74
5 6 7 8 9 10 11 IN OUT 1 2 3 4 100.06 tree 100.30 tree 100.23 tree 101.10 tree 100.77 tree 101.00 tree 99.62 tree 100.13 tree 100.64 tree 98.52 tree 100.95 tree 100.22 lp 100.56 lp 99.79 lp 99.37 lp 101.01 lp 100.34 lp 100.12 lp 100.21 lp 100.10 lp 100.26 lp 99.19 lp 100.64 lp GREEN HOUSE CHICKEN PENS CISTERN SAND PIT Z:99.73 Z:100.21 Z:100.12 Z:99.33 Z:99.33 Z:100.85 Z:100.63 Z:100.02 Z:101.09 Z:99.35 Z:99.32 Z:99.47 Z:99.86 Z:99.95 Z:99.87 Z:100.31 Z:99.79 Z:99.72 Z:99.33 Z:99.51 Z:100.37 Z:99.70 Z:100.93 Z:100.85 Z:100.51 Z:99.08 Z:99.30 Z:100.39 Z:100.32 Z:99.49 Z:100.50 Z:100.98 Z:100.70 Z:99.82 Z:100.18 Z:99.76 Z:100.05 Z:99.93 Z:99.72 Z:99.68 Z:100.18 Z:99.94 Z:100.31 Z:100.51 Z:99.53 Z:99.19 Z:101.01 CAFETERIA BLOCK A DN. DN. ART RM. CLASS RM. #3 CLASS RM. #4 CLASS RM. #5 CLASS RM. #6/STAGE AUDITURIUM CLASS RM. #7 UP COMPUTER LAB. 452 s.f. CHEMISTRY 604 s.f. BIOLOGY 604 s.f. M. WASH RM. F. WASH RM. MECH. UP INDUSTRIAL ARTS 906 s.f. COUNTER TOPFUME CABINET PROPOSED COMPUTER LAB. 602 s.f. SEC. 126 s.f. LOBBY/ WAITING 135 s.f. STO. 1 91 s.f. STO. 1 75 s.f. STAFF RM. 330 s.f. M. WRM. 47 s.f. F. WRM. 47 s.f. BLOCK B RAMP UP PROPOSED SCIENCE LAB. 916 s.f. CLASS RM. #1 498 s.f. CLASS RM. #2 498 s.f. DN. OFFICE 56 s.f. STO. 53 s.f. STO. 29 s.f. KITCHEN 345 s.f. DEPUTY PRICIPAL OFFICE 160 s.f. BLOCK D BLOCK E MECH. RM 75s.f. ELEC. RM. 158s.f. PRINCIPAL WASHRM. 33s.f. PROPOSED STAFFRM. 597s.f. PRINCIPAL OFFICE 133s.f. RAMP(#1) UP24'-0" PROPOSED CLASSRM. #1 526s.f. RAMPUP(#2) 24'-0" FEMALE WRM. 33s.f. LOBBY/ ENTRANCE UP PROPOSED SEC. 133 s.f. MALE WRM. 33s.f. UNDERPASS UP ELEVATOR SHAFT BLOCK B D1 W1 4'-0"x 4'-0" ACCESSHATCH PUMP STORAGE UNDERSLAB FIN. GRD. FL. 2'-4" HOME ECONOMICS 763s.f. PROPOSED214s.f. MALEWASHRM. PROPOSED 214 s.f. FEMALEWASHRM. MECH. RM. 77s.f. URINAL RAMPDN. 24'-0" DN. PROPOSED HOME MANAGEMENT 768s.f. BLOCK C D4 WASHRM. 32s.f. FIN. GRD. FL. 2'-4" FIN. GRD. FL. 2'-4" FIN. GRD. FL. 2'-4" NOTES 1. DONOT SCALE DRAWINGS 2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS. 3. IF YOU ARE IN DOUBT PLEASE ASK. 4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES 5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED 6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS 7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR DRAWING NO: DRAWING TITLE: Moulton Mayers Architects INTERIOR DESIGNERS, URBAN DESIGNERS, CONSTRUCTION MANAGERS MOULTON MAYERS DIP. ARCH. BS, ARCH. B, ARCH. MS, URBAN DESIGN. P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I. TEL: 784-457-2072 E-MAIL:[email protected] DATE REVISIONS BY DRAWN BY: SCALES: CHECKED: APPROVED BY JOB NO: DATE: M M PROJECT TITLE: REVISION M.M AS SHOWN BRANSON OLLIVIERRE SIR MC CHESNEY GEORGE SECONDARY SCHOOL (BARBUDA ANTIGUA) 03/11/16 SITE PLAN S1 SITE PLAN SCALE:1"=40' EXISTING BUILDING REMAIN PROPOSED BUILDING REMAINING LANDS FOR PLAYING GROUND & AGRICULTURE E.T.C. GARBAGE COLLECTION PROPOSED PEDESTRIAN CIRCULATION EXIST. PEDESTRIAN CIRCULATION TO REMAIN OUT PROPOSED SECURITY GARBAGE COLLECTION PROPOSED PLAYING FIELD EXIST. AGRICULTURE PLOT COURT YARD 448A/16 THE WORKING DRAWING PHASE PROPOSED ROAD & PARKING BY OTHER BLOCK F BLOCK G BLOCK H BLOCK I BLOCK J REV.#1 REV.#1 REV.#1 11/16/16 REV.#1: SECURITY BOOTH RELOCATED B.O.

PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

5 6 7 8 9 10 11

IN

OUT

1 2 3 4

100.06tree

100.30tree

100.23tree

101.10tree

100.77tree

101.00tree

99.62tree

100.13tree

100.64tree

98.52tree

100.95tree

100.22lp

100.56lp

99.79lp

99.37lp

101.01lp

100.34lp

100.12lp

100.21lp100.10

lp

100.26lp

99.19lp

100.64lp

GREEN HOUSE

CHICKEN PENSCISTERN

SAND PIT

Z:99.73

Z:100.21

Z:100.12

Z:99.33

Z:99.33

Z:100.85

Z:100.63

Z:100.02

Z:101.09

Z:99.35

Z:99.32

Z:99.47Z:99.86

Z:99.95

Z:99.87

Z:100.31

Z:99.79

Z:99.72

Z:99.33

Z:99.51

Z:100.37

Z:99.70

Z:100.93

Z:100.85

Z:100.51

Z:99.08

Z:99.30

Z:100.39

Z:100.32

Z:99.49

Z:100.50

Z:100.98

Z:100.70

Z:99.82

Z:100.18

Z:99.76

Z:100.05

Z:99.93

Z:99.72

Z:99.68

Z:100.18

Z:99.94

Z:100.31

Z:100.51

Z:99.53Z:99.19

Z:101.01

CAFETERIA

BLOCK ADN.

DN.

ART RM.CLASS

RM. #3CLASS

RM. #4CLASS

RM. #5 CLASS RM. #6/STAGE

AUDITURIUM CLASS RM. #7

UP

COMPUTER

LAB. 452 s.f.

CHEMISTRY

604 s.f.

BIOLOGY

604 s.f.

M. WASH

RM.

F. WASH RM.MECH.

UP

INDUSTRIAL ARTS

906 s.f.

COUNTER

TOP FUME

CABINET

PROPOSED

COMPUTER

LAB. 602 s.f.

SEC.126 s.f.LOBBY/ WAITING

135 s.f.STO. 1

91 s.f.

STO. 175 s.f.

STAFF RM.

330 s.f. M. W

RM.

47 s.

f.F.

WRM

.47

s.f.

BLOCK B

RAMP

UP

PROPOSED

SCIENCE

LAB. 916 s.f.

CLASS RM. #1 498 s.f.

CLASS RM. #2 498 s.f.

DN.

OFFIC

E56

s.f.

STO.

53 s.

f.

STO.29 s.f.

KITCHEN345 s.f.

DEPUTY PRICIPAL

OFFICE 160 s.f.

BLOCK D

BLOCK E

MECH

. RM

75 s.

f.

ELEC. R

M.

158 s

.f.

PRIN

CIPAL

WASH

RM

.

33 s.

f.

PRO

POSE

D

STAFF

RM

.

597 s

.f.

PRIN

CIPAL

OFF

ICE

133 s

.f.

RAMP

(#1)

UP

24'-0

"

PRO

POSE

D

CLASS

RM

. #1

526 s

.f. RAMP

UP (#

2) 24

'-0"

FEM

ALE

WRM

. 33 s

.f.

LOBBY/

ENTRAN

CE

UP

PRO

POSE

D

SEC. 1

33 s.

f.

MALE

W

RM. 3

3 s.f.

UND

ER PA

SS

UP

ELEVATO

R

SHAFT

BLOCK B

D1

W1

4'-0"

x 4'-0

"

ACCESS H

ATCH

PUM

P ST

ORAG

E

UND

ER SL

AB

FIN

. GRD

. FL.

2'-4"

HOME ECONOMICS763 s.f.

PROPOSED 214 s.f. MALE WASH RM.

PROPOSED 214 s.f.FEMALE WASH RM.

MECH. RM. 77 s.f.

UR

INA

L

RAMP DN. 24'-0"

DN.

PROPOSED HOME MANAGEMENT 768 s.f.

BLOCK C

D4

WASH RM.32 s.f.

FIN. GRD. FL.

2'-4"

FIN. GRD. FL.

2'-4"

FIN

. GR

D. F

L.

2'-4

"

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

M.MAS SHOWNBRANSON OLLIVIERRE

SIR MC CHESNEY GEORGE SECONDARY SCHOOL (BARBUDA ANTIGUA)

03/11/16

SITE PLAN

S1SITE PLANSCALE:1"=40'

EXISTING BUILDING REMAIN

PROPOSED BUILDING

REMAINING LANDS FOR PLAYING GROUND & AGRICULTURE E.T.C.

GARBAGE COLLECTION

PROPOSED PEDESTRIAN CIRCULATION

EXIST. PEDESTRIAN CIRCULATION TO REMAIN

OUT

PROPOSED SECURITY

GARBAGE COLLECTION

PROPOSED PLAYING FIELD

EXIST. AGRICULTURE PLOT

COURT YARD

448A/16

THE WORKING DRAWING PHASE

PROPOSED ROAD & PARKING BY OTHER

BLOCK FBLOCK G

BLOCK H

BLOCK I

BLOCK J

REV.#1

REV.#1

REV.#1

11/16/16 REV.#1: SECURITY BOOTH RELOCATED B.O.

Page 2: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

5 6 7 8 9 10 11

IN

OUT

1 2 3 4

100.06tree

100.30tree

100.23tree

101.10tree

100.77tree

101.00tree

99.62tree

100.13tree

100.64tree

98.52tree

100.95tree

100.22lp

100.56lp

99.79lp

99.37lp

101.01lp

100.34lp

100.12lp

100.21lp100.10

lp

100.26lp

99.19lp

100.64lp

GREEN HOUSE

CHICKEN PENSCISTERN

SAND PIT

Z:99.73

Z:100.21

Z:100.12

Z:99.33

Z:99.33

Z:100.85

Z:100.63

Z:100.02

Z:101.09

Z:99.35

Z:99.32

Z:99.47Z:99.86

Z:99.95

Z:99.87

Z:100.31

Z:99.79

Z:99.72

Z:99.33

Z:99.51

Z:100.37

Z:99.70

Z:100.93

Z:100.85

Z:100.51

Z:99.08

Z:99.30

Z:100.39

Z:100.32

Z:99.49

Z:100.50

Z:100.98

Z:100.70

Z:99.82

Z:100.18

Z:99.76

Z:100.05

Z:99.93

Z:99.72

Z:99.68

Z:100.18

Z:99.94

Z:100.31

Z:100.51

Z:99.53Z:99.19

Z:101.01

CAFETERIA

BLOCK ADN.

DN.

ART RM.CLASS

RM. #3CLASS

RM. #4CLASS

RM. #5 CLASS RM. #6/STAGE

AUDITURIUM CLASS RM. #7

UP

COMPUTER

LAB. 452 s.f.

CHEMISTRY

604 s.f.

BIOLOGY

604 s.f.

M. WASH

RM.

F. WASH RM.MECH.

UP

INDUSTRIAL ARTS

906 s.f.

COUNTER

TOP FUME

CABINET

PROPOSED

COMPUTER

LAB. 602 s.f.

SEC.126 s.f.LOBBY/ WAITING

135 s.f.STO. 1

91 s.f.

STO. 175 s.f.

STAFF RM.

330 s.f. M. W

RM.

47 s.

f.F.

WRM

.47

s.f.

BLOCK B

RAMP

UP

PROPOSED

SCIENCE

LAB. 916 s.f.

CLASS RM. #1 498 s.f.

CLASS RM. #2 498 s.f.

DN.

OFFIC

E56

s.f.

STO.

53 s.

f.

STO.29 s.f.

KITCHEN345 s.f.

DEPUTY PRICIPAL

OFFICE 160 s.f.

BLOCK CRAMP DN.

DN

.

BLOCK D

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

M.MAS SHOWNBRANSON OLLIVIERRE

SIR MC CHESNEY GEORGE SECONDARY SCHOOL (BARBUDA ANTIGUA)

03/11/16

SITE PLAN

S2SITE PLANSCALE:1"=40'

EXISTING BUILDING REMAIN

PROPOSED BUILDINGREMAINING LANDS FOR PLAYING GROUND & AGRICULTURE E.T.C.

GARBAGE COLLECTION

PROPOSED PEDESTRIAN CIRCULATION

EXIST. PEDESTRIAN CIRCULATION TO REMAIN

OUT

PROPOSED SECURITY

GARBAGE COLLECTION

PROPOSED PLAYING FIELD

EXIST. AGRICULTURE PLOT

COURT YARD

448A/16

PROPOSED ROAD & PARKING BY OTHER

BLOCK D

BLOCK F

BLOCK E

BLOCK G

BLOCK H

BLOCK I

BLOCK J

BLOCK CCU

TLI

NE

#1

OPE

N T

O B

ELOW

BLOCK B

FIN

. RO

OF

LEVEL

21'-9

"

FIN

. ELE

VATOR

SHAFT

24'-9

"

BLOCK B

REV.#1

REV.#1

REV.#1

11/16/16 REV.#1: SECURITY BOOTH RELOCATED B.O.

DINING AREA

1068 s.f.

BLOCK A

DN.

DN.

DN.

BLOCK A

THE WORKING DRAWING PHASE

Page 3: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

GRD. FL. PLAN KITCHEN/DINING BLOCK (BLOCK A)

AA1GRD. FL. PLAN KITCHEN/DINING BLOCK (BLOCK A)SCALE:1/8"=1'-0"

GROSS: 1347 s.f.

DINING AREAEXIST. FL. SPACE 1003 s.f. BLOCK A

DN.

DN.

DN.

KITCHEN304 s.f.

6'-6" 6'-6"

4'-8"

8'-6

"8'

-6"

4'-8"

6'-6" 6'-6"

51'-0"

5'-6"

7'-8"

7'-8"

5'-6"

26'-5

"

20'-11"9'-0"

3'-7

"

3'-7"

BAA2

D2D1

W1

W1

W1W2

W1

STAIR INFO. #18 RISERS @ 7"7 TREADS @ 12"

STAIR INFO. #28 RISERS @ 7"7 TREADS @ 12"

STAIR INFO. #38 RISERS @ 7"7 TREADS @ 12"

A

B C

DB

AA2

AAA2

AAA2

W2

A B C D

1

2

5

1

E F

3

4

5

9'-8

"6'

-4"

9'-8

"5"

5"

10'-5" 10'-5" 8'-4" 10'-5" 10'-5"

8'-1" 9'-0" 20'-11"

5" 5"

A B C D E F

12'-1

0"12

'-10"

5"5"

26'-5

"

BAA2

BAA2

8'-1"

10'-5"5" 10'-5" 8'-4" 10'-5" 10'-5" 5"

51'-0"

REV.#1

REV.#1

12/06/16REV.#1: B.O.NEW ROOF OVER DINING AREA

Page 4: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

AA2

SECTION A-ASCALE:1/8"=1'-0"

SECTION B-BSCALE:1/8"=1'-0"

KITCHEN/DINING BLOCK (BLOCK A)SECTIONS A-A & B-B/DET.

KEYEXIST. TO REMAIN

NEW 6" RC BLK. WALL

EXIST. WATER TANK EXIST. WATER TANK

A B C D E F

FIN. GRADE0'-0"

FIN. GRD.FL.4'-8"

FIN. ROOF20'-10"

4'-3"

5"3'

-6"

3'-6

"1'-

10"

10"

2'-6"

4'-0"

4'-8"

16'-2

"

PUMP RM.

