Page | 1 PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK Budget Line Item 2020 Approved Budget Naira 2020 Approved Budget Billion Naira Previous Year Actual Previous Year Budget Target Budget Execution Total Budget Expenditure 177,340,521,774.0 177.3 71,932,988,352.0 153,537,190,069.0 46.9% Total Budget Revenue and Grants 91,349,337,287.0 91.3 74,709,644,986.0 82,060,761,270.0 91.0% Budget Deficit 85,991,184,487.0 86.0 -2,776,656,634.0 71,476,428,799.0 -3.9% Total Budget Financing 59,645,334,167.0 59.6 26,600,000,000.0 46,787,300,436.0 56.9% Financing Gap 26,345,850,320.0 26.3 -29,376,656,634.0 24,689,128,363.0 -119.0%

PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 1

PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Budget Line Item 2020 Approved Budget

Naira

2020 Approved

Budget Billion

Naira

Previous Year Actual Previous Year Budget

Target

Budget Execution

Total Budget Expenditure 177,340,521,774.0 177.3 71,932,988,352.0 153,537,190,069.0 46.9%

Total Budget Revenue and Grants 91,349,337,287.0 91.3 74,709,644,986.0 82,060,761,270.0 91.0%

Budget Deficit 85,991,184,487.0 86.0 -2,776,656,634.0 71,476,428,799.0 -3.9%

Total Budget Financing 59,645,334,167.0 59.6 26,600,000,000.0 46,787,300,436.0 56.9%

Financing Gap 26,345,850,320.0 26.3 -29,376,656,634.0 24,689,128,363.0 -119.0%

Page 2: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 2

WHERE DOES ALL THE MONEY COME FROM?

Page 3: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 3

NA WEA ALL DEY MONIE DEY COME FROM, EH? Budget Resource Envelope (Source of Funds) 2020 Budget Target

Revenue Internally Generated Revenue 21,213,793,723

Statutory Allocation 46,000,000,000

Value Added Tax 18,000,000,000

Other Statutory Revenue 1,500,000,000

Grant Domestic Grants 4,635,543,564

Foreign Grants -

Opening Balance Opening Balance

Total Revenue, Grant (including Opening Balance) 91,349,337,287

Budget Financing Domestic Loans 47,645,334,167

Foreign Loans 12,000,000,000

Sales of Government Assets -

Other Deficit Financing Items 26,345,850,320

Total Budget Financing 85,991,184,487

Total Budget Revenue and Financing 177,340,521,774

INTERNALLY GENERATED REVENUE

Source of Funds Composition 2020 Budget Target

Internally Generated Revenue 21,213,793,723

Statutory Allocation 46,000,000,000

Value Added Tax 18,000,000,000

Other Statutory Revenue 1,500,000,000

Domestic Grants 4,635,543,564

Foreign Grants -

Opening Balance -

Domestic Loans 47,645,334,167

Foreign Loans 12,000,000,000

Sales of Government Assets -

Other Deficit Financing Items 26,345,850,320

TOTAL REVENUE 177,340,521,774

Page 4: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 4

GRANTS

Domestic Grants 2020 Budget Target

Project/Donor Amount Naira

TET FUND COE GINDIRI 406,777,000

PUBLIC SECTOR GOVT, REFORM & DEVT 400,000,000

NHIS AND MDGS 251,137,664

PLASMEDA 1,000,000

TET FUND PLAPOLY 286,628,900

TET FUND PLASU 2,600,000,000

NEED ASSESSMENT PLASU 240,000,000

GRANTS FROM LGCS 450,000,000

Total Domestic Grants 4,635,543,564

Foreign Grants 2020 Budget Target

Project/Donor Amount Naira

Total Foreign Grants -

Page 5: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 5

DOMESTIC AND FOREIGN LOANS

Domestic Loans 2020 Budget Target

Project/Institution Amount Naira

DOMESTIC LOAN BONDS 10,000,000,000

DOMESTIC LOAN DEFICIT FINANCING 37,645,334,167

Total Domestic Loans 47,645,334,167.00

Foreign Loans 2020 Budget Target

Project/Insitution Amount Naira

FOREIGHN LOAN 12,000,000,000

Total Foreign Loans 12,000,000,000

Page 6: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 6

WEA DI MONIE DEY GO?

Expenditure 2020 Budget Target

Recurrent Expenditure

Personnel Cost 36,193,484,435

Overhead Cost 28,490,669,419

Consolidated Revenue Charges 34,059,641,900

Transfers

Interest Payments

Other Recurrent Expenditure

Total Recurrent Expenditure 98,743,795,754

Total Capital Expenditure 78,596,726,020

Total Expenditure 177,340,521,774

Page 7: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 7

NA WEA DU MONIE DEY GO, EH?

