International Blvd. TOD Plan Plan Overview Plan Overview February 2011 1

Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

International Blvd. TOD PlanPlan OverviewPlan Overview

February 20111

Page 2: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

What is Transit-Oriented Development (TOD)

Mixed-use projects centered around a transit resource thataround a transit resource, that creates areas that are:- Sustainable/green

W lk bl / t / i fill- Walkable / compact / infill- Mixed use where feasible- Diverse (income, age, family size)

H lth- Healthy

Considers:- Population growth- Population growth- Demographics- Global warming - Water supplyWater supply- Health services- Transportation Infrastructure

2

Page 3: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Project Purpose

Identify a long-term visiony g

Examine opportunities for developing TOD Projects along International Boulevardg

Lay the foundation for implementing TOD Projects at appropriate locationspp p

Identify a variety of flexible & far-reaching actions to implement the TOD Planp- Private investment- Public funds over time

C it b d i ti- Community-based organizations

3

Page 4: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Planning Team

City of Oakland (project lead)

CalTrans

TransForm & Oakland Community Organizationsy g

Consultant Team- Raimi + Associates (project management; land use; health)(p j g ; ; )

- Sargent Town Planning (urban design)

- Conley Consulting Group (market, economic and housing)

- Nelson\Nygaard (transit)

- Dowling (traffic modeling)

Community Advisory Committee

Technical Advisory Committee4

Page 5: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

55

Page 6: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Outreach &Participation

5 Community Advisory Committee (CAC) M ti(CAC) Meetings

Community Workshops- Workshop #1: September 2010

- Workshop #2: October 2010

- Workshop #3: January 2011- Workshop #3: January 2011

5 Focus Group meetings

SStakeholder interviews and discussions

Outreach to community groupsOutreach to community groups

Meetings with public agencies6

Page 7: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Key Issues

Crime & prostitutionCrime & prostitution

Unattractive & dirty streets and sidewalks

Run down & abandoned buildings

Lack of grocery stores, retail & banksLack of grocery stores, retail & banks

Traffic congestion

Pedestrian safetyPedestrian safety

Need for a diversity of quality & affordable housingg

Lack of jobs & economic opportunity

7

Page 8: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Community Assets

Diverse ethnicitiesDiverse ethnicities

Strong social-service organization presence

Affordable housing

Rich historyRich history

Engaged & active citizenry

Close to frequent transit service

8

Page 9: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Vision

“O ti d b ildi th f l“Over time, and building on the successful

implementation of AC Transit’s proposed Bus Rapid

Transit (BRT) system, International Boulevard will

b t f d f f tt i lbe transformed from a forgotten regional

thoroughfare with significant crime issues into a

beautiful, attractive “main street” for the adjacent

neighborhoods ”neighborhoods….”

9

Page 10: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Guiding Principles

1. Focused TOD as A Catalyst for Positive ChChange

2. A Safe and Healthy Community

3 Buildings That Support Transit and the3. Buildings That Support Transit and the Public Realm

4. Transportation Choices

5. Beautiful, Attractive Streets

6. Foster Jobs and Economic Development

7. Support the Neighborhoods’ Need for Goods and Services

8 A Citizenry That is Engaged in Its Future8. A Citizenry That is Engaged in Its Future

9. A Celebration of Ethnicity and Culture

10

Page 11: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Sit #1 22nd d I t ti lSite #1 – 22nd and International11

Page 12: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Sit #1 22nd d I t ti lSite #1 – 22nd and International12

Page 13: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Sit #1 22nd d I t ti lSite #1 – 22nd and International13

Page 14: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Sit #1 22nd d I t ti lSite #1 – 22nd and International14

Page 15: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Sit #1 22nd d I t ti lSite #1 – 22nd and International15

Page 16: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Sit #2 57th d I t ti lSite #2 – 57th and International16

Page 17: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Sit #2 57th d I t ti lSite #2 – 57th and International17

Page 18: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Sit #2 57th d I t ti lSite #2 – 57th and International18

Page 19: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Sit #2 57th d I t ti lSite #2 – 57th and International19

Page 20: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Sit #3 81st d I t ti lSite #3 – 81st and International20

Page 21: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Sit #3 81st d I t ti lSite #3 – 81st and International21

Page 22: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Sit #3 81st d I t ti lSite #3 – 81st and International22

Page 23: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Sit #3 81st d I t ti lSite #3 – 81st and International23

Page 24: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Sit #3 81st d I t ti lSite #3 – 81st and International24