KITCHEN

FIN. GRADE0'-0"

FIN. GRD.FL.4'-8"

FIN. ROOF20'-10"

EXIST. WATER TANK

4'-8"

3'-7

"3'

-0"

10"16

'-2"

8'-3

"5"

3AA2

1 52 4

FIN. GRADE0'-0"

FIN. GRD.FL.4'-8"

FIN. ROOF20'-10"

EXIST. WATER TANK

4'-8"

3'-6

"3'

-6"

1'-1"16

'-2"

8'-1"

15

DINING AREA

SECTION C-CSCALE:1/8"=1'-0"

SEE ENG. DWG.

1AA2

SEE ENG. DWG.

1AA2

2A3

REV. #2

REV.#2

12/06/16REV.#1: B.O.NEW ROOF OVER DINING AREA12/06/16REV.#2: B.O.EXIST. PUMP RM. SHOWN

TYP. 8" WIDE PVC HORIZONTAL GUTTER

RC RING BEAM

24 GUAGE PVF 2 GALV. IRON SHEETING ON 1" x 4" T.Y.P. LATHS ON 2"x 6" T.Y.P. RAFTERS

TYP. 2 1/2" PVC DN. PIPE

2'-0"

1"x 10" T.Y.P. FACIA BD.

PRODEX ROOF INSULATION ON 5/8" TREATED GROOVE PLYWOOD

SECTION "DET" #1SCALE: 1/2" = 1'-0"1

24 GUAGE PVF 2 GALV. IRON SHEETING ON 1" x 4" T.Y.P. LATHS ON 2"x 6" T.Y.P. RAFTERS

SECTION "DET" #1SCALE: 1/2" = 1'-0"2

PRODEX ROOF INSULATION ON 5/8" TREATED GROOVE PLYWOOD

2"x 8" T.Y.P. RIDGE BD.

NEW 6" CONC. BLK. WALL W/ 1/2" CEMENT PLASTER ON BOTH SIDES

6"

FIN. GRD.FL.4'-8"

3'-7

"5"

2"

SECTION "DET" #1SCALE: 1/2" = 1'-0"3

EXIST. FL. SLAB

NEW 6" RC BLK. WALL

TYP. 1/2" CONTINUOUS WATER DRIP

C

1

HOLDING SLEEVE

Page 5: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

ROOF FRAMING PLAN KITCHEN/DINING BLOCK (BLOCK A)

AA3ROOF FRAMING PLAN KITCHEN/DINING BLOCK (BLOCK A)SCALE:1/8"=1'-0"

51'-0"

26'-5

"

BAA2

A

C

DB

AA2

AAA2

AAA2

A B C D

1

2

5

1

E F

3

4

5

9'-8

"6'

-4"

9'-8

"5"

5"

10'-5" 10'-5" 8'-4" 10'-5" 10'-5"5" 5"

A B C D E F

12'-1

0"12

'-10"

5"5"

26'-5

"

BAA2

BAA2

10'-5"5" 10'-5" 8'-4" 10'-5" 10'-5" 5"

51'-0"

REV.#1

REV.#1

12/06/16REV.#1: B.O.NEW ROOF OVER DINING AREA

Page 6: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

ROOF PLAN KITCHEN/DINING BLOCK (BLOCK A)

AA4ROOF PLAN KITCHEN/DINING BLOCK (BLOCK A)SCALE:1/8"=1'-0"

DINING AREA1068 s.f.

BLOCK A

DN.

DN.

DN.

A

B C

D

BAA2

BAA2

AAA2

AAA2

REV.#1

REV.#1

12/06/16REV.#1: B.O.NEW ROOF OVER DINING AREA

Page 7: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

KITCHEN/DINING BLOCK (BLOCK A) ELEVATIONS

ELEVATIONSSCALE:1/8"=1'-0"

AA5

ELEVATION A ELEVATION B

ELEVATION DELEVATION C

W3

W3

REV. #1

REV. #1

12/06/16REV.#1:NEW ROOF OVER DINING AREA B.O.

Page 8: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

DN.

STAIR INFO. #1 & 28 RISERS @ 7"7 TREADS @ 12"

COMPACTED EARTH

COMPACTED EARTH

A

3'-7

"

1'-0"

7"

RC. STAIR SEE ENGINEERING DWG. FOR STRUCTUAL INFO.

SEE FIN. SCHEDULEFOR STAIR. FIN.

DN.

STAIR INFO. #38 RISERS @ 7"7 TREADS @ 12"

COMPACTED EARTH

COMPACTED EARTH

B

3'-7

"

7"

EXIST. PLATFORM

SEE FIN. SCHEDULEFOR STAIR. FIN.

RC. STAIR SEE ENGINEERING DWG. FOR STRUCTUAL INFO.

1'-0"

SECTION A-ASCALE:1/2"=1'-0"

SECTION B-BSCALE:1/2"=1'-0"

AA6

KITCHEN/DINING BLOCK (BLOCK A)STAIR DETAILS

1 1/2" DIA. GALV. PIPE

1 1/2" DIA. GALV. PIPE

3'-6

"

3'-6

"

Page 9: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

W2

WHITE AL. SASH WIN.GREY TINTED GLASS 02 REQUIRED

FIN. FL. LEVEL

4'-0"

5'-0"

W3

2'-6"

2'-6"

WHITE AL. CIRCULAR FIXED LOURVE WIN.PLASTIC INSECT NET ON INSIDE FACE 03 REQUIRED

AL. DOUBLE DR. W/ AL. FRAME W/ SADDLE01 REQUIRED

D1

2'-8" 2'-8"

5'-4"

7'-0"

D2

2'-8" 2'-8"

5'-4"

AL. DOUBLE DR. W/ AL. FRAME W/ SADDLEW/ GLASS INSERTONE LEAF SWING IN AND ONE LEAF SWING OUT01 REQUIRED

7'-0"

DOOR & WINDOWSCHEDULE

WINDOW SCHEDULESCALE:1/2"=1'-0"

DOOR SCHEDULESCALE:1/2"=1'-0"

GLAZED INSERT

7"

2'-5"

AA7

W1

WHITE AL. AWNING WIN.W/ GREY TINTED GLASS 04 REQUIRED

FIN. FL.

2" 1'-9" 2" 1'-9" 2"

4'-0"

2"9"

2"9"

2"9"

2"

3'-0

"

4'-0"

2" 4'-8" 2"

2"2'-

8"2"

REV.#1

REV.#1

12/06/16 REV.#1: B.O.1-W3 ADDED

Page 10: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

McCHESNEY KITCHEN & DINING BLOCK (BLOCK A)

CLA

Y T

ILE

S

ROOMS FLOORS MOLDINGS CEILINGS

PAIN

T (H

ARD

EN

ER

AD

DE

D IN

CO

NC

.)C

ER

AM

IC T

ILE

S (N

ON

-SK

ID)

CA

RPE

T (C

OM

ME

RC

IAL)

FAIR

FA

CE

CO

NC

.(HA

RD

EN

ER

AD

DE

D)

STU

DD

ED

VIN

YL

TILE

SQ

UA

RR

Y T

ILE

S

CE

ILIN

G (T

IMBE

R)

SKIR

TIN

G (T

IMBE

R)

BALUSTRADES WALLS & COLUMNS REMARKS

POR

CE

LAIN

TIL

ES

DO

OR

S (T

IMBE

R)W

IND

OW

S (T

IMBE

R)

CLA

Y T

ILE

BA

SEC

ON

CR

ETE

PLA

STE

RE

D &

PA

INTE

D

GY

PSU

M B

OA

RD

PA

INTE

DPA

INTE

D C

ON

CRE

TESU

SPE

ND

ED

CE

ILIN

G (D

ROP-

IN T

ILE

S)M

ELA

MIN

E C

ED

AR

PA

NE

L

CO

NC

RE

TE B

LOC

KS

PLA

STE

RE

D &

PA

INTE

DPO

RC

ELA

IN T

ILE

SPR

EC

AST

CO

NC

RETE

CO

NC

RE

TE C

AST

IN P

LAC

E

PAIN

TED

GLA

SS B

LOC

KS

CE

RA

MIC

TIL

ES

GR

AN

ITE

TRA

VE

NTI

NE

(PO

LISH

)

CE

DA

R V

EN

EE

R P

AN

ELS

WIL

SON

ART

SO

LID

SU

RFA

CE

MO

LDIN

GS

1/2"

DIA

. S/S

PIP

E R

AIL

GRD.FL. PLANDINING AREA EXIST. FLOOR

GR

OO

VE

& T

ON

UG

E T

IMBE

R

EPO

XY

PA

INT

POR

CE

LAIN

BA

SE

T-11

PLY

BD

. TR

EA

TED

5/8

" TH

K P

AN

EL

PAIN

TED

YE

LLO

W P

INE

RA

IL

POR

CE

LAIN

(PO

LISH

ED

)

KITCHEN

PVF2 GALV. SHEETING

ROOF LEVEL

PAIN

TED

1/2

" G

ALV

ST.

PIP

E R

AIL

STAIR

FINISHES SCHEDULE BLOCK (BLOCK A)

AA8

Page 11: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

CEDAR FRAME 2 COATSOF GLOSS NATURAL

POLYURATHENE

6"DRAWER

2"1'-

9"5"

3" 2"

1'-7"

2'-11"

1'-2"

3'-0

"

1'-0"

1'-2"

9"1'-

1"

2'-0"

1/2" H/W LIPPING

1/2" ADJUSTABLEPLYWOOD SHELVES

WITH H/W EDGE LIPPING

T.P.P BEARERS

1"1/2" ADJUSTABLEPLYWOOD SHELVES

WITH H/W EDGE LIPPING

KITCHEN CUPBOARD ( DOORS DET.#1 )Scale: 1" = 1'-0"

FL. TILES

2'-11"

7'-0"

1/2"PLY WOODPANEL FITTED INTO CEDAR FRAME

1"1" CEDAR FRAME

SOLID SURFACE

TYP.GLASS

KITCHEN345 s.f.

A

C

BD AA13

KITCHEN ELEVATION AScale: 1/4" = 1'-0"

AAA9

KITCHEN ELEVATION BScale: 1/4" = 1'-0"

BAA9

KITCHEN ELEVATION CScale: 1/4" = 1'-0"

CAA9

KITCHEN ELEVATION DScale: 1/4" = 1'-0"

DAA9

1

AA9

INT. ELEVATIONS KITCHEN/DINING BLOCK (BLOCK A)

TYP. 12"x 12" TILE

A B

1

2

5

4

1

5

A B

Page 12: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE BLOCK A

BAA2

BAA2

AAA2

AAA2

T-11 TREATED 5/8" GROOVE PLY BD. ON TREATED YELLOW PINE

KEY

REFLECTIVE CEILING PLAN

AC1

Page 13: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

GRD. FL. TILE PLAN KITCHEN/DINING BLOCK (BLOCK A)

AT1GRD. FL. TILE PLAN KITCHEN/DINING BLOCK (BLOCK A)SCALE:1/8"=1'-0"

343 s.f.

DINING AREAEXIST. FL. SPACE 1068 s.f. BLOCK A

KITCHEN345 s.f.

BAA2 A

B C

DB

AA2

AAA2

AAA2

DARK CLAY TILES ( 12"x12")

LIGHT CLAY TILE (12"x12")

12" x 12" CLAY TILES W/ NOSING

18"x 18" PORCELIN TILES

KEY

12" x 12" CLAY TILES W/ NOSING

DN.

DN.

DN.

Page 14: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

GRD. FL. FURNITURE PLAN KITCHEN/DINING BLOCK (BLOCK A)

AF1GRD. FL. FURNITURE PLAN KITCHEN/DINING BLOCK (BLOCK A)SCALE:1/8"=1'-0"

343 s.f.

DINING AREAEXIST. FL. SPACE 1068 s.f.

BLOCK A

DN.

DN.

DN.

KITCHEN345 s.f.

KEY

FIRE EXTINQUISHER

GARBAGE BIN

Page 15: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

5 6 7 8 9 10 11

IN

OUT

1 2 3 4

100.06tree

100.30tree

100.23tree

101.10tree

100.77tree

101.00tree

99.62tree

100.13tree

100.64tree

98.52tree

100.95tree

100.22lp

100.56lp

99.79lp

99.37lp

101.01lp

100.34lp

100.12lp

100.21lp100.10

lp

100.26lp

99.19lp

100.64lp

GREEN HOUSE

CHICKEN PENSCISTERN

SAND PIT

Z:99.73

Z:100.21

Z:100.12

Z:99.33

Z:99.33

Z:100.85

Z:100.63

Z:100.02

Z:101.09

Z:99.35

Z:99.32

Z:99.47Z:99.86

Z:99.95

Z:99.87

Z:100.31

Z:99.79

Z:99.72

Z:99.33

Z:99.51

Z:100.37

Z:99.70

Z:100.93

Z:100.85

Z:100.51

Z:99.08

Z:99.30

Z:100.39

Z:100.32

Z:99.49

Z:100.50

Z:100.98

Z:100.70

Z:99.82

Z:100.18

Z:99.76

Z:100.05

Z:99.93

Z:99.72

Z:99.68

Z:100.18

Z:99.94

Z:100.31

Z:100.51

Z:99.53Z:99.19

Z:101.01

CAFETERIA

BLOCK ADN.

DN.

ART RM.CLASS

RM. #3CLASS

RM. #4CLASS

RM. #5 CLASS RM. #6/STAGE

AUDITURIUM CLASS RM. #7

UP

COMPUTER

LAB. 452 s.f.

CHEMISTRY

604 s.f.

BIOLOGY

604 s.f.

M. WASH

RM.

F. WASH RM.MECH.

UP

INDUSTRIAL ARTS

906 s.f.

COUNTER

TOP FUME

CABINET

PROPOSED

COMPUTER

LAB. 602 s.f.

SEC.126 s.f.LOBBY/ WAITING

135 s.f.STO. 1

91 s.f.

STO. 175 s.f.

STAFF RM.

330 s.f. M. W

RM.

47 s.

f.F.

WRM

.47

s.f.

RAMP

UP

PROPOSED

SCIENCE

LAB. 916 s.f.

CLASS RM. #1 498 s.f.

CLASS RM. #2 498 s.f.

DN.

OFFIC

E56

s.f.

STO.

53 s.

f.

STO.29 s.f.

KITCHEN345 s.f.

DEPUTY PRICIPAL

OFFICE 160 s.f.

BLOCK D

BLOCK E

MECH

. RM

75 s.

f.

ELEC. R

M.

158 s

.f.

PRIN

CIPAL

WASH

RM

.

33 s.

f.

PRO

POSE

D

STAFF

RM

.

597 s

.f.

PRIN

CIPAL

OFF

ICE

133 s

.f.

RAMP

(#1)

UP

24'-0

"

PRO

POSE

D

CLASS

RM

. #1

526 s

.f. RAMP

UP (#

2) 24

'-0"

FEM

ALE

WRM

. 33 s

.f.

LOBBY/

ENTRAN

CE

UP

PRO

POSE

D

SEC. 1

33 s.

f.

MALE

W

RM. 3

3 s.f.

UND

ER PA

SS

UP

ELEVATO

R

SHAFT

BLOCK B

D1

W1

4'-0"

x 4'-0

"

ACCESS H

ATCH

PUM

P ST

ORAG

E

UND

ER SL

AB

FIN

. GRD

. FL.

2'-4"

HOME ECONOMICS763 s.f.

PROPOSED 214 s.f. MALE WASH RM.

PROPOSED 214 s.f.FEMALE WASH RM.

MECH. RM. 77 s.f.

UR

INA

L

RAMP DN. 24'-0"

DN.

PROPOSED HOME MANAGEMENT 768 s.f.

BLOCK C

D4

WASH RM.32 s.f.

FIN. GRD. FL.

2'-4"

FIN. GRD. FL.

2'-4"

FIN

. GR

D. F

L.

2'-4

"

BLOCK B

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

M.MAS SHOWNBRANSON OLLIVIERRE

SIR MC CHESNEY GEORGE SECONDARY SCHOOL (BARBUDA ANTIGUA)

03/11/16

SITE PLAN

S1SITE PLANSCALE:1"=40'

EXISTING BUILDING REMAIN

PROPOSED BUILDING

REMAINING LANDS FOR PLAYING GROUND & AGRICULTURE E.T.C.

