8
PLANNING ACT 2008 INFRASTRUCTURE PLANNING (APPLICATIONS: PRESCRIBED FORMS AND PROCEDURE) REGULATIONS 2009 REGULATION 5 (2) (o) PROPOSED PORT TERMINAL AT FORMER TILBURY POWER STATION TILBURY2 TRO30003 VOLUME 2 GENERAL ARRANGEMENT PLANS DOCUMENT REF: 2.2

PLANNING ACT 2008 INFRASTRUCTURE … · planning act 2008 infrastructure planning (applications: prescribed forms and procedure) ... road and road layout js sr sr

  • Upload
    lamnga

  • View
    217

  • Download
    1

Embed Size (px)

Citation preview

Page 1: PLANNING ACT 2008 INFRASTRUCTURE … · planning act 2008 infrastructure planning (applications: prescribed forms and procedure) ... road and road layout js sr sr

PLANNING ACT 2008

INFRASTRUCTURE PLANNING

(APPLICATIONS: PRESCRIBED FORMS AND PROCEDURE) REGULATIONS 2009

REGULATION 5 (2) (o)

PROPOSED PORT TERMINAL AT

FORMER TILBURY POWER STATION

TILBURY2TRO30003

VOLUME 2

GENERAL ARRANGEMENT PLANS

DOCUMENT REF: 2.2

Page 2: PLANNING ACT 2008 INFRASTRUCTURE … · planning act 2008 infrastructure planning (applications: prescribed forms and procedure) ... road and road layout js sr sr

CONTENTS

DRAWING TITLE DRAWING NUMBER REV

GENERAL ARRANGEMENT PLANS KEY PLAN REGULATION 5(2)(o)

5153187-ATK-ZZ-ZZ-SK-ZZ-0001 P08

GENERAL ARRANGEMENT PLANS INFRASTRUCTURE CORRIDOR SHEET 1 OF 5 REGULATION 5(2)(o)

5153187-ATK-ZZ-XX-SK-ZZ-1001 P08

GENERAL ARRANGEMENT PLANS CMAT SHEET 2 OF 5 REGULATION 5(2)(o)

5153187-ATK-Z2-XX-SK-BH-1004 P03

GENERAL ARRANGEMENT PLANS RORO CONTAINER AND TRAILER YARD SHEET 3 OF 5 REGULATION 5(2)(o)

5153187-ATK-Z3-XX-SK-RL-1002 P02

GENERAL ARRANGEMENT PLANS RORO AND CMAT BERTH SHEET 4 OF 5 REGULATION 5(2)(o)

5153187-ATK-Z4-XX-SK-RW-1003 P02

GENERAL ARRANGEMENT PLANS ASDA ROUNDABOUT SHEET 5 OF 5 REGULATION 5(2)(o)

5153187-ATK-ZZ-XX-DR-ZZ-1011 P01

Page 3: PLANNING ACT 2008 INFRASTRUCTURE … · planning act 2008 infrastructure planning (applications: prescribed forms and procedure) ... road and road layout js sr sr

TILBURY

PORT OFTILBURY

TILBURYFORT

TILBURYPOWERSTATION

RIVER THAMES

ASDAROUNDABOUT

01

02

03

04

05

Reproduced from the 1997 Ordnance Survey 1:1250 map with the permission ofThe Controller of her Majesty's Stationary Office, Crown @ Copyright Port ofTilbury. Tilbury Freeport, Tilbury, Essex, RM18 7EH. Licence No: AL 52076A0001

N

P1 16/02/17 DRAFT FOR COMMENT JS SR

P2 23/02/17 SCOPING REPORT JS SR SR

P3 07/03/17 UPDATES TO ORDER LIMITS BOUNDARY JS SR SR

P4 23/03/17 SCOPING REPORT JS SR SR

P5 16/05/17 FOR CONSULTATION JS SR SR

P6 12/06/17 UPDATES TO ORDER LIMITS BOUNDARY JS SR SR

P7 07/07/17 UPDATES TO ORDER LIMITS BOUNDARY JS SR SR

P8 13/09/17 PINS REVIEW JS SR SR

NOTES:

1. THIS PLAN SHOULD BE READ ALONGSIDE OTHERPLANS AND DOCUMENTS IN THE DEVELOPMENTCONSENT ORDER APPLICATION

KEY:

