SF402 $07 402
GRETrash Receptacles EA4 $07 4
$18,583
PARKING LOT
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREAsphalt SF12,979 $11,1366 12,979
GREConcrete Curbs LF511 $3,0846 511
BLULights, Pole Mounted EA14 $50,3365 212
GREParking lot interior plantings LF119 $06 119
GRETrash Compactor EA1 $3,5756 1
Assessment Date: 3/11/2013 Page 14 of 15
Philip Rogers Elementary School
7345 N Washtenaw Ave Chicago, IL 60645
GRETrash Enclosure SF936 $07 936
GREVehicular Screening LF25 $07 25
$68,131
PLAYGROUND
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREPlayground Equipment - Combo 3-12 EA1 $06 1
GREPlayground Surfacing - Poured Surface SF1,621 $4,2886 1,621
$4,288
SIDEWALKS
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREInternal Walks LF1,731 $7,8526 899832
GREPerimeter Sidewalks SF9,184 $31,4126 5,9463,238
$39,264
SIGNAGE
Assessed Item
Composite
Rank Unit
Total
Quantity Cost
Rank 7
Qty
Rank 6
Qty
Rank 5
Qty
Rank 4
Qty
Rank 3
Qty
Rank 2
Qty
Rank 1
Qty
GREFlag Pole EA1 $07 1
GREMarquee - Free Standing Back Lighted EA1 $06 1
$0
$149,539SITE Total
$3,383,757Total Campus Need ² ³
² As stated above, Total Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost.
³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below.
¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked “1” in summary reports; by the time the report is compiled, they have been resolved.
Assessment Date: 3/11/2013 Page 15 of 15