Philippine Rural Development Proiect (PRDP)Environmental Management Plan Template for Rural/Farm-to-Market Roads
Name of Road:Location:Implementing LGU:
Concreting of TagAnahaw-San Isidro FMREsperanza, Agusan Del SurIocal Government of Esperanza
Estimated number of beneficiaries: 728New or Rehab: New ConstructionEstimated Total Cost: Ptrp 77,404,378.79
A. Site and Design ConsiderationlDo not proceed with the Subproject preparation including this ESMP unless all items below areconfirmed true.)
1. The Road does not encroach into or traverse any declared protected area of natural habitat
2. The subproject will not displace, disfigure or render inoperable/inaccessible any monument orphysical structure of known cultural and historical significance.
B. Environmental Issues and Mitigation Measures lThe following are issues frequently associatedwith Farm to Market Roads. Issues include alleged/perceived impacts, potential impacts, health andsafety and environmental risks. Entries in the "Assessment" column should describe or providequalifications regarding the significance of the issues. Issues that are deemed critical or significantshould have a coruesponding entry in the "Mitigation" column. Entries in the "Instrument" columnshould indicate how and where in the measures will be implemented in the Subproject. Please feel freeto add, delete or modifi any of the items in the template. In preparing the EMP below refer to theEnvironmental and Social Assessment Section of the FS for specific safeguards issues andassessments)
Issue (PotentialImpact)
Assessment (Sampleassessments)
Mitigation Measure Instrument ofImplementation(POW, Contract,IDP, or O&M
PIan)*1. Tempomryincrease insedimentationduringconstruction
'/ Topography ofthe roadalignmentnecessitatemassiveearthmoving andcutting of clayeyor loose topsoil.
[ ] Cut materials willconsist mainly of hardrocks and are unlikely togenerate significantsediments
./ Earthmoving/cutting of slopesto be done duringdry months
'/ Proper disposaland compactionof spoils
No measures requiredtl
DED/POW;Contract
Issue (PotentialImpact)
Assessment (SamPle
assessments)
Mitigation Measure I Instrument o[I Implementation
I trow, contract,I IDP, or o&M
r
I Ptan)* I
2. Potentialcontaminationof surface and
groundwaterwith oil/gtease
/ \7aste oil and
grease fromequiPment could
contaminatesutface water
[ ] There will be no orinsignificant amount ofwaste oil/grease
'/ Proper handlingand disPosal ofwaste oil and
gfease
Contract
Agreementbetween LGU &Contractor.
3. Potentialcontaminationwith humanwaste
'/ Constructionworkets wouldbe temPorarilYhoused in a base
camp( I Workers would be
mosdy locals and are
expected to go home to
theit resPective houses
Set up adequate
latrine/toiletfacility at the base
camp
[ ] I(eep the road oPen to
traffic flow and minimizedisruptions along the
access roadandfotcoflstruction area;
[{ Provide adequate
warning signs and tafltcpersonnel whennecessary;
[] Undertake regularmaintenance measures on
the passable portions ofthe toads
[] No measures
needed
Contract4. Potentialdisruption oftraffic flow
[] The access road
andf or segments to be
rehabilitated need is vitalto daily activities of the
residents and farmers
and need to be kePt
open to tafftc duringconstrucrion
,/ [] rheconstruction willnot affect dailY
movement ofresidents and
farmers
5. Potentialdust/mudnuisance duringconstruction
Roads couldbecome Powderyduring dry daYs
and muddyduring rainY daYs
of theconstructionperiod
Access road and/or the
construction/rehabilitation workspasses through a
populated area./ [] Access road
andf orconstruction/
rehabilitation does notDass through anY
Undertakesprinkling of toad(including access
toads) during drydays, and fillingup of potholesduring rainy daYs,
especially inresidential areas
Set up speed limitsfor vehicles, especiallY
within tesidentialateas,/ [] No measures
needed
Contract
fl
I
I
.ll
fr:n lFtmmildl .trutsruent lSempleJhpnt fssessnrents)
Mitigation Measure Instrument ofImplementation(POW, Contract,IDP, or O&M
Plan)*F,:rF,ulared area
t ,,.rurus,,l'de
fitritl5il:fiT I ff'flfillill$I f]:E!td
$u,[Hi. :rluJtlng['f
llslflnmEnIMinn
: ri nrn mefr* A) S
[ ] Ttr. road rvill traversea mountainous area
neces sitating deep cutson mountainsides,particulady betweenstarion
-
and _,etc (check DED fordeep cuts). . .
[] The exposed slopeswill likely consist ofhighly erodible loosematerials
[] The cut slopes will behard materials thatwould resist erosion
r' [] The roadpasses through a
telatively benignterrain, cuts willbe minimal
[] The rehabilitationwork does not involveadditional road cuts
[] Include slopepfotectiori works at thefollowing stations:0+240 to 0+260 &0+760..etc..
(Specify the type/s ofslope protection to beapplied at each section-Consult with theMunicipal Engineer:
[] Bioengineering withgeomat and cover crop
[] Fast growing shrubspecies
r' []Riprap[]Gabions[] Teracing
[] Concrete protectionwallI I Others )LJ +
DED/PO!r
Or (if budgetdoes not permit)LGUCommitmentLetter
7. Inadequatedrainageresulting intlooding orponding
,/ The road willblock runoff,resulting inflooding on oneside of the roadduring rainydays.
[] Drainage issues
unlikelv
'/ Installation ofcross drainbetween station0*250m,1*370m
DED
8. Potentialincrease use ofpesticides due tointensification ofcash cropproduction inthe atea
[ ] There is an ongoingIPM program of DA inthe service atea
[ ] Farmers in theservice area have notbeen trained on IPM
[] DA to continue tosupport IPM program
[ ] LGU to Coordinatewith DA on IPM training
Capaciry BuildingPlanO&M Plan;CapacirJ BuildingPlan
9. Potentialacceletation ofdenudation ofthe upland/hillyareas due tointensification ofcrop production
[ ] The proposed roadwill connect to themarket an upland/hillyatea where farmers are
curendy practicingetosive farmingtechniques. The roadcould help accelerate thedenudation of the
[] DA to coordinate withLGU for the introductionof sustainable uplandfatming systems in theafea
'/ No measurerequired
O&M Plan;CapacittJ BuildingPlan
'tr r,-r rrnual ASSeSSment (Sampleir:n;,act assessments)
, upland/hillsidesrendering themunproductive in a fewYeaIS.
t'
J , The roadI connects only, lowland farms toI the market
Mitigation Measure Instrument ofImplementation(POW, Contract,IDP, or O&M
Planlx
[] Coordinate with-DENR for the enacrmenr I
ofordinancedepuuzing I
the local communiry to I
enforce forestry laws I
'/ [] No measure Irequired i
:a
I [] fn.proposedroua] will improve human
I access to the nearbypublic forest, resulting inincrease slash and burncultivation, illegallogging and poaching.
./ [] The proposedroad does notimprove access
to a public forest
O&M Plan;Capacity BuildingPlan
'/ Co.rrtr.ritio.r-will provide localemploymentopportunities
Hting priorityshall be given toqualified localresidents;Implement RIManual on localhirino
Contract
[ ] Consruction doesnot provide any localemploymentopportunities
L J 1\ o measures required
GLENN
n6N.;io7ffiffiN:JR.
Noted by:
lViirnicipatr"r;;" ""