23
ATTACHMENT 3 TO ENTERGY LETTER 2.14.023 PILGRIM RELIEF REQUEST PRR-25 Calculation Cover Page EC # 49514 Pilgrim Salt Service Water Discharge Piping Elbow (JF29-8-4) Wall Thinning Stress Analysis Structural Integrity Associates Calculation No. 1400287.301, Rev. 0 (22 Pages)

Pilgrim, Salt Service Water Discharge Piping Elbow (JF29-8 ... the appropriate load combination piping resultant moments in a later calculation. The input files for the moment evaluation

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Pilgrim, Salt Service Water Discharge Piping Elbow (JF29-8 ... the appropriate load combination piping resultant moments in a later calculation. The input files for the moment evaluation

ATTACHMENT 3

TO ENTERGY LETTER 2.14.023

PILGRIM RELIEF REQUEST PRR-25

Calculation Cover Page EC # 49514

Pilgrim Salt Service Water Discharge Piping Elbow (JF29-8-4) Wall Thinning StressAnalysis

Structural Integrity Associates Calculation No. 1400287.301, Rev. 0

(22 Pages)

Page 2: Pilgrim, Salt Service Water Discharge Piping Elbow (JF29-8 ... the appropriate load combination piping resultant moments in a later calculation. The input files for the moment evaluation

ATTACHMENT 9.2 ENGINEERING CALCULATION COVER PAGE

Sheet 1 of 2

nI ANO-1 LI ANO-2 El GGNS E] IP-2 [I IP-3 El PLP

El JAF E PNPS E] RBS EL VY [I W3

LI NP-GGNS-3 LI NP-RBS-3

CALCULATION ()EC # 49514 J2) Page I of 2.2.

COVER PAGE

(3) Design Basis Calc. [-]YES [•NO (4) [N CALCULATION. El- EC Markup

(5) Calculation No: M1397 Ir) Revision: 0

(7) Title: Pilgrim Salt Service Water Discharge Piping Elbow (O) Editorial(JF29-8-4) Wall Thinning Stress Analysis D- YES NO(9) System(s): 29 (10) Review Org (Department):

(11) Safety Class: (12) Component/Equipment/StructureType/N umber:__________

Ej Safety / Quality Related PIpe/Nu F29 8-PIPE / JF29-8-4

D- Augmented Quality Program

E- Non-Safety Related

(13) Document Type: CALC

(14) Keywords (Description/Topical

Codes):

JF29-8-4, spool, SIA, Structural IntegrityAssociates, flaw, leak, rubber lining,1400287.301, 1400287

REVIEWS

(15) Name/Signature/Date (16) Name/Sigrnature/Date (17) Name/Signature/DateStructural Integrity Assoc. John A. Tucker , 3),IY See IAS

Responsible Engineer L--] Design Verifier Supervisor/ApprovalN Reviewer--El Comments Attached El Comments Attached

EN-DC-126 R005

Page 3: Pilgrim, Salt Service Water Discharge Piping Elbow (JF29-8 ... the appropriate load combination piping resultant moments in a later calculation. The input files for the moment evaluation

ATTACHMENT 9.3 CALCULATION REFERENCE SHEET

Sheet 1 of 3

CALCULATION CALCULATION NO: M1397REFERENCE SHEET REVISION: O0

I. EC Markups Incorporated (N/A to NP calculations)1.N/A2.3.4.5.I1. Relationships: Sht Rev Input Output Impact Tracking

Doc Doc Y/N No.1. Specification M300 2-12 109 x 0 N2. M100-7250 - 5 x 0 N3. _0 0_4. []0 05. 0 0 __

II1. CROSS REFERENCES:

1.PNPS Dwg M100-72502.ASME Code Case N-513-33.Flow of Fluids Through valves, Fittings and Pipe, Crane Co,., Technical Paper No.

4104.5.

IV. SOFTWARE USED:

Title: ANSYS Mechanical APDL and PrepPost Version/Release: 12.1x64, Nov2009 Disk/CD No. --

V. DISK/CDS INCLUDED:

Title: N/A Version/Release Disk/CD No.

