15

Click here to load reader

Philip Rogers Elementary School - CPSschoolreports.cps.edu/Assessment_PDF_Summary/5630.pdf · Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645 $0 ROOF SYSTEM

  • Upload
    ledien

  • View
    212

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Philip Rogers Elementary School - CPSschoolreports.cps.edu/Assessment_PDF_Summary/5630.pdf · Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645 $0 ROOF SYSTEM

Philip Rogers Elementary School

7345 N Washtenaw Ave Chicago, IL 60645

Facility Assessment SummaryThis report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors’ visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school’s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/About_CPS/Policies_and_guidelines/Pages/facilitystandards.aspx.

Condition Rankings and Descriptions

Rank 7: The item/system is new or in good condition and no work is required.

Rank 6: The item/system requires general cleaning and/or routine maintenance.

Rank 5: The item/system requires repairs and has not reached the end of its serviceable life.

Rank 4: The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs.

Rank 3: The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs.

Rank 2: The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs.

Rank 1: The item’s/system’s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹

Total Quantity

Unit

means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes.

Definitions

means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that Total Quantity, different portions may have different rankings.

means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement “EA” for “each.” Other items, like chimneys, are measured in terms of linear feet (“LF”). Still other items, like flooring, are generally measured in square feet (“SF”).

Cost

For the same reason, the Total Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features.

Total Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs.

EXTERIOR

CHIMNEY

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREBrick Chimney - Concrete/ Mortar Liner LF54 $07 54

$0

DOORS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREExterior Steel Door EA7 $2,3126 7

GREExterior Wood Door EA9 $2,8886 9

GRETransom Lite EA4 $1,1336 4

$6,333

Assessment Date: 3/11/2013 Page 1 of 15

Page 2: Philip Rogers Elementary School - CPSschoolreports.cps.edu/Assessment_PDF_Summary/5630.pdf · Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645 $0 ROOF SYSTEM

Philip Rogers Elementary School

7345 N Washtenaw Ave Chicago, IL 60645

ENTRANCE

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREConcrete Exterior Stairs LF498 $53,4116 498

GREConcrete Ramp LF126 $17,5686 126

GREEntrance Controls - Audio and Video EA1 $1,4306 1

GRERamp Handrails LF330 $06 330

GREStair Handrails LF185 $06 185

GRESteel or Aluminum Stairs LF6 $426 6

$72,451

FOUNDATION

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREConcrete Foundation LF1,258 $07 1,258

$0

LIGHTING

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREExterior Lights - Parapet or Roof Mounted EA10 $1,0016 82

GREExterior Lights - Wall Mounted EA19 $4,0766 19

$5,077

LINTELS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRELintels - Steel LF444 $07 444

GRELintels - Stone LF489 $07 489

$0

PARAPET

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRECoping - Stone LF1,688 $07 1,688

GREParapet > 30" Height LF474 $07 474

GREParapet 16" to 30" Height LF1,214 $07 1,214

Assessment Date: 3/11/2013 Page 2 of 15

Page 3: Philip Rogers Elementary School - CPSschoolreports.cps.edu/Assessment_PDF_Summary/5630.pdf · Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645 $0 ROOF SYSTEM

Philip Rogers Elementary School

7345 N Washtenaw Ave Chicago, IL 60645

$0

ROOF SYSTEM

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREInterior Downspouts LF575 $3,2186 54530

GREModified Bitumen Roof SF31,973 $07 31,973

GRERoof Structure: Steel with Clay Tile Arch SF31,973 $07 31,973

$3,218

SUPERSTRUCTURE

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREConcrete SF68,302 $07 68,302

$0

WALLS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREBrick SF41,197 $07 41,197

GREStone - Cast SF2,516 $07 2,516

$0

WINDOWS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRECurtain wall - Insulated panel SF27 $07 27

GREWindow - Guards perforated SF3,422 $07 3,422

GREWindows - Casement Aluminum Double-pane SF1,740 $07 1,740

GREWindows - Decorative SF48 $07 48

GREWindows - Sash Aluminum Double-pane SF6,177 $07 6,177

$0

$87,077EXTERIOR Total

Assessment Date: 3/11/2013 Page 3 of 15

Page 4: Philip Rogers Elementary School - CPSschoolreports.cps.edu/Assessment_PDF_Summary/5630.pdf · Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645 $0 ROOF SYSTEM

