Tuesday, September 20, 2016 Weekly Ethylene Outlook US & Canada 0 2 4 6 8 10 12 14 16 18 0 2 4 6 8 10 12 14 16 18 01/01 01/13 01/25 02/06 02/18 03/01 03/13 03/25 04/06 04/18 04/30 05/12 05/24 06/05 06/17 06/29 07/11 07/23 08/04 08/16 08/28 09/09 09/21 10/03 10/15 10/27 11/08 11/20 12/02 12/14 12/26 Sum of Command.FIVE_YEAR_AVG_CAPACITY_OFFLINE Sum of Command.PREV_YEAR_CAPACITY_OFFLINE Sum of Command.CURRENT_YEAR_CAPACITY_OFFLINE B Lbs/yr Total Offline Ethylene Capacity Key Market Updates ExxonMobil Chemical has restarted the 800M Lbs/yr USC I and 1 Billion Lbs/yr USC II Ethane Cracking units located at the Beaumont, Texas plant with temporary cooling towers in place. Rebuild of the permanent cooling tower will take place over the next several months. Chevron Phillips has begun an approximately 65-day planned maintenance turnaround at its 1,840MM Lbs/yr 1592 Ethylene unit at the Baytown (Cedar Bayou), Texas plant. LyondellBasell is in the process of restarting its 1,130M Lbs/yr ethylene unit located at the Morris, Illinois plant. The unit has been offline for a 60-Day planned maintenance turnaround which started July 22, 2016. A final investment decision on Williams Energy Canada’s proposed plans to build a 1.1 Billion Lbs/yr Propylene unit in Fort Saskatchewan, Alberta Canada has been delayed due to the company selling its Canadian businesses to Inter Pipeline Limited. 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 01/01 01/19 02/06 02/24 03/13 03/31 04/18 05/06 05/24 06/11 06/29 07/17 08/04 08/22 09/09 09/27 10/15 11/02 11/20 12/08 12/26 2015 2016 B Lbs/yr Planned Outages with Moving Average 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 01/01 01/18 02/04 02/21 03/09 03/26 04/12 04/29 05/16 06/02 06/19 07/06 07/23 08/09 08/26 09/12 09/29 10/16 11/02 11/19 12/06 12/23 2015 2016 B Lbs/yr Unplanned Outages with Moving Average (c) 2016 All Rights Reserved, IIR Energy IIR Energy 2277 Plaza Dr., Suite 300 Sugar Land, TX 77479 713-980-1779

Planned Outages Weekly Ethylene Outlook US & Canada Tuesday, … · 2016. 10. 19. · Tuesday, September 20, 2016 Weekly Ethylene Outlook US & Canada Ethylene Projects and Capacity

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Planned Outages Weekly Ethylene Outlook US & Canada Tuesday, … · 2016. 10. 19. · Tuesday, September 20, 2016 Weekly Ethylene Outlook US & Canada Ethylene Projects and Capacity

Tuesday, September 20, 2016

Weekly Ethylene Outlook

US & Canada

0

2

4

6

8

10

12

14

16

18

0

2

4

6

8

10

12

14

16

18

01/0

1

01/1

3

01/2

5

02/0

6

02/1

8

03/0

1

03/1

3

03/2

5

04/0

6

04/1

8

04/3

0

05/1

2

05/2

4

06/0

5

06/1

7

06/2

9

07/1

1

07/2

3

08/0

4

08/1

6

08/2

8

09/0

9

09/2

1

10/0

3

10/1

5

10/2

7

11/0

8

11/2

0

12/0

2

12/1

4

12/2

6

Sum ofCommand.FIVE_YEAR_AVG_CAPACITY_OFFLINE

Sum ofCommand.PREV_YEAR_CAPACITY_OFFLINE

Sum ofCommand.CURRENT_YEAR_CAPACITY_OFFLINE

B L

bs

/yr

Total Offline Ethylene Capacity

Key Market Updates

● ExxonMobil Chemical has restarted the 800M Lbs/yr USC I and 1 Billion Lbs/yr USC II Ethane Cracking units located at the

Beaumont, Texas plant with temporary cooling towers in place. Rebuild of the permanent cooling tower will take place over the

next several months.

● Chevron Phillips has begun an approximately 65-day planned maintenance turnaround at its 1,840MM Lbs/yr 1592 Ethylene

unit at the Baytown (Cedar Bayou), Texas plant.

● LyondellBasell is in the process of restarting its 1,130M Lbs/yr ethylene unit located at the Morris, Illinois plant. The unit has

been offline for a 60-Day planned maintenance turnaround which started July 22, 2016.

