    Fasten mold to injection machine

    1,$fter estimation of the mold weight and molding situation,the right clamping bolt could

    be adopted. &old weight over 1 %on,the clamping bolt should not be less than ' pieces

    on the $ and ! plates,mold weight below 1 %on,( clamping bolts should be used on the

    both plates.

    ", ejection bars should be same length and diameter for the balance pushing to the

    ejector pins plate.when the ejection bars retrack,there should have a gap between the

    bars and ejector pins plate.

    )f ejector pins plate is forced to recover place ,the connecting screws should be

    adopted,and no gap need.

  • 8/14/2019 Plastic Mold Operation Key Points

    3/10

    Connection of

    water hose

    1, $fter

    connection of

    the cooling hoseand water

    plug,confirm the

    connection

    situation by

    hands

    ", *ater plug of

    +water out and

    +water in

    should be

    connectedcorrectly

    according to the

    specified

    seuence ,any

    changed

    seuence would

    have a negative

    impact on the

    uality offinished part.

    #,%o avoid

    possible interfering with the cooling water hoses when mold is opening and closing,it

    should use the appropriate length of the hose.

    (,)f the longer hoses is unavoidable, the proper length should be arranged properly to

    prevent to bruise water hose and damage mold.

  • 8/14/2019 Plastic Mold Operation Key Points

    4/10

    Confirmation of the oil hose and limit switch connection

    1.heck the oil hose for the possible leakage.

    ".heck theopening and

    closing of the mold

    for unusual

    sounds.

    #.heck the limit

    switch installing

    and wires.

    (.onfirm when

    mold ejection

    plate normallymove, the limit

    switch completely

    response.

    Injection

    molding

    1.!efore the

    injection molding

    begins, the mold

    should be heated

  • 8/14/2019 Plastic Mold Operation Key Points

    5/10

    up firstly.

    %he security door should be shut off. $fter the security door is closed, the operator

    shouldnt go intothe inside of the injection machine.

    ".the mold shouldnt be fully filled at the first shot, and it should be operated like this way 3-4 times before the

    final full filling.

    #.o not apply the the inappropriate clamping force /below the minimum reuirement0

    (.o not apply the the inappropriate injection pressure /below the minimum

    reuirement0. !e cautious of ecessive filling.

    The treatment of

    excessie filling

    1.Overfilling

    plastic or

    plastic inside

    slider2 slotneed to be

    completely

    removed

    immediately.

    Overfilling

    plastic should

    be removed

    completely

    when space ofthe slider

    center, spring,

    the head of the

    screw and

    bushing are

    filled with them.

    ".$fter the plastics scrape is removed, the check for the normal operation should be

    done. %he net injection molding cycle should never be done until they are cleaned

    completely.

    #.%he tools removing the overfilling and plastics sticked should be prohibited from theharder metalones, like crowbar, wrench, hammer, screwdriver.%he tools contacting directly

    with surface of the cavity and core should be made of copper! aluminum.

  • 8/14/2019 Plastic Mold Operation Key Points

    6/10

    3egrind material:

    4ach shift should check the hopper magnet for little metal scrapes to aoid possible damageto the

    barrel screw and hot runner.

  • 8/14/2019 Plastic Mold Operation Key Points

    7/10

    Check

    points

    for the

    plastic

    mold

    1,

    parting

    surface.3egularly clean and keep no foreign body on that.the burr and scrape on the

    surface should be removed immediatly otherwise they will bruise and damage the mold

    surface

    ", %he guide pins the guide bushing.%he guide pins the guide bushing should be cleaned

    regularly,and remove the used lubricate on that. 5uide pin with abnormal wear of thesurface should be fied in the tooling shop.$fter check and fiing,they should be

    lubricated again.

    # slots on the core ,cavity and sliders.6lots on the core ,cavity and sliders should be

    cleaned regularly and checked for the abnormal wear and rust.

    (, cooling water.heck the cooling pipes for unnormal bend to prevent clogging.heck

    water plug for leakage,gasket damage and plug wear and deformation will result in the

    cooling water leakage ,they should be inspected regularly.

    7, hydraulic cylinder.heck the hydraulic cylinder on the mold for oil leakage,and confirm

    the stable movement of the sliders activated by the cylinder.

  • 8/14/2019 Plastic Mold Operation Key Points

    8/10

    The maitenance of the plastic mold

    1,$fter molding, mold should be transported to the tooling workshop timely to clean the

    water inside the cooling channel with blowing of compressed air and lubricate for the

    rust.%he water remained inside the channel should lead to the rust in the channel and

    then clog the it,which could result in poor cooling.

    ",8ot runner mold.$fter the hot runner system power are shut off,it need at least

    another 17 minutes for the circulation of the cooling water working,otherwise, 9ailure to

    do so will result in adverse conseuences of the +O ring damage and leak in the cavity.

    #,$fter molding,the surface of cavity and core should be sprayed with the anti-rust agent

    if the mold could be stored for a long time.(,$fter the mold is released from the injection machine,it should be locked by the lock

    plates

    7,%he mold should be place in the circumstance free of the water and moisture.

    ,&old should not be placed directly on ground such as concrete.

    ;,omponents and cooling hose on the bottom side of mold should not touch the

    ground.

    ',Put the mold on the ground same direction as it in the injection machine.

    http://www.myplasticmold.com/plastic-mold-maintenance.htmlhttp://www.myplasticmold.com/plastic-mold-maintenance.html
  • 8/14/2019 Plastic Mold Operation Key Points

    9/10

    Plastic mold

    maintenance steps

    1.:,, ,

    ,,,,,,.

    Prepare mold cleaning

    tools:spray gun,$ir

    gun,electric hand

    drill,leaning fluid ,

    clean loth ,Oil

    stone,

  • 8/14/2019 Plastic Mold Operation Key Points

    10/10

    heck whether the elasticity of the spring is sufficient

    1'.O .

    heck whether the +Oring is damaged.

    1A.b 9TU\]cdefgh ,9(\])idefgh.

    heck whether the four puller of cavity plate is eual in length and whether the

    puller hole is eual in depth.

    "=../b jkefl; ,