Page 8: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 8

Page 9: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 9

Page 10: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 10

SHARE

Page 11: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 11

TOP PROJECTS TO CAPITAL AND RECURRENT SHARE TO

BUDGET

Top Sector/Ministry Allocation Personnel Cost Overheads and Other Recurrent Recurrent Expenditure Capital Expenditure Total Expenditure

CONSOLIDATED REVENUE FUND CHARGES 1,878,695,255.93 34,059,641,900.00 35,938,337,156 35,938,337,156

MINISTRY OF BUDGET AND ECONOMIC PLANNING 6,722,864,710.00 2,718,866,000.00 9,441,730,710 9,441,730,710

MINISTRY OF EDUCATION (SECONDARY EDUCATION) 6,040,769,368.00 209,498,000.00 6,250,267,368 6,250,267,368

OFFICE OF THE SECRETARY TO THE GOVERNMENT OF THE STATE 3,187,142.00 5,091,000,000.00 5,094,187,142 2,895,000,000 7,989,187,142

PLATEAU STATE UNIVERSITY, BOKKOS 2,667,297,500.00 700,000,000.00 3,367,297,500 3,760,138,258 7,127,435,758

OFFICE OF THE EXECUTIVE GOVERNOR 66,228,541.00 2,769,000,000.00 2,835,228,541 2,835,228,541

PLATEAU STATE HOSPITALS MANAGEMENT BOARD 1,921,177,743.08 190,000,000.00 2,111,177,743 2,111,177,743

PLATEAU STATE POLYTECHNIC, BARKIN LADI 1,628,045,732.16 470,000,000.00 2,098,045,732 2,098,045,732

COLLEGE OF EDUCATION, GINDIRI 1,440,508,373.00 190,000,000.00 1,630,508,373 1,630,508,373

OFFICE OF THE ACCOUNTANT-GENERAL 435,799,807.00 1,080,750,000.00 1,516,549,807 1,516,549,807

PLATEAU STATE SPECIALIST HOSPITAL 1,174,987,912.00 300,400,000.00 1,475,387,912 1,475,387,912

PLATEAU STATE HIGH COURT OF JUSTICE 1,060,480,735.32 224,000,000.00 1,284,480,735 1,284,480,735

PLATEAU STATE INTERNAL REVENUE SERVICES 489,097,373.00 770,000,000.00 1,259,097,373 1,259,097,373

COLLEGE OF AGRICULTURE, GARKAWA 1,081,776,968.00 69,010,000.00 1,150,786,968 1,150,786,968

OFFICE OF THE HEAD OF CIVIL SERVICE 905,454,198.00 160,000,000.00 1,065,454,198 1,065,454,198

PLATEAU STATE OPERATION RAINBOW - 1,050,000,000.00 1,050,000,000 1,050,000,000

PLATEAU STATE MUSLIM PILGRIMS WELFARE BOARD 7,219,828.00 975,950,000.00 983,169,828 983,169,828

PLATEAU STATE CHRISTIAN PILGRIMS WELFARE BOARD 6,015,377.00 972,050,000.00 978,065,377 978,065,377

PLATEAU STATE HOUSE OF ASSEMBLY (LEGISLATIVE) - 913,500,000.00 913,500,000 913,500,000

PLATEAU STATE HOUSE OF ASSEMBLY COMMISSION 277,762,919.00 635,263,419.00 913,026,338 913,026,338

PLATEAU UNITED FOOTBALL CLUB 430,000,000.65 474,148,000.00 904,148,001 904,148,001

PLATEAU STATE HOUSE OF ASSEMBLY (BUDGET) - 900,500,000.00 900,500,000 900,500,000

PLATEAU STATE HOUSE OF ASSEMBLY 584,171,766.00 306,200,000.00 890,371,766 2,895,000,000 3,785,371,766

MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT 485,716,755.00 220,905,000.00 706,621,755 706,621,755

PLATEAU STATE WATER BOARD 482,847,742.00 220,000,000.00 702,847,742 12,529,450,000 13,232,297,742

PLATEAU STATE INDEPENDENT ELECTORAL COMMISSION 83,977,883.00 555,250,000.00 639,227,883 639,227,883

PLATEAU RADIO TELEVISION CORPORATION 464,896,482.00 155,000,000.00 619,896,482 619,896,482

COLLEGE OF ART, SCIENCE AND REMEDIAL STUDIES, KURGWI 572,163,672.00 40,000,000.00 612,163,672 612,163,672

PLATEAU STATE SCHOLARSHIP BOARD - 606,770,000.00 606,770,000 606,770,000

PLATEAU STATE SPORT COUNCIL 297,725,074.00 300,000,000.00 597,725,074 597,725,074

COLLEGE OF HEALTH TECHNOLOGY, ZAWAN 456,351,191.00 100,000,000.00 556,351,191 556,351,191

COLLEGE OF HEALTH TECHNOLOGY, PANKSHIN 456,619,594.00 62,160,000.00 518,779,594 518,779,594

MINISTRY OF ENVIRONMENT 197,251,915.00 320,000,000.00 517,251,915 6,374,800,000 6,892,051,915

MINISTRY OF TOURISM, CULTURE AND HOSPITALITY 54,049,010.00 445,000,000.00 499,049,010 499,049,010

PLATEAU STATE HOUSE OF ASSEMBLY (OFFICE OF THE CLERK) - 488,000,000.00 488,000,000 488,000,000

PLATEAU STATE AGRICULTURAL DEVELOPMENT PROGRAMME 306,659,037.00 166,000,000.00 472,659,037 472,659,037

Total 32,679,799,604 58,908,862,319 91,588,661,923 28,454,388,258 120,043,050,181

Other MDA Expenditure Other MDA Expenditure 57,297,471,593

Total Budgeted Expenditure Total Budgeted Expenditure 177,340,521,774

2020 Budget Target

Page 12: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 12

TOP 2020 LINE MINISTRY/AGENCY VS CAPITAL

BUDGETTop Capital Projects : 2020 Proposed Budget

Project Line Ministry/Agency Location(s) LGA(s) Amount

Distribution AFD

PLATEAU STATE WATER

BOARD PLATEAU STATE JOS NORTH 7,823,250,000

Waste to Energy (Prefeasibility and Preconstruction) MINISTRY OF ENVIRONMENT PLATEAU NORTH JOS NORTH 6,000,000,000