● A final investment decision on Williams Energy Canada’s proposed plans to build a 1.1 Billion Lbs/yr Propylene unit in Fort

Saskatchewan, Alberta Canada has been delayed due to the company selling its Canadian businesses to Inter Pipeline Limited.

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

01/0

1

01/1

9

02/0

6

02/2

4

03/1

3

03/3

1

04/1

8

05/0

6

05/2

4

06/1

1

06/2

9

07/1

7

08/0

4

08/2

2

09/0

9

09/2

7

10/1

5

11/0

2

11/2

0

12/0

8

12/2

6

2015 2016

B L

bs/y

r

Planned Outageswith Moving Average

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

01/0

1

01/1

8

02/0

4

02/2

1

03/0

9

03/2

6

04/1

2

04/2

9

05/1

6

06/0

2

06/1

9

07/0

6

07/2

3

08/0

9

08/2

6

09/1

2

09/2

9

10/1

6

11/0

2

11/1

9

12/0

6

12/2

3

2015 2016

B L

bs/y

r

Unplanned Outageswith Moving Average

(c) 2016 All Rights Reserved, IIR Energy

IIR Energy 2277 Plaza Dr., Suite 300 Sugar Land, TX 77479 713-980-1779

Page 2: Planned Outages Weekly Ethylene Outlook US & Canada Tuesday, … · 2016. 10. 19. · Tuesday, September 20, 2016 Weekly Ethylene Outlook US & Canada Ethylene Projects and Capacity

Tuesday, September 20, 2016

Weekly Ethylene Outlook

US & Canada

Daily OutagesContact Market Hotline for more insight

E: [email protected]

09/17 09/18 09/19 09/20 09/21 09/22 09/23 09/24 09/25

Current Year Design Capacity

Capacity Offline

Daily Change

73.2

6.3

0.0

73.2

6.3

0.0

73.2

6.3

0.0

73.2

5.1

-1.1

73.2

5.1

0.0

73.2

5.1

0.0

73.2

5.1

0.0

73.2

5.1

0.0

73.2

5.1

0.0

(in B Lbs/yr)

09/17 09/18 09/19 09/20 09/21 09/22 09/23 09/24 09/25

Prior Year Capacity Offline

Delta

1.6

4.7

5.0

1.3

5.0

1.3

5.0

0.2

5.5

-0.4

5.5

-0.4

5.5

-0.4

5.5

-0.4

5.5

-0.4

09/17 09/18 09/19 09/20 09/21 09/22 09/23 09/24 09/25

Planned

Prior Yr

Capacity Offline

Delta

1.6

4.7

1.6

4.7

1.6

4.7

1.6

3.6

1.6

3.6

1.6

3.6

1.6

3.6

1.6

3.6

1.6

3.6

09/17 09/18 09/19 09/20 09/21 09/22 09/23 09/24 09/25

Unplanned

Prior Yr

Capacity Offline

Delta

0.0

0.0

3.4

-3.4

3.4

-3.4

3.4

-3.4

4.0

-4.0

4.0

-4.0

4.0

-4.0

4.0

-4.0

4.0

-4.0

Page 3: Planned Outages Weekly Ethylene Outlook US & Canada Tuesday, … · 2016. 10. 19. · Tuesday, September 20, 2016 Weekly Ethylene Outlook US & Canada Ethylene Projects and Capacity
Page 4: Planned Outages Weekly Ethylene Outlook US & Canada Tuesday, … · 2016. 10. 19. · Tuesday, September 20, 2016 Weekly Ethylene Outlook US & Canada Ethylene Projects and Capacity
Page 5: Planned Outages Weekly Ethylene Outlook US & Canada Tuesday, … · 2016. 10. 19. · Tuesday, September 20, 2016 Weekly Ethylene Outlook US & Canada Ethylene Projects and Capacity

Tuesday, September 20, 2016

Weekly Ethylene Outlook

US & Canada

Ethylene Projects and Capacity ChangesContact Market Hotline for more insight

E: [email protected]

0

0.5

1

1.5

2

2.5

3

3.5

0

20

40

60

80

100

2013

01

2013

07

2014

01

2014

07

2015

01

2015

07

2016

01

2016

07

2017

01

2017

07

2018

01

2018

07

2019

01

2019

07

Sum ofCommand.PROJECT_CAPACITY

Sum ofCommand.RUNNING_TOTAL

YearMonth

Incre

men

tal P

roje

cts

(B

Lb

s/y

r)

Insta

lled

Base (B

Lb

s/y

r)

Total Ethylene Plant CapacityCurrent Ethylene Plant Capacity

(B Lbs/yr) (kt/yr)

