Pipeline Infrastructure Pipeline Infrastructure ManagementManagement

The Hague March 9th

Page 2: Pipeline Infrastructure Management - UNECE

GasunieGasunieGasunie

Presentation on:

• Pipeline Infrastructure Management

by Gasunie

• Key Performance Indicators

Presentation on:Presentation on:

•• Pipeline Infrastructure Management Pipeline Infrastructure Management

by Gasunieby Gasunie

•• Key Performance IndicatorsKey Performance Indicators

The Hague, March 9thThe Hague, March 9thThe Hague, March 9th

Page 3: Pipeline Infrastructure Management - UNECE

Gastransport in the Netherlands

Page 4: Pipeline Infrastructure Management - UNECE

Pipeline Management SystemPipeline Management Systemmore than Integrity alonemore than Integrity alone

Page 5: Pipeline Infrastructure Management - UNECE

Pipeline Management

SafetySafetySafety

CostCostCost ReliabilityReliabilityReliability

IntegritymanagementIntegrityIntegritymanagementmanagement

RiskManagementRiskRiskManagementManagement

Client needClient needClient need

Safety of the Public, Employees, and the EnvironmentReliability for Customers and SuppliersCost minimization while maintaining Safety and Reliability

Safety of the Public, Employees, and the EnvironmentSafety of the Public, Employees, and the EnvironmentReliability for Customers and SuppliersReliability for Customers and SuppliersCost minimization while maintaining Safety and ReliabilityCost minimization while maintaining Safety and Reliability

PMPMPM

Page 6: Pipeline Infrastructure Management - UNECE

Constr. specsMainten. SchedContract cond

DevelopingPolicy

DevelopingStrategy

Implementation

Verification &Evaluation

Construction &Modification

Maintenance

SLA

InventarisationOpportunities

ThreatsChallenges

R&DMeansPM Policy

FFP SystemRequiredavailability

LegislationSensoring

GU policyRequirementsof planning& sales

Standards

Studies

Pipeline ManagementPipeline ManagementPipeline Management

KPI’s

Page 7: Pipeline Infrastructure Management - UNECE

DevelopingPolicy

LegislationSensoring

GU policyRequirementsof planning& sales

Pipeline ManagementPipeline ManagementPipeline Management

PM Policy:• Life Cycle Cost –based design,

construction and maintenance

• Cover all threats

• Deal with threats proactively

• Maintain (national) risk standards

• Set performance targets

• Involvement in EU legislation & Normalisation

PM Policy:PM Policy:

•• Life Cycle Cost Life Cycle Cost ––based design, based design, construction and maintenanceconstruction and maintenance

•• Cover all threatsCover all threats

•• Deal with threats proactivelyDeal with threats proactively

•• Maintain (national) risk standards Maintain (national) risk standards

•• Set performance targetsSet performance targets

•• Involvement in EU legislation & Involvement in EU legislation & NormalisationNormalisation

Page 8: Pipeline Infrastructure Management - UNECE

DevelopingPolicy

InventarisationOpportunities

ThreatsChallenges

Opportunities

LegislationSensoring

GU policyRequirementsof planning& sales

Studies

Pipeline ManagementPipeline ManagementPipeline Management

Threats (Technical)

Design & Construction :Design failuresDelay in constructionMaterial and / or construction failures

Operations: Damage caused by third partyAgeing in generalCoating degenerationDefects / breakdownsCorrosion and fatigue(to) high insurance claims(unnecessary) Re-routing(to) high costs of maintenance

Abandonment:high costsenvironmental problems

Threats (Technical)Threats (Technical)

Design & Construction :Design & Construction :Design failuresDesign failuresDelay in constructionDelay in constructionMaterial and / or construction failuresMaterial and / or construction failures

Operations: Operations: Damage caused by third partyDamage caused by third partyAgeing in generalAgeing in generalCoating degenerationCoating degenerationDefects / breakdownsDefects / breakdownsCorrosion and fatigueCorrosion and fatigue(to) high insurance claims(to) high insurance claims(unnecessary) Re(unnecessary) Re--routingrouting(to) high costs of maintenance(to) high costs of maintenance

Abandonment:Abandonment:high costshigh costsenvironmental problemsenvironmental problems

Page 9: Pipeline Infrastructure Management - UNECE

Cause (percentage)

62 2 1 1

59

74

0

10

20

30

40

50

60

70

80

EI EC IC

GWD

MD

OUND

THER NK

Page 10: Pipeline Infrastructure Management - UNECE

DevelopingPolicy

DevelopingStrategy

InventarisationOpportunities

ThreatsChallengesDemands

MeansPM Policy

LegislationSensoring

GU policyRequirementsof planning& sales

Standards

Studies

Pipeline ManagementPipeline ManagementPipeline Management

Page 11: Pipeline Infrastructure Management - UNECE

Constr. specsMainten. SchedContract cond

DevelopingPolicy

DevelopingStrategy

Implementation

Construction &Modification

Maintenance

SLA

InventarisationOpportunities

ThreatsChallengesDemands

MeansPM Policy

FFP SystemRequiredavailability

LegislationSensoring

GU policyRequirementsof planning& sales

Standards

Studies

Pipeline Management

Pipeline Pipeline ManagementManagement

Implementation in 2 sub-processes:4a. Construction & Modification4b. Maintenance

• Integrity management• Right of way management

Implementation in 2 subImplementation in 2 sub--processes:processes:4a. Construction & Modification4a. Construction & Modification4b. 4b. MaintenanceMaintenance

•• Integrity managementIntegrity management•• Right of way managementRight of way management