Maintenance of State Roads

PLATEAU STATE ROAD

MAINTENANCE AGENCY PLATEAU STATE ENTIRE STATE 2,414,000,000Construction of 8Nos. Model Primary Schools in Plateau State

(Lalong Legacy Project) MINISTRY OF FINANCE PLATEAU STATE ENTIRE STATE 2,200,000,000

Production of Water (AFD)

PLATEAU STATE WATER

BOARD PLATEAU STATE ENTIRE STATE 2,104,500,000

Procurement of 275Nos. of various Models of Official Vehicles

OFFICE OF THE SECRETARY

TO THE GOVERNMENT OF PLATEAU STATE ENTIRE STATE 2,000,000,000

Acquisition of Election Materials

PLATEAU STATE

INDEPENDENT ELECTORAL

COMMISSION PLATEAU NORTH JOS NORTH 1,000,000,000

Construction of 6Nos. Model Secondary Schools in Plateau State

(Lalong Legacy Project) MINISTRY OF FINANCE PLATEAU STATE JOS NORTH 1,000,000,000

Procurement of 25No of PRADO JEEP

PLATEAU STATE HOUSE OF

ASSEMBLY PLATEAU STATE JOS NORTH 937,950,000Procurement of Medical Equipment & Furnishing Of Secondary

Health Care Facilities in the State MINISTRY OF HEALTH PLATEAU STATE JOS NORTH 758,000,000Mangu Regional Water Supply (Network Distribution & pipe line

)(phase I)

MINISTRY OF WATER

RESOURCES AND PLATEAU STATE JOS NORTH 700,000,000Implementation of Greater Jos Master Plan(Planning, Design,

Upgrading of Slums,ICT Data Bank & Accelerated Districts)

MINISTRY OF PHYSICAL

PLANNING AND URBAN PLATEAU STATE JOS NORTH 650,000,000

Constituency Development Projects

PLATEAU STATE HOUSE OF

ASSEMBLY PLATEAU STATE JOS NORTH 600,000,000Reconstruction and resurfacing of Mararaban Jama'a- British

American Junction MINISTRY OF WORKS PLATEAU STATE JOS NORTH 600,000,000

Goodluck Ebele Jonathan Road Stadium Complex Phases I & II

MINISTRY OF YOUTH AND

SPORT PLATEAU STATE JOS NORTH 600,000,000

Technical Assistance PSWB (AFD)

PLATEAU STATE WATER

BOARD PLATEAU STATE JOS NORTH 508,475,000

Government Counterpart Contribution to CSDA

PLATEAU STATE COMMUNITY

AND SOCIAL DEVELOPMENT PLATEAU STATE JOS NORTH 500,000,000

Acquisition of BARC Farm

MINISTRY OF COMMERCE

AND INDUSTRIES PLATEAU STATE JOS NORTH 500,000,000Construction of 6Nos. Modern Hospitals in Plateau State (Lalong

Legacy Project) MINISTRY OF FINANCE PLATEAU STATE JOS NORTH 500,000,000

Intervention on State and Federal Roads in Plateau State MINISTRY OF WORKS PLATEAU STATE JOS NORTH 500,000,000

Building of Faculty of Arts (TET Fund)

PLATEAU STATE UNIVERSITY,

BOKKOS PLATEAU STATE JOS NORTH 500,000,000

Establishment of Cassava Processing Plants

MINISTRY OF COMMERCE

AND INDUSTRIES PLATEAU STATE JOS NORTH 450,000,000Construction of Kufang Wildlife park with spur to Domkat Bali and

Bitrus Rwang Pam road MINISTRY OF WORKS PLATEAU NORTH JOS NORTH 450,000,000Survey of Infrastructure (Health, Education, GHHS and Food

Security)

PLATEAU STATE BUREAU OF

STATISTICS PLATEAU NORTH JOS NORTH 450,000,000

Aquisition of Land for Layout Preparation

MINISTRY OF LANDS, SURVEY

AND TOWN PLANNING PLATEAU NORTH JOS NORTH 450,000,000

Acquisition of Fertilizer (Subsidy)

MINISTRY OF AGRICULTURE

AND RURAL DEVELOPMENT PLATEAU NORTH JOS NORTH 400,000,000

Maraban Demshin-Demshin with spur to Ungwan-Rina. MINISTRY OF WORKS PLATEAU CENTRAL KANAM 400,000,000

Tahoss-Ganawuri with spur to Dahreng MINISTRY OF WORKS PLATEAU NORTH RIYOM 400,000,000Fobur-Natong-Bayan Dutse-Maijuju -Zandi-Dorong with spur to Natok

and Rat MINISTRY OF WORKS PLATEAU NORTH JOS EAST 400,000,000Expansion of Water Pipeline Distribution Network in Jos/Bukuru

Metropolis and others

PLATEAU STATE WATER

BOARD PLATEAU NORTH JOS SOUTH 400,000,000

Building of Shendam Mini-Stadium (Legacy Project)

MINISTRY OF YOUTH AND

SPORT PLATEAU NORTH JOS NORTH 400,000,000Rehabilitation of Jos and Bukuru Treatment Plants Engineering