ORDER LIMITS

Scale 1:6000

120m 0m 120m 240m 360m

Date

DesignedScale

Drawing Title

Project Title

Drawing Status

Date Date Date

Drawn Checked Authorised

Milli

met

res

100

100

Client

Copyright C Atkins Limited (2017) www.atkinsglobal.com

Original Size

Suitability

Tel:Fax:

Drawing Number Revision

Western House (Block C)Peterborough Business ParkLynch WoodPeterboroughPE2 6FZ

+44 (0)1733 366900+44 (0)1733 366999

Rev. Date Description By Chk'd App'd

Filename: P:\G

BEMC

\WG

E\Projects\Trans\20161714 POTLL R

oRo Term

inal Design\7 W

IP\Draw

ings\7.1 WIP\ZZ - Site W

ide\5153187-ATK-ZZ-XX-SK-ZZ-0001.dwg

USER

: SOR

T8646D

ate: 23/10/17 09:48:02

DO NOT SCALE

GENERAL ARRANGEMENT PLANSKEY PLAN

REGULATION 5(2)(o)

JSSR SR SR

16/02/1716/02/17 16/02/17 16/02/17

1:6,000

S0

5153187-ATK-ZZ-ZZ-SK-ZZ-0001 P

DCO SUBMISSION

08

A1

AutoCAD SHX Text
PORT OF
AutoCAD SHX Text
LONDON
AutoCAD SHX Text
TILBURY
Page 4: PLANNING ACT 2008 INFRASTRUCTURE … · planning act 2008 infrastructure planning (applications: prescribed forms and procedure) ... road and road layout js sr sr

PROPOSED INFRASTRUCTURECORRIDOR RAIL

PROPOSED INFRASTRUCTURECORRIDOR HIGHWAY

EXISTING RIVERSIDE RAILSIDING TO BE CLOSED

PROPOSED SECURITY FENCE

FOR

CO

NTI

NU

ATIO

N S

EE S

HEE

T 2

PROPOSED TOUCANCROSSING

NETWORK RAILOPERATIONAL FENCING

EXISTING LONDON TOTILBURY RAILWAY

N

Reproduced from the 1997 Ordnance Survey 1:1250 map with the permission ofThe Controller of her Majesty's Stationary Office, Crown @ Copyright Port ofTilbury. Tilbury Freeport, Tilbury, Essex, RM18 7EH. Licence No: AL 52076A0001

N

NOTES:

1. THIS PLAN SHOULD BE READ ALONGSIDE OTHER PLANS ANDDOCUMENTS IN THE DEVELOPMENT CONSENT ORDERAPPLICATION.

2. DESIGN AND LOCATION OF EACH ELEMENT OF THE SCHEMESHOWN HERE FOR ILLUSTRATIVE PURPOSES ONLY.

KEY:

ORDER LIMITS

KEY EXISTING WATERCOURSES (SUBJECT TODIVERSION AND/OR CROSSING)

EXISTING PUBLIC RIGHT OF WAY

EXISTING GREEN BELT

PROPOSED NOISE BARRIER

PROPOSED OPEN DRAINAGE

PROPOSED WATERCOURSE CROSSINGS

PROPOSED LANDSCAPING AND ECOLOGICAL MITIGATION

PROPOSED SHARED CYCLE AND PEDESTRIAN FACILITY

P1 16/02/17 DRAFT FOR COMMENT JS SR

P2 23/02/17 SCOPING REPORT JS SR SR

P3 07/03/17 ORDER LIMITS BOUNDARY ADDED JS SR SR

P4 23/03/17 SCOPING REPORT JS SR SR

P5 16/05/17 UPDATED DCO, ROAD AND ROAD LAYOUT JS SR SR

P6 12/06/17 FOR CONSULTATION JS SR SR

P7 13/09/17 PINS REVIEW JS SR SR

P8 16/10/17 DRAWING UPDATE JS SR SR

KEY PLAN

Scale 1:2000

50m 0m 50m 100m

DESIGN SHOWN HEREFOR ILLUSTRATIVEPURPOSES ONLY

Date

DesignedScale

Drawing Title

Project Title

Drawing Status

Date Date Date

Drawn Checked Authorised

Milli

met

res

100

100

Client

Copyright C Atkins Limited (2017) www.atkinsglobal.com

Original Size

Suitability

Tel:Fax:

