PIPELINE CDBM PIPELINE SIZ E SERVICE LENGTH PLATFORM STATUS PL-41 10” Flowline 1.83km BNJT-F – BNP-B Ongoing PL-188R 6” Gas Lift 1.398 km TKDP-A – TKJT-E Completed PL-189R 6” Gas Lift 0.946 km TKDP-B – TKJT-G Completed PL-193R 6” Gas Lift 0.929km TKDP-B – TKJT-C Completed PL-194R 6” Gas Lift 0.440km TKJT-C – TKJT-D Completed PL-197R 6” LP Flowline 0.427km TKJT-D – TKJT-C Completed PL-199R 6” LP Flowline 1.4km TKJT-E – TKDP-A Completed PL-200R 6” Gas Lift 0.494km TKJT-E – TK-3 Completed PL-202R 6” LP Flowline 1.576km TKJT-F – TKP-A Completed PL-203R 6” Flowline 0.66km TKJT-G – TKDP-B Completed PL-206R 6” Gas Lift 1.639km TKP-A – TKJT-F Completed PL-211R 6” Gas Lift 1.226km TKP-A – TKP-B Completed PL-218 6” Gas Lift 1.112km WL-123 – WLDP-B Ongoing PL-220 6” Gas Lift 1.224km WLP-A – WL-4 Ongoing PL-221 6” Gas Lift 0.551km WLDP-A – WL-123 Ongoing PL-222 6” LP Flowline 1.5km WLDP-B – WLDP-A Ongoing PL-225 6” LP Flowline 1.572km WLDP-B – WLDP-A Ongoing PL-232 6” Gas Gathering 12.383km WLP-A – MCOT Ongoing PL-238 6” Gas Lift 0.454km WL-4 – WLP-C Ongoing PL-367 (PL- 178) 8” Oil Gathering 10.7km TEP-A – TEP-B Completed PL-381 (PL- 210) 10” Oil Gathering 20.6km TKP-A – WLDP-C Completed PL-387 (PL- 77) 12” Oil Gathering 20.2km D18MP-A – BYR-A Ongoing

Pipeline Cdbm List b1

  • Upload
    asyraf

  • View
    216

  • Download
    1

Embed Size (px)

DESCRIPTION

aa

Citation preview

PIPELINE CDBM

PIPELINE

SIZE

SERVICE

LENGTH

PLATFORM

STATUS

PL-41

10

Flowline

1.83km

BNJT-F BNP-B

Ongoing

PL-188R

6

Gas Lift

1.398 km

TKDP-A TKJT-E

Completed

PL-189R

6

Gas Lift

0.946 km

TKDP-B TKJT-G

Completed

PL-193R

6

Gas Lift

0.929km

TKDP-B TKJT-C

Completed

PL-194R

6

Gas Lift

0.440km

TKJT-C TKJT-D

Completed

PL-197R

6

LP Flowline

0.427km

TKJT-D TKJT-C

Completed

PL-199R

6

LP Flowline

1.4km

TKJT-E TKDP-A

Completed

PL-200R

6

Gas Lift

0.494km

TKJT-E TK-3

Completed

PL-202R

6

LP Flowline

1.576km

TKJT-F TKP-A

Completed

PL-203R

6

Flowline

0.66km

TKJT-G TKDP-B

Completed

PL-206R

6

Gas Lift

1.639km

TKP-A TKJT-F

Completed

PL-211R

6

Gas Lift

1.226km

TKP-A TKP-B

Completed

PL-218

6

Gas Lift

1.112km

WL-123 WLDP-B

Ongoing

PL-220

6

Gas Lift

1.224km

WLP-A WL-4

Ongoing

PL-221

6

Gas Lift

0.551km

WLDP-A WL-123

Ongoing

PL-222

6

LP Flowline

1.5km

WLDP-B WLDP-A

Ongoing

PL-225

6

LP Flowline

1.572km

WLDP-B WLDP-A

Ongoing

PL-232

6

Gas Gathering

12.383km

WLP-A MCOT

Ongoing

PL-238

6

Gas Lift

0.454km

WL-4 WLP-C

Ongoing

PL-367 (PL-178)

8

Oil Gathering

10.7km

TEP-A TEP-B

Completed

PL-381 (PL-210)

10

Oil Gathering

20.6km

TKP-A WLDP-C

Completed

PL-387 (PL-77)

12

Oil Gathering

20.2km

D18MP-A BYR-A

Ongoing