(AFD)

PLATEAU STATE WATER

BOARD PLATEAU NORTH JOS NORTH 394,975,000

Total Top Capital Projects 2020 36,991,150,000

Total Capital Projects 2020 78,596,726,020

% share of total top capital projects vs. capital projects for 2020 47.06%

Total Budget 2020 177,340,521,774

% share of total top capital projects vs. total budget for 2020 20.86%

Top 5 Capital Projects : 2020 Proposed Budget Amount

Distribution AFD 7,823,250,000

Waste to Energy (Prefeasibility and Preconstruction) 6,000,000,000

Maintenance of State Roads 2,414,000,000

Production of Water (AFD) 2,104,500,000

Procurement of 275Nos. of various Models of Official Vehicles 2,000,000,000

Other Capital Projects 58,254,976,020

Total of top 5 Capital Projects 20,341,750,000

Total Capital 78,596,726,020

Total Recurrent 98,743,795,754

Total Expenditure 177,340,521,774

Page 13: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 13

PLATEAU STATE SEPTEMBER 2020 MINUTES

AND REPORT OF CITIZENS’ BUDGET

TOWN HALL MEETING

Page 14: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 14

MINUTES OF STAKEHOLDERS TOWN HALL MEETING ON CITIZENS

ENGAGEMENT ON THE STATE BUDGETING PROCESS HELD AT THE THREE

SENATORIAL ZONES OF THE STATE

SOUTHERN ZONE HELD ON THE 15TH SEPTEMBER, 2020 AT SHENDAM

YOUTH CENTRE.

DATE OF MEETING: ……………………………………………………..

TIME OF MEETING: ……………………………………………………..

MUNUTES PREPARED BY: …………………………………………..

1.0 PRESENT

The meeting was attended by stakeholders from the six(6) local

governments that made up the zone.

Among those who attended were His Royal Highness the Long Goemai

of Shendam, Mishkoom Martins Shaldas the Third ably represented by

Long_Pan, Cosmos Ndelon, Clerk of the Plateau State House of Assembly,

Representative of the Hon. Commissioner Ministry of Budget and Economic

Planning, Nde Shedrack Goleng (Permanent Member), Directors and other

staff of the Ministry, Civil Society Organization, CAN, JNI, Women and Youth

groups, Community Leaders, labour organization and the Press.

On arrival, the representative of the Commissioner led a delegation for

courtesy call on His Royal Highness, Long Goemai of Shendam, Mishkoom

Sheldas the Third to inform him of the ministry’s desire to robe minds with

stakeholders of the zone on Budgeting Process.

It should be noted that the meeting was strictly on the invitation to

comply with the led down guidelines of COVID-19 Safety protocol.

Page 15: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 15

1.1 OPENING PRAYER

The meeting commenced with a word of prayer led by the

Representative of the CAN at about 11:45am.

1.2 WELCOMING ADDRESS

This was delivered by the Director of Administration in the Ministry

Hajiya Aisha I. Saleh. In her remark the director submitted that, the reason

behind the meeting was to informed citizens that the state 2020 budget

which was signed into law was directed to be reviewed downward because

of the effect of the COVID-19 Pandemic on the nation’s economy, she

added that, during the discussion, stakeholders are expected to add their

voice by offering meaningful contributions taking note that their

communities’ expectations from government.

1.3 SPEECH BY THE HON. COMMISSIONER MINISTRY OF BUDGET AND

ECONOMIC PLANNING

The representative of the Hon. Commissioner in his speech advanced

that, the reviewed 2020 budget estimate came as a result of the advent of

COVID-19 and its impact on the nation’s economy and stakeholders as key

players were expected to be informed to enable government response to

the challenges. He added that there was nee for synergy and collaboration

with stakeholders to fight this battle.

The commissioner submitted that despite the menace, government

remains committed to their responsibilities to citizens’ welfare which was

evident in the prompt payment of salaries and pension, treatment of

COVID-19 patients, establishment of more testing centers for COVID-19 and

keying into Federal Government COVID-19 action recovery and economic

stimulus programme.

Page 16: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 16

The Commissioner enjoined the participant to appreciate

government’s effort in that regard and contribute freely during the

meeting.

2.0 GOODWILL MESSAGES

The goodwill messages came from the representative of His Royal

Highness the Long Goemai of Shendam, the blong-Pan, Cosmos Ndelon,

Clerk of the Plateau State House of Assembly and Civil Society Organization.

In their separate messages H.R.H. the Long Goemai lamented the hardship

imposed on citizens by the pandemic while the Clerk commended

government for initiating the programme where citizens could contribute in

the process.

3.0 PRESENTATION OF 2020 REVIEWED BUDGET BY THE DIRECTOR OF

BUDGET

In his presentation, the director of Budget Mr. Abraham H. Mamdam

highlighted that the reviewed budget emerged as a result of the advent of

COVID-19 Pandemic when the approved 2020 budget was already signed

into law but was directed to be reviewed downward.

It was on this note that the approved budget of N177.1b Naira was

revised to N122.8b naira but with a revenue target of N113b naira and

deficit of N9.1b. This he said calls for adjusting all government programmes

to matched with realities on ground.

The director stressed that during the reviewed, the approved

personnel cost of N36.1b naira was reviewed to N36.7b naira while

overhead cost of N28.4b naira was revised to N25b naira, consolidated

revenue fund charges was reviewed from N34b to N18b naira, while capital

expenditure of N78 naira was revised to N42b naira.