GARBAGE COLLECTION

PROPOSED PEDESTRIAN CIRCULATION

EXIST. PEDESTRIAN CIRCULATION TO REMAIN

OUT

PROPOSED SECURITY

GARBAGE COLLECTION

PROPOSED PLAYING FIELD

EXIST. AGRICULTURE PLOT

COURT YARD

448A/16

THE WORKING DRAWING PHASE

PROPOSED ROAD & PARKING BY OTHER

BLOCK FBLOCK G

BLOCK H

BLOCK I

BLOCK J

REV.#1

REV.#1

REV.#1

11/16/16 REV.#1: SECURITY BOOTH RELOCATED B.O.

Page 16: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

5 6 7 8 9 10 11

IN

OUT

1 2 3 4

100.06tree

100.30tree

100.23tree

101.10tree

100.77tree

101.00tree

99.62tree

100.13tree

100.64tree

98.52tree

100.95tree

100.22lp

100.56lp

99.79lp

99.37lp

101.01lp

100.34lp

100.12lp

100.21lp100.10

lp

100.26lp

99.19lp

100.64lp

GREEN HOUSE

CHICKEN PENSCISTERN

SAND PIT

Z:99.73

Z:100.21

Z:100.12

Z:99.33

Z:99.33

Z:100.85

Z:100.63

Z:100.02

Z:101.09

Z:99.35

Z:99.32

Z:99.47Z:99.86

Z:99.95

Z:99.87

Z:100.31

Z:99.79

Z:99.72

Z:99.33

Z:99.51

Z:100.37

Z:99.70

Z:100.93

Z:100.85

Z:100.51

Z:99.08

Z:99.30

Z:100.39

Z:100.32

Z:99.49

Z:100.50

Z:100.98

Z:100.70

Z:99.82

Z:100.18

Z:99.76

Z:100.05

Z:99.93

Z:99.72

Z:99.68

Z:100.18

Z:99.94

Z:100.31

Z:100.51

Z:99.53Z:99.19

Z:101.01

CAFETERIA

BLOCK ADN.

DN.

ART RM.CLASS

RM. #3CLASS

RM. #4CLASS

RM. #5 CLASS RM. #6/STAGE

AUDITURIUM CLASS RM. #7

UP

COMPUTER

LAB. 452 s.f.

CHEMISTRY

604 s.f.

BIOLOGY

604 s.f.

M. WASH

RM.

F. WASH RM.MECH.

UP

INDUSTRIAL ARTS

906 s.f.

COUNTER

TOP FUME

CABINET

PROPOSED

COMPUTER

LAB. 602 s.f.

SEC.126 s.f.LOBBY/ WAITING

135 s.f.STO. 1

91 s.f.

STO. 175 s.f.

STAFF RM.

330 s.f. M. W

RM.

47 s.

f.F.

WRM

.47

s.f.

BLOCK B

RAMP

UP

PROPOSED

SCIENCE

LAB. 916 s.f.

CLASS RM. #1 498 s.f.

CLASS RM. #2 498 s.f.

DN.

OFFIC

E56

s.f.

STO.

53 s.

f.

STO.29 s.f.

KITCHEN345 s.f.

DEPUTY PRICIPAL

OFFICE 160 s.f.

BLOCK CRAMP DN.

DN

.

BLOCK D

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

M.MAS SHOWNBRANSON OLLIVIERRE

SIR MC CHESNEY GEORGE SECONDARY SCHOOL (BARBUDA ANTIGUA)

03/11/16

SITE PLAN

S2SITE PLANSCALE:1"=40'

EXISTING BUILDING REMAIN

PROPOSED BUILDINGREMAINING LANDS FOR PLAYING GROUND & AGRICULTURE E.T.C.

GARBAGE COLLECTION

PROPOSED PEDESTRIAN CIRCULATION

EXIST. PEDESTRIAN CIRCULATION TO REMAIN

OUT

PROPOSED SECURITY

GARBAGE COLLECTION

PROPOSED PLAYING FIELD

EXIST. AGRICULTURE PLOT

COURT YARD

448A/16

PROPOSED ROAD & PARKING BY OTHER

BLOCK D

BLOCK F

BLOCK E

BLOCK G

BLOCK H

BLOCK I

BLOCK J

BLOCK CCU

TLI

NE

#1

OPE

N T

O B

ELOW

BLOCK B

FIN

. RO

OF

LEVEL

21'-9

"

FIN

. ELE

VATOR

SHAFT

24'-9

"

BLOCK B

REV.#1

REV.#1

REV.#1

11/16/16 REV.#1: SECURITY BOOTH RELOCATED B.O.

DINING AREA

1068 s.f.

BLOCK A

DN.

DN.

DN.

BLOCK A

THE WORKING DRAWING PHASE

Page 17: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

A

B

D

C

O

CISTERN LAYOUT ADMIN. BLOCK (BLOCK B)

BA0

2 3 4 5 6 7 8 9 10 11

GRD. FL. PLAN ADMIN. BLOCK (BLOCK B)SCALE:1/8"=1'-0"

2 3 4 5 6 7 8 9 10 11

A

B

D

E

CUTLINE

BLOCK B

A

BC

D

E

BBA4

BBA4

ABA4

ABA4

1

1

4'-0"x 4'-0" ACCESS HATCH

4'-0"x 4'-0" ACCESS HATCH

WATER TANK #1967 s.f.

WATER TANK #2757 s.f.

6'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 6'-0"14'-10"

COMPACTED EARTH

COMPACTED EARTH

COMPACTED EARTH

8" 18'-9" 8" 3'-3" 8" 12'-2" 8" 35'-6" 8" 3'-4" 8"

5'-7"

8"8'

-4"

8"3'

-3"

8"8'

-5"

8"

35'-6" 3'-4"8" 8"8"35'-6"8"

6'-0"12'-0"12'-0"12'-0"12'-0"12'-0"12'-0"12'-0"6'-0"14'-10"

24'-8

"

25'-0

"11'-

4"10

'-8"

5'-11"

5'-11"

22'-0

"25

'-0"

Page 18: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

PROPOSED STAFF RM. 597 s.f.

PRINCIPAL OFFICE 133 s.f.

RAMP (#1) UP 24'-0"

PROPOSED CLASS RM. #1526 s.f.

RAMP UP (#2) 24'-0"

FEMALE WRM. 33 s.f.

LOBBY/ENTRANCE252 s.f.

6'-0"12'-0"12'-0"12'-0"12'-0"12'-0"12'-0"12'-0"6'-0"14'-10"

25'-0

"22

'-0"

5'-11"

UP

PROPOSED SEC. 133 s.f.

A

B

D

C

O

MALE WRM. 33 s.f.

UNDER PASS

UP

UP

GRD. FL. PLAN ADMIN. BLOCK (BLOCK B)

BA1

7'-11" 10'-5" 3'-6" 6'-0" 3'-6" 22'-6" 4'-0" 3'-7" 10'-0"2'-4" 23'-6"

6" 6"

111'-10"

2 3 4 5 6 7 8 9 10 11

25'-6

"23

'-0"

5'-9"

4"1'-

0"

54'-3

"

25'-0"11'-0"49'-0"6'-0"14'-10"

6'-0"12'-0"12'-0"12'-0"12'-0"12'-0"12'-0"12'-0"6'-0"14'-10" 6"

111'-10"

25'-6

"6'

-0"

5'-9"

5'-11"

25'-0

"11'-

4"10

'-8"

5'-11"

6"1'-

0"

54'-5

"

STAIR INFO. #317 RISERS @ 7"16 TREADS @ 12"

ELEVATOR SHAFT

STAIR INFO. #24 RISERS @ 7"3 TREADS @ 12"

STAIR INFO. #14 RISERS @ 7"3 TREADS @ 12"

OUTLINE OF SLAB ABOVE

GRD. FL. PLAN ADMIN. BLOCK (BLOCK B)SCALE:1/8"=1'-0"

-GROSS: 3,368 s.f.

6'-0"

1'-6" 9" 9"

2 3 4 5 6 7 8 9 10 11

A

B

D

E

CUTLINE

BLOCK B

A

BC

D

6'-4

"

6'-4"

3" 3"

3"9"9

"3"

3" 9"3" 3" 9"3"

D1

W1

D1 D1 D1 D1

D2 D2

D3D3

W1

W2

W1

W1 W1

W1 W1

W1

W1W1W1

W2W2W2W2W3W3

W5

E

BBA4

BBA4

ABA4

ABA4

MECH. RM75 s.f.

D5D4

ELEC. RM.158 s.f.

4'-0"x 4'-0" ACCESS HATCH

1

1

6"

4'-0"x 4'-0" ACCESS HATCH

FIN. GRD. FL.2'-4"

FIN. GRD. FL.2'-4"

W3

D3

REV. #2

REV. #2

10/06/16REV.#1:WASH RM INTRODUCED IN PRINCIPAL'S OFFICE

B.O.5'-

11"

11/17/16REV.#2:MECH. RM. & ELECTRICAL RM. EXTENDED

B.O.

5'-3"

W7

2'-6"

W7

PRINCIPAL WASH RM. 33 s.f.

Page 19: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

LIBRARY509 s.f.

PROPOSED CLASS RM. #2510 s.f.

PROPOSED CLASS RM. #3505 s.f.

PROPOSED CLASS RM. #4505 s.f.

UNDER PASS

6'-0"12'-0"12'-0"12'-0"12'-0"12'-0"12'-0"12'-0"6'-0"14'-10"

25'-0

"22

'-0"

5'-11"

6" 6"

111'-10"

4"9"

54'-0

"

6'-0"12'-0"12'-0"12'-0"12'-0"12'-0"12'-0"12'-0"6'-0"14'-10"

111'-10"

25'-0

"11'-

4"10

'-8"

5'-11"

6"9"

54'-2

"

OPEN TO BELOW

25'-3

"11'-

4"5'-

11"5'-

9"5'-

11"

7'-2" 7'-8" 3'-6" 18'-2" 5'-8" 14'-2" 1'-6" 2'-1" 5'-9" 1'-6" 10'-0" 1'-6" 2'-1" 5'-9" 18'-1"

25'-3

"23

'-0"

5'-9"

6"

24'-6"24'-0"24'-0"24'-6"14'-10"

FIRST FL. PLAN ADMIN. BLOCK (BLOCK B)

BA2FIRST FL. PLAN ADMIN. BLOCK (BLOCK B)SCALE:1/8"=1'-0"

-GROSS: 3,654 s.f.

DN.

A

B

D

E

C

1 2 3 4 5 6 7 8 9 10 11

1 2 3 4 5 6 7 8 9 10 11

A

B

D

E

CUTLINE #1

BLOCK B

A

BC

D

3" 3" 3" 3" 3" 3"

3"9"9

"3"

STAIR INFO. #317 RISERS @ 7"16 TREADS @ 12"

D1

W1

W2

D1 D1 D1 D1 D1 D1

W2 W2 W2

W1

W4W2W4W4W2

3'-6"

W4

2'-1"

W4W2W4W4W2W4

W1

W5

BBA4

BBA4

ABA4

ABA4

D1ELEVATOR SHAFT

6"

W5

FIN. FIRST FL.12'-4"

FIN. FIRST FL.12'-4"

RC ROOF SLAB

REV. #1

REV. #1

11/17/16 REV.#1:RC ROOF OVER MECH. & ELECTRICAL RM.

B.O.

Page 20: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

BA3

1 2 3 4 5 6 7 8 9 10 11

FIN. ELEVATOR SHAFT0'-0"

FIN. GRD. FL.4'-1"

FIN. FIRST FL.14'-1"

FIN. SEC. FL.23'-6"

6"3'

-8"

5"3'

-0"

1'-7"

5"6"

5'-0"

2'-6"

1'-0"5

"2'-0

"

4'-1"

10'-0

"9'-

5"

PRINCIPAL OFFICE

PROPOSED SECRETARY

PROPOSED STAFF RM.

LOBBY/ENTRANCE

PROPOSED CLASS RM. #1

PROPOSED CLASS RM. #2

PROPOSED CLASS RM. #3

PROPOSED CLASS RM. #4

LIBRARY

2" 4'-0" 5'-8" 4'-0" 6"

3'-0

"

3'-0

"

OPEN

OPEN

LOBBY/ENTRANCE

PROPOSED CLASS RM. #4

ABDE

FIN. GRD. FL.2'-4"

FIN. FIRST FL.12'-4"

FIN. ROOF30'-1"

5"1'-2

"3'

-2"

4'-6"

1'-7"

5"4"

4"3'

-2"

4'-6"

1'-0"3 1/

4"1'-9"

5"6'-

4"

2'-4"

10'-0

"9'

-3"

8'-6

"

1'-1"

9"

SECTION A-ASCALE:1/8"=1'-0"

SECTION B-BSCALE:1/8"=1'-0"

8'-0

"

ADMIN. BLOCK (BLOCK B) SECTIONS A-A & B-B

TYP. 8" WIDE PVC HORIZONTAL GUTTER

1 1/2" GALVANISE PIPE RAIL FASTENED TO EXIST. FL. SLABSEE ENG. DWG.

SEE ENG. DWG.

1BA7 2

BA73

BA7

4BA7

5BA7

6BA7

7BA7

FIN. ROOF SLAB21'-7"

8BA7

WATER TANK #1 WATER TANK #2

FIN. CISTERN-2'-5"

1'-11"

1'-0"

2'-5"

8"5'-

0"1'-

0"6"

6'-6

"

WATER TANK #2

FIN. CISTERN-6'-6"

4'-2"

8"5'-

0"1'-

0"6"

5'-0"

W6 W6

8'-6

"

8'-6

"

6" 8"1'-

0"

GRADE 2'-4"

19'-5

"3'

-0"

24'-9

"

PRINCIPAL OFFICE WASH RM.

REV. #1

REV. #1

10/06/16 REV.#1:WASH RM. INSTALLED IN PRINCIPAL OFFICE

B.O.

1'-0"

8"6'

-0"

6"

Page 21: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

RC ROOF SLAB

DN.

6'-0"12'-0"12'-0"12'-0"12'-0"12'-0"12'-0"12'-0"6'-0"7'-11"

25'-0

"22

'-0"

5'-11"

6"

4"

54'-0

"

12'-0"12'-0"12'-0"12'-0"12'-0"12'-0"12'-0"6'-0"14'-10"

111'-10"

25'-0

"11'-

4"5'-

11"9"

54'-2

"

6"

ROOF FRAMING PLAN ADMIN. BLOCK (BLOCK B)

BA4ROOF FRAMING PLAN ADMIN. BLOCK (BLOCK B)SCALE:1/8"=1'-0"

111'-10"

6'-0"

A

B

D

E

C

1 2 3 4 5 6 7 8 9 10 11

1 2 3 4 5 6 7 8 9 10 11

A

B

D

E

CUTLINE #1

OPEN TO BELOW BLOCK B

A

BC

D

6'-11"

10'-8

"6"

9"

BBA4

BBA4

ABA4

ABA4

ELEVATOR SHAFT

6"

6"

FIN. FIRST FL.12'-4"

REV. #1

REV. #1

11/17/16 REV.#1:RC ROOF OVER MECH. & ELECTRICAL RM.

B.O.

Page 22: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

RC ROOF SLAB

CUTLINE #1

OPEN TO BELOW

6'-0"12'-0"12'-0"12'-0"12'-0"12'-0"12'-0"12'-0"6'-0"14'-10"

25'-0

"22

'-0"

5'-11"

6" 6"

4"

54'-0

"

12'-0"12'-0"12'-0"12'-0"12'-0"12'-0"12'-0"6'-0"14'-10"

111'-10"

25'-0

"11'-

4"10

'-8"

5'-11"

9"

54'-2

"

6"

ROOF PLAN ADMIN. BLOCK (BLOCK B)

BA5ROOF PLAN ADMIN. BLOCK (BLOCK B)SCALE:1/8"=1'-0"

111'-10"

9"A

B

D

E

C

1 2 3 4 5 6 7 8 9 10 11

1 2 3 4 5 6 7 8 9 10 11

A

B

D

EBLOCK B

A

BC

D BBA4

BBA4

ABA4

ABA4

6"

6"

FIN. ROOF LEVEL21'-9"

FIN. ELEVATOR SHAFT24'-9"

TIMBER ROOF

REV. #1

REV. #1

11/17/16 REV.#1:RC ROOF OVER MECH. & ELECTRICAL RM.

B.O.

