CUPLOK CLAD ACCESS SCAFFOLDING
1. THE DESIGN IMPOSED LOADING FOR THIS SCAFFOLD IN ACCORDANCE WITH
TG20:13 IS AS FOLLOWS.
1.1 ONE NUMBER ACCESS AND WORKING PLATFORM AT 2.00KN/M²
AND ONE FURTHER PLATFORM AT 0.75KN/M² VERY LIGHT DUTY AND ACCESS
PURPOSES WHILST OTHER LIFTS ARE BOARDED THEY ARE CONSIDERED AS
NON WORKING LIFTS
2. ALL BEAMS TO BE LACED AND BRACED UNLESS OTHERWISE STATED AT:
1.1 CROSS BRACING EVERY 2.4m
1.2 PLAN BRACING EVERY 2.4m
1.3 TOP CHORDS LACED EVERY 1.2m
1.4 BOTTOM CHORDS LACED EVERY 2.4m AND ANY POINTS OF LOADING
3. CLIENT TO ENSURE THE SUITABILITY OF THE BEARING/GROUND LEVELS TO
ACCEPT LOADS FROM SCAFFOLD UPRIGHTS.
4. THE TUBES & FITTINGS SYSTEM IS TO BE INSTALLED IN ACCORDANCE WITH
ADVICE GIVEN IN THE TG20:13 GUIDANCE.
5. THE TUBES & FITTINGS IS TO BE TIED TO THE PERMANENT STRUCTURE IN
ACCORDANCE WITH INFORMATION PROVIDED IN THE TG20:08 GUIDANCE.
6. CLIENT TO ENSURE THE SUITABILITY OF THE EXISTING STRUCTURE TO
ACCEPT THE LOADS IMPOSED FROM THE SCAFFOLD TIES.
CDM REGULATIONS 2007
THE CONSTRUCTION DESIGN AND MANAGEMENT REGULATIONS 2007
REQUIRE THAT WE MAKE THE CLIENT AWARE OF HIS DUTIES UNDER
THE ABOVE MENTIONED REGULATIONS. THESE DUTIES UNDER CDM
REGULATIONS ARE PUBLISHED BY THE HSC AND HSE
1. THIS DRAWING IS CONFIDENTIAL AND THE EXCLUSIVE PROPERTY OF
ASC LIMITED. NO UNAUTHORISED USE, COPY
OR DISCLOSURE IS TO BE MADE AND IT IS TO BE RETURNED UPON
REQUEST.
2. THIS DESIGN AND DRAWING HAS BEEN PREPARED FROM
INFORMATION SUPPLIED TO US BY, OR ON BEHALF OF THE CLIENT,
WHO SHOULD CHECK THAT WE HAVE CORRECTLY INTERPRETED HIS
REQUIREMENTS AND THAT ALL LOADINGS, ERECTION DETAILS,
DIMENSIONS AND SETTING OUT SIZES ARE AS REQUIRED AND
PRACTICABLE.
3. THE CLIENT IS RESPONSIBLE FOR ENSURING THAT THE FOUNDATIONS
PROVIDED ARE ADEQUATE TO SAFELY SUPPORT THE LOADING IMPOSED
BY THE SCAFFOLD.
4. NO TIES OR BRACES ARE TO BE REMOVED FROM, OR ANY
MODIFICATIONS MADE TO THE SCAFFOLD STRUCTURE WITHOUT
APPROVAL FROM ASC LIMITED.
5. THE CLIENT IS RESPONSIBLE FOR SETTING OUT THE FINAL LEVELING
OF THE SCAFFOLD STRUCTURE OR SIMILAR EQUIPMENT USED AS A
SYSTEM SUPPORT.
6. WIND LOADS MAY NEED TO BE CALCULATED BY EXTERNAL
ENGINEERS AND SHOULD THIS BE REQUIRED THEY SHOULD BE
CALCULATED IN ACCORDANCE WITH CP3: CHAPTER V: PART 2: 1972.