VI. OTHER CHANGES:

EN-DC-126 R005

Page 4: Pilgrim, Salt Service Water Discharge Piping Elbow (JF29-8 ... the appropriate load combination piping resultant moments in a later calculation. The input files for the moment evaluation

V Structural Integrity Associates, Incy® File No.: 1400287.301Project No.: 1400287

CALCULATION PACKAGE Quality Program: Z Nuclear E] Commercial

PROJECT NAME:Pilgrim Leaking Elbow Evaluation Support

CONTRACT NO.:

10404807, Change Order No. 001

CLIENT: PLANT:Entergy Nuclear Pilgrim Nuclear Power Station

CALCULATION TITLE:Pilgrim Salt Service Water Discharge Piping Elbow (JF29-8-4 Spool) Wall Thinning Stress Analysis

Document Affected Project Manager Preparer(s) &Revision Pages Revision Description Approval Checker(s)

Signature &Date Signatures & Date

0A -1-16 Initial IssueA-I - A-2 - 2B-I - B-2

Eric Houston Richard BaxEJH 3/3/14 RLB 3/3/14

Jim WuJW 3/3/14

Page 1 of 16F0306-OI RI

Page 5: Pilgrim, Salt Service Water Discharge Piping Elbow (JF29-8 ... the appropriate load combination piping resultant moments in a later calculation. The input files for the moment evaluation

rStructural Integrity Associates, Inc!

Table of Contents

1.0 O BJECTIV E ......................................................................................................... 4

2.0 TECHNICAL APPROACH .................................................................................... 4

3.0 ASSUMPTIONS / DESIGN INPUTS ..................................................................... 4

4.0 900 ELBOW FINITE ELEMENT MODEL DEVELOPMENT ............................. 4

4.1 Geometry and Element Selection ................................................................. 4

4.2 Boundary Conditions ................................................................................... 5

5.0 RESULTS OF ANALYSIS ..................................................................................... 5

6.0 REFERENCES .................................................................................................... 6

APPENDIX A COMPUTER FILES ................................................................................ A-i

APPENDIX B JF29-8-4 SPOOL UT DATA ................................................................... B-1

File No.: 1400287.301Revision: 0

Page 2 of 16

F0306-01 RI

Page 6: Pilgrim, Salt Service Water Discharge Piping Elbow (JF29-8 ... the appropriate load combination piping resultant moments in a later calculation. The input files for the moment evaluation

CStructural Integrity Associates, Inc.0

List of Tables

Table 1: Membrane Stresses along the Elbow through the Leak Location ........................ 7

List of Figures

Figure 1:

Figure 2:

Figure 3:

Figure 4:

Figure 5:

Figure 6:

Figure 7:

Figure 8:

Figure 9:

Photo of UT Grid .................................................................................................. 8

Leak Location ........................................................................................................ 9

Model Geometry, Global View .......................................................................... 10

Model Geometry, Thinning View ........................................................................... 11

Finite Element Model ......................................................................................... 12

Loads and Boundary Condition Application for Global-Z Moment .................. 13

Total Hoop Stress Results due to In-Plane (Global-Z) Unit Moment ................. 14

Total Hoop Stress Results due to Out-of-Plane (Global-Y) Unit Moment ........ 15

Linearized Path Locations .................................................................................. 16

File No.: 1400287.301Revision: 0

Page 3 of 16

F0306-OIRI

Page 7: Pilgrim, Salt Service Water Discharge Piping Elbow (JF29-8 ... the appropriate load combination piping resultant moments in a later calculation. The input files for the moment evaluation

1f'Structural Integrity Associates, Inc!

1.0 OBJECTIVEA weeping flaw was identified in a 900 elbow at Pilgrim Nuclear Power Station. The leakage wasidentified in the Salt Service Water system, JF29-8-4 Spool [1]. Structural Integrity Associates (SI) wascontracted to demonstrate the suitability for continued operation of the leaking elbow using methodsconsistent with an upcoming revision of Code Case N-513-3 [2]. The objective of this calculation is todevelop a finite element model of the thinned elbow and determine the local stresses due to appliedbending loads.

