8/10/2019 Piles Method Statement http://slidepdf.com/reader/full/piles-method-statement 1/10  10 S1.)23 IC METHO T TEMENT Client: Donside Limited Date Produced:  Sept 2 3 Project: Environmental Improvement Revision No: Rev ‘A’ Works Title: Phase 2 Enabling Works Job No: SD2381C Drawing Ref:  2)  1 Scope of work Location: No. of operatives involved: Supervisor Name: Start Date: Duration: Scope: Donside, Aberdeen 8  10 Andy Smillie TBC 10 weeks  tbc) The installation of the phase 2 haul road as noted on SB A drawing reference J2807 -100 including retention system, soil nailing as hand picking of asbestos. 2. Control Measures > All operatives to have a site induction at first arrival to site and must sign in and out every day. All site operatives will also be required to undertake an Asbestos Awareness Training course prior to working on site, provided by atUKATA approved training provider. Whilst the works are not intended to ‘disturb’ asbestos, the widespread presence of asbestos  including asbestos insulation) in the vicinity of the work zone renders this a prudent course of action. Site Rules must be adhered to. The works will be under the daily control of a supervisor wh o has successfully completed the Demolition Supervisor course devised an d administered jointly by the National Federation of Demolition Contractors an d CITB. The supervisor will be the holder of a recognised First Aid training certificate. A suitably qualified asbestos analyst/project manager  from a UKAS accredited consultancy) will also be present throughout the works to carry out air testing an d to advise on an y observed presence or disturbance of suspected asbestos materials. > The site supervisor will monitor noise, dust and vibration and will implement additional control measures if deemed necessary. The PP E required for noise will also be dependent on the task involved. The asbestos analyst will also carry ou t an on -going programme of air monitoring for asbestos fibres. This will include reassurance  background) monitoring an d personal monitoring.

Piles Method Statement

Embed Size (px)

Citation preview

Page 1: Piles Method Statement

8/10/2019 Piles Method Statement

http://slidepdf.com/reader/full/piles-method-statement 1/10

  10

S1.)23 IC

METHO

T TEMENT

Client:

Donside Limited

Date

Produced:

 

Sept 2 3

Project: Environmental

Improvement

Revision No:

Rev

‘A’

Works

Title:

Phase

2 Enabling

Works

Job

No:

SD2381C

Drawing

Ref:  2)  1

Scope of

work

Location:

No.

of operatives

involved:

Supervisor Name:

Start Date:

Duration:

Scope:

Donside,

Aberdeen

8   10

Andy

Smillie

TBC

10

weeks

 tbc)

The installation

of the phase 2

haul road

as noted

on

SBA

drawing reference J2807

-100 including

retention

system,

soil

nailing as

hand picking

of

asbestos.

2.

Control Measures

>

Al l operatives

to

have

a

site

induction at

first

arrival

to

s it e and must s ign

in a nd out

every

day. Al l

site

operatives will

also

be

required to

undertake an Asbestos Awareness

Training

course

prior to working

on site, provided

by

at UKATA

approved training

provider.

Whilst the

works are not intended to

‘disturb’

asbestos,

the

widespread

presence

of asbestos

 including asbestos

insulation) in

the

vicinity

of

the

work

zone

renders this a

prudent course

of

action.

Site

Rules

must

be

adhered

to.

The

works

will

be

under the

daily control of a

supervisor

who has successfully

completed

the Demolition

Supervisor course

devised

and

administered

jointly

by

the

National

Federation

of

Demolition

Contractors and

CITB.

The

supervisor will

be

the

holder

of a

recognised First

Aid training

certificate.

A suitably

qualified asbestos

analyst/project

manager  from

a UKAS

accredited consultancy)

will

also be

present throughout

the

works

to carry

out a ir

testing

and to

advise

on

any

observed

presence

or disturbance

of

suspected asbestos

materials.

>

The

site supervisor will

monitor noise, dust

and

vibration and wil l implement additional

control

measures

if deemed

necessary.

The

PPE

required

for

noise

will

also

be dependent

on

the

task involved.

The asbestos

analyst will

also

carry

ou t an on -going

programme of

air

monitoring

for

asbestos fibres. This

will

include

reassurance

 background)

monitoring

and

personal

monitoring.