Page 25: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Sit #4 104th d I t ti lSite #4 – 104th and International25

Page 26: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Sit #4 104th d I t ti lSite #4 – 104th and International26

Page 27: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Sit #4 104th d I t ti lSite #4 – 104th and International27

Page 28: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Sit #4 104th d I t ti lSite #4 – 104th and International28

Page 29: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Plan Structure

Introduction

Existing conditions

History of the processHistory of the process

Vision and guiding principles

Sub area plansSub-area plans

Design guidance

Implementation recommendationsImplementation recommendations

Implementing the vision

D t il d t t ti d tiDetailed transportation recommendations

29

Page 30: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Sub-Area Plans

30

Page 31: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

5 Sub-Area Plans

Existing Conditions – More detailed & sub-area specific.

Key Issues – Lists key issues identified by the community.

Vision – A forward-looking statement.Vision A forward looking statement.

Sub-Area Recommendations – Stakeholder- and community-identified strategies to help achieve the sub-y g parea vision

Community Priorities – Lists of the land uses and physical improvements most desired by the community for the sub-area.

TOD C t l t A E h b ’ TOD t l tTOD Catalyst Areas – Each sub-area’s TOD catalyst areas where resources should be focused

31

Page 32: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

San Antonio (14th to 23rd)

Vision: “the San Antonio Sub-area will be transformed into i hb h d i t d i d id th t b ilda neighborhood-oriented mixed use corridor that builds on

the diverse ethnicities in the San Antonio neighborhoods.”

Priorities- Affordable housing- Family housingFamily housing- Senior housing- Full-service bank or credit union

S- Small-scale supermarket- Add resources to address prostitution- Add street lightingg g- Increase police presence

32

Page 33: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Fruitvale (23rd to 51st)

Vision: “the thriving commercial corridor on International B l d b t f i t l F it l ABoulevard between from approximately Fruitvale Avenue to 38th Avenue and the nationally-renowned Fruitvale Transit Village – Fruitvale will once again become the g g“second downtown” of the City of Oakland.”

Priorities- Entertainment uses- Art galleries and cultural spaces

Ad lt d ti d/ j b l t t- Adult education and/or job-placement center- Affordable housing- Senior housing- Take steps to address prostitution- Increase the police presence in Fruitvale

33

Page 34: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Hegenberger (69th to 86th)

Vision: “The Hegenberger Sub-area will continue to evolve f il i t d id t i i i i las a family-oriented corridor containing various social

services, and will be supported by neighborhood-serving retail.”

Priorities- Grocery storey- Bank- Neighborhood-serving retail and services- Senior centerSenior center- Add parks and open spaces- Add a recreation center/gymnasium

Add t dd tit ti- Add resources to address prostitution- Address truck traffic- Improve pedestrian crossings

34

Page 35: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Havenscourt-Lockwood (51st to 69th)

Vision: “Over time, the Havenscourt-Lockwood Sub-area ill b t f d i t b tif l d t i i t dwill be transformed into a beautiful, pedestrian-oriented

corridor with a diversity of uses. The focal point of activity will be around the TOD Catalyst Area between 51st and y57th Avenues.”

Priorities- Supermarket- Adult education or job-placement center

E l t- Employment uses- Bank- Art galleries and cultural spaces- Limit liquor stores- Add street lighting

35

Page 36: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Elmhurst (86th to Durant)

Vision: “enhance the Sub-area as a small-scale retail street th t it li it l ti D t S iththat capitalizes on its location near Durant Square, with a focus on development in the TOD Catalyst Area between 94th and 104th Avenues.”

Priorities- Grocery storeGrocery store- Bank- Arts and entertainment uses

N i hb h d i t il d i- Neighborhood-serving retail and services- Regular street and sidewalk cleaning- Increase code enforcement activities- Add pedestrian amenities- Improve pedestrian crossings

36

Page 37: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

TOD Catalyst Areas

Smaller areas within sub-areasSmaller areas within sub areas

Focus of initial resources

Improvements will spread outwards from these areas along the rest of the corridor

8 catalyst areas identified along corridor

37

Page 38: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

TOD CatalystTOD Catalyst Areas

38

Page 39: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Implementation Recommendations

Focus resources in TOD Catalyst Areas (#1)

Address criminal activity (#2)

Improve the physical appearance of the corridor (#3)

Improve the pedestrian environment (#4)

Build partnerships and work with the community (#11)

Enhance job access and training (#12)

Recruit and promote new uses (#13)

Celebrate arts, ethnicity and culture (#15)

39

Page 40: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Implementation Recommendations

Create clear TOD standards and guidelines (#5)

Streamline the environmental review process (#6)

Improve transit facilities (#7)

Improve the bicycle network (#8)

Create a comprehensive approach to parking (#9)

Manage motor vehicle traffic (#10)

Increase the availability of and access to healthy foods (#14)foods (#14)

40

Page 41: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Why Implement this Plan?