2.0 TECHNICAL APPROACH

A finite element model (FEM) of the leaking elbow will be developed using the ANSYS finite elementsoftware program [3]. Unit moment loads will then be applied to the model and stresses in the localregion of the leak will be extracted for use in an evaluation of allowable through-wall flaw lengths,which will be documented in a later calculation.

3.0 ASSUMPTIONS / DESIGN INPUTSThe evaluated local thinning is from Reference [4] and is shown in Appendix B. The grid spacing is0.75 inch [4]. The thinning data point locations for the Reference [4] values are shown in Figure 1.

Design input for the 90' elbow is taken from Reference [1] unless noted otherwise.

" Elbow Type: long radius (R) = 1.5.(Nominal Pipe Size) = 27 inches" Outside diameter (OD): 18 inches* Nominal wall thickness (t): Schedule 20 pipe = 0.312 inches [5]" Elbow material: ASTM A-234, Grade WPB.

4.0 900 ELBOW FINITE ELEMENT MODEL DEVELOPMENTA three-dimensional (3-D) FEM of the 900 elbow is developed with the ANSYS finite element analysissoftware package [3].

4.1 Geometry and Element Selection

The three-dimensional finite element model is constructed using ANSYS 8-node SOLID45 structuralsolid elements. The region of ultrasonic (UT) measurement consists of eight (8) axial grid blocks bysixty-one (61) circumferential grid blocks [4]. Reference [4b] indicates that the axial grid is centeredacross the axial position of the leak (see Figure 1). The axial position of the hole, relative to the elbow isprovided in Reference [6] and shown in Figure 2. The remaining elbow region, which was not UTexamined is assumed to have a wall thickness equal to the nominal wall thickness of the pipe,0.312 inch.

File No.: 1400287.301 Page 4 of 16Revision: 0

F0306-0I R1

Page 8: Pilgrim, Salt Service Water Discharge Piping Elbow (JF29-8 ... the appropriate load combination piping resultant moments in a later calculation. The input files for the moment evaluation

VStructural Integrity Associates, Inc.!

An additional length of straight pipe is added to either end of the elbow in order to remove boundarycondition end effects from the areas of interest. The wall thicknesses of the additional lengths of pipeare modeled using nominal wall thickness, 0.312 inch.

The leak location that is shown in Figure 2 is modeled as a square hole that is approximately 0.674inches long axially by 0.464 inches long circumferentially. The elements originally modeled in the holeregion are deactivated via the ANSYS EKILL command. The deactivated elements have near-zerostiffness contribution to the structure. The hole center axially between the Row 4, Column AO andRow 5 Column AO UT data points [4b] (see Appendix B).

Figure 3 shows a global view of the FEM solid model geometry. Figure 4 shows a view of the thinningin the solid model geometry with a detailed view of the leak region. Figure 5 shows a global view of thefinal finite element model mesh. The ANSYS input files that generate the FEM are listed in Appendix A.

4.2 Boundary Conditions

Two separate moment loads are applied to the FEM; an arbitrary unit 10,000 in-lb moment in the plane(moment about the global-z) of the elbow and an arbitrary unit 10,000 in-lb moment out of the plane(moment about the global-y) of the elbow (torsion loading is not evaluated). For the evaluations, oneend of the attached piping is fixed in the axial and circumferential directions, and the CONTA 175 andTARGE170 ANSYS elements are used in the application of a pilot node to apply the moment loading tothe other free end of the attached piping. An example of the applied boundary conditions is shown inFigure 6.

The resulting peak hoop stresses in the elbow are shown in Figures 7 and 8 for the in-plane and out-of-plane moment loads, respectively. The resulting stresses from these moment evaluations will be scaledto the appropriate load combination piping resultant moments in a later calculation. The input files forthe moment evaluation are listed in Appendix A.