Canada 11.1 5,053.0

Caribbean 0.0 0.0

PADD I 0.0 0.0

PADD II 2.7 1,233.8

PADD III 59.3 26,917.7

PADD IV 0.0 0.0

PADD V 0.0 0.0

Total 59.3 26,917.7

0

1

2

3

4

5

0

2

4

6

8

10

12

2013

01

2013

07

2014

01

2014

07

2015

01

2015

07

2016

01

2016

07

2017

01

2017

07

2018

01

2018

07

2019

01

2019

07

Sum ofCommand.PROJECT_CAPACITY

Sum ofCommand.RUNNING_TOTAL

YearMonth

Incre

men

tal P

roje

cts

(B

Lb

s/y

r)

Insta

lled

Base (B

Lb

s/y

r)Ethylene Plant Capacity

For Canada

0

0.1

0.2

0.3

0.4

0.5

0

0.1

0.2

0.3

0.4

0.5

2013

01

2013

07

2014

01

2014

07

2015

01

2015

07

2016

01

2016

07

2017

01

2017

07

2018

01

2018

07

2019

01

2019

07

Sum ofCommand.PROJECT_CAPACITY

Sum ofCommand.RUNNING_TOTAL

YearMonth

Incre

men

tal P

roje

cts

(B

Lb

s/y

r)

Insta

lled

Base (B

Lb

s/y

r)

Ethylene Plant Capacity

For PADD I

PADD I

Projects (B Lbs/yr) Project (kt/yr)

Apr-2018 0.5 226.8

Total 0.5 226.8

IIR Energy 2277 Plaza Dr., Suite 300 Sugar Land, TX 77479 713-980-1779

(c) 2016 All Rights Reserved, IIR Energy

Page 6: Planned Outages Weekly Ethylene Outlook US & Canada Tuesday, … · 2016. 10. 19. · Tuesday, September 20, 2016 Weekly Ethylene Outlook US & Canada Ethylene Projects and Capacity

Tuesday, September 20, 2016

Weekly Ethylene Outlook

US & Canada

Ethylene Projects and Capacity ChangesContact Market Hotline for more insight

E: [email protected]

0.00

0.02

0.04

0.06

0.08

0.10

0

0.4

0.8

1.2

1.6

2

2.4

2.8

2013

01

2013

07

2014

01

2014

07

2015

01

2015

07

2016

01

2016

07

2017

01

2017

07

2018

01

2018

07

2019

01

2019

07

Sum ofCommand.PROJECT_CAPACITY

Sum ofCommand.RUNNING_TOTAL

YearMonth

Incre

men

tal P

roje

cts

(B

Lb

s/y

r)

Insta

lled

Base (B

Lb

s/y

r)

Ethylene Plant Capacity

For PADD II

PADD II

Projects (B Lbs/yr) Project (kt/yr)

Jun-2017 0.1 31.8

Total 0.1 31.8

0

0.5

1

1.5

2

2.5

3

3.5

0

20

40

60

80

100

2013

01

2013

07

2014

01

2014

07

2015

01

2015

07

2016

01

2016

07

2017

01

2017

07

2018

01

2018

07

2019

01

2019

07

Sum ofCommand.PROJECT_CAPACITY

Sum ofCommand.RUNNING_TOTAL

YearMonth

Incre

men

tal P

roje

cts

(B

Lb

s/y

r)

Insta

lled

Base (B

Lb

s/y

r)Ethylene Plant Capacity

For PADD III

PADD III

Projects (B Lbs/yr) Project (kt/yr)

Mar-2013 0.2 108.9

Jun-2014 0.9 385.6

May-2015 0.4 181.4

Jul-2015 0.2 90.7

Dec-2015 0.3 113.4

Jul-2016 0.3 113.4

Sep-2016 0.2 68.0

Nov-2016 1.7 771.1

Dec-2016 1.2 544.3

May-2017 2.6 1,179.3

Jun-2017 2.8 1,270.1

Jul-2017 3.0 1,360.8

Sep-2017 3.3 1,496.9

Dec-2017 0.9 385.6

Mar-2018 1.1 499.0

Oct-2018 3.4 1,545.4

Mar-2019 2.2 1,000.2

Apr-2019 0.1 56.7

Oct-2019 0.7 326.6

Nov-2019 2.2 1,016.0

Total 27.7 12,513.4

No part of this Report may be copied, reproduced, e-mailed, or transmitted in any form, by any means, without the express written

permission of IIR Energy or Industrial Information Resources, Inc., who, furthermore, does not assume any responsibility and/or liability for

the information, accuracy or content of this Report.

IIR Energy 2277 Plaza Dr., Suite 300 Sugar Land, TX 77479 713-980-1779

(c) 2016 All Rights Reserved, IIR Energy