Drawing Number Revision

Western House (Block C)Peterborough Business ParkLynch WoodPeterboroughPE2 6FZ

+44 (0)1733 366900+44 (0)1733 366999

Rev. Date Description By Chk'd App'd

Filename: P:\G

BEMC

\WG

E\Projects\Trans\20161714 POTLL R

oRo Term

inal Design\7 W

IP\Draw

ings\7.1 WIP\ZZ - Site W

ide\5153187-ATK-ZZ-XX-SK-ZZ-1001 P8.dwg

USER

: SOR

T8646D

ate: 23/10/17 09:50:54

DO NOT SCALE

GENERAL ARRANGEMENT PLANSINFRASTRUCTURE CORRIDOR

SHEET 1 OF 5REGULATION 5(2)(o)

JSSR SR SR

16/02/1716/02/17 16/02/17 16/02/17

1:2,000

S0

5153187-ATK-ZZ-XX-SK-ZZ-1001 P

DCO SUBMISSION

08

A1

AutoCAD SHX Text
PORT OF
AutoCAD SHX Text
LONDON
AutoCAD SHX Text
TILBURY
Page 5: PLANNING ACT 2008 INFRASTRUCTURE … · planning act 2008 infrastructure planning (applications: prescribed forms and procedure) ... road and road layout js sr sr

FUTUREBLOCKPLANT

EXISTINGOVERHEAD

POWERCABLES

EXISTINGPYLON

PROPOSEDGENERALSTORAGE

PROPOSEDRORO TERMINALWORKSHOP /ADMIN /WELFARE /PARKING

PROPOSEDRADIALCONVEYOR

PROPOSEDRAIL SIDINGS

PROPOSEDCONVEYOR

PROPOSEDGENERALSTORAGE

PROPOSEDRAIL LINE

FOR

CO

NTI

NU

ATIO

N S

EE S

HEE

T 1

FOR CONTINUATION SEE SHEET 3

PROPOSED CMATAGGREGATESSTORAGE YARD

EXISTINGOVERHEAD

POWERCABLES

EXISTINGPYLON

PROPOSEDGENERALSTORAGE

PROPOSEDCMAT

PROCESSINGFACILITIES

PROPOSED CMATPROCESSING AREA

NETWORK RAILOPERATIONAL FENCING

PROPOSED RAILACCESS ROAD

PROPOSED CMATAGGREGATESSTORAGE YARD

N

Reproduced from the 1997 Ordnance Survey 1:1250 map with the permission ofThe Controller of her Majesty's Stationary Office, Crown @ Copyright Port ofTilbury. Tilbury Freeport, Tilbury, Essex, RM18 7EH. Licence No: AL 52076A0001

N

P1 12/06/17 FOR CONSULTATION JS AH SR

P2 13/09/17 PINS REVIEW JS AH SR

P3 16/10/17 DRAWING UPDATE JS SR SR

NOTES:

1. THIS PLAN SHOULD BE READ ALONGSIDE OTHER PLANS ANDDOCUMENTS IN THE DEVELOPMENT CONSENT ORDERAPPLICATION.

2. DESIGN AND LOCATION OF EACH ELEMENT OF THE SCHEMESHOWN HERE FOR ILLUSTRATIVE PURPOSES ONLY.

KEY:

ORDER LIMITS

KEY EXISTING WATERCOURSES (SUBJECT TO DIVERSION AND CROSSING)

EXISTING GREEN BELT

PROPOSED NOISE BARRIER

PROPOSED OPEN DRAINAGE

PROPOSED RAIL ACCESS ROAD

PROPOSED INTERNAL ROADS

PROPOSED LANDSCAPING AND ECOLOGICAL MITIGATION

PROPOSED SHARED CYCLE AND PEDESTRIAN FACILITY

PROPOSED STOCKPILE

KEY PLAN

DESIGN SHOWN HEREFOR ILLUSTRATIVEPURPOSES ONLY

Scale 1:1500

50m 0m 50m 100m

Date

DesignedScale

Drawing Title

Project Title

Drawing Status

Date Date Date

Drawn Checked Authorised

Milli

met

res

100

100

Client

Copyright C Atkins Limited (2017) www.atkinsglobal.com

Original Size

Suitability

Tel:Fax:

Drawing Number Revision

Western House (Block C)Peterborough Business ParkLynch WoodPeterboroughPE2 6FZ

+44 (0)1733 366900+44 (0)1733 366999

Rev. Date Description By Chk'd App'd

Filename: P:\G

BEMC

\WG

E\Projects\Trans\20161714 POTLL R

oRo Term

inal Design\7 W

IP\Draw

ings\7.1 WIP\TO

006 Bulk Materials D

esign\5153187-ATK-Z2-XX-SK-BH-1004.dw

gU

SER: SO

RT8646

Date: 25/10/17 17:39:58

DO NOT SCALE

GENERAL ARRANGEMENT PLANSCMAT

SHEET 2 OF 5REGULATION 5(2)(o)