Invest in Oakland’s neighborhoods

Restore International Boulevard to the way it was

Reduce crime through beautification

Increase private investment opportunities

Beautify the area to push aside a lot of the current issues and increase civic prideincrease civic pride

Increase transportation choices

More recreational opportunitiesMore recreational opportunities

Improve health and physical activity

41

Page 42: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Top Priorities

1. Continue the IBCAC and IBTAC- Continued meetings and discussion

- Refinement of the priority actions

2. Undertake stabilization efforts focused on crime, prostitution and liquor stores

3. Implement the BRT and/or streetscape improvement efforts

4 Target funding programs to the TOD Catalyst Areas4. Target funding programs to the TOD Catalyst Areas

5. Codify the vision and recommendations in the TOD Plan

42

Page 43: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

for additional information

Elois A. Thornton - 510-238-6284Ulla Britt Jonsson 510 238 3322Ulla-Britt Jonsson - 510-238-3322

Holly Pearson - 510-238-3079

43

Page 44: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

TOD Catalyst Areas

Smaller areas within sub-areasSmaller areas within sub areas

Focus of initial resources

Improvements will spread outwards from these areas along the rest of the corridor

8 catalyst areas identified along corridor

44

Page 45: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

New TOD Location Criteria

Transit-availability and proximityTransit availability and proximity

Major crossroads and/or connectivity to adjacent areas

Vacant and underutilized parcels

Larger parcels and/or parcels under common ownership

Close to existing community resources

Attaching to e isting/so nd rban fabricAttaching to existing/sound urban fabric

45

Page 46: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Major CrossMajor Cross Streets

46

Page 47: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

ProposedProposed TOD

L tiLocations

47

Page 48: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

San Antonio (14th to 23rd)

Vision: “the San Antonio Sub-area will be transformed into i hb h d i t d i d id th t b ilda neighborhood-oriented mixed use corridor that builds on

the diverse ethnicities in the San Antonio neighborhoods.”

Priorities- Affordable housing- Family housingFamily housing- Senior housing- Full-service bank or credit union

S- Small-scale supermarket- Add resources to address prostitution- Add street lightingg g- Increase police presence

48

Page 49: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

San Antonio TOD Catalyst Area #1

49

Page 50: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Insert site plan

50

Page 51: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

San Antonio/Fruitvale TOD Catalyst Area #2TOD Catalyst Area #2

51

Page 52: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Insert site plan

52

Page 53: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Fruitvale (23rd to 51st)

Vision: “the thriving commercial corridor on International B l d b t f i t l F it l ABoulevard between from approximately Fruitvale Avenue to 38th Avenue and the nationally-renowned Fruitvale Transit Village – Fruitvale will once again become the g g“second downtown” of the City of Oakland.”

Priorities- Entertainment uses- Art galleries and cultural spaces

Ad lt d ti d/ j b l t t- Adult education and/or job-placement center- Affordable housing- Senior housing- Take steps to address prostitution- Increase the police presence in Fruitvale

53

Page 54: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Fruitvale TOD Catalyst Area #3

54

Page 55: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Insert site plan

55

Page 56: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Fruitvale TOD Catalyst Area #4

56

Page 57: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Insert site plan

57

Page 58: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Havenscourt-Lockwood (51st to 69th)

Vision: “Over time, the Havenscourt-Lockwood Sub-area ill b t f d i t b tif l d t i i t dwill be transformed into a beautiful, pedestrian-oriented

corridor with a diversity of uses. The focal point of activity will be around the TOD Catalyst Area between 51st and y57th Avenues.”

Priorities- Supermarket- Adult education or job-placement center

E l t- Employment uses- Bank- Art galleries and cultural spaces- Limit liquor stores- Add street lighting

58

Page 59: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Havenscourt / LockwoodTOD Catalyst Area #5TOD Catalyst Area #5

59

Page 60: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Insert site plan

60

Page 61: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Hegenberger (69th to 86th)

Vision: “The Hegenberger Sub-area will continue to evolve f il i t d id t i i i i las a family-oriented corridor containing various social

services, and will be supported by neighborhood-serving retail.”