5.0 RESULTS OF ANALYSISLinearized stresses are extracted at each of the grid locations provided in Reference [4] along the axialpath of the elbow and through the leak location as shown in Figure 9. The extracted hoop membranestress due to two moment loads are stored in the Excel spreadsheet, Pilgrim-Results.xlsx, and the resultsare shown in Table 1.

The input files for the post-processing as well as the output files are listed in Appendix A.

File No.: 1400287.301 Page 5 of 16Revision: 0

F0306-01 RI

Page 9: Pilgrim, Salt Service Water Discharge Piping Elbow (JF29-8 ... the appropriate load combination piping resultant moments in a later calculation. The input files for the moment evaluation

ýkSlructural Integrity Associates, Inc.®

6.0 REFERENCES

1. Entergy Drawing No. Ml100-7250, Rev. E5, "Service Water System, E209N SSW BackwashDrain Piping," SI File No. 1400287.201.

2. ASME Code Case N-513-3, "Evaluation Criteria for Temporary Acceptance of Flaws inModerate Energy Class 2 or 3 Piping Section XI, Division I," Cases of ASME Boiler andPressure Vessel Code, January 26, 2006.

3. ANSYS Mechanical APDL and PrepPost, Release 12.1 x64, ANSYS, Inc., November 2009.

4. Email from John Tucker (Entergy) to Eric Houston (SI), "Subject: FW: JF29-4-8," dated 2/25/14,with attached files, SI File No. 1400287.20 1.

a) JF29-4-8 spool.JPG

b) Spool JF29 4 8 012.xls

5. Flow of Fluids Through Valves, Fittings and Pipe, Crane Co., Technical Paper No. 410, 1976.

6. Email from Roger Metthe (Entergy) to Eric Houston (SI), "Subject: Pilgrim Hole LocationSketch," dated 2/25/14, with attached file, SI File No. 1400287.201.

a) Pilgrim Hole Location Sketch.pdf

File No.: 1400287.301Revision: 0

Page 6 of 16

F0306-01 RI

Page 10: Pilgrim, Salt Service Water Discharge Piping Elbow (JF29-8 ... the appropriate load combination piping resultant moments in a later calculation. The input files for the moment evaluation

V Structural Integrity Associates, Inc!

Table 1: Membrane Stresses along the Elbow through the Leak Location

UT Data Thickness Membrane Hoop Stress, psi°Point", Inches (2) In-Plane (Global-Z) Out-of-Plane (Global-Y)Nominal 0.312 16 2

1, AO 0.352 17 252, AO 0.353 25 213, AO 0.361 21 61

4, AO(4) 0.051 352 1655, AO 4

1 0.064 281 526, AO 0.362 21 397, AO 0.343 36 238, AO 0.366 41 42

Nominal 0.312 16 3Notes:

1) See Figure 9 for layout of UT Data Points and Figure 4 for relative location on the elbow.2) UT data per Reference 4b and nominal thickness for 18 inch, Schedule 20 pipe.3) The unit moment loadings where applied in arbitrary directions and thus the stress reported here

are in terms of absolute values.4) The modeled hole is centered between these two data points.

File No.: 1400287.301Revision: 0

Page 7 of 16

F0306-01 R1

Page 11: Pilgrim, Salt Service Water Discharge Piping Elbow (JF29-8 ... the appropriate load combination piping resultant moments in a later calculation. The input files for the moment evaluation

CStructural Integrity Associates, Inc!

Figure 1: Photo of UT Grid

(From Reference 4a)

File No.: 1400287.301Revision: 0

Page 8 of 16

F0306-01 RI

Page 12: Pilgrim, Salt Service Water Discharge Piping Elbow (JF29-8 ... the appropriate load combination piping resultant moments in a later calculation. The input files for the moment evaluation

V Structural Integrity Associates, Inc!