Page 23: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

ELEVATIONSSCALE:1/8"=1'-0"

BA6

ELEVATION A

OPEN

SIR MC CHESNEY GEORGE

SECONDARY SCHOOL

C. H. C. H.

ELEVATION B ELEVATION C

ADMIN. BLOCK (BLOCK B) ELEVATIONS

ELEVATION D

OPEN

W8W8

REV.#1

REV.#1

REV.#1

10/06/16REV.#1:ELEVATION A & D REVISED B.O.

Page 24: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

E

24 GUAGE PVF 2 GALV. IRON SHEETING ON 1" x 4" T.Y.P. LATHS ON 2"x 6" T.Y.P. RAFTERS

RC RING BEAM

PRODEX ROOF INSULATION ON 5/8" TREATED GROOVE PLYWOOD

TYP. 2 1/2" PVC DN. PIPE

TYP. 8" WIDE PVC HORIZONTAL GUTTER

1"x 10" T.Y.P. FACIA BD.

SECTION "DET" #1SCALE: 1/2" = 1'-0"1

2'-0" 1'-0"

1'-2"

IN FILL

A

RC RING BEAM

NEW 6" RC BLK. WALL

PLASTER BAND

1'-6"

1'-6"

5"8"

11"5"

2"

SECTION "DET" #2SCALE: 1/2" = 1'-0"2

B

SECTION "DET" #3SCALE: 1/2" = 1'-0"3

RC RING BEAM

NEW 6" RC BLK. WALL

1'-10

"

TYP. 2"x 6" T.Y.P. RAFTERS

10 11

SECTION "DET" #5SCALE: 1/2" = 1'-0"5

RC BEAM

5" THK. RC FL. SLAB

1'-0" 6'-0" 1'-7"

5"

NEW 6" RC BLK. WALL

FIN. FIRST FL.12'-4"

FIN. FIRST FL.12'-4"

E

SECTION "DET" #6SCALE: 1/2" = 1'-0"6

RC BEAM

TYP. 6" GALV. PIPE

TYP. 1 1/2" GALVANISE PIPE RAIL

5" THK. RC FL. SLAB

TYP. 2 1/2" PVC DN. PIPE

1'-7"

5"5"

1'-0"

1'-0"

1'-0"

3'-6

"

1'-0"

7"1"

8"TYP. CONC. BASE

3"6"3"

B

5" THK. RC FL. SLAB

RC BEAM

NEW 6" RC BLK. WALL

1'-0"

1'-7"

5"

3"6"3"

SECTION "DET" #7SCALE: 1/2" = 1'-0"7

24 GUAGE PVF 2 GALV. IRON SHEETING ON 1" x 4" T.Y.P. LATHS ON 2"x 6" T.Y.P. RAFTERS

SECTION "DET" #8SCALE: 1/2" = 1'-0"8

PRODEX ROOF INSULATION ON 5/8" TREATED GROOVE PLYWOOD

2"x 8" T.Y.P. RIDGE BD.

BA7

ADMIN. BLOCK (BLOCK B) DETAILS

TYP. CIRCULAR GALV. ST. PIPE

TYP. CIRCULAR GALV. ST. PIPE

HOLDING SLEEVE

HOLDING SLEEVE

1'-0"

TYP. GYP. BD. ON MET. CLG. JOIST (TYP.)CLG. 9'-0" AFF

FIN. ELEVATOR SHAFT0'-0"

FIN. GRD. FL.4'-1"

FIN. FIRST FL.14'-1"

FIN. SEC. FL.23'-6"

5"3'

-8"

5"3'

-0"

1'-7"

5"6"

5'-0"

2'-6"

1'-0"

5"2'-

0"

4'-1"

10'-0

"9'-

5"

2" 4'-0" 5'-8" 4'-0" 6"

5'-0"

6" 8"

1 2

RC BEAM

5" THK. RC FL. SLAB

RC BEAM

6" RC ELEVATOR SHAFT

SECTION "DET" #4SCALE: 1/2" = 1'-0"4

8'-6

"

TYP. SUSPENDED CLG.

1'-0"

3'-0

"

24'-9

"

TYP. 2 1/2" DIA. PVC PIPE EVERY 10'-0" O/C

Page 25: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

UP

10

E

D

10

E

D

A

10

STAIR INFO. #1 PLAN VIEW4 RISERS @ 7"3 TREADS @ 12"

SEE FIN. SCHEDULEFOR STAIR. FIN.

3'-6

"

3'-6

"

7"

1'-0"

COMPACTED EARTH

COMPACTED EARTH

SECTION A-ASCALE:1/2"=1'-0"

UP

STAIR INFO. #2 PLAN VIEW4 RISERS @ 7"3 TREADS @ 12"

7 8

7 8

B B

B

1 1/2" DIA. GALV. PIPE

B

7"

1'-0"

SEE FIN. SCHEDULEFOR STAIR. FIN.

1 1/2" DIA. GALV. PIPE

COMPACTED EARTH

3'-6

"

SECTION B-BSCALE:1/2"=1'-0"

BA8

ADMIN. BLOCK (BLOCK B) STAIR DETAILS

6'-8

"

FIN. ELEVATOR SHAFT0'-0"

FIN. FIRST FL.14'-1"

FIN. SEC. FL.23'-6"

3'-0

"2'-

11"3'

-11"

10'-0

"9'-

5"

1 2

6" RC ELEVATOR SHAFT

TYP. 1 1/2" GALVANISE PIPE RAIL

TYP. 1 1/2" GALVANISE PIPE RAIL

FIN. GRD. FL.4'-1"

4'-1"

6"5'-

0"

UP

STAIR INFO. #3 PLAN VIEW17 RISERS @ 7"16 TREADS @ 12"

ELEVATOR SHAFT

MECH. RM20 s.f.

ELEC. RM.20 s.f.

1

1 2

2

D D

C C

C C

SECTION C-CSCALE:1/4"=1'-0"

6" 4'-0" 8" 5'-0" 8" 4'-0" 6"

6"4'-

0"8"

5'-0"

8"

TYP. 2 1/2" DIA. PVC PIPE EVERY 10'-0" O/C

Page 26: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

RAMP (#1) UP 24'-0"

B

4 5 6 7

4 5 6 7B

B

A

A

A

SEE FIN. SCHEDULEFOR RAMP FIN.

4 5 6 7

SECTION A-ASCALE:3/8"=1'-0"

4A

3'-6

"

6"

1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0"

1'-0"

1'-0" 1'-0" 1'-0" 1'-0"

ELEVATION A

4 5 6 7

B

5"2'-

10"

6"1'-

8"

3'-0

"

6"4"2"

SEE FIN. SCHEDULEFOR RAMP FIN.

VOID

1 1/2" DIA. GALV. PIPE

SECTION B-BSCALE:3/8"=1'-0"

BA9

5'-0"

5'-0"

ADMIN. BLOCK (BLOCK B) RAMP DETAILS

Page 27: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

RAMP UP (#2) 24'-0"6'-4"

E

D

6 7 8

6 7 8

E

D

A A

6 7 8 8A

SEE FIN. SCHEDULEFOR RAMP FIN.

1 1/2" DIA. GALV. PIPE

GRADE

1'-11"

5"5"

1'-0"

1'-0"

1'-0"

3'-6

"2'-

4"

SECTION A-ASCALE:3/8"=1'-0"

A

ELEVATION ASCALE:3/8"=1'-0"

6'-4

"

E

SECTION B-BSCALE:3/8"=1'-0"

8"

8"

2'-10

"

1 1/2" DIA. GALV. PIPE

SEE FIN. SCHEDULEFOR RAMP FIN.

RAMP DETAILS

BA10

BB

Page 28: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

AL. DR. W/AL. FRAME W/ S/S HINGES & LEVER LOCKSW/ SADDLEW/GLASS TRANSOM13 REQUIRED

2" 2'-8" 2"

3'-0"

6'-10

"2"

10"

2"

8'-0

"

D1

SOLID CORE TIM. DR. W/ GLASS INSERT W/ TIM. FRAMEW/ S/S HINGES & LEVER LOCKS 02 REQUIRED

2" 2'-8" 2"

3'-0"

6'-10

"2"

7'-0"

7"1"

4'-0"

1"

6"1"1'-0"1"

D2

2" 2'-8" 2"

3'-0"

6'-10

"2"

7'-0"

D3

SOLID CORE TIM. DR.NATURAL OAK FINISH W/ TIM. FRAMEW/ S/S HINGES & LEVER LOCKS 03 REQUIRED

D4

3'-0" 3'-0"

6'-0"

2"2'-

1"2"

2'-1"

2"2'-

1"2"

7'-0"

2" 7" 1"3"1" 7" 1"3"1" 7" 2" 2"7"1"3"1"7"1"3"1"7"2"

6'-0"

GALV. MET. GATE GAS & PUMP HOUSESHALL BE FIN. W/ 2 COAT OF ZINC CHROMATE & 2 COATSOF FIN. MET. PAINTSUPPLY & INSTALL HINGES,LOCKS & BOLTS02 REQUIRED

TYP. HOLLOW GALV. 1"x 2"

TYP. HOLLOW GALV. 1"x 2"

TYP. HOLLOW GALV. 2"x 2"

W1

1'-9" 2" 1'-9" 2" 1'-9" 2"

6'-0"

10"

2"10

"2"

10"

2"10

"2"

10"

2"

5'-0"

WHITE AL. AWNING WIN.W/ GREY TINTED GLASS 13 REQUIRED

FIN. FL.

3'-0

"

2"

2"

W2

FIN. FL.

2" 2'-0" 2" 2'-0" 2" 2'-0" 2" 2'-0" 2" 2'-0" 2"

11'-0"

2"10

"2"

10"

2"10

"2"

10"

2"10

"2"

5'-0"

3'-0

"

WHITE AL. AWNING WIN.W/ GREY TINTED GLASS 13 REQUIRED

W3

2" 1'-8" 2"

2'-0"

2"1'-

8"2"

2'-0"

6'-0

"

FIN. FL.

WHITE AL. AWNING WIN.W/ GREY TINTED GLASS 03 REQUIRED

FIN. FL.

W4

2" 1'-9" 2" 1'-9" 2"

4'-0"

2"10

"2"

10"

2"10

"2"

10"

2"10

"2"

5'-0"

3'-0

"

WHITE AL. AWNING WIN.W/ GREY TINTED GLASS 08 REQUIRED

W6

WHITE AL. FIXED GLASS CIRCULAR WIN.W/ GREY TINTED GLASS 02 REQUIRED

5'-0"

5'-0"

W7

WHITE AL. LOURVE WIN. (FIXED)04 REQUIRED

1'-6"

1'-6"

6" FIN. ROOF

3'-0

"

3'-0"

WHITE AL. CIRCULAR LOURVE WIN. SYNTECTIC INSECT SCREEN02 REQUIRED

W8

DOOR & WINDOW SCHEDULEADMIN. BLOCK (BLOCK B)

BA11WINDOW SCHEDULESCALE:1/2"=1'-0"

DOOR SCHEDULESCALE:1/2"=1'-0"

REV. #2

10/06/16 REV.#1: B.O.1-D3 ADDED, 2-W3 ADDED & 1-W1 DELETED

D5

AL. DR. W/AL. FRAME W/ S/S HINGES & LEVER LOCKSW/ SADDLE01 REQUIRED

2" 2'-4" 2'-4" 2"

5'-0"

6'-10

"2"

7'-0"

REV.#2:

11/17/16 REV.#2: B.O.1-D5 ADDED, 2-W7 ADDED

REV.#2:

Page 29: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

McCHESNEY ADMIN. BLOCK (BLOCK B)

CLA

Y T

ILE

S

ROOMS FLOORS MOLDINGS CEILINGS

PAIN

T (H

ARD

EN

ER

AD

DE

D IN

CO

NC

.)C

ER

AM

IC T

ILE

S (N

ON

-SK

ID)

CA

RPE

T (C

OM

ME

RC

IAL)

FAIR

FA

CE

CO

NC

.(HA

RD

EN

ER

AD

DE

D)

STU

DD

ED

VIN

YL

TILE

SQ

UA

RR

Y T

ILE

S

CE

ILIN

G (T

IMBE

R)

SKIR

TIN

G (T

IMBE

R)

BALUSTRADES WALLS & COLUMNS REMARKS

POR

CE

LAIN

TIL

ES

DO

OR

S (T

IMBE

R)W

IND

OW

S (T

IMBE

R)

CLA

Y T

ILE

BA

SEC

ON

CR

ETE

PLA

STE

RE

D &

PA

INTE

D

GY

PSU

M B

OA

RD

PA

INTE

DPA

INTE

D C

ON

CRE

TESU

SPE

ND

ED

CE

ILIN

G (D

ROP-

IN T

ILE

S)M

ELA

MIN

E C

ED

AR

PA

NE

L

CO

NC

RE

TE B

LOC

KS

PLA

STE

RE

D &

PA

INTE

DPO

RC

ELA

IN T

ILE

SPR

EC

AST

CO

NC

RETE

CO

NC

RE

TE C

AST

IN P

LAC

E

PAIN

TED

GLA

SS B

LOC

KS

CE

RA

MIC

TIL

ES

GR

AN

ITE

TRA

VE

NTI

NE

(PO

LISH

)

CE

DA

R V

EN

EE

R P

AN

ELS

WIL

SON

ART

SO

LID

SU

RFA

CE

MO

LDIN

GS

1/2"

DIA

. S/S

PIP

E R

AIL

GRD.FL. PLANSTAIRS #3

SECRETARY'S OFFICE

STAFF ROOM

MALE WASHROOM

GR

OO

VE

& T

ON

UG

E T

IMBE

R

PARAPET WALL

FEMALE WASHROOM

PRINCIPAL'S OFFICE

LOBBY ENTRANCE

ROOF LEVEL

EPO

XY

PA

INT

POR

CE

LAIN

BA

SE

T-11

PLY

BD

. TR

EA

TED

5/8

" TH

K P

AN

EL

PAIN

TED

YE

LLO

W P

INE

RA

IL

POR

CE

LAIN

(PO

LISH

ED

)

CORRIDOR/RAMPS

CLASS ROOM #1

ELECTRICAL ROOM

MECHANICAL ROOM

FIRST FLOORSTAIRS #3

CORRIDOR

CLASS ROOM #2

CLASS ROOM #3

CLASS ROOM #4

LIBRARY

1/2"

DIA

. ST.

PIP

ES

UNDERPASS

STRIATED NOSING TILE

STRIATED NOSING TILE

FINISHES SCHEDULE ADMIN. BLOCK (BLOCK B)

BA12

PRINCIPAL'S WASHROOM

Page 30: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

FEMALE WASH RM. ELEVATION AScale: 1/4" = 1'-0"

ABA13

4

3'-0

"6"

1'-6"

2"

B

FEMALE WASH RM. ELEVATION BScale: 1/4" = 1'-0"

BBA13

5'-0"

2"

TYP. T.P.P. 2" MOLDING

FEMALE WASH RM. ELEVATION CScale: 1/4" = 1'-0"

CBA13

4

1'-9"

B

FEMALE WASH RM. ELEVATION DScale: 1/4" = 1'-0"

DBA13

2'-8"

4"6"

1'-2"

2'-6"

3'-0

"

TYP. TOILET PAPER HOLDER

TYP. HAND DRYER

B

MALE WASH RM. ELEVATION HXXXScale: 1/4" = 1'-0"

HBA13

5'-0"

2"

MALE WASH RM. ELEVATION GScale: 1/4" = 1'-0"

GBA13

4

1'-9"

TYP. TOILET PAPER HOLDER

TYP. T.P.P. 2" MOLDING

B

MALE WASH RM. ELEVATION FScale: 1/4" = 1'-0"

FBA13

3'-0

"6"

1'-2"

2'-6"

3'-0

"

TYP. HAND DRYER

MALE WASH RM. ELEVATION EScale: 1/4" = 1'-0"

EBA13

3

2'-3"

9"6"

TYP. 12"x 12" WALL TILE

FEMALE WRM. 33 s.f.

B

MALE WRM. 33 s.f.

B

3 4

A

C

BD BA13

E

G

FH BA13

3 4

KEY

WASH RM INT. ELEV.ADMIN. BLOCK (BLOCK B)

BA13

MIRROR

MIRROR

PRINCIPAL WASH RM. ELEVATION IScale: 1/4" = 1'-0"

IBA13

PRINCIPAL WASH RM. ELEVATION JScale: 1/4" = 1'-0"

JBA13

PRINCIPAL WASH RM. ELEVATION LScale: 1/4" = 1'-0"

LBA13

PRINCIPAL WASH RM. ELEVATION KScale: 1/4" = 1'-0"

KBA13

D

2 3

2 3

D

J

L

KI BA13

Page 31: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

PRINCIPAL OFFICE 133 s.f.