Priorities- Grocery storey- Bank- Neighborhood-serving retail and services- Senior centerSenior center- Add parks and open spaces- Add a recreation center/gymnasium

Add t dd tit ti- Add resources to address prostitution- Address truck traffic- Improve pedestrian crossings

61

Page 62: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Hegenberger TOD Catalyst Area #6

62

Page 63: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Insert site plan

63

Page 64: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Hegenberger TOD Catalyst Area #8

64

Page 65: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Insert site plan

65

Page 66: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Elmhurst (86th to Durant)

Vision: “enhance the Sub-area as a small-scale retail street th t it li it l ti D t S iththat capitalizes on its location near Durant Square, with a focus on development in the TOD Catalyst Area between 94th and 104th Avenues.”

Priorities- Grocery storeGrocery store- Bank- Arts and entertainment uses

N i hb h d i t il d i- Neighborhood-serving retail and services- Regular street and sidewalk cleaning- Increase code enforcement activities- Add pedestrian amenities- Improve pedestrian crossings

66

Page 67: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Elmhurst TOD Catalyst Area #9

67

Page 68: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Insert site plan

68

Page 69: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Insert site plan

69

Page 70: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Focus Resources in TOD Areas (#1)

Create TOD Catalyst Area policyCreate TOD Catalyst Area policy

Expand funding for Redevelopment Programs and focus in CatalystPrograms and focus in Catalyst Areas

Target affordable housing fundsTarget affordable housing funds

Acquire vacant properties

Identify contaminated sites and pursue funding for remediation

70

Page 71: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Address Criminal Activity (#2)

Increase development to create “eyesIncrease development to create eyes on the street”

Implement a CPTED program alongImplement a CPTED program along International Boulevard

Increase street lighting to improveIncrease street lighting to improve public safety

Create Hotel 24 hour stay ordinanceCreate Hotel 24-hour stay ordinance

Add resources to address prostitution & th i i l ti iti& other criminal activities

71

Page 72: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Improve the Physical Appearance (#3)

Build the BRT or other transitBuild the BRT or other transit

Expand the façade improvement program

Make streetscape improvements in TODMake streetscape improvements in TOD Catalyst Areas

Expand graffiti abatement p g

Clean streets and sidewalks regularly

Create a “Clean Community”Create a Clean Community Education Program

72

Page 73: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Improve the Ped. Environment (#4)

Prepare sidewalk width guidelinesPrepare sidewalk width guidelines

Enhance pedestrian crossings

Study & improve traffic signalization for pedestrian activity

Improve wheelchair ramps

73

Page 74: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Build Partnerships (#11)

On-going Community Advisory Committee to monitorOn going Community Advisory Committee to monitor TOD Plan implementation

Coordination with other community associationsCoordination with other community associations, organizations & agencies to facilitate TOD Plan implementation

74

Page 75: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Enhance Job Access / Training (#12)

Local-hire ordinanceLocal hire ordinance

Employment opportunities

Job placement/vocational training center

75

Page 76: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Recruit and Promote New Uses (#13)

Pursue banks for InternationalPursue banks for International Boulevard

Pursue grocery stores for areas g yalong or near International Boulevard

Create an affordable retail program

Prepare a Medical Clinic Feasibility Study

Prepare a Vacant Retail Study

Increase and improve parks andIncrease and improve parks and green spaces

76

Page 77: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Celebrate Ethnicity, Arts, Culture (#15)

Create an International Blvd publicCreate an International Blvd public art advisory committee and program

Establish an Arts and CulturalEstablish an Arts and Cultural Center

Market the artist community alongMarket the artist community along and near International Boulevard

Create a “History of InternationalCreate a History of International Boulevard” Project

H t A l I t ti lHost an Annual International Boulevard Community-Wide Event

77

Page 78: Plan OverviewPlan Overvie5 Sub-Area Plans Existing Conditions – More detailed & sub-area specific. Key Issues – Lists key issues identified by the community. Vision – AforwardA

Key Design Guidance

Provide transit-supportive residential d iti d i fdensities and a mix of uses

Design buildings to provide “eyes on the street”street

Locate buildings at or near the sidewalk with active ground-floor uses

Focus retail and services within walking distance of TOD Catalyst Areas

Design buildings to be good neighbors

Improve the visual character and pedestrian q alit of b ildingsquality of buildings