T4,¢0•

Figure 2: Leak Location

(From Reference 6a)

File No.: 1400287.301Revision: 0

Page 9 of 16

F0306-O1RI

Page 13: Pilgrim, Salt Service Water Discharge Piping Elbow (JF29-8 ... the appropriate load combination piping resultant moments in a later calculation. The input files for the moment evaluation

CStructural Integrity Associates, Inc.®

MAT NM_

ANFEB 26 2014

15:26:57PLOT NO. 1

• ~Region of UT DataI

Figure 3: Model Geometry, Global View

File No.: 1400287.301Revision: 0

Page 10 of 16

F0306-OIRI

Page 14: Pilgrim, Salt Service Water Discharge Piping Elbow (JF29-8 ... the appropriate load combination piping resultant moments in a later calculation. The input files for the moment evaluation

VStructural Integrity Associates, Inc.!

ANFEB 26 2014

15:36:55PLOT NO. 1

-11.25inches

Figure 4: Model Geometry, Thinning View

File No.: 1400287.301Revision: 0

Page II of 16

F0306-OIRI

Page 15: Pilgrim, Salt Service Water Discharge Piping Elbow (JF29-8 ... the appropriate load combination piping resultant moments in a later calculation. The input files for the moment evaluation

W Structural Integrity Associates, Inc.!

ELE=S

PEAL NUM

ANFEB 26 2014

16:26:36PLIOT NO. 1

Figure 5: Finite Element Model

File No.: 1400287.301Revision: 0

Page 12 of 16

F0306-01 RI

Page 16: Pilgrim, Salt Service Water Discharge Piping Elbow (JF29-8 ... the appropriate load combination piping resultant moments in a later calculation. The input files for the moment evaluation

V Structural Integrity Associates, Inc.

ELENENSPFL NUM

ANFEB 26 2014

16:28:04PLOT NO. 1

Pilot --

Node

Circumferentialand Axial DOF

Constraints

Figure 6: Loads and Boundary Condition Application for Global-Z Moment

File No.: 1400287.301Revision: 0

Page 13 of 16

F0306-Oi R1

Page 17: Pilgrim, Salt Service Water Discharge Piping Elbow (JF29-8 ... the appropriate load combination piping resultant moments in a later calculation. The input files for the moment evaluation

Structural Integrity Associates, Inc.®

NWDAL SOLUTICN

STEP=-2SUB =1TIME=2SZ (AVG)RSYS=12DMX =.009007SWN =-1169SMX =891.661

ANFEB 27 2014

16:33:51PILT NO. 1

-----• Modeled Hole

-1169 -711.041 -253.126 204..789 662.704-939.998 -482.083 -24.168 433.746 891.661

Figure 7: Total Hoop Stress Results due to In-Plane (Global-Z) Unit Moment

(Units are in terms of psi)

File No.: 1400287.301Revision: 0

Page 14 of 16

F0306-01 R1

Page 18: Pilgrim, Salt Service Water Discharge Piping Elbow (JF29-8 ... the appropriate load combination piping resultant moments in a later calculation. The input files for the moment evaluation

rStructural Integrity Associates, Inc!

NODAL SOLUTICN

STEP=-ISUB =1TIM1=1Sz (AVG)RSYS=12DMX =. 00522SHN =-642.857SMX =658.506

ANFEB 27 2014

16:34:16PLOT NO. 1

---- '•Modeled Hole

-642.857 -353.665-4q,.2?61 -?2fl_ fq

-64.474 Rfl 122 224.718 513.91ýF~q_.314

Figure 8: Total Hoop Stress Results due to Out-of-Plane (Global-Y) Unit Moment

(Units are in terms of psi)

File No.: 1400287.301Revision: 0

Page 15 of 16

F0306-01 R1

Page 19: Pilgrim, Salt Service Water Discharge Piping Elbow (JF29-8 ... the appropriate load combination piping resultant moments in a later calculation. The input files for the moment evaluation

4 Structural Integrity Associates, Inc.®

LhINES

REAL NUMNominal: 0.312"

Hole Region

I Nominal: 0.3 12"