Page 17: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 17

For revenue the director said statutory revenue allocation (FAAC) of

N47b was reviewed to N33.6b naira while VAT of N19b naira was dropped

to N12b naira, the IGR of N21b naira was dropped to N18 naira but external

grant which had no approval realized N16.7b naira.

The director enumerated some challenges encountered by

Government during the Pandemic and called on Citizens to add their voice

on a way forward and also pay their Tax.

This was interpreted in some common languages by the Deputy

Director of the Budget Mr. Peter Lamba Bot for more understanding.

He submitted that, budget does not mean funds already at hand but

sourcing of funds to finance available projects. This he said calls for

collaboration with all stakeholders if we must achieve, he added that,

budget process has four stages namely; formulation, approval,

implementation and auditing which citizens are expected to participate

after which he led the stakeholders’ interactive session. This he did by

asking them to form groups based on their local government to channel

their request.

4.0 CONTRIBUTIONS AND COMMENTS BY STAKEHOLDERS

In their separate contributions;

Mr. John Solomon from Wase observed that problems tendered

in meeting like this are not usually captured in the budget as

expected.

Mr. Lawrence from Langtang South advised government to put

more effort in revenue generation.

Page 18: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 18

Mr. Godsafe Diga from Mikang on the other hand called

government to set up effort in the distribution of COVID-19

palliatives to reduce hardship faced by citizens.

4.1 RESPONSE BY THE MINISTRY OF BUDGET AND ECONOMIC PLANNING

The representative of the Hon. Commissioner and other dignitaries

while responding submitted that some projects were not executed

because of financial constraint and advised stakeholders to pay taxes

and other revenue to supplement revenue from the Federal

Government.

That the Federal Government is intervening in the areas like

electricity, water, and agriculture.

That government is also intervening in areas like housing and

COVID-19 stimulus.

That government made some tax relief during COVID-19 lock down

to assist masses.

On the other hand, the representative of the Long Goemai of Shendam

appreciated government for the initiative and appealed that their plight be

forwarded to the high authority, while the Clerk of the Plateau State House

of Assembly appreciated members for attending the meeting.

4.2 PROJECTS IDENTIFIED PER LOCAL GOVERNMENT

SHENDAM LOCAL GOVERNMENT AREA

Electrification of shendam LGC as a whole.

Access road and street road to Tudun-Wada and total

Establishment of College of Health Technology in Shendam.

Page 19: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 19

Dragging of Dam.

Registration of Lands and Motor-cycles.

Establishment of rice processing factory in Dorok.

QUA’NPAN LOCAL GOVERNMENT AREA

Construction of Namu, Lankaku and Jenta road.

Construction of Kwande to Turmiang road.

Building of police outpost in Namu.

Upgrading of Kwala cottage Hospital to a general hospital.

Linking of Quan’pan to national grid.

Revamping of Relevant Technology Doemak to training centre.

Early distribution of fertilizers.

MIKANG LOCAL GOVERNMENT AREA

Construction of roads linking Baltep, Piapung to Lifidi.

Electrification of Mikang local government area.

Renovation of man-power and facilities in out G.H.T.

Provision of portable water.

Construction of Piapung-Gidan Adamu road.

Construction of Lalin-Garkawa road.

LANGTANG LOCAL GOVERNMENT AREA

Provision of portable water.

Provision of farming inputs like tractors, seedlings etc and monitor

distribution

Page 20: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 20

Ensure funding of Primary Health Care, creation of more COVID-19

testing centers.

Request for higher institution and personnel in primary and secondary

schools.

Construction of rural roads and electrification network.

Awareness to key into government empowerment programme b y

citizens.

Stepping up effort by government to boost revenue generation from

business owners.

5.0 VOTE OF THANKS

The vote of thanks was said by the Director of Planning of the ministry

Mr. Pam Mancha, he commended stakeholders, Royal Fathers, Clerk, Civil

Societies and staff of the ministry especially the representative of the Hon.

Commissioner and Director of Administration for attending and

contributions in the meeting.

5.1 CLOSING PRAYER

This was led by the representative of JNI at about 2:05pm

Page 21: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 21

Page 22: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 22

PICTURE DISPLAY OF PARTICIPANTS

Page 23: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 23

Page 24: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 24

Page 25: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 25

Page 26: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 26

Page 27: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 27

ATTENDANCE

Page 28: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 28

Page 29: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 29

Page 30: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 30

CENTRAL ZONE HELD ON THE 16TH SEPTEMBER, 2020 AT DADIN KOWA

YOUTH CENTRE

1.0 PRESENT

The meeting witnessed appreciable turnout in compliance to COVID-19

safety protocol of wearing face mask, social distancing and using of

sanitizers.

Amongst those who attended were the Emir of Kanam, Alh. Musa

Mohammadu. The sum Pyem Mr. Charlse Matoh Dakal, Ag. Saf Ron-kulere

Lawrence Ayizat and the Saf Bokkos Monday Adanchin, Representative of

the Hon. Commissioner, Directors and Staff of the Ministry for Budget and

Economic Planning, Civil Societies Organization, women and youth groups,

CAN, JNI leaders of the trade union, community leaders and the press.

The attendance was strictly on attendance.

1.1. OPENING PRAYERS

The prayer was led by a member of Civil Society Organization Mr.

