25

Phone : +90232 421 11 29 & +90541 826 60 39 & … · Page 1 COMPANY PROFILE Our company management have experienced in international companies in the Industrial and civil construction

Embed Size (px)

Citation preview

Phone : +90232 421 11 29 & +90541 826 60 39 & +90539 920 00 29 Fax: +90232 421 11 39 email : [email protected] // Address: Muzaffer Tuzcuoğlu Business Center 1473 Sk. No: 5/506 Alsancak / İZMİR / TURKEY

Page 1

COMPANY PROFILE

Our company management have experienced in international companies in the Industrial and

civil construction projects.

Pipe, steel manufacturing, installation and equipment assembly processes of civil construction

mechanical and industrial projects are carried out in accordance with international standards,

taking the quality management system as the basis of expert field team staff.

Our manufacturing and installation teams and great staff invested abroad in Turkey has taken

part in industrial and civil construction projects.

Project progress reports are regularly presented to the customer and the progress is

monitored daily and weekly.

INDUSTRIAL PROJECTS include stainless steel (SS), carbon steel (CS), low temperature carbon

steel (LTCS), duplex (DS), super duplex (SDX), glass reinforced plastic (FRP-GRE), chromium

moly (Galv), HDPE (High Density Polyethylene), PVC-U, Copper piping.

Steel structures are manufactured and assembled.

Project management consultancy services are provided in the projects.

The mechanical maintenance processes in INDUSTRIAL Maintenance are carried out by expert

staff.

CIVIL CONSTRUCTION PROJECTS include fire extinguishing systems, boiler chimneys, water

reservoir tanks, submursible pumps, water treatment process pumps, water treatment

systems, heat exchangers, dry and cold freezing fire systems, VRV system, clean agent systems

(gas fire- (hockey, electric, diesel) pumps, HVAC canal -chain power plant units, outdoor

watering-drip system, syphonic cati drain, water heaters, filters, hot water tank, chlorine

dioxyde units, expansion tank, chiller, cooling tower, boilers system is carried out in field

manufacturing and assembly works of all mechanical activities.

Page 2

ACTIVITY AREAS

INDUSTRIAL PROJECTS

PİPİNG, STEEL FABRİCATİON AND INSTALLATION

Piping - steel manufacturing assembly, piping testing and commissioning

processes are carried out in INDUSTRIAL PROJECTS. Coordination of pneumatic,

hydrostatic tests and pre-commissioning activities is ensured.

Page 3

Steel Structural / Proses Piping Fabrication and Installation processes are

coordinated and supervised according to quality standards and project

specifications.

Page 4

Progress status reporting of the project is made and the processes are effectively

coordinated in a timely manner when necessary.

Page 5

Coordination of international standards, project specifications, local standards

are prepared in accordance with appropriate method statements & procedures,

inspection test plans (ITPs).

Page 6

Planning and 3D programs are used to carry out projects effectively.

Page 7

CİVİL CONSTRUCTION PROJECTS

MECHANICAL FABRICATION AND INSTALLATION

Fire System

Fire Protection System

Fire Cabinet System

Hydrant System

Sprinkler System

Gas Fire Extinguishing System

Wet Fire Extinguishing System

Page 8

HVAC Duct and Piping Systems Ventilation Systems Cooling System

Page 9

Air Conditioning Systems VRV VRF Systems Air Conditioning and Ventilation

System

Page 10

Compressed air installation Low Pressure Steam Installations Medium Pressure Steam Installations High Pressure Steam Installations

Drinking Water Treatment Systems

Page 11

Sanitary Installation Clean Water Installation Hot Water Installation Clean Water Storage and

Pressurization System Waste - Waste Water Installation Hydrophore Installation Heater Installation Central Heating Installation Regional Heating Installation

Page 12

Infrastructure piping Waste Water Line Rain Water Line Sludge Line Clean Water Line