FEB 26 201416:44:08

PLOT NO. 1Location (8, AO): 0.366" 1

Location (7, AO): 0.343" 1

Location (6, AO): 0.362" 1

Location (5, AO): 0.064"I

Location (4, AO): 0.05 1" I1" |

I Location (3, AO): 0.361" 1

Location (2, AO): 0.353"

Location (1, AO): 0.3525

Figure 9: Linearized Path Locations

File No.: 1400287.301Revision: 0

Page 16 of 16

F0306-01R I

Page 20: Pilgrim, Salt Service Water Discharge Piping Elbow (JF29-8 ... the appropriate load combination piping resultant moments in a later calculation. The input files for the moment evaluation

r Structural Integrity Associates, Inc!

APPENDIX A

COMPUTER FILES

File No.: 1400287.301Revision: 0

Page A- I of A-2

F0306-01 R1

Page 21: Pilgrim, Salt Service Water Discharge Piping Elbow (JF29-8 ... the appropriate load combination piping resultant moments in a later calculation. The input files for the moment evaluation

rStructural Integrity Associates, Inc!

FILENAME DESCRIPTIONgeom-pil.inp ANSYS input file to generate finite element model.pilgrim.prn ASCI file called by geom-pil.inp containing UT data. Generated in

Excel spreadsheet Thickness Data.xls.load-pil-M.inp ANSYS input file to run two 10,000 in-lb moment evaluations.post-piI-M.inp ANSYS input file to extract linearized stress results for two

p10,000 in-lb moment evaluations.

Pilgrim-Unit-In.out Output file containing linearized stress results for 10,000 in-lbin-plane moment (about Global-Z) evaluation.

Pilgrim-Unit-Out.out Output file containing linearized stress results for 10,000 in-lbout-of-plane moment (about Global-Y) evaluation.

Thickness Data.xls Excel file with final UT data.Pilgrim-Resuits.xlsx Compilation of the linearized stress results.

File No.: 1400287.301Revision: 0

Page A-2 of A-2

F0306-OIRI

Page 22: Pilgrim, Salt Service Water Discharge Piping Elbow (JF29-8 ... the appropriate load combination piping resultant moments in a later calculation. The input files for the moment evaluation

V Slructural Integrity Associates, Inc!

APPENDIX B

JF29-8-4 SPOOL UT DATA

File No.: 1400287.301Revision: 0

Page B-1 of B-2

F0306-OIRI

Page 23: Pilgrim, Salt Service Water Discharge Piping Elbow (JF29-8 ... the appropriate load combination piping resultant moments in a later calculation. The input files for the moment evaluation

VStructural Integrity Associates, Inc.!

! • o• J• -J ;:] --F i i•5 d• ......... .................. i" ............ ....... . ..... .iIeI\3E e 9. E 0cm'' ___

" • ....... . .. ........ ................. . ." .... ...... ...... ....... ......... T °....... ... ........ ......... ,........ . .m;eaonj -) 1 -4--' II.:L

L!.bumlt ,'oe r"s..90......l•Jnet.• s, ,•o2. .....

Ipn r•rnt P .FM... .n mn', I'15tiumeitTa D'M 2 A Co0 11me JMItS N USvGY'23' "119v/In kl7Jm -A.n r om V-9c Ala-r ,n ~ 1

----....-T -....... ...... .

........ 1 - --.................. ...... .. ...... .... I......

S.. ....... .__-_ ....... .. ............. .rs l ,~ :0.00 __ 4'cl~r~I 0.03 :__I.A4 i33 AS 1,, V :0000 AL.:m r lar-tl 3(. ....... ............. . .... ... ...............inlr FAdH 0.lx2383. .

4E S R .. E".___!.... ... ....... ...... ......... ... . . . .. ...... . ................ ......... ............. ........... ...