PROPOSED SEC. 133 s.f.

PROPOSED CLASS RM. #1526 s.f.

LOBBY/ENTRANCE

A

B

D

C

O

1 2 3 4 5 6 7 8 9 10 11

ELEVATOR SHAFT

2 3 4 5 6 7 8 9 10 11

A

B

D

E

CUTLINE

BLOCK B

A

BC

D

E

1

BBA4

BBA4

ABA4

ABA4

PROPOSED CLASS RM. #1526 s.f.

FEMALE WRM. 33 s.f.

MALE WRM. 33 s.f.

UNDER PASS

14'-6"

110'-6"

6'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 6'-0"

52'-1

1"

5'-11"

22'-0

"25

'-0"

110'-6"

6'-0"12'-0"12'-0"12'-0"12'-0"12'-0"12'-0"12'-0"6'-0"14'-6"

52'-1

1"

5'-11"

10'-6

"11'-

6"25

'-0"

PROPOSED STAFF RM. 597 s.f.

WATER RESISTANT GYP. BD. CEILING

GYP. BD. CEILING

T-11 TREATED 5/8" PLY BD. ON 2"x6" TREATED YELLOW PINE

KEY

REINFORCE CONC.

GRD. FL. REFLECTED CEILING PLAN

BC1

MECH. RM75 s.f.

ELEC. RM.158 s.f.

PRIN

CIP

AL

WA

SH R

M.

33 s.

f.

REV. #1

REV. #1

11/17/16 REV.#1:CLG. REVISED IN MECH. & ELEC. RM. CLG. ADDED IN PRINCIPAL WASH RM.

B.O.

ARMSTRONG MINATONE 2'-0"x 2'-0" OR SIMILAR & APPROVED

Page 32: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

ELEVATOR SHAFT

OPEN TO BELOW

A

B

D

E

C

1 2 3 4 5 6 7 8 9 10 11

1 2 3 4 5 6 7 8 9 10 11

A

B

D

E

CUTLINE #1

A

BC

D BBA4

BBA4

ABA4

ABA4

UNDER PASS

BLOCK B

LIBRARY509 s.f.

PROPOSED CLASS RM. #2510 s.f.

PROPOSED CLASS RM. #3505 s.f.

PROPOSED CLASS RM. #4505 s.f.

GYP. BD. CEILING

T-11 TREATED 5/8" PLY BD. ON 2"x6" TREATED YELLOW PINE

KEY

REINFORCE CONC.

14'-6"

110'-6"

6'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 6'-0"

52'-1

1"

5'-11"

22'-0

"25

'-0"

110'-6"

6'-0"12'-0"12'-0"12'-0"12'-0"12'-0"12'-0"12'-0"6'-0"14'-6"

52'-1

1"

5'-11"

10'-6

"11'-

6"25

'-0"

FIRST FL. REFLECTED CEILING PLAN

BC2

Page 33: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

PROPOSED STAFF RM. 597 s.f.

PRINCIPAL OFFICE 133 s.f.

RAMP (#1) UP 24'-0"

PROPOSED CLASS RM. #1526 s.f.

RAMP UP (#2) 24'-0"

FEMALE WRM. 33 s.f.

LOBBY/ENTRANCE

UP

PROPOSED SEC. 133 s.f.

A

B

D

C

O

MALE WRM. 33 s.f.

UNDER PASS

UP

UP

GRD. FL. TILE PLAN ADMIN. BLOCK (BLOCK B)

BT1

1 2 3 4 5 6 7 8 9 10 11

ELEVATOR SHAFT

OUTLINE OF SLAB ABOVE

GRD. FL. TILE PLAN ADMIN. BLOCK (BLOCK B)SCALE:1/8"=1'-0"

3,125 s.f.

2 3 4 5 6 7 8 9 10 11

A

B

D

E

CUTLINE

BLOCK B

A

BC

D

D1W2

W1

E

1

BBA4

BBA4

ABA4

ABA4

2'-0"x 4'-0" CLEANOUT

DARK CLAY TILES ( 12"x12")LIGHT CLAY TILE (12"x12")12" x 12" CLAY TILES W/ NOSING

18"x 18" PORCELIN TILES

KEY

EPOXY PAINT

12" x 12" CLAY TILES W/ NOSING

MECH. RM75 s.f.

ELEC. RM.158 s.f.

PRINCIPAL WASH RM. 33 s.f.

REV. #1

REV. #1

11/17/16 REV.#1:TILE PLAN REVISED B.O.

Page 34: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE RC ROOF SLAB

LIBRARY509 s.f.

PROPOSED CLASS RM. #2510 s.f.

PROPOSED CLASS RM. #3505 s.f.

PROPOSED CLASS RM. #4505 s.f.

ELEVATOR SHAFT

UNDER PASS

OPEN TO BELOW

FIRST FL. TILE PLAN ADMIN. BLOCK (BLOCK B)

BT2FIRST FL. TILE PLAN ADMIN. BLOCK (BLOCK B)SCALE:1/8"=1'-0"

3,645 s.f.

DN.

A

B

D

E

C

1 2 3 4 5 6 7 8 9 10 11

1 2 3 4 5 6 7 8 9 10 11

A

B

D

E

CUTLINE #1

BLOCK B

A

BC

D BBA4

BBA4

ABA4

ABA4

DARK CLAY TILES ( 12"x12")LIGHT CLAY TILE (12"x12")12" x 12" CLAY TILES W/ NOSING

18"x 18" PORCELIN TILES

KEY

EPOXY PAINT

12" x 12" CLAY TILES W/ NOSING

REV. #1

REV. #1

11/17/16REV.#1:TILE PLAN REVISED B.O.

Page 35: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

GRD. FL. FURNITURE PLAN ADMIN. BLOCK (BLOCK B)

BF1GRD. FL. FURNITURE PLAN ADMIN. BLOCK (BLOCK B)SCALE:1/8"=1'-0"

3,125 s.f.

PRINCIPAL OFFICE 133 s.f.

RAMP (#1) UP 24'-0"

RAMP UP (#2) 24'-0"

FEMALE WRM. 33 s.f.

LOBBY/ENTRANCE

UP

PROPOSED SEC. 133 s.f.

A

B

D

C

O

MALE WRM. 33 s.f.

UNDER PASS

UP

UP

2 3 4 5 6 7 8 9 10 11

ELEVATOR SHAFT

2 3 4 5 6 7 8 9 10 11

A

B

D

E

CUTLINE

BLOCK BE

1

1

FIN. GRD. FL.2'-4"

PROPOSED CLASS RM. #1526 s.f.

KEY

FIRE EXTINQUISHER

GARBAGE BIN

PRINTER

PHOTO COPIER

GAS CYLINDER

FILING CABINET

PROPOSED STAFF RM. 597 s.f.FILING

FILI

NG

MECH. RM75 s.f.

ELEC. RM.158 s.f.

Page 36: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

RC ROOF SLAB

PROPOSED CLASS RM. #2510 s.f.

PROPOSED CLASS RM. #3505 s.f.

PROPOSED CLASS RM. #4505 s.f.ELEVATOR

SHAFT

UNDER PASS

OPEN TO BELOW

FIRST FL. FURNITURE PLAN ADMIN. BLOCK (BLOCK B)

BF2FIRST FL. FURNITURE PLAN ADMIN. BLOCK (BLOCK B)SCALE:1/8"=1'-0"

3,645 s.f.

DN.

CUTLINE #1

BLOCK B

A

B

D

C

O

2 3 4 5 6 7 8 9 10 11

2 3 4 5 6 7 8 9 10 11

A

B

D

EE

1

1

LIBRARY509 s.f.

KEY

FIRE EXTINQUISHER

GARBAGE BIN

PRINTER

PHOTO COPIER

GAS CYLINDER

FILING CABINET

Page 37: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

5 6 7 8 9 10 11

IN

OUT

1 2 3 4

100.06tree

100.30tree

100.23tree

101.10tree

100.77tree

101.00tree

99.62tree

100.13tree

100.64tree

98.52tree

100.95tree

100.22lp

100.56lp

99.79lp

99.37lp

101.01lp

100.34lp

100.12lp

100.21lp100.10

lp

100.26lp

99.19lp

100.64lp

GREEN HOUSE

CHICKEN PENSCISTERN

SAND PIT

Z:99.73

Z:100.21

Z:100.12

Z:99.33

Z:99.33

Z:100.85

Z:100.63

Z:100.02

Z:101.09

Z:99.35

Z:99.32

Z:99.47Z:99.86

Z:99.95

Z:99.87

Z:100.31

Z:99.79

Z:99.72

Z:99.33

Z:99.51

Z:100.37

Z:99.70

Z:100.93

Z:100.85

Z:100.51

Z:99.08

Z:99.30

Z:100.39

Z:100.32

Z:99.49

Z:100.50

Z:100.98

Z:100.70

Z:99.82

Z:100.18

Z:99.76

Z:100.05

Z:99.93

Z:99.72

Z:99.68

Z:100.18

Z:99.94

Z:100.31

Z:100.51

Z:99.53Z:99.19

Z:101.01

CAFETERIA

BLOCK ADN.

DN.

ART RM.CLASS

RM. #3CLASS

RM. #4CLASS

RM. #5 CLASS RM. #6/STAGE

AUDITURIUM CLASS RM. #7

UP

COMPUTER

LAB. 452 s.f.

CHEMISTRY

604 s.f.

BIOLOGY

604 s.f.

M. WASH

RM.

F. WASH RM.MECH.

UP

INDUSTRIAL ARTS

906 s.f.

COUNTER

TOP FUME

CABINET

PROPOSED

COMPUTER

LAB. 602 s.f.

SEC.126 s.f.LOBBY/ WAITING

135 s.f.STO. 1

91 s.f.

STO. 175 s.f.

STAFF RM.

330 s.f. M. W

RM.

47 s.

f.F.

WRM

.47

s.f.

RAMP

UP

PROPOSED

SCIENCE

LAB. 916 s.f.

CLASS RM. #1 498 s.f.

CLASS RM. #2 498 s.f.

DN.

OFFIC

E56

s.f.

STO.

53 s.

f.

STO.29 s.f.

KITCHEN345 s.f.

DEPUTY PRICIPAL

OFFICE 160 s.f.

BLOCK D

BLOCK E

MECH

. RM

75 s.

f.

ELEC. R

M.

158 s

.f.

PRIN

CIPAL

WASH

RM

.

33 s.

f.

PRO

POSE

D

STAFF

RM

.

597 s

.f.

PRIN

CIPAL

OFF

ICE

133 s

.f.

RAMP

(#1)

UP

24'-0

"

PRO

POSE

D

CLASS

RM

. #1

526 s

.f. RAMP

UP (#

2) 24

'-0"

FEM

ALE

WRM

. 33 s

.f.

LOBBY/

ENTRAN

CE

UP

PRO

POSE

D

SEC. 1

33 s.

f.

MALE

W

RM. 3

3 s.f.

UND

ER PA

SS

UP

ELEVATO

R

SHAFT

BLOCK B

D1

W1

4'-0"

x 4'-0

"

ACCESS H

ATCH

PUM

P ST

ORAG

E

UND

ER SL

AB

FIN

. GRD

. FL.

2'-4"

HOME ECONOMICS763 s.f.

PROPOSED 214 s.f. MALE WASH RM.

PROPOSED 214 s.f.FEMALE WASH RM.

MECH. RM. 77 s.f.

UR

INA

L

RAMP DN. 24'-0"

DN.

PROPOSED HOME MANAGEMENT 768 s.f.

BLOCK C

D4

WASH RM.32 s.f.

FIN. GRD. FL.

2'-4"

FIN. GRD. FL.

2'-4"

FIN

. GR

D. F

L.

2'-4

"

BLOCK B

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

M.MAS SHOWNBRANSON OLLIVIERRE

SIR MC CHESNEY GEORGE SECONDARY SCHOOL (BARBUDA ANTIGUA)

03/11/16

SITE PLAN

S1SITE PLANSCALE:1"=40'

EXISTING BUILDING REMAIN

PROPOSED BUILDING

REMAINING LANDS FOR PLAYING GROUND & AGRICULTURE E.T.C.

GARBAGE COLLECTION

PROPOSED PEDESTRIAN CIRCULATION

EXIST. PEDESTRIAN CIRCULATION TO REMAIN

OUT

PROPOSED SECURITY

GARBAGE COLLECTION

PROPOSED PLAYING FIELD

EXIST. AGRICULTURE PLOT

COURT YARD

448A/16

THE WORKING DRAWING PHASE

PROPOSED ROAD & PARKING BY OTHER

BLOCK FBLOCK G

BLOCK H

BLOCK I

BLOCK J

REV.#1

REV.#1

REV.#1

11/16/16 REV.#1: SECURITY BOOTH RELOCATED B.O.

Page 38: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

5 6 7 8 9 10 11

IN

OUT

1 2 3 4

100.06tree

100.30tree

100.23tree

101.10tree

100.77tree

101.00tree

99.62tree

100.13tree

100.64tree

98.52tree

100.95tree

100.22lp

100.56lp

99.79lp

99.37lp

101.01lp

100.34lp

100.12lp

100.21lp100.10

lp

100.26lp

99.19lp

100.64lp

GREEN HOUSE

CHICKEN PENSCISTERN

SAND PIT

Z:99.73

Z:100.21

Z:100.12

Z:99.33

Z:99.33

Z:100.85

Z:100.63

Z:100.02

Z:101.09

Z:99.35

Z:99.32

Z:99.47Z:99.86

Z:99.95

Z:99.87

Z:100.31

Z:99.79

Z:99.72

Z:99.33

Z:99.51

Z:100.37

Z:99.70

Z:100.93

Z:100.85

Z:100.51

Z:99.08

Z:99.30

Z:100.39

Z:100.32

Z:99.49

Z:100.50

Z:100.98

Z:100.70

Z:99.82

Z:100.18

Z:99.76

Z:100.05

Z:99.93

Z:99.72

Z:99.68

Z:100.18

Z:99.94

Z:100.31

Z:100.51

Z:99.53Z:99.19

Z:101.01

CAFETERIA

BLOCK ADN.

DN.

ART RM.CLASS

RM. #3CLASS

RM. #4CLASS

RM. #5 CLASS RM. #6/STAGE

AUDITURIUM CLASS RM. #7

UP

COMPUTER

LAB. 452 s.f.

CHEMISTRY

604 s.f.

BIOLOGY

604 s.f.

M. WASH

RM.

F. WASH RM.MECH.

UP

INDUSTRIAL ARTS

906 s.f.

COUNTER

TOP FUME

CABINET

PROPOSED

COMPUTER

LAB. 602 s.f.

SEC.126 s.f.LOBBY/ WAITING

135 s.f.STO. 1

91 s.f.

STO. 175 s.f.

STAFF RM.

330 s.f. M. W

RM.

47 s.

f.F.

WRM

.47

s.f.

BLOCK B

RAMP

UP

PROPOSED

SCIENCE

LAB. 916 s.f.

CLASS RM. #1 498 s.f.

CLASS RM. #2 498 s.f.

DN.

OFFIC

E56

s.f.

STO.

53 s.

f.

STO.29 s.f.

KITCHEN345 s.f.

DEPUTY PRICIPAL

OFFICE 160 s.f.

BLOCK CRAMP DN.

DN

.

BLOCK D

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

M.MAS SHOWNBRANSON OLLIVIERRE

SIR MC CHESNEY GEORGE SECONDARY SCHOOL (BARBUDA ANTIGUA)

03/11/16

SITE PLAN

S2SITE PLANSCALE:1"=40'

EXISTING BUILDING REMAIN

PROPOSED BUILDINGREMAINING LANDS FOR PLAYING GROUND & AGRICULTURE E.T.C.

GARBAGE COLLECTION

PROPOSED PEDESTRIAN CIRCULATION

EXIST. PEDESTRIAN CIRCULATION TO REMAIN

OUT

PROPOSED SECURITY

GARBAGE COLLECTION

PROPOSED PLAYING FIELD

EXIST. AGRICULTURE PLOT

COURT YARD

448A/16

PROPOSED ROAD & PARKING BY OTHER

BLOCK D

BLOCK F

BLOCK E

BLOCK G

BLOCK H

BLOCK I

BLOCK J

BLOCK CCU

TLI

NE

#1

OPE

N T

O B

ELOW

BLOCK B

FIN

. RO

OF

LEVEL

21'-9

"

FIN

. ELE

VATOR

SHAFT

24'-9

"

BLOCK B

REV.#1

REV.#1

REV.#1

11/16/16 REV.#1: SECURITY BOOTH RELOCATED B.O.