Page 12: Pipeline Infrastructure Management - UNECE

Constr. specsMainten. SchedContract cond

DevelopingPolicy

DevelopingStrategy

Implementation

Construction &Modification

Maintenance

SLA

InventarisationOpportunities

ThreatsChallengesDemands

MeansPM Policy

FFP SystemRequiredavailability

LegislationSensoring

GU policyRequirementsof planning& sales

Standards

Studies

Integrity Management:

Right of way • Mobile inspections (walk, drive, fly)• Supervision “Third party jobs”

(KLIC)• Preventive measures

IntegrityCorrosion prevention

• Cathodic Protection• Coating (primary protection)• Stray currents drainage

Inspections of condition

• Intelligent Pigging• CP control measurements• Coating inspections

Integrity Analysis• (Direct) Assessment

Integrity ManagementIntegrity Management::

Right of way Right of way •• Mobile inspections (walk, drive, fly)Mobile inspections (walk, drive, fly)•• Supervision “Third party jobs” Supervision “Third party jobs”

(KLIC)(KLIC)•• Preventive measures Preventive measures

IntegrityIntegrityCorrosion preventionCorrosion prevention

•• CathodicCathodic ProtectionProtection•• Coating (primary protection)Coating (primary protection)•• Stray currents drainageStray currents drainage

Inspections of conditionInspections of condition

•• Intelligent PiggingIntelligent Pigging•• CP control measurementsCP control measurements•• Coating inspectionsCoating inspections

Integrity AnalysisIntegrity Analysis•• (Direct) Assessment(Direct) Assessment

Page 13: Pipeline Infrastructure Management - UNECE

Pipeline ManagementPipeline Management

Marcogaz self regulation of the branch

Normalization in CEN and ISO– EN 1594 – TS 15173 – TS 17174

Marcogaz documents(website for information)

Page 14: Pipeline Infrastructure Management - UNECE

DevelopingDeveloping KPI KPI methodologymethodology

SMS presents in the European Gas Transmission Industry generally the same fundamental structure (Plan, Do, Check and Act).

Principles and the architecture philosophy followed for the SMS are described in a document issued by the IGU (2003) (reference)

Page 15: Pipeline Infrastructure Management - UNECE

PIMS

PLAN

DO

CHECK

ACT

SMS

PERFORMANCEINDICATORS

The global process guarantees the system’s coherency by managing the loop.

In the global process an important role is played by the Performance Indicators that shall support the Operator in measuring and monitoring the implementation of environmental and safety policieson a regular basis in order to plan the achievement of safety objectives.

The management loopThe management loop

Page 16: Pipeline Infrastructure Management - UNECE

Fail of MARKERS

Fail of CONTROL

ZONE

FailONE CALL SYSTEM

Fail of PERIODICAL

SURVEYUnespected works

Work not detected

THIRD PARTY INTERFERENCE

Bow tie model

Page 17: Pipeline Infrastructure Management - UNECE

Fault Tree Pipeline IncidentExternal Interference

(DRAFT)

Damageto the pipe

Damageresistance

thoughnesshoop stress levelsteelgradewallthicknessint. pressure reductiondesign pressuredefect area sizeprotective measurediameter ?depth of covernorm. CP protectionexternal stresses

constructionnearby pipe

one callsystem(KLIC)

Markersaerial surveysurveuillance RT possible

coatingdefectafter survey

aerial surveyno one call

(KLIC)

ML defect afterexcavation pressure

reductionimpact machinerydept of coverone call procedure

aerial survey during construction workunknown load & ground movement

ground movementload to the pipetracé controldrawing control (z)zet&zak measurements

PotentialLeakage

Leakageresistance

thoughnesswallthicknessint. pressurecrack arrestorsstress levelaxial load

Ignitionprohibitors

zoning (IR+GR)yellow cardinform firefighters/police/ambulance to keepdistances

CalamityControl

pressure reductionblockvalve (auto CCP)blockvalve (manually)gasflow // pipeline notblockedenclose calamity area

Heatradiation

Gas outflow

insufficient CPCP control measurements

mal functioningCP components

CP investigation & repair

Coating defect(DCVG, CIPS, Pearson)

Corrosive atmosphere(pH, soil type, Rsoil )

trained peoplecheck listyellow card (OEC 4.08) per diameter

duty scheduleeducationexercisestrainingmotivation

constructiontrained constr. workerstrench fillcoating surveyCP controlopdruk proef

materialinspection (FP)GTS specs

quality controlGTS specshydrostatic testingdeviation reports

APH10092004

Overige Maatregelenpcouponsgascompositiondew pointsoil investigations pH, SRBpipeline shop inspectionsgeo /caliber / gyro pigpressure safeguarding (monitoring/alarming/registering)dust/sand/fluids in scrubberspressure cyclestemperature profiles

Chance of apipeline failure

mfl piggingdefectassessment

pressure reductionimmediate repairout of orderrehab. scheduling

lackof CP

unexpectedwork

not detectedwork not detected

work ML defect non-criticalML defect

knowndefect

corrodingdefect

trainedpeople &proceduresinplace

1 coating defect2 CP defect3 non crit. ML-defect4 gouge or dent5 gouge in a dent6 crit. ML-defect

4A

dam

age

7 pinhole / crack8 small hole9 large hole

10 rupture11 propagated rupture

4B

leak

age

lifepropertycontainmenttransp. Routecapacityimage

loss

of 3p

Gu

KPI?

KPI?

KPI?KPI?

BE: Unexpected work

BE: Insufficient CP

IE: PIPELINE DAMAGEIE: GAS OUTFLOW

KPI?

TE: CALAMITY