Philip Rogers Elementary School

7345 N Washtenaw Ave Chicago, IL 60645

ELECTRICAL

EMERGENCY SYSTEM

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREEmergency Battery Packs - Corridors and Stairs EA22 $2,3606 22

GREEmergency Battery Packs - Lunchroom and Gym EA3 $3226 3

GREEmergency Battery Packs - Toilets EA10 $1,0736 10

GREExit Signs - Auditorium EA4 $9326 4

GREExit Signs - Corridors and Stairs EA22 $5,1286 22

GREExit Signs - Lunchroom - Gym - multipurpose rooms EA3 $6996 3

GREPublic Announcement System SF68,302 $41,0226 68,302

GRESecurity System - Intrusion detection SF68,302 $63,4876 68,302

$115,022

MAIN SERVICE

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

YELMain Electrical service 1000 A and below 120/208/3PH EA1 $96,0964 1

$96,096

POWER DISTRIBUTION

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRELighting and power panels EA2 $07 2

GREMain distribution panels 400-600 amp EA1 $07 1

GREMain distribution panels less than 400 amp EA2 $07 2

GRETransformers 120/240-120/208 EA1 $07 1

GRETransformers 277/480-120/208 EA2 $07 2

$0

$211,118ELECTRICAL Total

Assessment Date: 3/11/2013 Page 4 of 15

Page 5: Philip Rogers Elementary School - CPSschoolreports.cps.edu/Assessment_PDF_Summary/5630.pdf · Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645 $0 ROOF SYSTEM

Philip Rogers Elementary School

7345 N Washtenaw Ave Chicago, IL 60645

FIRE PROTECTION

FIRE ALARM

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

ORAFire Alarm Strobe Lights SF68,302 $144,5543 68,302

GREFire Alarm System SF49,098 $07 49,098

$144,554

$144,554FIRE PROTECTION Total

MECHANICAL

AIR CONDITIONING

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRECondensing Unit - Roof Mounted less than 5 tons EA1 $07 1

GREWindow A/C Unit EA14 $3,0036 14

$3,003

AIR HANDLING SYSTEMS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

YELAir Handling Unit Package - Single Zone - Steam 12,001 to 20,000 cfm EA1 $75,7904 1

YELAir Handling Unit Package - Single Zone - Steam less than 4,000 cfm EA1 $35,7504 1

GREAir Intake - Built Up Air Handling Unit EA3 $4,2906 3

BLUAir intake for all Air Handling Units except built up AHU EA1 $5,7205 1

BLUMulti Zone Built Up Air Handling Unit - Steam 15,001 to 25,000 cfm EA3 $115,5445 21

BLUMulti Zone Built Up Air Handling Unit Auxiliaries - Steam 15,001 to 25,000 cfm EA3 $38,6105 21

GREReheat Boxes With Steam Coils EA9 $9,3956 9

YELReturn Duct Work - Masonry and Ducts - Existing or Missing Exterior Shaft LF200 $529,1004 200

$814,199

BOILER SYSTEMS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

YELBoiler Assembly - Steam - Low Pressure Scotch Marine Boiler 151 - 200 HP EA2 $331,7604 2

YELBoiler Auxiliary - Steam Boiler 151 - 200 HP EA2 $48,6204 2

Assessment Date: 3/11/2013 Page 5 of 15

Page 6: Philip Rogers Elementary School - CPSschoolreports.cps.edu/Assessment_PDF_Summary/5630.pdf · Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645 $0 ROOF SYSTEM

Philip Rogers Elementary School

7345 N Washtenaw Ave Chicago, IL 60645

GREChemical Feed System (Steam Boilers) EA1 $2,1456 1

YELCombustion Dampers EA2 $11,1544 2

YELFeed Water Pumps and Tank - Steam Boilers EA1 $31,4604 1

$425,139

HEATING DEVICES

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

YELRadiators - Steam EA11 $15,4154 11

GREWall Heater - Electric EA15 $1,5446 15

$16,960

MECHANICAL PLUMBING

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRECondensate Assembly - Pumps and Tank EA2 $1,4306 2

BLUPiping - Condensate - Steel or Galvanized LF1,200 $39,0395 1,200

BLUPiping - Steam - Steel or Galvanized LF1,200 $59,3745 1,200

BLUPumps - Vacuum EA3 $34,3205 21

$134,163

TEMPERATURE CONTROL

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREPneumatic System SF68,302 $07 68,302