DINING AREA

1068 s.f.

BLOCK A

DN.

DN.

DN.

BLOCK A

THE WORKING DRAWING PHASE

Page 39: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

GRD. FL. PLAN HOME MANAGEMENT BLOCK (BLOCK C)

CA1GRD. FL. PLAN HOME ECONOMICS BLOCK (BLOCK C)SCALE:1/8"=1'-0"

-GROSS: 3,360 s.f.

HOME ECONOMICS763 s.f.

PROPOSED 214 s.f. MALE WASH RM.

PROPOSED 214 s.f.FEMALE WASH RM.

MECH. RM. 77 s.f.

UR

INA

L

RAMP DN. 24'-0" DN.

A

B

C

1 2 3 4 5 6 7 8 9 10

F

E

1 2 3 4 5 6 7 8 9 10

A

B

D

C

F

BLOCK C

12'-0" 12'-0" 11'-0" 3"9"9"3" 10'-0" 3"9"9"3" 10'-0" 3"9"9"3" 11'-0" 12'-0" 12'-0" 5'-9" 4"6"

102'-7"

CU

TLIN

E #

2

3"9"9

"3"

7'-10

"5'-

11"22

'-0"

1'-0"

6"

A

BC

D6'

-0"

37'-3

"

65'-11" 6" 6'-1" 5'-0" 4" 3'-0" 4" 3'-0" 4" 3'-0" 4" 9'-2" 5'-7"

12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 5'-9" 4"6"

102'-7"

3'-3

"6"

4'-10

"5'-

9"6'

-0"

STAIR INFO. #14 RISERS @ 7"3 TREADS @ 12"

2'-6"

7'-10

"5'-

11"7'-

5"7'-

5"7'-

3"6"

1'-0"

37'-3

"

4'-0"

4'-10

"4"

3'-9

"

6'-4

"6"

D1

W1W2

D1D1 D1D1

D1

W4W5W6 W3 W3 W3 W3

D3

D2

D3

D4

D4

D3 D3 D3

W3 W3 W3 W3

W1

W2 W3

W5

W5

W6 W6 W6 W4

W3

W3

BCA2

BCA2

ACA2

ACA2

N

6"4"

9"

W6

FIN. GRD. FL.2'-4"

FIN. GRD. FL.2'-4"

FIN

. GRD

. FL.

2'-4

"

WASH RM.37 s.f.

D4

GA

S STO

RA

GE

REV.#1

PROPOSED HOME MANAGEMENT 768 s.f.

REV.#1

10/06/16REV.#1:HOME ECONOMICS LAB. & HOME MANAGEMENT LAB. REVISED

B.O.

GAS CYLINDER STORAGE CONSTRUCTED

D5

Page 40: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

1 2 3 4 5 6 7 8 9 10

HOME ECONOMICS

HOME MANAGEMENT

MALE WASH RM.

FIN. GRD.FL.2'-4"

FIN. BEAM12'-9"

FIN. ROOF20'-7"

5"9"

2'-3"

1'-0"

4'-0"

2'-5"

7'-10

"

1'-1"

10'-5

"

HOME MANAGEMENT

ABCF

FIN. GRD.FL.2'-4"

FIN. BEAM12'-9"

FIN. ROOF20'-7"

1'-11"

5"3'

-0"

5'-0"

2'-5"

7'-10

"

1'-1"

2'-4"

10'-5

"

CA2

SECTION A-ASCALE:1/8"=1'-0"

SECTION B-BSCALE:1/8"=1'-0"

HOME MANAGEMENT BLOCK (BLOCK C)SECTIONS A-A & B-B & DETAILS

TYP. 8" WIDE PVC HORIZONTAL GUTTER

GALV. IRON SHEETING ON LATHS ON PLYWOOD ON RAFTERS SEE ENG. DWG.

SEE ENG. DWG.

1A3

2CA2

3CA2

4CA3

5CA3

REV.#1

REV.#1

10/06/16REV.#1:CONSTRUCTION OF GAS CYLINDER STORAGE

B.O.

A

1'-0" 2"

1'-7"

5"5"

1'-2"

5"

2'-5"

1'-7"

RC RING BEAM

NEW 6" RC BLK. WALL

PLASTER BAND

SECTION "DET" #1SCALE: 1/2" = 1'-0"1 SECTION "DET" #1SCALE: 1/2" = 1'-0"1

F

TYP. 8" WIDE PVC HORIZONTAL GUTTER

TYP. 2 1/2" PVC DN. PIPE

1"x 10" T.Y.P. FACIA BD.

24 GUAGE PVF 2 GALV. IRON SHEETING ON 1" x 4" T.Y.P. LATHS ON 2"x 6" T.Y.P. RAFTERS

RIGID INSULATION ON 5/8" TREATED GROOVE PLYWOOD

IN FILL

RC RING BEAM

NEW 6" RC BLK. WALL

24 GUAGE PVF 2 GALV. IRON SHEETING ON 1" x 4" T.Y.P. LATHS ON 2"x 6" T.Y.P. RAFTERS

RIGID INSULATION ON 5/8" TREATED GROOVE PLYWOOD

2"x 8" T.Y.P. RIDGE BD.

SECTION "DET" #2SCALE: 1/2" = 1'-0"2

SECTION "DET" #3SCALE: 1/2" = 1'-0"3

10

RC RING BEAM

NEW 6" RC BLK. WALL

TYP. 2"x 6" T.Y.P. RAFTERS

1'-0"

2'-5"

SECTION "DET" #4SCALE: 1/2" = 1'-0"4

B

SECTION "DET" #5SCALE: 1/2" = 1'-0"5

TYP. 1 1/2" GALVANISE PIPE RAIL

5" THK. RC FL. SLAB

TYP. CONC. BASE

TYP. 6" GALV. PIPE

SEE ENG. DWG. FOR FND. FOOTING DETAILS

8"5"

2'-10

"

5"1'-

0"1'-

0"1'-

0"

HOLDING SLEEVE

TYP. CIRCULAR GALV. ST. PIPE

TYP. CIRCULAR GALV. ST. PIPE

Page 41: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

6" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 5'-9"

102'-7"

9"9"3

"

ROOF FRAMING HOME MANAGEMENTBLOCK (BLOCK C)

CA3ROOF FRAMING PLAN HOME ECONOMICS BLOCK (BLOCK C)SCALE:1/8"=1'-0"

A

B

C

1 2 3 4 5 6 7 8 9 10

F

E

1 2 3 4 5 6 7 8 9 10

A

B

D

C

F

12'-0" 12'-0" 11'-0" 9"9"3" 10'-0" 3"9"9"3" 10'-0" 3"9"9"3" 11'-0" 12'-0" 12'-0" 5'-9" 4"6"

102'-7"

3"

7'-10

"22

'-0"

1'-0"

6"

A

BC

D

37'-3

"

7'-10

"5'-

11"7'-

5"7'-

5"7'-

3"6"

1'-0"

37'-3

"

5'-11"

102'-7"

4"

BCA2

BCA2

ACA2

ACA2

N

Page 42: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 5'-9"6"

102'-7"

9"3"

CA4

A

B

C

1 2 3 4 5 6 7 8 9 10

F

E

1 2 3 4 5 6 7 8 9 10

A

B

D

C

F

12'-0" 12'-0" 11'-0" 9"9"3" 10'-0" 3"9"9"3" 10'-0" 3"9"9"3" 11'-0" 12'-0" 12'-0" 5'-9" 4"6"

102'-7"

3"9"

7'-10

"22

'-0"

1'-0"

6"

A

BC

D

37'-3

"

7'-10

"5'-

11"7'-

5"7'-

5"7'-

3"6"

1'-0"

37'-3

"

5'-11"

4"

ROOF PLANHOME MANAGEMENTBLOCK (BLOCK C)

ROOF PLAN HOME ECONOMICS BLOCK (BLOCK C)SCALE:1/8"=1'-0"

BCA2

BCA2

ACA2

ACA2

N

Page 43: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

ELEVATION C

ELEVATION D

ELEVATION B

ELEVATION A

HOME MANAGEMENT BLOCK (BLOCK C) ELEVATIONS

ELEVATIONSSCALE:1/8"=1'-0"

CA5

W7

ELEVATION BELEVATION B

REV.#1

REV.#1

REV.#1

REV.#1

10/06/16REV.#1:CONSTRUCTION OF GAS CYLINDER STORAGE

B.O.

Page 44: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

RAMP (#1) DN. 24'-0" DN.

2 3 4 5 6

2 3 4 5 6

B

C

B

C

A

A

2 3 4 5 6

B

B

B

5"

SEE FIN. SCHEDULEFOR RAMP FIN.

1 1/2" DIA. GALV. PIPE

TYP. 6" GALV. PIPE

3'-6

"2'-

0"

SEE FIN. SCHEDULEFOR RAMP FIN.

2'-4"

7"

1'-0"

3'-6

"

STAIR INFO. #14 RISERS @ 7"3 TREADS @ 12"

SECTION B-BSCALE:1/4"=1'-0"

SECTION A-ASCALE:1/4"=1'-0"

8"2'-

10"

3'-6

"

6'-0

"

CA6

HOME MANAGEMENT BLOCK (BLOCK C) RAMP & STAIR DETAILS

Page 45: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

AL. DR. W/AL. FRAME W/ S/S HINGES & LEVER LOCKSW/ SADDLEW/GLASS TRANSOM06 REQUIRED

2" 2'-8" 2"

3'-0"

6'-10

"2"

10"

2"

8'-0

"

D1

2" 2'-8" 2"

3'-0"6'

-10"

2"

7'-0"

D2

AL. DR. W/AL. FRAME W/ S/S HINGES & LEVER LOCKSW/ SADDLE01 REQUIRED

SOLID CORE TIM. DR.W/ TIM. FRAMENATURAL OAK FINISH W/ S/S SPRING HINGES & L-BOLT 05 REQUIRED

D3

2" 2'-4" 2"

1'-0"

5'-0"

6"2"

6'-8

"

2'-8" 2" 2'-8" 2"

3'-0"

6'-10

"2"

7'-0"

D4

SOLID CORE TIM. DR.NATURAL OAK FINISH W/ TIM. FRAMEW/ S/S HINGES & LEVER LOCKS 03 REQUIRED

W1

1'-9" 2" 1'-9" 2" 1'-9" 2"

6'-0"

10"

2"10

"2"

10"

2"10

"2"

10"

2"

5'-0"

WHITE AL. AWNING WIN.W/ GREY TINTED GLASS 02 REQUIRED

FIN. FL.

3'-0

"

2"

2"

W2

FIN. FL.

2" 2'-0" 2" 2'-0" 2" 2'-0" 2" 2'-0" 2" 2'-0" 2"

11'-0"

2"10

"2"

10"

2"10

"2"

10"

2"10

"2"

5'-0"

3'-0

"

WHITE AL. AWNING WIN.W/ GREY TINTED GLASS 02 REQUIRED

W3

2" 1'-8" 2"

2'-0"

2"1'-

8"2"

2'-0"

6'-0

"

FIN. FL.

WHITE AL. AWNING WIN.W/ GREY TINTED GLASS 11 REQUIRED

FIN. FL.

W4

2" 1'-9" 2" 1'-9" 2"

4'-0"

2"10

"2"

10"

2"10

"2"

10"

2"10

"2"

5'-0"

3'-0

"

WHITE AL. AWNING WIN.W/ GREY TINTED GLASS 02 REQUIRED

W5

FIN. FL.

2" 1'-9" 2" 1'-9" 2" 1'-9" 2"

6'-0"

2"9"

2"9"

2"9"

2"9"

2"

4'-0"

WHITE AL. AWNING WIN.W/ GREY TINTED GLASS 03 REQUIRED

4'-0"

W6

FIN. FL.

2" 2'-0" 2" 2'-0" 2" 2'-0" 2" 2'-0" 2" 2'-0" 2"

11'-0"

2"9"

2"9"

2"9"

2"9"

2"

4'-0"

4'-0"

3'-0

"

3'-0"

WHITE AL. CIRCULAR LOURVE WIN. SYNTECTIC INSECT SCREEN01 REQUIRED

W7

CA7

HOME MANAGEMENT BLOCK (BLOCK C) DOOR & WINDOW SCHEDULE

1"PERIMETER FLAT GAL. ST.

1/2" x 1/2" GAL. ST.

GALV. ENCLOSURE ON GAS STORAGESHALL BE FIN. W/ 2 COATS OF SOLIGNUM & 2 COATSOF FIN. MET. PAINTSUPPLY & INSTALL HINGES,LOCKS & BOLTS01 REQUIRED

2'-6" 2'-6"

5'-0"

6'-0

"

D5

REV.#1

REV.#1

10/06/16REV.#1:1-D5 ADDED B.O.

Page 46: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

McCHESNEY HOME MANAGEMENT BLOCK (BLOCK C)C

LAY

TIL

ES

ROOMS FLOORS MOLDINGS CEILINGS

PAIN

T (H

ARD

EN

ER

AD

DE

D IN

CO

NC

.)C

ER

AM

IC T

ILE

S (N

ON

-SK

ID)

CA

RPE

T (C

OM

ME

RC

IAL)

FAIR

FA

CE

CO

NC

.(HA

RD

EN

ER

AD

DE

D)

STU

DD

ED

VIN

YL

TILE

SQ

UA

RR

Y T

ILE

S

CE

ILIN

G (T

IMBE

R)

SKIR

TIN

G (T

IMBE

R)

BALUSTRADES WALLS & COLUMNS REMARKSPO

RC

ELA

IN T

ILE

S

DO

OR

S (T

IMBE

R)W

IND

OW

S (T

IMBE

R)

CLA

Y T

ILE

BA

SEC

ON

CR

ETE

PLA

STE

RE

D &

PA

INTE

D

GY

PSU

M B

OA

RD

PA

INTE

DPA

INTE

D C

ON

CRE

TESU

SPE

ND

ED

CE

ILIN

G (D

ROP-

IN T

ILE

S)M

ELA

MIN

E C

ED

AR

PA

NE

L

CO

NC

RE

TE B

LOC

KS

PLA

STE

RE

D &

PA

INTE

DPO

RC

ELA

IN T

ILE

SPR

EC

AST

CO

NC

RETE

CO

NC

RE

TE C

AST

IN P

LAC

E

PAIN

TED

GLA

SS B

LOC

KS

CE

RA

MIC

TIL

ES

GR

AN

ITE

TRA

VE

NTI

NE

(PO

LISH

)

CE

DA

R V

EN

EE

R P

AN

ELS

WIL

SON

ART

SO

LID

SU

RFA

CE

MO

LDIN

GS

1/2"

DIA

. S/S

PIP

E R

AIL

GRD.FL. PLANHOME ECONOMICS

MALE WASHROOM

GR

OO

VE

& T

ON

UG

E T

IMBE

RFEMALE WASHROOM

EPO

XY

PA

INT

POR

CE

LAIN

BA

SE

T-11

PLY

BD

. TR

EA

TED

5/8

" TH

K P

AN

EL

PAIN

TED

YE

LLO

W P

INE

RA

IL

POR

CE

LAIN

(PO

LISH

ED

)

CORRIDOR/RAMPS/STAIR

HOME MANAGEMENT

WASHROOM/HOME MANAGEMENT

MECHANICAL ROOM

PARAPET WALL

ROOF LEVEL

1/2"

DIA

. ST.

PIP

ES

WATER RESISTANT GYP. BD.

WATER RESISTANT GYP. BD.

WATER RESISTANT GYP. BD.

WATER RESISTANT GYP. BD.

WATER RESISTANT GYP. BD.

