4
Philippine Rural Development Proiect (PRDP) Environmental Management Plan Template for Rural/Farm-to-Market Roads Name of Road: Location: Implementing LGU: Concreting of TagAnahaw-San Isidro FMR Esperanza, Agusan Del Sur Iocal Government of Esperanza Estimated number of beneficiaries: 728 New or Rehab: New Construction Estimated Total Cost: Ptrp 77,404,378.79 A. Site and Design Consideration lDo not proceed with the Subproject preparation including this ESMP unless all items below are confirmed true.) 1. The Road does not encroach into or traverse any declared protected area of natural habitat 2. The subproject will not displace, disfigure or render inoperable/inaccessible any monument or physical structure of known cultural and historical significance. B. Environmental Issues and Mitigation Measures lThe following are issues frequently associated with Farm to Market Roads. Issues include alleged/perceived impacts, potential impacts, health and safety and environmental risks. Entries in the "Assessment" column should describe or provide qualifications regarding the significance of the issues. Issues that are deemed critical or significant should have a coruesponding entry in the "Mitigation" column. Entries in the "Instrument" column should indicate how and where in the measures will be implemented in the Subproject. Please feel free to add, delete or modifi any of the items in the template. In preparing the EMP below refer to the Environmental and Social Assessment Section of the FS for specific safeguards issues and assessments) Issue (Potential Impact) Assessment (Sample assessments) Mitigation Measure Instrument of Implementation (POW, Contract, IDP, or O&M PIan)* 1. Tempomry increase in sedimentation during construction '/ Topography of the road alignment necessitate massive earthmoving and cutting of clayey or loose topsoil. [ ] Cut materials will consist mainly of hard rocks and are unlikely to generate significant sediments ./ Earthmoving/ cutting of slopes to be done during dry months '/ Proper disposal and compaction of spoils No measures required tl DED/POW; Contract

Philippine Rural Development Proiect (PRDP) Environmental

  • Upload
    ngongoc

  • View
    220

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Philippine Rural Development Proiect (PRDP) Environmental

Philippine Rural Development Proiect (PRDP)Environmental Management Plan Template for Rural/Farm-to-Market Roads

Name of Road:Location:Implementing LGU:

Concreting of TagAnahaw-San Isidro FMREsperanza, Agusan Del SurIocal Government of Esperanza

Estimated number of beneficiaries: 728New or Rehab: New ConstructionEstimated Total Cost: Ptrp 77,404,378.79

A. Site and Design ConsiderationlDo not proceed with the Subproject preparation including this ESMP unless all items below areconfirmed true.)

1. The Road does not encroach into or traverse any declared protected area of natural habitat

2. The subproject will not displace, disfigure or render inoperable/inaccessible any monument orphysical structure of known cultural and historical significance.

B. Environmental Issues and Mitigation Measures lThe following are issues frequently associatedwith Farm to Market Roads. Issues include alleged/perceived impacts, potential impacts, health andsafety and environmental risks. Entries in the "Assessment" column should describe or providequalifications regarding the significance of the issues. Issues that are deemed critical or significantshould have a coruesponding entry in the "Mitigation" column. Entries in the "Instrument" columnshould indicate how and where in the measures will be implemented in the Subproject. Please feel freeto add, delete or modifi any of the items in the template. In preparing the EMP below refer to theEnvironmental and Social Assessment Section of the FS for specific safeguards issues andassessments)

Issue (PotentialImpact)

Assessment (Sampleassessments)

Mitigation Measure Instrument ofImplementation(POW, Contract,IDP, or O&M

PIan)*1. Tempomryincrease insedimentationduringconstruction

'/ Topography ofthe roadalignmentnecessitatemassiveearthmoving andcutting of clayeyor loose topsoil.

[ ] Cut materials willconsist mainly of hardrocks and are unlikely togenerate significantsediments

./ Earthmoving/cutting of slopesto be done duringdry months

'/ Proper disposaland compactionof spoils

No measures requiredtl

DED/POW;Contract

Page 2: Philippine Rural Development Proiect (PRDP) Environmental

Issue (PotentialImpact)

Assessment (SamPle

assessments)

Mitigation Measure I Instrument o[I Implementation

I trow, contract,I IDP, or o&M

r

I Ptan)* I

2. Potentialcontaminationof surface and

groundwaterwith oil/gtease

/ \7aste oil and

grease fromequiPment could

contaminatesutface water

[ ] There will be no orinsignificant amount ofwaste oil/grease

'/ Proper handlingand disPosal ofwaste oil and

gfease

Contract

Agreementbetween LGU &Contractor.

