PIPELINE CDBM
PIPELINE
SIZE
SERVICE
LENGTH
PLATFORM
STATUS
PL-41
10
Flowline
1.83km
BNJT-F BNP-B
Ongoing
PL-188R
6
Gas Lift
1.398 km
TKDP-A TKJT-E
Completed
PL-189R
6
Gas Lift
0.946 km
TKDP-B TKJT-G
Completed
PL-193R
6
Gas Lift
0.929km
TKDP-B TKJT-C
Completed
PL-194R
6
Gas Lift
0.440km
TKJT-C TKJT-D
Completed
PL-197R
6
LP Flowline
0.427km
TKJT-D TKJT-C
Completed
PL-199R
6
LP Flowline
1.4km
TKJT-E TKDP-A
Completed
PL-200R
6
Gas Lift
0.494km
TKJT-E TK-3
Completed
PL-202R
6
LP Flowline
1.576km
TKJT-F TKP-A
Completed
PL-203R
6
Flowline
0.66km
TKJT-G TKDP-B
Completed
PL-206R
6
Gas Lift
1.639km
TKP-A TKJT-F
Completed
PL-211R
6
Gas Lift
1.226km
TKP-A TKP-B
Completed
PL-218
6
Gas Lift
1.112km
WL-123 WLDP-B
Ongoing
PL-220
6
Gas Lift
1.224km
WLP-A WL-4
Ongoing
PL-221
6
Gas Lift
0.551km
WLDP-A WL-123
Ongoing
PL-222
6
LP Flowline
1.5km
WLDP-B WLDP-A
Ongoing
PL-225
6
LP Flowline
1.572km
WLDP-B WLDP-A
Ongoing
PL-232
6
Gas Gathering
12.383km
WLP-A MCOT
Ongoing
PL-238
6
Gas Lift
0.454km
WL-4 WLP-C
Ongoing
PL-367 (PL-178)
8
Oil Gathering
10.7km
TEP-A TEP-B
Completed
PL-381 (PL-210)
10
Oil Gathering
20.6km
TKP-A WLDP-C
Completed
PL-387 (PL-77)
12
Oil Gathering
20.2km
D18MP-A BYR-A
Ongoing