Page 2: Piles Method Statement

8/10/2019 Piles Method Statement

http://slidepdf.com/reader/full/piles-method-statement 2/10

 g

2

nf

 

Should any

approach be made to

Safedem

Operatives

voicing complaint during

the

course

of

these works, please

ensure that you

immediately report

this to

Site

Management

in

order that

it can

be

investigated

further and

verified.

 

All site

operatives will hold

a valid

and

up to date CSCS card.

Daily

weather

reports

are

to

be

taken

to check for

periods of

heavy

rain

which

ma y cause

the

adjacent

watercourse

to flood causing

flood

which poses

a risk to

operatives I works

on

the

phase

2 site.

Weather

will

also

be

monitored to

ensure

adverse

conditions

in

respect

of

asbestos

fibre risk

are

not

encountered

without

the

provision

of

adequate risk

control

measures. Such

adverse

conditions

would typically be dry,

sunny

and windy.

 

Only

suitably licensed

and

experienced

persons

will

be

used for

any asbestos

work and

ALL

asbestos will

be

removed to

a suitably licensed

landfill. All

asbestos works,

whether

deemed

to

be

categorised

as ‘Minor’

or ‘Major’

will be subject

to

separate risk

assessments

and method

statements

 RAMS .

A temporary herras fence l ine

should

be constructed

along the

route of the

river to ensure

no

operatives can

access the

watercourse

deliberately

or

accidentally from

the phase

2

site.

A

decontamination unit

will

be on site

for

the duration

of the

works

along

with all

relevant

coveralls and

face

masks

given

the

nature of the work.

All

personnel

will

have

been trained in

the

correct use of PPE  including

face

-fit tests for

RPE and in the

decontamination procedures.

A

full

site

induction wil l be g iven

to

all site personnel explaining

the nature

of the works

and the use of

the

decontamination works.

During

periods of asbestos

work no

un licensed

operatives will

be working in

that area.

All

machines

will

be

checked

daily for evidence

of damage

which may

lead to any

spillages

which may

cause

harm to the

river;

if

anything is noted

this

will

be

recorded and

rectified

before works

progress.

Vehicle cabs

will

also

be

periodically

air

tested

for

the

presence

of asbestos fibres.

Sepa’s

emergency

pollution

line phone

number will

be

given

to all

personnel

on

site

so

that

in

the unlikely

event

of pollution

occurring thi s can be

reported

immediately;

if this

situation

occurs works

will cease immediately.

Daily

air

monitoring will

be

carried

out

during

this phase

of

the

works

to ensure that

no

air

borne asbestos

fibres

are being

generated above

0.0 If/cc  i.e. the

‘clearance

indicator’ ;

if evidence

shows

that airborne fibres

are being

generated above

these levels,

works

will cease

immediately and the

area

will

be

fully

sealed

to allow

a

re

-evaluation by

the

specialist

contractor and

asbestos

analyst.

3.

Labour

 

Plant

 

The

following

is

the machines

etc

required to

safely

execute

the

works

covered under

this

Method Statement.

Page 3: Piles Method Statement

8/10/2019 Piles Method Statement

http://slidepdf.com/reader/full/piles-method-statement 3/10

Puge   0)

SD23 1C

• Hand

tools

JCB.330

• Wheeled shovel

• Compactors

• Hiabs

Chain

saws

• iNo Project

Manager

• 8No

Operatives

• Harnesses

• Machine

operator

• Banksmen

Specialized

LincensedAsbestos   ontractor

 

The

machine

operator will be suitably ticketed for the

operation of the relevant machines.

The machines hand

tools

on

site wil l be

fully maintained

and

in good working order.

All banksmen

will have the relevant t ickets for

the

tasks

being

undertaken.

 

All personnel

involved in

any

asbestos

removal

will

be

from

an HSE licensed asbestos

removal contractor and a

TJKAS

accredited

asbestos consultancy will

be

involved

in

scoping,

supervising

and testing

all

such works. As noted previously, all

such

work

will

be

subject to

separate RAMS.

All

personnel

using

chain

saws

will have the

relevant

tickets.

All machines are

to

be

hosed down clean at the

end of each

day.

All

harnesses have

to

be ful ly tes ted

and

passed

as

safe to use.

4.

Supervision

 

A

competent

Safedem

Project

Manager

wil l be allocated

on

site

for

the delivery

of

materials.

 

A

competent Safedem Site

Manager  Andy

Smillie) will supervise the

works

on a full

time

basis.

A competent

and

suitably licensed Asbestos

  ontractorwill have senior

management on

site

managing the asbestos aspects of the

works.

