ATLAS week, CERN October 2001 Philippe Grenier (CERN) Cooling performances and tests during the September 2001 calibration period Fernando Varela / Philippe Grenier (CERN) ATLAS week, CERN October 2001

Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling performances and tests during the September 2001 calibration period Fernando Varela / Philippe

Embed Size (px)

DESCRIPTION

Philippe Grenier (CERN) ATLAS week, CERN October 2001 Monitoring of the cooling system cooling unit informations (ELMBs) - input/output temp on each drawer - water output temp - water flow drawer informations (HV program) - also, HV on the PMTs - 7 temp probes located in the drawers Monitoring PVSSII application Database (web interface)

Citation preview

Page 1: Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling performances and tests during the September 2001 calibration period Fernando Varela / Philippe

ATLAS week, CERN October 2001Philippe Grenier (CERN)

Cooling performances and testsduring the September 2001 calibration period

Fernando Varela / Philippe Grenier (CERN)

ATLAS week, CERN October 2001

Page 2: Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling performances and tests during the September 2001 calibration period Fernando Varela / Philippe

ATLAS week, CERN October 2001Philippe Grenier (CERN)

Cooling system in H8

water tank

output pipes

fridge unit

control box

return pipes

Page 3: Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling performances and tests during the September 2001 calibration period Fernando Varela / Philippe

ATLAS week, CERN October 2001Philippe Grenier (CERN)

Monitoring of the cooling system

cooling unit informations (ELMBs)

- input/output temp on each drawer- water output temp

- water flow

drawer informations (HV program)

- also, HV on the PMTs- 7 temp probes located in the drawers

Monitoring PVSSII application Database (web interface)

Page 4: Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling performances and tests during the September 2001 calibration period Fernando Varela / Philippe

ATLAS week, CERN October 2001Philippe Grenier (CERN)

Page 5: Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling performances and tests during the September 2001 calibration period Fernando Varela / Philippe

ATLAS week, CERN October 2001Philippe Grenier (CERN)

Low voltages control

Drawer temperatures trends

PMTs HVs

Page 6: Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling performances and tests during the September 2001 calibration period Fernando Varela / Philippe

ATLAS week, CERN October 2001Philippe Grenier (CERN)

Stability of the systemnormal working conditions: T=18 oC, Flow=60 l/h

Page 7: Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling performances and tests during the September 2001 calibration period Fernando Varela / Philippe

ATLAS week, CERN October 2001Philippe Grenier (CERN)

Stability of the system during data taking

Tout<Mod2>=19.70.1 oC<Mod5>=19.60.1 oC

<Mod2>=18.30.1 oC<Mod5>=18.40.1 oC

<Cooling>=18.30.1 oC

Tin

Page 8: Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling performances and tests during the September 2001 calibration period Fernando Varela / Philippe

ATLAS week, CERN October 2001Philippe Grenier (CERN)

Increase of the water temperature in the drawers

(oC)(oC)

Page 9: Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling performances and tests during the September 2001 calibration period Fernando Varela / Philippe

ATLAS week, CERN October 2001Philippe Grenier (CERN)

Stability of the temperature inside drawer

Page 10: Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling performances and tests during the September 2001 calibration period Fernando Varela / Philippe

ATLAS week, CERN October 2001Philippe Grenier (CERN)

Cooling tests

1- variation of the water input temperature (16 oC 22 oC)

(180 GeV electrons shooting in cell A14)

PMT gain variation measured with particules

drawer temperatures variations

2- variation of the water flow (10 l/h 60 l/h)

drawer temperatures variations

Page 11: Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling performances and tests during the September 2001 calibration period Fernando Varela / Philippe

ATLAS week, CERN October 2001Philippe Grenier (CERN)

Water flow variationsCooling Temperature = 18 oC

optimal flow: 60 l/h

Page 12: Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling performances and tests during the September 2001 calibration period Fernando Varela / Philippe

ATLAS week, CERN October 2001Philippe Grenier (CERN)

Drawer temperatures variationsFlow = 60 l/h

6 oC3 oC

T(PMT) = 1/2 T(cooling)

Page 13: Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling performances and tests during the September 2001 calibration period Fernando Varela / Philippe

ATLAS week, CERN October 2001Philippe Grenier (CERN)

PMT gain variation versus temperature

E/E = 0.2 % / oC(PMT) E/E = 0.1 % / oC(cooling)

resolution

total energy deposited versus temperature in PMT#22180 GeV electrons

Page 14: Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling performances and tests during the September 2001 calibration period Fernando Varela / Philippe

ATLAS week, CERN October 2001Philippe Grenier (CERN)

Conclusions

- optimal flow: 60 l/h (without LV in fingers)

- T(output - input) = 1.3 oC, for a flow of 60l/h

- Gain(PMT) = 0.2% / oC(PMT) = 0.1% / oC(cooling)

- cooling water temperature stability: 18.3 0.1 oC

Page 15: Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling performances and tests during the September 2001 calibration period Fernando Varela / Philippe

ATLAS week, CERN October 2001Philippe Grenier (CERN)

Still to be done

- Effect of room temperature variation with non-isolated pipes (using foreseen tubes)

- ( not yet operating: cooling unit for Cs calibration in blg 185 ready)

- Next year: re-optimize flow with finger LV power supplies

- Pilot Project (see next slide)

Page 16: Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling performances and tests during the September 2001 calibration period Fernando Varela / Philippe

ATLAS week, CERN October 2001Philippe Grenier (CERN)

Cooling pilot project in blg 185

- budget approved last week (50% financed by EP div JCOV committee)

- real size test (ATLAS): note

- Schedule (Sept 2001 - Sept 2002):- 15m high scaffolding available- components just ordered- start mounting/piping , until end of the year- tests to be done: Jan 02 Sept 02

Page 17: Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling performances and tests during the September 2001 calibration period Fernando Varela / Philippe

ATLAS week, CERN October 2001Philippe Grenier (CERN)

Cooling pilot project in blg 185: Scaffolding installation