Planning in production systems
Slovak University of TechnologyFaculty of Material Science and Technology in Trnava
Development of automation engineering manufacture conventional machines
conventional machines - NC machines - CNC a DNC control - flexible production systems PPS - CIM computer integrated manufacturing
CNC (Computer Numerical Control) control system of production device, which is connected direct to the local control microcomputer, where is the own program saved
DNC (Distributed Numerical Control) is characteristic by flexible distributed control of
several production machines from one center.
Dev
ice
pro
du
ctio
n
Mechanization
Computer control
Data networks
Computer integration
Program control
Term 1950 1970 1960 1980 1990
Figure 1: Development of production systems
Main components of production system – subsystems technological – geometric and physical – chemical
attributes change of the component transportation and handling – set of transportation and
handling tools to material, semi finished products and components movement between single workplaces of production process
store system – input, interoperated and output stores check - input, interoperated and output control control and information – set of control and informational
tools
Production system
Production system
Transportationand handling subsystem
Transportationand handling subsystem
Store subsystemStore subsystem
Technological subsystem
Technological subsystem
Control subsystem
Control subsystem
Managing and information subsystem
Managing and information subsystem
Figure 2: Components of the production system
Flexible Manufacturing Systems has open character, manufacturing orders can
be awarded continuously during planning period mutually interchangeable workplaces manufacturing orders can be splitted up into
parallel workplaces during planning period occur to failures possible alternative technical procedure minimally manual strikes minimal time to conversion
Main parts of the PVS processing NC a CNC devices to interoperating transport and
manipulation devices to operating transport – purpose
devices, manipulators, industrial robots components and tools carriers – Setting and
positioning problem is solved, establishment and fixing components
PVS tasks - provide especially production control
harmonization main and helping activities control manufacturing quality monitoring a scan
transport and storing - resolution store spoil, transport roads
PVS disadvantages high capital costs complex control system risk haywire of individual devices and thereby too
entire system
Elastic production system (PVS) mono or various technological devices with
system to ensure his functions in mechanical regime
automated production system, wherein oneself change production schedule solve by changing dating base
is possible to divide him into following parties: elastic production complex elastic Computer Integrated Manufacturing automated cartage - store system
PVS by organizational structure elastic production cell
plicate from technological machinery with code control with resources of the automation technological process, which works autonomous
elastic automated line includes several production cells arrange in order of
sequence technological operations and controlled by one direction system
elastic automated working to product certain assortment parts
elastic automated plant
Production planning in PVS working-out monthly operational plan products
for PVS designation basic terms and advances for preparation
production, safety and preparation of material, tools, documentation, subdelivery and co-operation
operational plan his part -> orientation terms commencement and
ending production at his base and real state in PVS oneself work out
short-time operational plan
short-time operational plan designates commencement and ending production
individual productional batches establishes priority of individual operations worked out weekly on fortnightly period