7. SNOW LOADING MAY NEED TO BE CALCULATED BY EXTERNAL
ENGINEERS AND SHOULD THIS BE REQUIRED THEY SHOULD BE
CALCULATED USING BS6399: PART 3.
8. ALL SCAFFOLDING TO BE ERECTED IN ACCORDANCE WITH BS
TG20:13.
9. ALL SCAFFOLD MATERIALS TO COMPLY WITH BS 1139. SCAFFOLD
BOARDS ASSUMED CAPABLE OF SPANNING 1.3 METERS.
10. ALL DIMENSIONS ARE AS STATED OR AS CALCULATED. DRAWING
MUST NOT BE SCALED.
11. THIS DRAWING HAS BEEN PREPARED ON THE ASSUMPTION THAT
ALL LOADS WILL BE APPLIED AXIALLY TO THE TUBES UNLESS
SPECIFICALLY STATED
AS STATED @ A1
KTD
DN
PROVISIONAL
***********
DN ----
----
************ORIGINAL DRAWING: ORIGINAL DRAWING STATUS P1
**************
---
SCAFFOLD DESIGNED IN
CONJUNCTION WITH NASC TG20:13
TECHNICAL GUIDANCE ON
BS EN 12811-1GENERAL NOTES:-
ALL CUPLOK SCAFFOLD TO BE ERECTED IN
ACCORDANCE WITH THE CUPLOK USERS
MANUAL.
ALL TUBE AND FITTING SCAFFOLD TO BE
ERECTED IN ACCORDANCE WITH NASC TG20:13
OPERATIONAL GUIDE TO GOOD PRACTICE WITH
TUBE AND FITTING SCAFFOLD.
ALL SCAFFOLD TO BE ERECTED IN
CONJUNCTION WITH NASC SG4:10
PREVENTION IN FALLS IN SCAFFOLDING.
ALL TIES FITTED, TESTED AND DOCUMENTED IN
ACCORDANCE WITH NASC TG4:11
PLAN VIEW
1
750 APOLLO X BEAMS 2 LINES OFF
LACED AT 1.2M CENTERS TOP
CHORD AND 2.4M ON THE BOTTOM
CHORD SECTION / KNEE BRACED AT
ALL POINTS OF LOADING AND PLAN
BRACED EVERY 2.4M ON THE TOP
THIRD OF THE TOP BOOM AT THE
SAME SPACING AS THE MAIN
SCAFFOLD, SUPPLEMENTARY
COUPLINGS TO BE USED ALL
COUPLINGS CLASS B DOUBLE
COUPLINGS.
SUPPORTING
STANDARD WITH
LACING TUBE FITTED
TO UNDERSIDE OF
BEAM AND FITTED WITH
SUPPLEMENTARY
COUPLING TO THE
UNDERSIDE OF THE
LACING TUBE ALL
FITTINGS CLASS B
DOUBLE COUPLINGS.
PUNCHEON FITTED
WITH LACING TUBE TO
UPPER SIDE OF THE
TOP CHORD ALSO
SUPPLEMENTARY
COUPLING FITTED TO
THE UPPER SIDE OF
THE LACING TUBE ALL
FITTINGS CLASS B
DOUBLE COUPLINGS.
2 X 750mm DEEP X 6M
LONG APOLLO BEAMS
SOME LEDGERS AND TRANSOMS OMITTED
FOR CLARITY
1200 Max
GENERAL NOTES:-
Ties
THE LIFT SUPPORTING THE FAN MUST BE TIED
AT ALTERNATE LEDGER BRACED STANDARDS
HEAVY DUTY 12.2KN TIES TO BE USED
CONNECTED TO BOTH INSIDE AND OUTSIDE
STANDARD OR LEDGER WITHIN 300MM FROM
THE NODE POINT. LEDGER BRACED AT
ALTERNATE STANDARDS AND PLAN BRACED
EVERY LIFT.