FINISHES SCHEDULE HOME MANAGEMENT BLOCK (BLOCK C)

CA8

Page 47: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

FEMALE WASH RM. ELEVATION CScale: 1/4" = 1'-0"

CBA13

9

FEMALE WASH RM. ELEVATION AScale: 1/4" = 1'-0"

ABA13

9

FEMALE WASH RM. ELEVATION BScale: 1/4" = 1'-0"

BBA13

F

FEMALE WASH RM. ELEVATION DScale: 1/4" = 1'-0"

DBA13

F

FEMALE DISABLED WASH RM. ELEVATION EScale: 1/4" = 1'-0"

EBA13

7 F

FEMALE DISABLED WASH RM. ELEVATION FScale: 1/4" = 1'-0"

FBA13

FEMALE DISABLED WASH RM. ELEVATION GScale: 1/4" = 1'-0"

GBA13

7 F

FEMALE DISABLED WASH RM. ELEVATION HScale: 1/4" = 1'-0"

HBA13

MALE WASH RM. ELEVATION IScale: 1/4" = 1'-0"

IBA13

9

MALE WASH RM. ELEVATION JScale: 1/4" = 1'-0"

JBA13

F

MALE WASH RM. ELEVATION KScale: 1/4" = 1'-0"

KBA13

9

MALE WASH RM. ELEVATION LScale: 1/4" = 1'-0"

LBA13

F

MALE DISABLED WASH RM. ELEVATION MScale: 1/4" = 1'-0"

MBA13

7 F

MALE DISABLED WASH RM. ELEVATION NScale: 1/4" = 1'-0"

NBA13

MALE DISABLED WASH RM. ELEVATION OScale: 1/4" = 1'-0"

OBA13

7

WASH RM INT. ELEV.HOME MANAGEMENTBLOCK (BLOCK C)

CA9

TYP. T.P.P. 2" MOLDING

TYP. TOILET PAPER HOLDER

TYP. HAND DRYER

TYP. 12"x 12" WALL TILE

TYP. S/S GRAB BAR

TYP. HAND DRYER

MIRROR

1'-9"

1'-3"

2'-8"

6"6"

2'-2"3'

-0"

2'-5"

3'-0

"6"

1'-6"

2"1'-

6"2"2

"

1"1"

3'-8

"

2'-8"

6"

4'-8" 3'

-0"6"

5'-0"

2"

PROPOSED 214 s.f. MALE WASH RM.

PROPOSED 214 s.f.FEMALE WASH RM.

MECH. RM. 77 s.f.

UR

INA

L

7

WASH RM.32 s.f.

8 9

C

F

7 8 9

C

F

A

C

BD BA13

E

G

FH BA13

I

K

JL BA13M

O

NP BA13

Q

S

RT BA135'-

0"2"

WASH RM. ELEVATION QScale: 1/4" = 1'-0"

QBA13

7

1'-9"

F

WASH RM. ELEVATION RScale: 1/4" = 1'-0"

RBA13

3'-0

"6"

1'-6"

2'-6"

3'-0

"

2"

WASH RM. ELEVATION SScale: 1/4" = 1'-0"

SBA13

7 F

WASH RM. ELEVATION TScale: 1/4" = 1'-0"

TBA13

5'-0"

2"

5'-0"

2"

Page 48: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

MECH. RM. 45 s.f.

URI

NA

L

A

B

C

1 2 3 4 5 6 7 8 9 10

F

E

1 2 3 4 5 6 7 8 9 10

A

B

D

C

F

BLOCK C

CU

TLIN

E #

2

A

BC

D

BCA2

BCA2

ACA2

ACA2

WATER RESISTANT GYP. BD. CEILING

T-11 TREATED 5/8" GROOVE PLY BD. ON TREATED YELLOW PINE

KEY

PROPOSED 214 s.f. MALE WASH RM.

PROPOSED 214 s.f.FEMALE WASH RM.

HOME ECONOMICS763 s.f.

PROPOSED HOME MANAGEMENT 768 s.f.

101'-9"

12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 5'-9"

35'-9

"

7'-10

"5'-

11"22

'-0"

101'-9"

12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 5'-9"

35'-9

"

7'-10

"5'-

11"7'-

5"7'-

5"7'-

3"

GRD. FL. REFLECTED CEILING PLAN

CC1

WASH RM.

Page 49: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

GRD. FL. TILE PLAN HOME MANAGEMENT BLOCK (BLOCK C)

CT1GRD. FL. TILE PLAN HOME ECONOMICS BLOCK (BLOCK C)SCALE:1/8"=1'-0"

3,283 s.f.

HOME ECONOMICS763 s.f.

PROPOSED 214 s.f. MALE WASH RM.

PROPOSED 214 s.f.FEMALE WASH RM.

MECH. RM. 77 s.f.

UR

INA

L

RAMP DN. 24'-0" DN.

PROPOSED HOME MANAGEMENT 768 s.f.

A

B

C

1 2 3 4 5 6 7 8 9 10

F

E

1 2 3 4 5 6 7 8 9 10

A

B

D

C

F

BLOCK C

CU

TLIN

E #

2

A

BC

D

STAIR INFO. #14 RISERS @ 7"3 TREADS @ 12"

BCA2

BCA2

ACA2

ACA2

N

D4

WASH RM.32 s.f.

DARK CLAY TILES ( 12"x12")LIGHT CLAY TILE (12"x12")12" x 12" CLAY TILES W/ NOSING

18"x 18" PORCELIN TILES

KEY

EPOXY PAINT

12" x 12" CLAY TILES W/ NOSING

Page 50: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

GRD. FL. FURNITURE PLAN HOME MANAGEMENT BLOCK (BLOCK C)

CF1GRD. FL. FURNITURE PLAN HOME ECONOMICS BLOCK (BLOCK C)SCALE:1/8"=1'-0"

3,283 s.f.

PROPOSED 214 s.f. MALE WASH RM.

PROPOSED 214 s.f.FEMALE WASH RM.

MECH. RM. 77 s.f.

UR

INA

L

RAMP DN. 24'-0" DN.

PROPOSED HOME MANAGEMENT 768 s.f.

BLOCK C

CU

TLIN

E #

2

N

A

B

C

1 2 3 4 5 6 7 8 9 10

F

E

1 2 3 4 5 6 7 8 9 10

A

B

D

C

F

KEY

FIRE EXTINQUISHER

GARBAGE BIN

PRINTER

PHOTO COPIER

GAS CYLINDER

LARGE FORMAT PLOTTER

MICRO WAVE

DE

EP

FRE

EZ

E

HOME ECONOMICS763 s.f.

DEEP FREEZE W

D

Page 51: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

5 6 7 8 9 10 11

IN

OUT

1 2 3 4

100.06tree

100.30tree

100.23tree

101.10tree

100.77tree

101.00tree

99.62tree

100.13tree

100.64tree

98.52tree

100.95tree

100.22lp

100.56lp

99.79lp

99.37lp

101.01lp

100.34lp

100.12lp

100.21lp100.10

lp

100.26lp

99.19lp

100.64lp

GREEN HOUSE

CHICKEN PENSCISTERN

SAND PIT

Z:99.73

Z:100.21

Z:100.12

Z:99.33

Z:99.33

Z:100.85

Z:100.63

Z:100.02

Z:101.09

Z:99.35

Z:99.32

Z:99.47Z:99.86

Z:99.95

Z:99.87

Z:100.31

Z:99.79

Z:99.72

Z:99.33

Z:99.51

Z:100.37

Z:99.70

Z:100.93

Z:100.85

Z:100.51

Z:99.08

Z:99.30

Z:100.39

Z:100.32

Z:99.49

Z:100.50

Z:100.98

Z:100.70

Z:99.82

Z:100.18

Z:99.76

Z:100.05

Z:99.93

Z:99.72

Z:99.68

Z:100.18

Z:99.94

Z:100.31

Z:100.51

Z:99.53Z:99.19

Z:101.01

CAFETERIA

BLOCK ADN.

DN.

ART RM.CLASS

RM. #3CLASS

RM. #4CLASS

RM. #5 CLASS RM. #6/STAGE

AUDITURIUM CLASS RM. #7

UP

COMPUTER

LAB. 452 s.f.

CHEMISTRY

604 s.f.

BIOLOGY

604 s.f.

M. WASH

RM.

F. WASH RM.MECH.

UP

INDUSTRIAL ARTS

906 s.f.

COUNTER

TOP FUME

CABINET

PROPOSED

COMPUTER

LAB. 602 s.f.

SEC.126 s.f.LOBBY/ WAITING

135 s.f.STO. 1

91 s.f.

STO. 175 s.f.

STAFF RM.

330 s.f. M. W

RM.

47 s.

f.F.

WRM

.47

s.f.

RAMP

UP

PROPOSED

SCIENCE

LAB. 916 s.f.

CLASS RM. #1 498 s.f.

CLASS RM. #2 498 s.f.

DN.

OFFIC

E56

s.f.

STO.

53 s.

f.

STO.29 s.f.

KITCHEN345 s.f.

DEPUTY PRICIPAL

OFFICE 160 s.f.

BLOCK D

BLOCK E

MECH

. RM

75 s.

f.

ELEC. R

M.

158 s

.f.

PRIN

CIPAL

WASH

RM

.

33 s.

f.

PRO

POSE

D

STAFF

RM

.

597 s

.f.

PRIN

CIPAL

OFF

ICE

133 s

.f.

RAMP

(#1)

UP

24'-0

"

PRO

POSE

D

CLASS

RM

. #1

526 s

.f. RAMP

UP (#

2) 24

'-0"

FEM

ALE

WRM

. 33 s

.f.

LOBBY/

ENTRAN

CE

UP

PRO

POSE

D

SEC. 1

33 s.

f.

MALE

W

RM. 3

3 s.f.

UND

ER PA

SS

UP

ELEVATO

R

SHAFT

BLOCK B

D1

W1

4'-0"

x 4'-0

"

ACCESS H

ATCH

PUM

P ST

ORAG

E

UND

ER SL

AB

FIN

. GRD

. FL.

2'-4"

HOME ECONOMICS763 s.f.

PROPOSED 214 s.f. MALE WASH RM.

PROPOSED 214 s.f.FEMALE WASH RM.

MECH. RM. 77 s.f.

UR

INA

L

RAMP DN. 24'-0"

DN.

PROPOSED HOME MANAGEMENT 768 s.f.

BLOCK C

D4

WASH RM.32 s.f.

FIN. GRD. FL.

2'-4"

FIN. GRD. FL.

2'-4"

FIN

. GR

D. F

L.

2'-4

"

BLOCK B

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

M.MAS SHOWNBRANSON OLLIVIERRE

SIR MC CHESNEY GEORGE SECONDARY SCHOOL (BARBUDA ANTIGUA)

03/11/16

SITE PLAN

S1SITE PLANSCALE:1"=40'

EXISTING BUILDING REMAIN

PROPOSED BUILDING

REMAINING LANDS FOR PLAYING GROUND & AGRICULTURE E.T.C.

GARBAGE COLLECTION

PROPOSED PEDESTRIAN CIRCULATION

EXIST. PEDESTRIAN CIRCULATION TO REMAIN

OUT

PROPOSED SECURITY

GARBAGE COLLECTION

PROPOSED PLAYING FIELD

EXIST. AGRICULTURE PLOT

COURT YARD

448A/16

THE WORKING DRAWING PHASE

PROPOSED ROAD & PARKING BY OTHER

BLOCK FBLOCK G

BLOCK H

BLOCK I

BLOCK J

REV.#1

REV.#1

REV.#1

11/16/16 REV.#1: SECURITY BOOTH RELOCATED B.O.

Page 52: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

5 6 7 8 9 10 11

IN

OUT

1 2 3 4

100.06tree

100.30tree

100.23tree

101.10tree

100.77tree

101.00tree

99.62tree

100.13tree

100.64tree

98.52tree

100.95tree

100.22lp

100.56lp

99.79lp

99.37lp

101.01lp

100.34lp

100.12lp

100.21lp100.10

lp

100.26lp

99.19lp

100.64lp

GREEN HOUSE

CHICKEN PENSCISTERN

SAND PIT

Z:99.73

Z:100.21

Z:100.12

Z:99.33

Z:99.33

Z:100.85

Z:100.63

Z:100.02

Z:101.09

Z:99.35

Z:99.32

Z:99.47Z:99.86

Z:99.95

Z:99.87

Z:100.31

Z:99.79

Z:99.72

Z:99.33

Z:99.51

Z:100.37

Z:99.70

Z:100.93

Z:100.85

Z:100.51

Z:99.08

Z:99.30

Z:100.39

Z:100.32

Z:99.49

Z:100.50

Z:100.98

Z:100.70

Z:99.82

Z:100.18

Z:99.76

Z:100.05

Z:99.93

Z:99.72

Z:99.68

Z:100.18

Z:99.94

Z:100.31

Z:100.51

Z:99.53Z:99.19

Z:101.01

CAFETERIA

BLOCK ADN.

DN.

ART RM.CLASS

RM. #3CLASS

RM. #4CLASS

RM. #5 CLASS RM. #6/STAGE

AUDITURIUM CLASS RM. #7

UP

COMPUTER

LAB. 452 s.f.

CHEMISTRY

604 s.f.

BIOLOGY

604 s.f.

M. WASH

RM.

F. WASH RM.MECH.

UP

INDUSTRIAL ARTS

906 s.f.

COUNTER

TOP FUME

CABINET

PROPOSED

COMPUTER

LAB. 602 s.f.

SEC.126 s.f.LOBBY/ WAITING

135 s.f.STO. 1

91 s.f.

STO. 175 s.f.

STAFF RM.

330 s.f. M. W

RM.

47 s.

f.F.

WRM

.47

s.f.

BLOCK B

RAMP

UP

PROPOSED

SCIENCE

LAB. 916 s.f.

CLASS RM. #1 498 s.f.

CLASS RM. #2 498 s.f.

DN.

OFFIC

E56

s.f.

STO.

53 s.

f.

STO.29 s.f.

KITCHEN345 s.f.

DEPUTY PRICIPAL

OFFICE 160 s.f.

BLOCK CRAMP DN.

DN

.

BLOCK D

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

M.MAS SHOWNBRANSON OLLIVIERRE

SIR MC CHESNEY GEORGE SECONDARY SCHOOL (BARBUDA ANTIGUA)

03/11/16

SITE PLAN

S2SITE PLANSCALE:1"=40'

EXISTING BUILDING REMAIN

PROPOSED BUILDINGREMAINING LANDS FOR PLAYING GROUND & AGRICULTURE E.T.C.

GARBAGE COLLECTION

PROPOSED PEDESTRIAN CIRCULATION

EXIST. PEDESTRIAN CIRCULATION TO REMAIN

OUT

PROPOSED SECURITY

GARBAGE COLLECTION

PROPOSED PLAYING FIELD

EXIST. AGRICULTURE PLOT

COURT YARD

448A/16

PROPOSED ROAD & PARKING BY OTHER

BLOCK D

BLOCK F

BLOCK E

BLOCK G

BLOCK H

BLOCK I

BLOCK J

BLOCK CCU

TLI

NE

#1

OPE

N T

O B

ELOW

BLOCK B

FIN

. RO

OF

LEVEL

21'-9

"

FIN

. ELE

VATOR

SHAFT

24'-9

"

BLOCK B

REV.#1

REV.#1

REV.#1

11/16/16 REV.#1: SECURITY BOOTH RELOCATED B.O.

DINING AREA

1068 s.f.

BLOCK A

DN.

DN.

DN.

BLOCK A

THE WORKING DRAWING PHASE

Page 53: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

5"

12'-6"

12'-6"

12'-6"

12'-6"

12'-6"

12'-6"

12'-6"

12'-6"

12'-6"

12'-6"

12'-6"

12'-6"

12'-6"

12'-6"

12'-6"

12'-6"

12'-6"

12'-6"

12'-6"

12'-6"

12'-6"

138'-4"

12'-6" 5"

138'-4"

5'-4"

4"25

'-6"

31'-7

"

5"

5"

5"

EXIST. HOME ECONOMICS916 s.f.

GRD. FL. DEMOLITION PLAN SCIENCE BLOCK (BLOCK D)

D1

EXIST. COMPUTER LAB. 452 s.f.EXIST. CHEMISTRY LAB.

604 s.f.EXIST. BIOLOGY LAB.604 s.f.

PROPOSED COMPUTER LAB. 602 s.f.

EXIST.OFFICE56 s.f.

EXIST.STORAGE53 s.f.

EXIST.STORAGE29 s.f.