Shamaki at 11:15 am.

1.2 WELCOMING REMARK

This was said by the director of Administration in the ministry, Haj.

Aisha I. Isah. She said in her address that, the meeting was neccessited by

the advent of COVID-19 pandemic when the 2020 approved budget was

already signed into law but had to be revised because of its effect on the

economy of the state and the national in general.

The director added that because citzens are key in the process, it

became imperative for them to be informed of the development so that,

they can add their voice.

Page 31: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 31

1.3 SPEECH BY THE HONOURABLE COMMISSIONER MINISTRY OF BUDGET

AND ECONOMIC PLANNING

The honourable commissioner Mr. Sylvester I. Wallangko was ably

represented by a Permanent Member in the Ministry Nde Shedrack Golang.

In his speech, the commissioner submitted that, citizens may be wondering

why the meeting was organized having signed the reviewed budget into law

but the facts remain that citizens are partners in the process hence the

need for them to be informed becomes imperative.

He added that the impact of the pandemic resulted to the crash of the

countries economy and government was directed to adjust activities in

order to face the reality on ground that was why our 2020 budget was

reviewed from 177.1b to 122.8b. he however said, despite the menace the

governor remains committed to his responsibility and not deviating from his

3 pillar policy thrust of his administration which was demonstrated in the

prompt payment of salaries and pension, execution of ongoing projects,

fighting of COVID-19 pandemic and keying into the federal government

COVID-19 action recovery and economic stimulus programme.

On this background, the commissioner called on citizens to appreciate

government and contribute meaningfully taken cognizant of their

communities aspiration.

2.0 GOODWILL MESSAGE

Goodwill messages were received from the Emir of Kanam on behalf of

the royal fathers. In his message the royal father appreciated government

for involving them in the process and pledge to mobilized support for

government but lamented the hardship been forced by citizens as a result

of COOVID-19 pandemic.

Page 32: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 32

2.1 PRESENTATION OF 2020 REVIEWED BUDGET BY THE DIRECTOR OF

BUDGET

In the presentation, the director of budget Mr. Abraham H. Mamdam

submitted that, transparency and accountability is a programme initiated

by the world bank where states are expected to be rewarded based on

budget performance.

He stated that, reviewing a budget is not a usual thing but comes as a

result of the advent of COVID-19 pandemic. When the 2020 budget

estimate was already signed into law. He stressed that government was

adviced to revised the budget to match with current realities which our

budget was reviewed from 177.1b to 122.8b naira with a revenue of 113b

with a deficit of 9.7b naira.

In his presentation, the director said personnel cost was reviewed from

36.1b to 36.7b, overhead reviewed from 28.4b to 25b naira, consolidated

revenue fund charge of 34b was reviewed to 18b while capital expenditure

of 78.5b revised to 42b naira.

The director in a related development adviced citizens to help

government implement programmes by paying their taxes.

Interpreted in some common language, the deputy director of budget

Mr. Lamba Bot said budget process has four stages and citizens are

expected to participate actively in all the stages to own the budget starting

with formulation, approval, implementation to auditing or assessment

stage. He submitted that budget process has shifted from those days where

projects were decided for communities by government MDAs.

3.0 CONTRIBUTION/COMMENTS BY STAKEHOLDERS

i.Dr. Danladi from Kanam commended government for involving

stakeholders in the budgeting process and also appreciated the

ministry for including one of their projects they registered.

Page 33: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 33

ii.Mr. Garba Daniel from Pankshin commended government for

financing some projects despite the effect of the COVID-19 and also

adviced government to intensify revenue collection especially at the

local government level.

3.1 RESPONSE BY THE MINISTRY

The permanent member while responding to some issues said

government will use the meager resources and finance some

projects.

That government now involved citizens in projects initiation on the

communities aspiration.

That federal government has initiated programmes in agriculture

and social investment health etc to cursion the hardship faced by

citizens.

That citizens should stop politicizing government programmes.

4.0 PROJECTS IDENTIFY PER LOCAL GOVERNMENT

BOKKOS LOCAL GOVERNMENT AREA

Completion of general hospital in Bokkos.

Construction of road project from Mbar to Kamirai through Riccha.

Completion of Kuba Daffo road through Mangor to Mangun.

Rehabilitation of Government Secondary School Mbar.

Provision of Assorted fertilizer.

Fencing of Government College Bokkos and Mbar.

MANGU LOCAL GOVERNMENT AREA

Completion of Mangu regional project and distribution to

communities.

Roads and bridges construction for Gindiri – Kadunnung to Korof

road.

Upgrading of hospitals and completion of Lalong legacy project.

Page 34: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 34

Provision of fertilizer and potato value change.

Building of more school and employment of teachers.

Construction of modern market for agricultural projects.

Youth Empowerment and employment.

PANKSHIN LOCAL GOVERNMENT AREA

Construction of access road from Pankshin through Kagu to Shirin.

Construction of primary health care.

Construction of markets.

Establishment of loacal industries.

Youth improvement.

Improve agriculture.

Electrification of communities.

KANKE LOCAL GOVERNMENT AREA

Provision of rural water to communities.

Construction of motorable road network.

Provision of health facilities.

Introduction to mechanized agriculture.

Renovation of delipidated school and facilities.

Youth empowerment.

Provision of scholarship to students and facilities in schools.

KANAM LOCAL GOVERNMENT AREA

Provision of pipe born water and rural roads construction.