BLUThermostats - Pneumatic EA46 $14,3005 3115

BLUZone Dampers EA46 $17,0895 3115

$31,389

VENTILATION

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

YELExhaust Fan - Indoor EA2 $11,1544 2

YELExhaust Fans - Roof Mounted 500 to 1,500 cfm EA3 $6,8644 3

GREType II Exhaust Hood - Warming Kitchen EA1 $9306 1

$18,948

Assessment Date: 3/11/2013 Page 6 of 15

Page 7: Philip Rogers Elementary School - CPSschoolreports.cps.edu/Assessment_PDF_Summary/5630.pdf · Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645 $0 ROOF SYSTEM

Philip Rogers Elementary School

7345 N Washtenaw Ave Chicago, IL 60645

$1,443,800MECHANICAL Total

PLUMBING

HOT WATER

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREHot Water Heater - Gas 150,000 -300,000 BTU/HR EA2 $07 2

$0

PIPING

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

YELDomestic Piping - Cold Water from Risers to Fixtures SF68,302 $22,4654 68,302

YELDomestic Piping - Cold Water Risers SF68,302 $43,9524 68,302

YELDomestic Piping - Hot Water from Riser to fixtures SF68,302 $14,6514 68,302

YELDomestic Piping - Hot Water Return Risers SF68,302 $31,2554 68,302

YELDomestic Piping - Hot Water Risers SF68,302 $37,1154 68,302

YELDomestic Piping Cold Water Horizontal lines SF68,302 $163,1124 68,302

YELDomestic Piping Hot Water Horizontal lines SF68,302 $134,7874 68,302

YELDomestic Piping Hot Water Return Lines SF68,302 $78,1374 68,302

BLUSanitary Piping SF68,302 $41,9995 68,302

BLUStorm Piping SF68,302 $32,2325 68,302

BLUVent Piping SF68,302 $24,4185 68,302

$624,123

PUMPS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREDomestic Booster Pump duplex EA1 $07 1

GREEjector Pump EA1 $3,0036 1

GRESump Pump EA2 $2,7176 2

$5,720

$629,843PLUMBING Total

Assessment Date: 3/11/2013 Page 7 of 15

Page 8: Philip Rogers Elementary School - CPSschoolreports.cps.edu/Assessment_PDF_Summary/5630.pdf · Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645 $0 ROOF SYSTEM

Philip Rogers Elementary School

7345 N Washtenaw Ave Chicago, IL 60645

INTERIOR

ADMINISTRATIVE SUITES

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRECeiling - Exposed SF346 $6536 346

GRECeiling - Plaster/Drywall SF1,108 $2,0196 395713

GREFlooring - Carpet SF713 $1,0206 713

GREFlooring - Concrete SF346 $1,6336 346

GREFlooring - Tile/Sheet SF573 $8196 573

GRELighting - Pendant/Surface SF26 $146 620

GREWalls - Concrete Block SF747 $5866 542205

GREWalls - Plaster/Drywall SF3,054 $6,7226 2052,849

$13,466

AUDITORIUM - DEDICATED

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREMain Floor Seating EA260 $07 260

GRESound System EA1 $07 1

GREStage Curtains EA8 $90,6056 8

GREStage Lighting System EA1 $07 1

$90,605

DOORS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREInterior Steel Doors incl hw EA31 $8,7776 31

BLUInterior Wood Doors incl hw EA155 $72,0125 6149

GRETransom Window SF360 $6,6926 360

$87,482

DRINKING FOUNTAINS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREDouble Fountain EA6 $07 6

GRESingle Fountain EA4 $07 4

Assessment Date: 3/11/2013 Page 8 of 15

Page 9: Philip Rogers Elementary School - CPSschoolreports.cps.edu/Assessment_PDF_Summary/5630.pdf · Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645 $0 ROOF SYSTEM

Philip Rogers Elementary School

7345 N Washtenaw Ave Chicago, IL 60645

$0

GYMNASIUM / AUDITORIUM

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRECeiling - Lay-In SF2,399 $07 2,399

GREFlooring - Tile/Sheet SF2,399 $3,4316 2,399

GRELighting - Pendant/Surface EA20 $07 20

GREWalls - Concrete Block SF1,686 $07 1,686

GREWalls - Structural Glazed Tile SF1,686 $07 1,686

$3,431

KITCHEN

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRECeiling - Plaster/Drywall SF605 $2,2846 605