Page 13

Natural Gas Installation Internal Installation Natural Gas

Installation Industrial Natural Gas Installation

Page 14

Siphonic System Rain Water System

LPG installation

Page 15

Sandblating & Painting

Page 16

INDIVIDUAL REFERENCES

PROJECT INFORMATION WHICH ARE DIRECTED BY THE FIRM

MANAGEMENT AS ADMINISTRATOR

Project: Petkim Petrochemical (SOCAR) - TURKEY

Project : PETKİM Petrochemical (SOCAR) - TURKEY

About Project

Petkim Petrokimya Holding A.Ş. was established on April 3, 1965 under the leadership of TPAO, following

the studies and evaluations performed.

Privatization tender of 51% of the public shares of PETKİM through block sale method, handed over to

SOCAR&Turcas Petrochemical with 2.040.000.000-USD payment in 30.06.2008. Petkim, one of the most popular corporations in Turkey, is indispensable raw-material producer of the

industry with its product range of more than 50 products. Its petrochemical products are important input of

construction, electricity, electronic, packaging, textile also medical, dying, detergent and cosmetic sectors. Thermoplastic products (AYPE, PVC, YYPE and PP), fiber raw materials (ACN, PTA and MEG) and other

petrochemical products (Ethylene, Benzene, PA, Gas Chlorine, VCM) with a total capacity of 1,903

thousand tons are produced.

Work Carried Out

Consultancy services in the coordination between 22 factories and subcontractors in the planning of

ongoing maintenance works. Controling and reporting of pipe, steel, painting, sandblasting, insulation, scaffolding, pressurized water

washing works.

Solution offers to reduce the loss of production losses in factories.

Improvement recommendation about project management , team organization, quality control, health and

safety executive.

Page 17

Project : Shah Deniz Stage 2 Topsides Project- AZERBAJIAN

Company : ATA (Amec Foster Wheeler /Tekfen/Azfen Consortium ) - British Petroleum

Project Value : US$ 974.783.328

About Project

The Shah Deniz Bravo (SDB) Platform Complex will include a Production and Risers platform (SDB-PR),

where the well production fluids will be received, processed and exported to the onshore terminal via

separate gas and liquid pipelines, and a Quarters and Utilities platform (SDB-QU) bridge linked to SDB-PR. Total: 26.442 Tons

Flow line reception facilities. Production and test manifolds.

2 phase high pressure well fluid separation.2 phase low pressure separation.3 phase test separation. Flash

gas re-compression. Gas export to shore via marine pipelines Condensate export to shore via marine pipeline. MEG import from shore via marine pipeline.

Flare system and boom. Fuel gas and marine pipeline gas buy-back systems.

Flow lines Direct Electrical Heating Interface. Living Quarters with helideck (integration only).

Power generation and distribution. Direct Electrical Heating system for subsea flow line hydrate

management. MEG bulk storage and distribution to subsea bulk lines and subsea production systems. Subsea hydraulic power system. Subsea controls interface.

Chemical injection system. Utilities, platform support systems and infrastructure.

Work Carried Out

Coordinating of all activities for installation and fabrication of pipes {stainless steel (SS), carbon steel (CS) ,

low tempreture carbon steel (LTCS) , duplex (DS) ,super duplex (SDX) , glass reinforced plastic (FRP-GRE) , crom-moly (CrMo) , galvanize (Galv) }

Monitoring of scheduled various activities for worker and assisted in delivery of appropriate materials and equipments.

Controlling of compliance to all safety regulations and mitigate all risks. Coordinating of evaluation all pipe specifications for projects and ensured compliance to installation

process. Coordinating all required engineering functions. Monitoring of all phases of project from job implementation to completion of piping. Coordinating of progress reports for projects to resolve all issues efficiently on time. Coordinating of the team for timely and accurate work execution and all the work activities complete as per

the quality norms and as per project specifications.

