17
POWERING A THRIVING FUTURE Platform Well Abandonment – Cormorant Alpha Planning for the Modular Rig-based Well Decommissioning Operations on Cormorant Alpha May 2021

Planning for the MDR Well Decommissioning Operations on

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Planning for the MDR Well Decommissioning Operations on

POWERING A THRIVING FUTURE

Platform Well Abandonment – Cormorant Alpha

Planning for the Modular Rig-based Well Decommissioning Operations on Cormorant AlphaMay 2021

Page 2: Planning for the MDR Well Decommissioning Operations on

01

02

03

04

05

Introduction

Deck Management

Integrated Project Schedule

Tension Table

Corroded Pipe Handling Tool

CONTENTPlatform Well Abandonment Cormorant Alpha

06 Other Challenges

Page 3: Planning for the MDR Well Decommissioning Operations on

Introduction3

Page 4: Planning for the MDR Well Decommissioning Operations on

Platform Well Abandonment – Cormorant AlphaBackground Information Cormorant Alpha

4

Field Discovery: 1972

Date of Construction: 1978

Last Drilling Activity: 2007

Planned Activity: Plug andabandonment (P&A) of the CormorantAlpha platform well stock.

Cormorant Alpha Well Stock (22Wells):

18 wells - require all phase ofabandonment. 2 wells - phase 1 complete. 2 wells - phase 2 complete.

Page 5: Planning for the MDR Well Decommissioning Operations on

Platform Well Abandonment – Cormorant AlphaRig Re-Activation vs HWU vs MDR

5

HWU:• Requirement for

potential drilling, workover and abandonment activities

1978

Rig Drilling Package after 43 years

Rig Reactivation:• £££m• Full overhaul

required

ModularDrilling Rig:

• Met all tender criteria

Page 6: Planning for the MDR Well Decommissioning Operations on

Platform Well Abandonment – Cormorant AlphaArcher Topaz Modular Drilling Rig

6

Air Compressors & dryer

Generator

Cement Unit

CRI Unit

Pipe

Pipe Handling Crane

Active MUD system & HPU

TOPAZ MDR

Swarf Unit

Reserve Mud Tanks

Power Tower

HVAC Unit

SAS Unit

BOP Skid & Bottle Rack(obscured from view)

GeneratorGenerator

Summary: The Archer TOPAZ MDR has been contracted to undertake the well abandonments of the Cormorant Alpha wellinventory. It will be modified and adapted to operate on the installation prior to mobilisation. It will be coupled with severalexisting systems on the Cormorant Alpha to enhance its functionality and to make best use of the existing supportinfrastructure.

Page 7: Planning for the MDR Well Decommissioning Operations on

Deck Management 7

Page 8: Planning for the MDR Well Decommissioning Operations on

Platform Well Abandonment – Cormorant AlphaDeck Management

8

Page 9: Planning for the MDR Well Decommissioning Operations on

Integrated Project Schedule 9

Page 10: Planning for the MDR Well Decommissioning Operations on

Platform Well Abandonment – Cormorant AlphaIntegrated Project Schedule

10

TAR

1. MDR Project

Rig Trials

Derrick Deconstruct

CoA Modifications

2. Operations

Prioritised Annuli Bleed Downs

Conductor Measurements

Execution Phase

MDR R/U & ComUpfront Well Interventions

Page 11: Planning for the MDR Well Decommissioning Operations on

Tension Table11

Page 12: Planning for the MDR Well Decommissioning Operations on

Platform Well Abandonment – Cormorant AlphaTension Table

12

Surface Casing: The surface casing is either landed out on the conductor or a clamp will be run to transfer the well load tothe conductor.

Environmental Load Assessment: Sonomatic tool is being run as a screening tool to identify potential areas of corrosionand areas that may need additional support during well operations

Tension Table: Well load needs to be transferred to East-West skid rails. Commitment required to tension table prior toachieving results.

Page 13: Planning for the MDR Well Decommissioning Operations on

Corroded Pipe Handling Tool13

Page 14: Planning for the MDR Well Decommissioning Operations on

Platform Well Abandonment – Cormorant AlphaCorroded Pipe Handling Tool

14

Issue: A technical solution for handling pipe was sought due to concerns relating to structural failure of corroded completion tubulars recovered from the well.

Solution: The drilling contractor Archer approached the Original Equipment Manufacturer (OEM) of the MDR, Streicher, to propose an integrated solution that would support the pipe and contain any potential dropped objects.

Page 15: Planning for the MDR Well Decommissioning Operations on

Other Challenges 15

Page 16: Planning for the MDR Well Decommissioning Operations on

Platform Well Abandonment – Cormorant AlphaOther Challenges

16

Coiled Tubing Annuli Pressures

Units

Well Issues

Historic Data

Page 17: Planning for the MDR Well Decommissioning Operations on