GREFlooring - Tile Quarry SF605 $07 605

GRELighting - Pendant/Surface SF18 $07 18

GREWall - Plaster/Drywall SF502 $07 502

GREWall - Structural Glazed Tile SF502 $07 502

$2,284

LIBRARY

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRECasework LF80 $2,4546 80

GREFlooring Carpet SF997 $1,4266 997

GRELighting - Pendant/ Surface SF20 $146 20

$3,894

LOCKER/SHOWER ROOM

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRELockers EA4 $1966 4

$196

Assessment Date: 3/11/2013 Page 9 of 15

Page 10: Philip Rogers Elementary School - CPSschoolreports.cps.edu/Assessment_PDF_Summary/5630.pdf · Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645 $0 ROOF SYSTEM

Philip Rogers Elementary School

7345 N Washtenaw Ave Chicago, IL 60645

LUNCHROOM

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREServing Line LF18 $07 18

$0

MDF/IDF

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREFinishes SF107 $07 107

GREVentilation and Cooling EA1 $07 1

$0

MECHANICAL/SERVICE ROOMS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREAir Handling/ Mechanical Room SF796 $07 796

GREAir Tunnels SF1,470 $07 1,470

GREBoiler Room SF1,700 $07 1,700

GRECrawl Space - Unfinished SF18,360 $34,6566 18,360

GREJanitor's Closet SF3 $146 3

GREMechanical/Service Rooms SF3,854 $14,2896 8263,028

GREStorage Room SF2,895 $10,2126 7312,164

$59,172

STAFF RESTROOM

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREAccessories SF2,489 $15,1896 5221,967

GRECeiling - Plaster/Drywall SF2,489 $1,8386 1,840649

GREFloor Drain EA10 $6016 82

GREFlooring - Terrazzo SF47 $2666 47

GREFlooring - Tile Ceramic/Porcelain SF2,282 $3,6606 8441,438

GREFlooring - Tile/Sheet SF160 $1896 28132

GREHand Dryer EA4 $4346 22

GRELavatory EA23 $2,2316 176

Assessment Date: 3/11/2013 Page 10 of 15

Page 11: Philip Rogers Elementary School - CPSschoolreports.cps.edu/Assessment_PDF_Summary/5630.pdf · Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645 $0 ROOF SYSTEM

Philip Rogers Elementary School

7345 N Washtenaw Ave Chicago, IL 60645

GRELighting - Pendant/ Surface SF48 $86 3711

GREPartitions EA23 $5386 203

GREUrinals EA16 $2,2316 106

GREWall - Concrete Block SF160 $4586 160

GREWall - Plaster/Drywall SF4,060 $5,2076 1,8532,207

GREWall - Structural Glazed Tile SF4,794 $14,6866 2,7402,054

GREWater Closet EA34 $1,8596 295

$49,394

THEATER

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRECeiling - Lay-In SF1,241 $07 1,241

GRECeiling - Plaster/Drywall SF1,241 $10,6126 1,241

GREFlooring - Concrete SF1,241 $07 1,241

GREFlooring - Tile/Sheet SF1,241 $07 1,241

GRELighting - Lay-In SF160 $07 160

GREStage SF633 $2,6886 633

GREWall - Plaster/Drywall SF2,537 $07 2,537

GREWall - Structural Glazed Tile SF2,537 $07 2,537

$13,301

VOCATIONAL SHOP

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREWork Sink EA14 $2,3176 86

$2,317

$325,541INTERIOR Total

ROOM

CASEWORK

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRECasework LF453 $10,0466 172281

$10,046

Assessment Date: 3/11/2013 Page 11 of 15

Page 12: Philip Rogers Elementary School - CPSschoolreports.cps.edu/Assessment_PDF_Summary/5630.pdf · Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645 $0 ROOF SYSTEM

Philip Rogers Elementary School

7345 N Washtenaw Ave Chicago, IL 60645

CEILING

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREPlaster/Drywall SF23,500 $40,4496 9,21414,286

$40,449

CHALK BOARD

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

YELChalk Board LF278 $31,0024 30248

$31,002

CORRIDORS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREPendant/Surface EA11,829 $1,5496 9,6632,166