Page 18

Project : Baku Olympic Stadium Project- AZERBAIJAN

Company : SOCAR (The State Oil Company of the Azerbaijan Republic)

Project Value : US$ 640.500.000

About Project

Baku Olympic Stadium Project will have a capacity of 68.000 seats. 496.000 m2 total site area, 204.000 m2

gross floor area of the Stadium contains commercial areas and disabled, public, media, CIP, VIP and VVIP

Sections.

Tekfen Construction and Installation Co., Inc. has been awarded for completion of Overall Design Works, Earthworks: 4.500.000 m3 , Reinforced Concrete: 350.000 m3 , Steel Re-Bar: 43.000 ton , Formwork:

415.000 m2 , Structural Steel: 14.000 ton ,Facade: 35.000 m2 and Roof Cover: 38.000 m2, Sports

Facilities, Mechanical Works , Electrical Works , Architectural Works , Interior Works, Elevators and Escalators

Work Carried Out

Supervising all method statements & procedures, installation manuals and ITP’s related to mechanical and

piping works comply with project specifications local regulations and meet the requirements of international codes and standards (NFPA, EN, ASME, ASHRAE, SMACNA, AABC ).

Coordinating of installation and inspection of boiler breeching, water reservoir tank,submursible pumps,

water treatment process-pumps,heat exchanger,dry-wet sprinkler system, heat pump unit (VRV), clean agent system, filter units, hot water storage tank, chlorine dioxyde unit, expantion tanks, chillers,cooling

tower, boiler,pump (booster , fire ), mechanical ventilating system (HVAC), Fire Fighting (Dry,Wet,Gas),

Irrigation, Syphonic (Roof Drain) building management system (BMS). Monitors and inspects construction operations to ensure compliance with design documents.

Monitors subcontractor’s performance to ensure conformance to project quality and specification

requirements.

Investigates and resolves engineering and technical related problems.

Coordinating of the completion of systems on time as per given schedule. Coordinating of 26 Elevator , 16 Escalator installation as per given schedule.

Coordinating of infrastructure piping installation ( Rain/ Storm Drainage, Sweage Drainage, Outlet Fire

Protection, Naturel Gas, Irrigation, Syphonic , Water Supply )

Page 19

Proje : COP-WC-PDQ ( Chiraq Oil Project-West Chirag-Production, Drilling and

Quarters Platform) Fabrication of Topside, Drilling Facilities and

The Integration of Living Quarters - AZERBAJIAN

Company : ATA (Amec Foster Wheeler /Tekfen/Azfen Consortium ) - British Petroleum

Project Value : US$ 745.000.000

About Project

COP-WC-PDQ is a single integrated deck comprising a Production Platform, Drillig Module, utilities and

Living Quarters. The overall weight of the Platform is about 22500 tons.

Fabrication and fitting out of the Integrated Deck including pressure vessels, tanks, mechanical equipment,

piping, electrical and instrumentation cables, cable rack, cable tray and supports. Any detailed engineering necessary for fabrication shop drawings, sub-assemblies, erection, lifting procedures, temporary installation

aids and attachments. Receipt, storage, fabrication, erection, post-weld heat treatment (PWHT), non-destructive examination

(NDE), coating and certification of all structural steel including rolling and field machining as required in

and out of country. Receipt, storage, fabrication, erection, bolt tensioning, PWHT, NDE, pressure testing, nitrogen/helium leak

testing, coating and certification of all piping system components.

Work Carried Out

Coordinating of erection, installation , and testing of stainless steel (SS), carbon steel (CS) , low

tempreture carbon steel (LTCS) , duplex (DS) ,super duplex (SDX) , glass reinforced plastic (FRP-GRE) ,

crom-moly (CrMo) , galvanize (Galv) pipe. Coordinating of schedule, quality, all contractual requirements and execution plan.

Planning of manpower and work distribution within group on regular basis.

Coordinating of the completion of packages on time as per given schedule.

Planning of erection sequence as per site conditions.

Coordinating of erection and installation of piping, valves, fittings, supports, etc, for gas and oil lines, utility

and potable water, fire fighting systems (foam and water),service and instrumentation air, etc.

