Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Pictures of old and new Grit Chamber 2009
Grit Auger
Auger Motor and shaft
Old Clarifier Drive March 2010
Set up for removal of bridge
Moving line from Pre-Aeration tank that discharged into Primary Effluent to the Primary Influent
New pre-aeration tank discharge
Intermediate Tank Rehab 2009
Intermediate Tank Rehab 2009
Removal of old Alum tank 2010
Removal of old Alum tank 2010
Removal of old Alum tank 2010
Air line before and after painting 2009
Air line before and after painting 2009
Concrete around plant
Catwalk over old concrete
Concrete around plant
Concrete around plant
Catwalk to # 3 digester 2011
Catwalk to get around return line 2011
Final clarifier rehab 2010
Final clarifier rehab 2010
Final clarifier rehab 2010
Northwest Lift station 2010
Northwest lift station 2010
Northwest lift station 2010
Northwest lift station 2010
Conference room old and new 2011
Conference room new 2012
Conference room new 2012
Conference room new 2012
Construction of new lab 2011
Construction of new lab 2011
Construction of new lab 2012
New Lab construction 2012
New Lab construction 2012
New Lab construction 2012
Removal of old lab trailer 2012
Removal of old lab trailer 2012
Removal of old lab trailer 2012
Area to grit chamber 2012
Stairs to grit chamber 2012
Area to Nitrification Towers 2012
Sidewalk to Nitrification Towers 2012