Mineral development and security issues.

Provision of secondary and primary health care.

Rural electrification to communities.

Sanitation and environmental degradation.

Agriculture and education issues.

Youth Empowerment and social development.

Page 35: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 35

5.0 VOTE OF THANKS

The vote of thanks was said by His Royal highness, the Sum-Pyem Mr.

Charlse Maloh Dakat. He appreciated the government for continuity of

projects and federal government to the completion of Mangu regional plant

but appealed for the completion of the Dam and the road linking Mangu,

Bokkos Wamba which has been abandon to be revisit.

5.1 CLOSING PRAYER

The meeting ended with a word of prayer by Alh. Mutsafa at 1:00 pm.

Page 36: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 36

PICTURE DISPLAY OF PARTICIPANTS

Page 37: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 37

Page 38: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 38

Page 39: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 39

ATTENDANCE

Page 40: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 40

Page 41: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 41

Page 42: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 42

NORTHERN ZONE HELD ON THE 16TH SEPTEMBER, 2020 AT DADIN KOWA

YOUTH CENTRE.

1.0 PRESENT

Present in the meeting were His Royal Highness, the Gbong Gwom Jos

Da Gyang Buba ably represented by the Royal Highness, The Gwom Rwei of

Barkin Ladi Da Edward Gyang Bot, His Royal Highness, the Ada Agwom Azi

Ali Ibrahim of Jos East traditional Council and other Royal Fathers of the

zone, the Deputy Chairman of Jos East Local Government, Hon. Simon

Izang, Community leaders, youth and women leaders, labour organization,

Civil society organizations, Politicians, Representative of the Hon.

Commissioner of Budget and Economic Planning and other staff of the

ministry, CAN, JNI and the press.

Worthy of note was compliance to COVID-19 safety protocol of wearing

of face mask, distancing, washing of hands and using of sanitizers in the

meeting.

1.1 OPENING PRAYER

At about 1:30pm Rev. Stephen Dingmiel, CAN Chairman, Jos East led

the prayers.

1.2 WELCOMING REMARK

The Director of Administration of the ministry, Hajiya Aisha I. Saleh

while welcoming members highlighted that the rationale behind the

meeting was to informed citizens on the recent development of 2020

budget reviewed that was occasion by the emergence of COVID-19

Pandemic. This she said, was imperative as stakeholders needs to be

informed having known that, the approved 2020 budget was already passed

and signed into law. She added that stakeholders are expected to

contribute their quarter to enable government planned for the 2021 fiscal

year and to also note governments constraint with respect to finances.

Page 43: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 43

1.3 SPEECH BY THE HONOURABLE COMMISSIONER MINISTRY OF BUDGET

AND ECONOMIC PLANNING

The honourable commissioner Mr. Sylvester I. Wallangko was ably

represented by the Permanent Member in the Minstry, Nde Shedrack

highlighted in the speech that the reviewed 2020 budget estimate was not

a usual one but came as a result of COVID-19 Pandemic with a lot of impact

on the nation’s economy and citizens as stakeholders needs to be imformed

to lent their voices to enable government respond to the challenges. He

added that, the situation at hand demands synergy and collaboration with

all Plateau people to fight the battle.

The Hon. Commissioner also submitted that, despite the challenges

occasioned by the Corona Virus, government remains committed to her

responsibilities on the citizens’ welfare which was evident in the prompt

payment of workers’ salaries and pension in addition to execution of some

ongoing projects. Others were treatment of COVID-19 patients,

establishment of COVID-19 testing centres and keying into federal

government COVID-19 action recovery and economic stimulus programme.

On this note, the commissioner enjoined citizens to appreciate

government and add their voices on a way forward with regards to the

states revenue and expenditure pattern.

2.0 PRESENTATION OF 2020 REVIEWED BUDGET BY THE DIRECTOR OF

BUDGET

The Director of Budget Mr. Abrahim H. Mamdam while presenting the

revised budget in a slight highlighted that, revising a budget that had

already been signed into law is not common but by circumstances. This he

said COVID-19 Pandemic was behind the review.

The director submitted that, the review was to take effect from July to

December 2020 and also summarized that, the 2020 approved budget

Page 44: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 44

estimate of N177.1b naira was revised to N122.8b naira with a revenue of

N113.3b naira having a deficit of N9.1b naira.

For expenditure, the director said personnel cost of N36.1b naira as

approved was reviewed to N36.7b naira, while overhead cost of N28.4b

naira was revised yo N25b naira, Consolidated Revenue Fund charge was

reviewed from N34b naira to N18b naira and capital expenditure of N78.5b

naira revised to N42b naira. For revenue he submitted that, statutory

revenue allocation of N47b naira went down to N33.6b naira while VAT

dropped from N21.2b naira to N18b naira, but external grant which had no

approval realized a sum of N16.7b naira.

The director in the end noted how the budget was so challenging in

the implementing government programmes and advice citizens to play their

part by paying their taxes.

This was interpreted in some common language for more

understanding by the deputy director of budget Mr. Lamba Bot and later

led the citizens’ interactive session where all were asked to form groups

based on local governments to discussed their communities’ expectation

from government and stressed that budget process has four stages and

stakeholders are expected to participate in all the stages of formation,

approval, execution and auditing.