Coordinating of piping that connection to Mechanical Equipment (Compressor, HP/LP Separator, Tank , Oil Pipeline Pig Launcher, HP Gas Cooler, Pump etc. )

Planing to pneumatic tests and hydro tests and pre-commissioning activities.

Coordinating of Reinstatement & final acceptance with the owner.

Supervising all method statements & procedures, installation manuals and ITP’s related to mechanical and

piping works comply with project specifications, local regulations and meet the requirements of international codes and standards.

Page 20

Company : AKFEL GROUP - TURKEY

(Promet Project Control & Imformation Technology Construction Trade Inc.)

Work Carried Out

Industrial Natural Gas Projects

Preparing the list of material and exploration

Areal studies, assembly and material controls

Steel Line Construction Control

Hydrostatic Test Controls RMS-A, RMS-B construction and assemblage controls

Polyethylene (PE) Line Construction Control

Service Line Construction Control

Service Box Assemblage Controls

IGDAS Job Control, Monitoring Field Studies.

Project Monitoring and Advisory.

Energy Efficiency Studies.

Gas stations, regulator, filter, gauge, valve, such as equipment selection, project

The station equipment, the desired condition of the selected projects sures the control station, the station

design.

Page 21

Project : SGI Stage 1, SGI Stage 2, Korolev, Tengiz Trunklines and West Ringmain 1 Pipelines

of the SGP Next Generation Gathering System (NGGS) 97 Km 2“ / 3“ / 6“ / 8“ /

12“ / 16“ / 18“ / 24“ –KAZAKHSTAN

Company : SİCİM-TENGİZCHEVROİL

About Project

Fluor and its joint venture partner provided engineering, procurement, and construction management services to

TengizChevroil (TCO) for the Asset Development Project, one of the largest and most complex projects undertaken

in the oil & gas industry.

The Asset Development Project was a combination of the Sour Gas Injection (SGI) and the Second Generation Plant

(SGP) Projects at the giant Tengiz and Korolev Fields, located on the northeastern shore of the Caspian Sea.

Work Carried Out

Coordinating of schedule, quality, all contractual requirements and execution plan.

Planning of manpower and work distribution within group on regular basis.

Coordinating of the completion of packages on time as per given schedule.

Planning of erection sequence as per site conditions.

Coordinating of erection and installation of piping, valves, fittings, supports, etc,

Planing to pneumatic tests and hydro tests and pre-commissioning activities.

Coordinating of Reinstatement & final acceptance with the owner.

Supervising all method statements & procedures, installation manuals and ITP’s related to mechanical and

piping works comply with project specifications, local regulations and meet the requirements of

international codes and standards.

Page 22

Project : VARIOUS CONSTRUCTION SERVICES, TENGIZ FIELD- KAZAKHSTAN

Company : SİCİM-TENGİZCHEVROİL

About Project

Construction Services. SOW: provision of manpower, equipment, supervision, logistics support and management

team to perform and support Company execution of planned turnarounds and unplanned shut down activities.

General maintenance support throughout the Tengiz Area.

Maintenance, repair, disassembly, assembly, troubleshooting of fixed or static equipment. Cleaning of tanks,

vessels. Blinding or de-blinding of equipment or piping, exchanger cleaning and repairs.

Work Carried Out

Planning of erection sequence as per site conditions.

Coordinating of erection and installation of piping, valves, fittings, supports, etc,

Planing to pneumatic tests and hydro tests and pre-commissioning activities.

Coordinating of Reinstatement & final acceptance with the owner.

Coordinating of schedule, quality, all contractual requirements and execution plan.

Planning of manpower and work distribution within group on regular basis.

Coordinating of the completion of packages on time as per given schedule.

Supervising all method statements & procedures, installation manuals and ITP’s related to mechanical and

piping works comply with project specifications, local regulations and meet the requirements of

international codes and standards.