JSSR SR SR

16/02/1716/02/17 16/02/17 16/02/17

1:1500

S0

5153187-ATK-Z2-XX-SK-BH-1004 P

DCO SUBMISSION

03

A1

AutoCAD SHX Text
PORT OF
AutoCAD SHX Text
LONDON
AutoCAD SHX Text
TILBURY
Page 6: PLANNING ACT 2008 INFRASTRUCTURE … · planning act 2008 infrastructure planning (applications: prescribed forms and procedure) ... road and road layout js sr sr

FTA Design Articulated Vehicle (1998)

FTA Design Articulated Vehicle (1998)

FTA Design Articulated Vehicle (1998)

FTA Design Articulated Vehicle (1998)

EXISTINGFLOOD WALL

EXISTINGFOOTPATH

PROPOSEDWAREHOUSE

PROPOSEDRAIL SIDINGS

PROPOSEDCONVEYOR

PROPOSED SILO ANDCOMPOUND AREA

RETENTION OFEXISTINGLANDSCAPING

RETENTION OFEXISTINGLANDSCAPING

PROPOSED BOOKINGIN GATES

PROPOSED BOOKINGIN QUEUING AREA

FOR

CO

NTIN

UATIO

N SEE SH

EET 2

PROPOSED CONTAINERSASSOCIATED WITHWAREHOUSE

EXISTING TREES ONBOUNDARY RETAINED

EXISTING TREES ONBOUNDARY RETAINED

PROPOSEDOPERATIONS

PARKING

EXISTING PYLON

FOR

CO

NTIN

UATIO

N SEE SH

EET 4

FOOTPATH TOPASS UNDER

PROPOSEDBRIDGE

N

N NOTES:

1. THIS PLAN SHOULD BE READ ALONGSIDE OTHER PLANS ANDDOCUMENTS IN THE DEVELOPMENT CONSENT ORDER APPLICATION.

2. DESIGN AND LOCATION OF EACH ELEMENT OF THE SCHEMESHOWN HERE FOR ILLUSTRATIVE PURPOSES ONLY.

3. NUMBER AND LOCATION OF TRAILERS AND CONTAINERSSHOWN HERE FOR ILLUSTRATIVE PURPOSES ONLY AND DO NOT INDICATE ANY MINIMUM OR MAXIMUM CAPACITY FORTILBURY2.

KEY:

ORDER LIMITS

PROPOSED OPEN DRAINAGE

PROPOSED CULVERTS

PROPOSED TRAILERS AND CONTAINERS

PROPOSED INTERNAL ROAD

PROPOSED WORKSHOPS AND OTHER ANCILLARY BUILDINGS

P1 12/06/17 FOR CONSULTATION JS SR SR

P2 13/09/17 PINS REVIEW JS SR SR

Reproduced from the 1997 Ordnance Survey 1:1250 map with the permission ofThe Controller of her Majesty's Stationary Office, Crown @ Copyright Port ofTilbury. Tilbury Freeport, Tilbury, Essex, RM18 7EH. Licence No: AL 52076A0001

KEY PLAN

DESIGN SHOWN HEREFOR ILLUSTRATIVEPURPOSES ONLY

Scale 1:1500

50m 0m 50m 100m

Date

DesignedScale

Drawing Title

Project Title

Drawing Status

Date Date Date

Drawn Checked Authorised

Milli

met

res

100

100

Client

Copyright C Atkins Limited (2017) www.atkinsglobal.com

Original Size

Suitability

Tel:Fax:

Drawing Number Revision

Western House (Block C)Peterborough Business ParkLynch WoodPeterboroughPE2 6FZ

+44 (0)1733 366900+44 (0)1733 366999

Rev. Date Description By Chk'd App'd

Filename: P:\G

BEMC

\WG

E\Projects\Trans\20161714 POTLL R

oRo Term

inal Design\7 W

IP\Draw

ings\7.1 WIP\TO

005 RoR

o Terminal D

esign\5153187-ATK-Z3-XX-SK-RL-1002.dw

gU

SER: SO

RT8646

Date: 26/10/17 12:30:39

DO NOT SCALE

GENERAL ARRANGEMENT PLANSDRORO CONTAINER AND TRAILER YAR

SHEET 3 OF 5REGULATION 5(2)(o)