Fan construction
ALL FITTINGS CLASS B DOUBLE COUPLINGS
SUPPORTED BY PROPPED CANTILEVER
PRINCIPAL TRANSOMS MATCHING THE BAY
SPACING OF THE MAIN SCAFFOLD, THE FAN
MAYBE SUBJECT TO SIGNIFICANT UPLIFT AND
THRUST SO THE RAKERS SHOULD HAVE
SUPPLEMENTARY COUPLERS FITTED TO BOTH
SIDES OF THE MAIN COUPLINGS.
CONNECTED BELOW THE INNER LEDGER AND
ABOVE THE OUTER LEDGER OF THE MAIN
SCAFFOLD WITH RIGHT ANGLE COUPLERS
BUTTING OFF THE EXISTING STRUCTURE.
SUPPORTED BY RAKING PROPS CONNECTED TO
THE LIFT BELOW OR BY RAKING HANGERS
CONNECTED TO THE LIFT ABOVE AT THE BAY
SPACING OF THE MAIN SCAFFOLD.
DECKED WITH 38MM THICK TIMBER SCAFFOLD
BOARDS, CLOSE BOARDED AND RESTRAINED
FROM LIFTING OFF.
DECKING SUPPORTED BY INTERMEDIATE
TRANSOMS WITH A MAXIMUM SPACING OF 1.2M.
TOE BOARDS AND GUARD RAILS MUST REMAIN
IN PLACE AT THE LIFT SUPPORTING THE FAN.
FURTHER DETAILS ON THE FITTING AND
TESTING OF SCAFFOLDING TIES CAN BE FOUND
IN THE OPERATIONAL GUIDE OF NASC TG20:13
SCAFFOLD TUBES TO BE BUTTED OFF THE
EXISTING STRUCTURE AND TIED AT THE LIFT
THE FAN IS FITTED, ADDITIONAL LINES OF TIES
MAY BE REQUIRED
SOME LEDGERS AND TRANSOMS OMITTED
FOR CLARITY
1300
MAXIMUM 6 BOARDS WIDE ON 1 LEVEL ONLY
2500250025002500250025002500250025002500
2500
2500
2500
2500
1800
1800 2500
5600
2500
2500
25002500
25002500
1300180013001300130018001300 1800
Max 2000
PROTECTION FAN ERECTED TO BOTH
ELEVATIONS MAX 6 BOARDS WIDE
PROTECTION FAN ERECTED TO BOTH
ELEVATIONS MAX 6 BOARDS WIDE
STAIR ACCESS LOCATED AS PER SITE
REQUEST ADDITIONAL ACCESS TO BE
AGREED ON SITE
STAIR ACCESS LOCATED AS PER SITE
REQUEST ADDITIONAL ACCESS TO BE
AGREED ON SITE
WEST REGENT STREET ELEVATION
2
PITT STREET ELEVATION
3
FAN DETAIL
4
BRIDGED ACCESS OVER
CANOPY
ADDITIONAL TIE FITTED
TO THE CENTER OF THE
BEAM
SUPPORT SCAFFOLD AT EACH SIDE
OF THE SCAFFOLD BRIDGE TO BE
BRACED IN ALL DIRECTIONS ( ALL 4
SIDES), ADDITIONAL STANDARD TO
BE FITTED WITHIN 150MM TO
SUPPLEMENT THE EXISTING
STANDARD AND SHOULD BE LEDGER
BRACED TO THE FULL HEIGHT OF
THE SCAFFOLD BRIDGE WITH LOAD
BEARING COUPLERS
HEAVY DUTY TIES 12.2KN ALL OTHER
ELEVATIONS IF NOT SHOWN SHOULD BE
MEDIUM DUTY TIES AND TIED TO THE
CUPLOK MANUAL
BOARDS REMOVED FOR CLARITY
ALL CORNERS RETURNED WITH RETURN
TRANSOMS OR UNDER SLUNG TUBE WITH
BAND & PLATE AT EVERY LIFT