GREPlaster/Drywall SF19,684 $8,0816 16,2593,425

GREStair Handrails LF256 $06 256

GREStructural Glazed Tile SF3,425 $24,4896 3,425

GREStudent Lockers EA555 $79,3656 555

GRETerrazzo SF1,186 $6,7166 1,186

GRETile/Sheet Flooring SF10,155 $6,6686 5,4924,663

$126,868

CORRIDORS CEILING

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREPlaster/Drywall SF11,829 $17,9436 5,4926,337

$17,943

FLOOR

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRECarpet SF304 $07 304

GRETile/Sheet SF17,236 $21,0146 2,54114,695

GREWood SF5,960 $45,0006 5,960

$66,014

Assessment Date: 3/11/2013 Page 12 of 15

Page 13: Philip Rogers Elementary School - CPSschoolreports.cps.edu/Assessment_PDF_Summary/5630.pdf · Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645 $0 ROOF SYSTEM

Philip Rogers Elementary School

7345 N Washtenaw Ave Chicago, IL 60645

LIBRARY_CEILING

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREPlaster/Drywall SF997 $2,8236 997

$2,823

LIBRARY_WALL

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREPlaster/Drywall 1,661 $3,9196 1,661

$3,919

LIGHTING

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREPendant/Surface EA646 $28,2436 251395

$28,243

MARKER BOARD

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREMarker Board LF638 $11,0406 252386

$11,040

STAIRS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRETerrazzo SF120 $1,3596 120

$1,359

WALL

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREPlaster/Drywall SF36,668 $52,5796 14,38422,284

$52,579

$392,285ROOM Total

Assessment Date: 3/11/2013 Page 13 of 15

Page 14: Philip Rogers Elementary School - CPSschoolreports.cps.edu/Assessment_PDF_Summary/5630.pdf · Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645 $0 ROOF SYSTEM

Philip Rogers Elementary School

7345 N Washtenaw Ave Chicago, IL 60645

SITE

CIVIL/DRAINAGE

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GRECatch Basin EA9 $07 9

GRESite Drain EA1 $07 1

GRESite Manhole EA13 $07 13

$0

FENCING

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREOrnamental Iron LF1,021 $19,2726 1,021

$19,272

LANDSCAPE

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREAsphalt Play Area/Hardscape SF21,659 $18,5836 21,659

GREBenches EA8 $07 8

GREGrass SF96,287 $07 96,287

GREIrrigation SF76,621 $07 76,621

GREParkway trees EA27 $07 27

GREPlanting Beds/ Areas SF4,302 $06 4,302

GRERetaining Wall - Concrete SF402 $07 402

GRETrash Receptacles EA4 $07 4

$18,583

PARKING LOT

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREAsphalt SF12,979 $11,1366 12,979

GREConcrete Curbs LF511 $3,0846 511

BLULights, Pole Mounted EA14 $50,3365 212

GREParking lot interior plantings LF119 $06 119

GRETrash Compactor EA1 $3,5756 1

Assessment Date: 3/11/2013 Page 14 of 15

Page 15: Philip Rogers Elementary School - CPSschoolreports.cps.edu/Assessment_PDF_Summary/5630.pdf · Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645 $0 ROOF SYSTEM

Philip Rogers Elementary School

7345 N Washtenaw Ave Chicago, IL 60645

GRETrash Enclosure SF936 $07 936

GREVehicular Screening LF25 $07 25

$68,131

PLAYGROUND

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREPlayground Equipment - Combo 3-12 EA1 $06 1

GREPlayground Surfacing - Poured Surface SF1,621 $4,2886 1,621

$4,288

SIDEWALKS

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREInternal Walks LF1,731 $7,8526 899832

GREPerimeter Sidewalks SF9,184 $31,4126 5,9463,238

$39,264

SIGNAGE

Assessed Item

Composite

Rank Unit

Total

Quantity Cost

Rank 7

Qty

Rank 6

Qty

Rank 5

Qty

Rank 4

Qty

Rank 3

Qty

Rank 2

Qty

Rank 1

Qty

GREFlag Pole EA1 $07 1

GREMarquee - Free Standing Back Lighted EA1 $06 1

$0

$149,539SITE Total

$3,383,757Total Campus Need ² ³

² As stated above, Total Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost.

³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below.

¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked “1” in summary reports; by the time the report is compiled, they have been resolved.

Assessment Date: 3/11/2013 Page 15 of 15