A suitably

qualified

asbestos

analyst/project

manager

 from a UK S

accredited consultancy)

will also be

present

throughout

the

works to

carry out

air testing and t o advi se

on any

observed

presence or

disturbance

of

suspected asbestos materials.

 

A

resident Engineer from SBA

 Scott

Bennett Associates) will

be

based on site at

appropriate

stages

during

the

works.

Page 4: Piles Method Statement

8/10/2019 Piles Method Statement

http://slidepdf.com/reader/full/piles-method-statement 4/10

Page 5: Piles Method Statement

8/10/2019 Piles Method Statement

http://slidepdf.com/reader/full/piles-method-statement 5/10

Page 6: Piles Method Statement

8/10/2019 Piles Method Statement

http://slidepdf.com/reader/full/piles-method-statement 6/10

la

ge

 

1

SD23

IC

On

com

pleti

on

o

f

this

exer

cise tes

ting wi

ll be

c

arrie

d

out

on “

gate   ” to a

llow

sui ta

ble

con f

irma

tion

to

b

e

prov

ided

tha

t

the

re

are

n

o asb e

stos

con

taini

ng ma te

rials

pr

esen

t.

A

fter

thi

s

the

soil

nail

s

over this g

ate wi

ll

be

s

et out

and m

  rked

an

d ins

talled by

a

s

peci

alist

contract

 a

detailed

meth

od

state

men

t

w

ill

b

e

pro

vided

for

th

is e lem

ent of

the

w

ork s

in

du

e

co

urse

 .

On

com

plet

ion

of

th

e

g

ate   s

oil na il

s

the

ex

cava

tion

for the

te

rr m

esh

wa

ll

ba

se uni

t will be

car

ried

out ;

al

l ma

teria

l

ex

cav

ated

o

ut w

ill be

rem

oved of

sit

e to

a sui ta

bly

lice

nse d

tip

depe

ndin

g

on the

p

re de

term

ined

cla

ssifi

catio

n

of the s

e

s

oils.

The

pr

efihl

ed

t

err m

esh units

wi

ll

the

n

be

lift

ed into p

ositi

on

an

d th

e r

eleva

nt b

ackf

ill

but

in p

lace

a

nd

com

pact

ed

to

loc

k

th

e te

rr m

esh

tails

in

posit

ion;

this

pr

oces

s

will

repe

at

u

nti l the

ter

rame

sh

wall is

con

stru

cted

3

ba

sket

s

h

igh

o

ver

gat

e  

An

y

lev

el dif

feren

ce bet

ween the pha

se

 

haul roa

d  nd th

e

g

  te  

pla

tform is to

be sw

eete

ned

o

ut

us ing

the

sam

e

b  ck

fill m

ateria

l wi t

h

t

his

“swe

eten

ing

ou t” o

ccur

ring

o

ver ha

lf the

leng th

of

g

ate   T

his all

ows the

m

achi

ne

to

saf

ely

track

along

gate

 

to

ga

in

ac

ces s

to

gat

e 2

Th

e abo

ve

sec

tion

w

ill

repe

at

t

hrou

gh

all

o

f th

e gat

es u

ntil

t

he

fu

ll le

ng th

of

ha

ul r

oad is

con

struc

ted

to

a l

evel th

at coi

ncide

s

wi th

3

ba

sket

s

hi

gh

on

the

t

erram

esh

wa

ll.

 

T

he m a

chin

e

w

ill th

en tra

ck b

ck

ont

o

th

e

pha

se

 

hau

l

r

oad

are

a;

from

th

ere

t

he

rem

ainde

r

of

the

te

rr m

esh

un

its wil

l

be

pl

ced

 

emp

ty

a

nd fi

lled wi

th clean stone i

nsitu

.

T

he

a

rea

behin

d

the

wa ll w

ill

al

so be

ba

ckfil

led

an

d

com

pacte

d

to

loc

k

th

e tail

s i

n

p

ositio

n;

this pr

oces

s

w

ill

repea

t

unti

l

th

e fu

ll heig

ht wa ll is c

omp

lete

on

ga

te

 

w

ith

the h

aul ro

ad in

po s

ition

at

tha t l

evel

.

The timb er

ba

rrier

rails will the n be construc ted over gate

 

to

complete th is

gat e.

 

Th

is pro

cess will ag

ain repe

at unti

l

the

fu

ll

lengt

h

of

haul ro

ad

is

c

omp

leted at i

ts

fini

shed le

vel.