•...,.• ..... :• :, ... .. .... .. ,- ,,,, ...... - •. ---------- • , '- T • T '-.... .... .... ... ..... ... .... .... .... ..... .............. . .... ..... ..... .... ... .... ........ . .. ...... .. ... .... .... ....... .... .... ....... .... .... ... ..... ... .... ... .... ..... .. .... ........ ... .... .... ...'Fe •a .! -Or A:!i. r.......-. ' I...ll...l. -............................... . ......Z.... .iv ini um v-m r inn.......... .. .. .............. ...... .......

' l l.r n ..... ..l.".. i.. . .. I . ... .. ...

,,-/,lrnu- .l, nr o 7.-,~ ~~ I -I . ..

..................

'I................

*.7'ATI AC I R- IL r. I F. F. I- .-l M" I N" I

E I C3,18 I 03B I C(3E3 3.E.6 I 57I 3.57 I 3.5I I5 3377 I3.576 1 3.37,1 0.36? 1 0.387 0368 1 0.3384 (351 03 3 CM0 3.569f I r 11364 r J wk; I c .FA

1 I 1 C E 1).E 13.33C( 0.32~ 1 ~ j~ 0.8 06 0.3831 77 I 1.1ý I FF I 1IRF n 177 I n 7ý I 113t3 I nu?

I 353 0 357 1 C 34 I 3.c7 (I78 I 3.c7E I 3.1EI 3.332 1. 3.5. 1.3311 0.3751 0.3711 03731 0.372

L U FI UJ .' 1 U.5 I J. 14 L ' t/5 L UL J.LL1 L1 JZ L J.m U.J ;e U.Jil uws I UJ uI .F n 3 I n113,4) I 3( 1774 I,73 " I " 17 1 1 1831-r 1 I7" 1F 77 11 377 n.375 I 137

. .. ... .......... ..... ................ ... .. .... ... . ........... .. .. ..

i _ -- _ " I -I_.. ..................... . ........ ....... . . ............ ............. ......... i..o.... ..... o... ........- ... i .

U.J:S VUiu: I UJti UlJ I I 1-41' 1 JA1'j I UA.-I1F-UJ,: IJ4 I~ici

11 37 I fl37q I nv:L 113m I r4111 I 114ml I r4r7 I 4"7 I r4m i zi;ln I fl-CA 1~7 1 147l1 1&)7 1477~ I 1477t I 114210.372 0383 1 0383 0393 1 (464 1 0407, C414 (42" (419 3A26 0A•'I 3-38 ] 3A4 3-2-E 3.42- 0.-2 0.423U.I UJUJ UjUi U J'UiJ LL1J1J U4LL L412 L414 j Lc J.lI JA 1. 1U2U JiL J1 J4L J-J/ JA42' U•' U' "-

I2 n77 n[ w1 n,3 r14n" n J 14 1-41 41 MIR r47'? lFF 57 1R 1,77 ].f I J2 1,1 147 1 n77 I 4,'21

AP A= I Ar; At" A I .441 AlC 397L UJUC 93o

A'A Al, .4-1 1 AP -4171 Ar I AF AT A.]

0/3" 1 032 1 0393 0388 I 0389 z0393a C(89 F C 309 I O.,.I C3-17 F" EE 1I 3.31 3.5 1-6 0.327 3.331F0h

0-Q33 0393 0383 1 0382 1 0383 1 0389 1 C388 I C392 C ICSI 1352 1 02i:2 I C 32 I3.882 1 1334 1 ).39 1 0.292- 3.317

F. RI- RI3.5-i1 (.558341 32

UJ-'S I UiiJ. I U.J4i I 111144 I UIJ45 1 1111e L U 'IU UILJJL UZU L 6J I J.1LLYI L.4J0.328 0332 0.338 0343 03431 0339 0337 (227 C(55 (331 .556 (356 3.559 C.5-1-1013"3 0323 0.333 1034 0332 0329 033 1 C336 I 55 4 331 8.556 4C 356 3.510 (.51959321 1n331 "1 37 5133 11347 11N4" 11333 rmi I 7 I7 77F 133 57.71 p37n1 77;-16 77.33

File No.: 1400287.301Revision: 0

Page B-2 of B-2

F0306-01 RI