3. Potentialcontaminationwith humanwaste

'/ Constructionworkets wouldbe temPorarilYhoused in a base

camp( I Workers would be

mosdy locals and are

expected to go home to

theit resPective houses

Set up adequate

latrine/toiletfacility at the base

camp

[ ] I(eep the road oPen to

traffic flow and minimizedisruptions along the

access roadandfotcoflstruction area;

[{ Provide adequate

warning signs and tafltcpersonnel whennecessary;

[] Undertake regularmaintenance measures on

the passable portions ofthe toads

[] No measures

needed

Contract4. Potentialdisruption oftraffic flow

[] The access road

andf or segments to be

rehabilitated need is vitalto daily activities of the

residents and farmers

and need to be kePt

open to tafftc duringconstrucrion

,/ [] rheconstruction willnot affect dailY

movement ofresidents and

farmers

5. Potentialdust/mudnuisance duringconstruction

Roads couldbecome Powderyduring dry daYs

and muddyduring rainY daYs

of theconstructionperiod

Access road and/or the

construction/rehabilitation workspasses through a

populated area./ [] Access road

andf orconstruction/

rehabilitation does notDass through anY

Undertakesprinkling of toad(including access

toads) during drydays, and fillingup of potholesduring rainy daYs,

especially inresidential areas

Set up speed limitsfor vehicles, especiallY

within tesidentialateas,/ [] No measures

needed

Contract

Page 3: Philippine Rural Development Proiect (PRDP) Environmental

fl

I

I

.ll

fr:n lFtmmildl .trutsruent lSempleJhpnt fssessnrents)

Mitigation Measure Instrument ofImplementation(POW, Contract,IDP, or O&M

Plan)*F,:rF,ulared area

t ,,.rurus,,l'de

fitritl5il:fiT I ff'flfillill$I f]:E!td

$u,[Hi. :rluJtlng['f

llslflnmEnIMinn

: ri nrn mefr* A) S

[ ] Ttr. road rvill traversea mountainous area

neces sitating deep cutson mountainsides,particulady betweenstarion

-

and _,etc (check DED fordeep cuts). . .

[] The exposed slopeswill likely consist ofhighly erodible loosematerials

[] The cut slopes will behard materials thatwould resist erosion

r' [] The roadpasses through a

telatively benignterrain, cuts willbe minimal

[] The rehabilitationwork does not involveadditional road cuts

[] Include slopepfotectiori works at thefollowing stations:0+240 to 0+260 &0+760..etc..

(Specify the type/s ofslope protection to beapplied at each section-Consult with theMunicipal Engineer:

[] Bioengineering withgeomat and cover crop

[] Fast growing shrubspecies

r' []Riprap[]Gabions[] Teracing

[] Concrete protectionwallI I Others )LJ +

DED/PO!r

Or (if budgetdoes not permit)LGUCommitmentLetter

7. Inadequatedrainageresulting intlooding orponding

,/ The road willblock runoff,resulting inflooding on oneside of the roadduring rainydays.

[] Drainage issues

unlikelv

'/ Installation ofcross drainbetween station0*250m,1*370m

DED

8. Potentialincrease use ofpesticides due tointensification ofcash cropproduction inthe atea

[ ] There is an ongoingIPM program of DA inthe service atea

[ ] Farmers in theservice area have notbeen trained on IPM

[] DA to continue tosupport IPM program

[ ] LGU to Coordinatewith DA on IPM training

Capaciry BuildingPlanO&M Plan;CapacirJ BuildingPlan

9. Potentialacceletation ofdenudation ofthe upland/hillyareas due tointensification ofcrop production

[ ] The proposed roadwill connect to themarket an upland/hillyatea where farmers are

curendy practicingetosive farmingtechniques. The roadcould help accelerate thedenudation of the

[] DA to coordinate withLGU for the introductionof sustainable uplandfatming systems in theafea

'/ No measurerequired

O&M Plan;CapacittJ BuildingPlan

Page 4: Philippine Rural Development Proiect (PRDP) Environmental

'tr r,-r rrnual ASSeSSment (Sampleir:n;,act assessments)

, upland/hillsidesrendering themunproductive in a fewYeaIS.

t'

J , The roadI connects only, lowland farms toI the market

Mitigation Measure Instrument ofImplementation(POW, Contract,IDP, or O&M

Planlx

[] Coordinate with-DENR for the enacrmenr I

ofordinancedepuuzing I

the local communiry to I

enforce forestry laws I

'/ [] No measure Irequired i

:a

I [] fn.proposedroua] will improve human

I access to the nearbypublic forest, resulting inincrease slash and burncultivation, illegallogging and poaching.

./ [] The proposedroad does notimprove access

to a public forest

O&M Plan;Capacity BuildingPlan

'/ Co.rrtr.ritio.r-will provide localemploymentopportunities

Hting priorityshall be given toqualified localresidents;Implement RIManual on localhirino

Contract

[ ] Consruction doesnot provide any localemploymentopportunities

L J 1\ o measures required

GLENN

n6N.;io7ffiffiN:JR.

Noted by:

lViirnicipatr"r;;" ""