 

The

tem

por

ary helTas fenc

e co

nstru

cted

alon

g the

riv

er

w

ill then

be

un

clipp

ed

b

y

o

pera

tives at

the

low

er

lev

el wh

o wil

l have su

itable

harne

sses

fi

xed

bac

k

in t

o

t

he

ter

ram

esh wall ; the fen

ce

pa

nels

will

t

hen b

e

l

ifted ove

r

  n

d o

nto

t

he ha

ul road are

a

w

here

they

w

ill

be

r

emov

ed 

6

Smo

king

Are

as

S

mok

ing

w

ill not

be p

erm

itted

on

the

site

 

nd wi

ll b

e

cont

ained to

the

d

esign

ated

smo

king

a

reas.

7

Fir

e

Poin

ts

Fi

re po

ints will

b

e

as d

etail

ed

in th

e s ite in

ducti

on .

8

PAT

Testing

Page 7: Piles Method Statement

8/10/2019 Piles Method Statement

http://slidepdf.com/reader/full/piles-method-statement 7/10

  nf

10

 

All

electrical equipment on s it e wil l have an

up

to

date pat test,

with certification available

for

view

in the

site

office.

9.

Site Parking

 

Site

parking will

be

in the a rea

noted on

the

attached drawing number

SK.OOl.

10.  ccess to the site

Access

to s it e wil l be

controlled

by

a gate man

situated

in

a

small gate

house cabin

located at

the site

entrance.

All

facilities will

be

available for the

gate

man to access

and use.

11. Site

Security

A sub

contract security f irm wil l be

used

for

over

night and weekend

security.

 

All

sub contract security

guards

used wil l be inducted to the site

rules

 

Welfare facilities

will

be

available for the

security

to

use.

12. Emergency arrangements

Method statements

to

be briefed

to all

operatives

and

once understood

a

method statement

briefing

sheet to be s igned

Emergency phone numbers

and the

address

of

the nearest hospital

are

obtained from the

site

notice

board

 Aberdeen

Royal

Infirmary

In case

of injury,

initial treatment should be

provided

by

site first

-aiders.

Injured

persons

requiring

further tre tment

should

be

taken to

Hospital,

by

either

site

transport, or

ambulance

 dial 999 .

Follow

Company Policy

requirements for

accident

reporting

Procedure.

High

standards of

housekeeping

and

site tidiness

must

be

maintained to ensure clear

access/egress

at

all

times, should the emergency services be required.

 

Unforeseen

exposure

to

asbestos

materials

will

be

controlled

by t he

asbestos training,

decont min tion arrangements

and presence of the UKAS

accredited consultancy

personnel,

who wil l adv ise on the

appropriate actions to

be taken.

13. First

  id

‘When the welfare is segregated from

the site, Information boards

and

first

aid boxes wil l be

placed

in

prominent positions

on

the

site.

Page 8: Piles Method Statement

8/10/2019 Piles Method Statement

http://slidepdf.com/reader/full/piles-method-statement 8/10

Page

8

of

1

SD238

IC

• Site office

• Site

canteen

• First aid and eye

wash station

• Site

location

First

aid

signage

with relevant

information will

also be placed on

information boards and

site

canteen

>

A weekly

check sheet

will

be

placed

in the

first aid

boxes

and

fil led in

by the Safedem

site

management

>

The

site

address

wil l be

clearly marked

on the

front

  each

first

aid box.

14.PPE

All

operatives

will be

in

possession

or have

access to

the

Following

• Hard Hats

• High Vis

Vests

or

Coats

Gloves suitable

for the

task

• Safety Boots

• Coveralls

 Tyvek

type

5 6

or other

impervious

material

On-nasal

masks P3 or

respirators

 P3 , as

deemed

appropriate

Written By

Name

Barry

Ward

Position

Technical

Manager

Signature

Date

Checked

By

Name

Andy

Smillie

Position

Contracts

Manager

Signature

Date

Page 9: Piles Method Statement

8/10/2019 Piles Method Statement

http://slidepdf.com/reader/full/piles-method-statement 9/10

 

Si 3S

Sinned

off

 y

Name

 ndy

Smillie

Position

Contracts

Manager

Signature

Date

I the

undersigned have had

the

attached

Method

Statement

pertaining to the

above

contract explained

to

me

Name

 

Operative Signed

Date

Page 10: Piles Method Statement