JSAH SR SR

19/05/1718/05/17 25/05/17 12/06/17

1:1500

S0

25153187-ATK-Z3-XX-SK-RL-100 P

DCO SUBMISSION

02

A1

AutoCAD SHX Text
PORT OF
AutoCAD SHX Text
LONDON
AutoCAD SHX Text
TILBURY
Page 7: PLANNING ACT 2008 INFRASTRUCTURE … · planning act 2008 infrastructure planning (applications: prescribed forms and procedure) ... road and road layout js sr sr

PROPOSED UPSTREAM RORO BERTH

PROPOSED DOWNSTREAM RORO BERTH

PROPOSED CMAT BERTH

PROPOSED CONVEYORFEED HOPPER

PROPOSEDCONVEYOR

EXISTING NAVIGATION POST TO REMAINTO BE USED AS PONTOON RESTRAINT

PROPOSED APPROACH BRIDGE

EXISTING ANGLIAN WATERJETTY TO BE REMOVED

EXISTING MOORINGDOLPHIN TO BE REMOVED

PROPOSEDBERTHINGDOLPHINSEXISTING JETTY

EXISTINGBERTHINGDOLPHIN

EXISTING APPROACH BRIDGE

PROPOSED LINKBRIDGE

EXISTING JETTY

PROPOSEDPONTOON

PROPOSED BERTHINGDOLPHINS

EXISTING MOORINGDOLPHIN TO BE REMOVED

PROPOSED BERTHINGDOLPHINS

PROPOSED SHEET PILERETAINING WALL

PROPOSEDBERTHINGDOLPHINS

PROPOSEDPONTOON

RESTRAINTSTRUCTURE

PROPOSED PONTOONRESTRAINT STRUCTURE

FOR CONTINUATION SEE SHEET 3

PROPOSED CONVEYOR BRIDGE

PROPOSEDFENDERS

N

Reproduced from the 1997 Ordnance Survey 1:1250 map with the permission ofThe Controller of her Majesty's Stationary Office, Crown @ Copyright Port ofTilbury. Tilbury Freeport, Tilbury, Essex, RM18 7EH. Licence No: AL 52076A0001

KEY:

ORDER LIMITS

EXISTING PUBLIC RIGHT OF WAY

N

NOTES:

1. THIS PLAN SHOULD BE READ ALONGSIDE OTHER PLANS ANDDOCUMENTS IN THE DEVELOPMENT CONSENT ORDERAPPLICATION.

2. DESIGN AND LOCATION OF EACH ELEMENT OF THE SCHEMESHOWN HERE FOR ILLUSTRATIVE PURPOSES ONLY.

P1 12/06/17 FOR CONSULTATION JS AH SR

P2 13/09/17 PINS REVIEW JS AH SR

KEY PLAN

DESIGN SHOWN HEREFOR ILLUSTRATIVEPURPOSES ONLY

Scale 1:2000

50m 0m 50m 100m

Date

DesignedScale

Drawing Title

Project Title

Drawing Status

Date Date Date

Drawn Checked Authorised

Milli

met

res

100

100

Client

Copyright C Atkins Limited (2017) www.atkinsglobal.com

Original Size

Suitability

Tel:Fax:

Drawing Number Revision

Western House (Block C)Peterborough Business ParkLynch WoodPeterboroughPE2 6FZ

+44 (0)1733 366900+44 (0)1733 366999

Rev. Date Description By Chk'd App'd

Filename: P:\G

BEMC

\WG

E\Projects\Trans\20161714 POTLL R

oRo Term

inal Design\7 W

IP\Draw

ings\7.1 WIP\TO

004 RoR

o Berthing Design\5153187-ATK-Z4-XX-SK-R

W-1003.dw

gU

SER: SO

RT8646

Date: 26/10/17 12:45:05

DO NOT SCALE

GENERAL ARRANGEMENT PLANSRORO AND CMAT BERTH

SHEET 4 OF 5REGULATION 5(2)(o)

PVAH AH SR

15/05/201715/05/2017 25/05/2017 26/05/2017

1:2000

S0

5153187-ATK-Z4-XX-SK-RW-1003P

DCO SUBMISSION

02

A1

AutoCAD SHX Text
PORT OF
AutoCAD SHX Text
LONDON
AutoCAD SHX Text
TILBURY
Page 8: PLANNING ACT 2008 INFRASTRUCTURE … · planning act 2008 infrastructure planning (applications: prescribed forms and procedure) ... road and road layout js sr sr

