December 21, 2019This week the chassis continued with chassis prep and the
pump house structure was joined with the fire pump which
finished the paint process. The body continued with fabrication.
In the next report the chassis should continue with chassis
prep and the pump house should finish with final pump
assembly. The body should begin the paint process. Due to the
Pierce Winter/Holiday Break, your next reports are scheduled
for January 2020. Thank you!
© 2005-2019 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC00291 DSC00292
DSC00293 DSC00294
© 2005-2019 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC00295 DSC00583
DSC00584 DSC00585
© 2005-2019 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC00586 DSC00587
DSC00588 DSC00589
© 2005-2019 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
DSC00590 DSC00591
© 2005-2019 Fire & Safety Consulting, LLC
Neenah, Wisconsin 54956
•Pierce Authorized Sales and Service Representative www.hughesfire.com