3.0 GOODWILL MESSAGES

The goodwill messages came from the representatives of His Royal

Highness, The Gbong Gwom Jos, Da Gyang Buba, the Deputy Chairman of

Jos East Local Government, Hon. Jonnie Simon Izang and Civil Societies

Organization.

In their separate remarks, the Gbong Gwom Jos commended

government for initiating the programme where citizens could contribute to

the nation’s building and called on citizens to understand with government

as the review was not intentional while the Deputy Chairman commended

Page 45: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 45

government for sustaining payment of workers’ salaries and the Civil

Society commended government for sustaining the town hall meeting.

Page 46: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 46

4.0 CONTRIBUTION/COMMENTS BY STAKEHOLDERS

Stakeholders in their separate contribution and comments submitted as

follow;

Mr. John Musa a representative of tri-cycle noted with concern why

government could not recognize their contribution in government.

Engr. Dung Chollom from Heipang appealed to government to make

inland port functional.

Mr. Nyam noted with concern why government depend on foreign

loan without plan B.

Mr. Azi Waziri Atu of Afizere commended government but called for

realistic budget implementation not mere reflection.

Gwom Ayuba Usman noted why expenditure surpassed revenue.

Bensdon Benard appealed for citizens’ inclusion in budget

implementation.

Moh’d Alhassan advised government to create truck terminals in

Babale and Mararaban jama’a.

Hon. Yusuf Umar advised government to place tourism as a priority in

order to generate revenue.

Hon. Jonnie Simon Izang advised government to restructure Jos main

market, complete Zaria road stadium and consider JIB and BARC far to

use.

4.1 RESPONSE BY THE MINISTRY OF BUDGET AND ECONOMIC PLANNING

The director of Administration while responding to some issues raised

said government is fully aware of the contribution of tri-cycles in

governance.

The director of budget also noted the issue of expenditure surpassing

revenue in budget to be set as a result of limited resources.

Page 47: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 47

He also said, budget process allows citizens participating in all the

budget process hence the need for them to key in an always liaised

with their House of Assembly members.

4.2 PROJECTS IDENTIFY PER LOCAL GOVERNMENT

JOS NORTH LOCAL GOVERNMENT AREA

The menace of Sarasuka and cultism should be checked.

Restructuring of Jos main market should be noted.

Construction of access road within Jos and its environs.

Completion of Zaria road stadium.

Provision of water and regular environment sanitation.

Satellite layout should be established.

Health facilities should be developed.

JOS SOUTH LOCAL GOVERNMENT AREA

Construction of D.B Zang junction to Gyel market.

Construction of road from Gero junction to Rafibona.

Construction of road from trade centre to Da Gwom palace.

Construction of road from Vet to Jagaram.

Construction of road from sparkling junction to Ray Field.

Construction of road from Namowa to Gura-Gwoadiok.

Completion of stadium at Ro-gatak.

Construction of clinic in Rantiya Du.

Construction of Vwang market.

Page 48: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 48

Completion of Bukuru stadium.

BARKIN LADI LOCAL GOVERNMENT AREA

Rehabilitation of Dorowa Babuje Mari Mazat road.

Rehabilitation of Bakin-Kogi Kadunung road, Kankyo Nhar road,

Rat/Nafok road.

Rehabilitation of Bet-Ropp, Dorowa Rafatis road.

Electrification of Tapo Bridge Heipang.

Provision of pipe borne water.

Returning of IDPs to their homes, provision of security and building of

houses.

Tourism and NESCO development.

BASSA LOCAL GOVERNMENT AREA

Provision of security and youth and women empowerment.

Construction of Janare-Amo-Katako Binchi Jebu Bassa-Jos Miango road.

Provision of agricultural inputs e.g Tractor, fertilizer and BARC farm.

Renovation and rehabilitation of PHC/borehole across the LGA.

Construction of market to boost revenue.

Electrification of rural communities in the local government area.

RIYOM LOCAL GOVERNMENT AREA

Provision of security to protect farm lands.

Provision of health facilities.

Construction of motorable road in Ryom.

Page 49: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 49

Provision of mechanized agriculture.

Renovation of dilapidated school and provision of facilities.

Lack of opportunities for disable.

Provision of Youth and women empowerment.

JOS EAST LOCAL GOVERNMENT AREA

Construction of Fobur-Maijuju-Zandi and Fobur-Angware.

Construction of NDLEA junction-Fobur Ekan and Zendi Gada.

Construction of Angware roads.

Security upgrade and remuneration for hunters.

Construction of boarding school at GSS Federe.

Early distribution of fertilizer.

Construction of Mazah-Shere_Angware road.

Building of hospital in Zandi and Ribung.

Construction of Dams in angware Keben and Janowa.

5.0 VOTE OF THANKS

This was said by the Director of International Cooperation Mr. Fidelis

Daboer. He appreciated citizens for attending the programme and pledge

that the ministry will capture their request in the budget and also advise

them to liaise with their House of Assembly members.

5.1 CLOSING PRAYER

The meeting ended with a word of prayer by the representative of JNI

at 3:25pm.

Page 50: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 50

Page 51: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 51

PICTURE DISPLAY OF PARTICIPANTS

Page 52: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 52

Page 53: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 53

Page 54: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 54

Page 55: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 55

Page 56: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 56

ATTENDANCE

Page 57: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 57

Page 58: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 58

Page 59: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 59

Page 60: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 60

Page 61: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 61

Page 62: PLATEAU STATE 2020 BUDGET GENERAL FRAMEWORK

Page | 62