PROPOSED PHYSICAL SUBSIDIARYDEFLECTION (1.6m WIDE) ISLANDDESIGNED TO TD 51/17

EXISTING TRAFFICISLAND REINSTATEDWITH KERB LINES

EXISTING FOOTWAY IS REDUNDANT AS NEW LINKBENEATH A1089 ST ANDREWS ROAD NOW OPEN.THEREFORE EXISTING FOOTWAY TO BE REMOVEDFROM DOCK ROAD TO A1089 ST ANDREWS ROAD

PROPOSEDPLAIN LITBOLLARD

N

NOTES:

1. THIS PLAN SHOULD BE READ ALONGSIDE OTHER PLANS ANDDOCUMENTS IN THE DEVELOPMENT CONSENT ORDERAPPLICATION.

2. DESIGN AND LOCATION OF EACH ELEMENT OF THE SCHEMESHOWN HERE FOR ILLUSTRATIVE PURPOSES ONLY.

KEY:

ORDER LIMITS

EXISTING PUBLIC RIGHT OF WAY

P1 18/10/17 DCO SUBMISSION SM SR SR

KEY PLAN

DESIGN SHOWN HEREFOR ILLUSTRATIVEPURPOSES ONLY

Reproduced from the 1997 Ordnance Survey 1:1250 map with the permission ofThe Controller of her Majesty's Stationary Office, Crown @ Copyright Port ofTilbury. Tilbury Freeport, Tilbury, Essex, RM18 7EH. Licence No: AL 52076A0001

Scale 1:1000

10m 10m0m 20m 60m40m30m 50m 70m

Date

DesignedScale

Drawing Title

Project Title

Drawing Status

Date Date Date

Drawn Checked Authorised

Milli

met

res

100

100

Client

Copyright C Atkins Limited (2017) www.atkinsglobal.com

Original Size

Suitability

Tel:Fax:

Drawing Number Revision

Western House (Block C)Peterborough Business ParkLynch WoodPeterboroughPE2 6FZ

+44 (0)1733 366900+44 (0)1733 366999

Rev. Date Description By Chk'd App'd

Filename: P:\G

BEMC

\WG

E\Projects\Trans\20161714 POTLL R

oRo Term

inal Design\7 W

IP\Draw

ings\7.1 WIP\ZZ - Site W

ide\5153187-ATK-ZZ-XX-DR

-ZZ-1011.dwg

USER

: SOR

T8646D

ate: 23/10/17 15:52:46

DO NOT SCALE

GENERAL ARRANGEMENT PLANSASDA ROUNDABOUT

SHEET 5 OF 5REGULATION 5(2)(o)

SMSM SR SR

18/10/1718/10/17 18/10/17 18/10/17

1:1000

S0

5153187-ATK-ZZ-XX-DR-ZZ-1011 P

DCO SUBMISSION

01

A1

AutoCAD SHX Text
0.9m
AutoCAD SHX Text
DOCK ROAD
AutoCAD SHX Text
El Sub Sta
AutoCAD SHX Text
SL
AutoCAD SHX Text
Tanks
AutoCAD SHX Text
CW
AutoCAD SHX Text
CF
AutoCAD SHX Text
CR
AutoCAD SHX Text
Tank
AutoCAD SHX Text
WINDRUSH ROAD
AutoCAD SHX Text
London Distribution Park
AutoCAD SHX Text
1
AutoCAD SHX Text
0.3m
AutoCAD SHX Text
PARK WAY
AutoCAD SHX Text
1.8m
AutoCAD SHX Text
0.3m
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Und
AutoCAD SHX Text
46
AutoCAD SHX Text
21
AutoCAD SHX Text
17
AutoCAD SHX Text
38 to 44
AutoCAD SHX Text
30 to 36
AutoCAD SHX Text
Marshes
AutoCAD SHX Text
Little
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Thurrock
AutoCAD SHX Text
A 1089
AutoCAD SHX Text
Hypermarket
AutoCAD SHX Text
Drain
AutoCAD SHX Text
0.8m
AutoCAD SHX Text
3.9m
AutoCAD SHX Text
Drain
AutoCAD SHX Text
1.3m
AutoCAD SHX Text
Drain
AutoCAD SHX Text
CR
AutoCAD SHX Text
Drain
AutoCAD SHX Text
MP .25
AutoCAD SHX Text
THURROCK
AutoCAD SHX Text
1.4m
AutoCAD SHX Text
PORT OF
AutoCAD SHX Text
LONDON
AutoCAD SHX Text
TILBURY