BLOCK DCORRIDOR CORRIDOR 5'-4"

25'-6

"5"

4"

31'-7

"

A

B

C

1 2 3 4 5 6 7 8 9 10 11 12

A

B

C

1 2 3 4 5 6 7 8 9 10 11 12

4,326 s.f.DEMOLITION GRD. FL. PLAN SCIENCE BLOCK (BLOCK D)SCALE:1/8"=1'-0"

AA4

AA4

EXIST. RC BLK. WALL TO REMAIN

NEW RC 6" BLK. WALL

KEY

EXIST. ITEMS TO BE REMOVED

8'-9

"8'

-9"

2'-6"

2'-2"

5'-3"

8'-5

"

11'-1 1/2" 1'-6"

A

B

C

D

Page 54: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

AL. DR. W/AL. FRAME W/ S/S HINGES & LEVER LOCKSW/ SADDLEW/GLASS TRANSOM01 REQUIRED

2" 2'-8" 2"

3'-0"

6'-10

"2"

10"

2"

8'-0

"

D1 W1

1'-9" 2" 1'-9" 2" 1'-9" 2"

6'-0"

10"

2"10

"2"

10"

2"10

"2"

10"

2"

5'-0"

WHITE AL. AWNING WIN.W/ GREY TINTED GLASS 02 REQUIRED

FIN. FL.

3'-0

"

2"

2"

1"PERIMETER FLAT GAL. ST.

1/2" x 1/2" GAL. ST.

GALV. ENCLOSURE ON GAS STORAGESHALL BE FIN. W/ 2 COATS OF SOLIGNUM & 2 COATSOF FIN. MET. PAINTSUPPLY & INSTALL HINGES,LOCKS & BOLTS01 REQUIRED

2'-6" 2'-6"

5'-0"

6'-0

"

D2

PROPOSED GRD. FL. PLAN & DOOR & WINDOW SCHEDULE SCIENCE BLOCK (BLOCK D)

DA1-GROSS:4,322 s.f.

EXIST. COMPUTER LAB. 452 s.f.EXIST. CHEMISTRY LAB.

604 s.f.EXIST. BIOLOGY LAB.604 s.f.

COUNTER TOP FUME CABINET

PROPOSED COMPUTER LAB. 602 s.f.

PROPOSED SCIENCE LAB. 916 s.f.

EXIST.OFFICE56 s.f.

EXIST.STORAGE53 s.f.

EXIST.STORAGE29 s.f.

A

B

C

1 2 3 4 5 6 7 8 9 10 11 12

A

B

C

1 2 3 4 5 6 7 8 9 10 11 12

12'-6"

EXIST. RC BLK. WALL TO REMAIN

NEW RC 6" BLK. WALL

KEY

12'-6" 12'-6" 12'-6" 12'-6" 12'-6" 12'-6" 12'-6" 12'-6" 12'-6" 12'-6" 5"5"

138'-4"

12'-6" 12'-6" 12'-6" 12'-6" 12'-6" 12'-6" 12'-6" 12'-6" 12'-6" 12'-6" 12'-6" 5"5"

138'-4"

5'-4"

25'-6

"5"

4"

31'-7

"

BLOCK DCORRIDOR CORRIDOR 5'-4"

25'-6

"5"

4"

31'-7

"

PROPOSED GRD. FL. PLAN SCIENCE BLOCK (BLOCK D)SCALE:1/8"=1'-0"

AA3

AA3

A

B

C

D

W1

W1

D1

2'-0"x 2'-0" MAN HOLE

REV.#2

10/07/16 REV.#1:EYE WASH STATION & GAS STORAGE INSTALLED

B.O.

REV.#2

D2

11/23/16 REV.#2:GAS STORAGE RELOCATED B.O.

Page 55: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

21 3 4 5 6 7 8 9 10 11 12

PROPOSED SCIENCE LAB. EXIST. BIOLOGY LAB. EXIST. CHEMISTRY LAB.

EXIST.STORAGEPROPOSED

COMPUTER LAB.EXIST. COMPUTER LAB.

SECTION A-A SCIENCE BLOCK (BLOCK D)

SECTION A-A SCALE:1/8"=1'-0"

DA2

Page 56: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

ELEVATION B

SCIENCE BLOCK (BLOCK D) ELEVATIONS

ELEVATIONSSCALE:1/8"=1'-0"

DA3

ELEVATION D

ELEVATION A

ELEVATION C

REV.#2

REV.#2

REV.#2

10/07/16REV.#1:GAS CYLINDER STORAGE INSTALLED

B.O.

11/23/16REV.#2:GAS CYLINDER STORAGE RELOCATED

B.O.

Page 57: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

McCHESNEY SCIENCE BLOCK (BLOCK D)

CLA

Y T

ILE

S

ROOMS FLOORS MOLDINGS CEILINGS

PAIN

T (H

ARD

EN

ER

AD

DE

D IN

CO

NC

.)C

ER

AM

IC T

ILE

S (N

ON

-SK

ID)

CA

RPE

T (C

OM

ME

RC

IAL)

FAIR

FA

CE

CO

NC

.(HA

RD

EN

ER

AD

DE

D)

STU

DD

ED

VIN

YL

TILE

SQ

UA

RR

Y T

ILE

S

CE

ILIN

G (T

IMBE

R)

SKIR

TIN

G (T

IMBE

R)

BALUSTRADES WALLS & COLUMNS REMARKS

POR

CE

LAIN

TIL

ES

DO

OR

S (T

IMBE

R)W

IND

OW

S (T

IMBE

R)

CLA

Y T

ILE

BA

SEC

ON

CR

ETE

PLA

STE

RE

D &

PA

INTE

D

GY

PSU

M B

OA

RD

PA

INTE

DPA

INTE

D C

ON

CRE

TESU

SPE

ND

ED

CE

ILIN

G (D

ROP-

IN T

ILE

S)M

ELA

MIN

E C

ED

AR

PA

NE

L

CO

NC

RE

TE B

LOC

KS

PLA

STE

RE

D &

PA

INTE

DPO

RC

ELA

IN T

ILE

SPR

EC

AST

CO

NC

RETE

CO

NC

RE

TE C

AST

IN P

LAC

E

PAIN

TED

EX

ISTI

NG

GLA

SS B

LOC

KS

CE

RA

MIC

TIL

ES

GR

AN

ITE

TRA

VE

NTI

NE

(PO

LISH

)

CE

DA

R V

EN

EE

R P

AN

ELS

WIL

SON

ART

SO

LID

SU

RFA

CE

MO

LDIN

GS

1/2"

DIA

. S/S

PIP

E R

AIL

GRD.FL. PLANPROPOSED SCIENCE LAB.

PROPOSED COMPUTER LAB.

GR

OO

VE

& T

ON

UG

E T

IMBE

R

EXIST. OFFICE

EPO

XY

PA

INT

POR

CE

LAIN

BA

SE

T-11

PLY

BD

. TR

EA

TED

5/8

" TH

K P

AN

EL

PAIN

TED

YE

LLO

W P

INE

RA

IL

POR

CE

LAIN

(PO

LISH

ED

)

EXIST. BIOLOGY LAB.

EXIST. CHEMISTRY LAB.

EXIST. STORAGE #1

PARAPET WALL

ROOF LEVEL

EXIST. STORAGE #2

EXIST. CORRIDOR

PAIN

T E

XIS

TIN

G

WATER RESISTANT GYP. BD.

FINISHES SCHEDULE SCIENCE BLOCK (BLOCK D)

DA4

Page 58: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

SCHEDULE OF WORKS - SCIENCE BLOCK (BLOCK D)SIR MCCHESNEY GEORGE SECONDARY SCHOOL (EXISTING)

GROUND FLOOR

SPACE DESCRIPTION SCOPE OF WORKS REMARKS

ART ROOM FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:

CLASSROOM #3

CLASSROOM #4

CLASSROOM #5

CLASSROOM #6/ AUDITORIUM

CLASSROOM #7

CLEAN, BUFF AND POLISH VINYL TILES

REMOVE POSTERS, CLEAN AND PAINT

CLEAN DOOR AND SPRAY PAINT

REPAIR THE WINDOWS

CLEAN AND PAINT

CLEAN, BUFF AND POLISH VINYL TILES

REMOVE POSTERS, CLEAN AND PAINT

CLEAN DOOR AND SPRAY PAINT

REPAIR THE WINDOWS

CLEAN AND PAINT

CLEAN, BUFF AND POLISH VINYL TILES

REMOVE POSTERS, CLEAN AND PAINT

CLEAN DOOR AND SPRAY PAINT

REPAIR THE WINDOWS

CLEAN AND PAINT

CLEAN, BUFF AND POLISH VINYL TILES

REMOVE POSTERS, CLEAN AND PAINT

CLEAN DOOR AND SPRAY PAINT

REPAIR THE WINDOWS

CLEAN AND PAINT

CLEAN, BUFF AND POLISH VINYL TILES

REMOVE POSTERS, CLEAN AND PAINT W/ ONE COAT TO MATCH EXIST.

CLEAN DOOR AND SPRAY PAINT

REPAIR THE WINDOWS

CLEAN AND PAINT

CLEAN, BUFF AND POLISH VINYL TILES

CLEAN AND PAINT TO MATCH EXISTING INCLUDING ACCORDIAN TIMBER WALL

CLEAN AND PAINT PLY BD. CLGS.

CLEAN DOOR AND SPRAY PAINT STEEL DOOR AND FRAME

REPAIR THE WINDOWS

CLEAN, BUFF AND POLISH TIMBER STAGEFINISHES SCHEDULE SCIENCE BLOCK (BLOCK D)

DA5

Page 59: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

SCHEDULE OF WORKS - SCIENCE BLOCK (BLOCK D)SIR MCCHESNEY GEORGE SECONDARY SCHOOL (EXISTING)

FINISHES SCHEDULE SCIENCE BLOCK (BLOCK D)

DA6

FLOOR:

WALLS:

CEILINGS:

OTHER:

COVERED SIDE WALK

FINISH EXIST. CONC. FL. WITH CLAY TILES

CLEAN AND PAINT

CLEAN AND PAINT PLY BD. CLGS.

CLEAN AND SPRAY PAINT STEEL LOLLY COLUMNS

Page 60: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

PROPOSED GRD. FL. TILE PLAN SCIENCE BLOCK (BLOCK D)

DT14,326 s.f.

EXIST. COMPUTER LAB. 452 s.f.EXIST. CHEMISTRY LAB.

604 s.f.EXIST. BIOLOGY LAB.604 s.f.

COUNTER TOP FUME CABINET

PROPOSED COMPUTER LAB. 602 s.f.

PROPOSED SCIENCE LAB. 916 s.f.

EXIST.OFFICE56 s.f.

EXIST.STORAGE53 s.f.

EXIST.STORAGE29 s.f.

A

B

C

1 2 3 4 5 6 7 8 9 10 11 12

A

B

C

1 2 3 4 5 6 7 8 9 10 11 12

BLOCK DCORRIDOR CORRIDOR

PROPOSED GRD. FL. TILE PLAN SCIENCE BLOCK (BLOCK D)SCALE:1/8"=1'-0"

AA3

AA3

A

B

C

D

2'-0"x 2'-0" MAN HOLE

DARK CLAY TILES ( 12"x12")LIGHT CLAY TILE (12"x12")12" x 12" CLAY TILES W/ NOSING

18"x 18" PORCELIN TILES

KEY

EPOXY PAINT

12" x 12" CLAY TILES W/ NOSING

Page 61: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

PROPOSED GRD. FL. FURNITURE PLANSCIENCE BLOCK (BLOCK D)

DF14,326 s.f.

EXIST. COMPUTER LAB. 452 s.f.EXIST. CHEMISTRY LAB.

604 s.f.EXIST. BIOLOGY LAB.604 s.f.

COUNTER TOP FUME CABINET

PROPOSED COMPUTER LAB. 602 s.f.

PROPOSED SCIENCE LAB. 916 s.f.

EXIST.OFFICE56 s.f.

EXIST.STORAGE53 s.f.

EXIST.STORAGE29 s.f.

BLOCK DCORRIDOR CORRIDOR

PROPOSED GRD. FL. FURNITURE PLAN SCIENCE BLOCK (BLOCK D)SCALE:1/8"=1'-0"

D1

KEY

FIRE EXTINQUISHER

GARBAGE BIN

PRINTER

PHOTO COPIER

GAS CYLINDER

LARGE FORMAT PLOTTER

MICRO WAVE

Page 62: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

5 6 7 8 9 10 11

IN

OUT

1 2 3 4

100.06tree

100.30tree

100.23tree

101.10tree

100.77tree

101.00tree

99.62tree

100.13tree

100.64tree

98.52tree

100.95tree

100.22lp

100.56lp

99.79lp

99.37lp

101.01lp

100.34lp

100.12lp

100.21lp100.10

lp

100.26lp

99.19lp

100.64lp

GREEN HOUSE

CHICKEN PENSCISTERN

SAND PIT

Z:99.73

Z:100.21

Z:100.12

Z:99.33

Z:99.33

Z:100.85

Z:100.63

Z:100.02

Z:101.09

Z:99.35

Z:99.32

Z:99.47Z:99.86

Z:99.95

Z:99.87

Z:100.31

Z:99.79

Z:99.72

Z:99.33

Z:99.51

Z:100.37

Z:99.70

Z:100.93

Z:100.85

Z:100.51

Z:99.08

Z:99.30

Z:100.39

Z:100.32

Z:99.49

Z:100.50

Z:100.98

Z:100.70

Z:99.82

Z:100.18

Z:99.76

Z:100.05

Z:99.93

Z:99.72

Z:99.68

Z:100.18

Z:99.94

Z:100.31

Z:100.51

Z:99.53Z:99.19

Z:101.01

CAFETERIA

BLOCK ADN.

DN.

ART RM.CLASS

RM. #3CLASS

RM. #4CLASS

RM. #5 CLASS RM. #6/STAGE

AUDITURIUM CLASS RM. #7

UP

COMPUTER

LAB. 452 s.f.

CHEMISTRY

604 s.f.

BIOLOGY

604 s.f.

M. WASH

RM.

F. WASH RM.MECH.

UP

INDUSTRIAL ARTS

906 s.f.

COUNTER

TOP FUME

CABINET

PROPOSED

COMPUTER

LAB. 602 s.f.

SEC.126 s.f.LOBBY/ WAITING

135 s.f.STO. 1

91 s.f.

STO. 175 s.f.

STAFF RM.

330 s.f. M. W

RM.

47 s.

f.F.

WRM

.47

s.f.

RAMP

UP

PROPOSED

SCIENCE

LAB. 916 s.f.

CLASS RM. #1 498 s.f.

CLASS RM. #2 498 s.f.

DN.

OFFIC

E56

s.f.

STO.

53 s.

f.

STO.29 s.f.

KITCHEN345 s.f.

DEPUTY PRICIPAL

OFFICE 160 s.f.

BLOCK D

BLOCK E

MECH

. RM

75 s.

f.

ELEC. R

M.

158 s

.f.

PRIN

CIPAL

WASH

RM

.

33 s.

f.

PRO

POSE

D

STAFF

RM

.

597 s

.f.

PRIN

CIPAL

OFF

ICE

133 s

.f.

RAMP

(#1)

UP

24'-0

"

PRO

POSE

D

CLASS

RM

. #1

526 s

.f. RAMP

UP (#

2) 24

'-0"

FEM

ALE

WRM

. 33 s

.f.

LOBBY/

ENTRAN

CE

UP

PRO

POSE

D

SEC. 1

33 s.

f.

MALE

W

RM. 3

3 s.f.

UND

ER PA

SS

UP

ELEVATO

R

SHAFT

BLOCK B

D1

W1

4'-0"

x 4'-0

"

ACCESS H

ATCH

PUM

P ST

ORAG

E

UND

ER SL

AB

FIN

. GRD

. FL.

2'-4"

HOME ECONOMICS763 s.f.

PROPOSED 214 s.f. MALE WASH RM.

PROPOSED 214 s.f.FEMALE WASH RM.

MECH. RM. 77 s.f.

UR

INA

L

RAMP DN. 24'-0"

DN.

PROPOSED HOME MANAGEMENT 768 s.f.

BLOCK C

D4

WASH RM.32 s.f.

FIN. GRD. FL.

2'-4"

FIN. GRD. FL.

2'-4"

FIN

. GR

D. F

L.

2'-4

"

BLOCK B

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

M.MAS SHOWNBRANSON OLLIVIERRE

SIR MC CHESNEY GEORGE SECONDARY SCHOOL (BARBUDA ANTIGUA)

03/11/16

SITE PLAN

S1SITE PLANSCALE:1"=40'

EXISTING BUILDING REMAIN

PROPOSED BUILDING

REMAINING LANDS FOR PLAYING GROUND & AGRICULTURE E.T.C.

GARBAGE COLLECTION

PROPOSED PEDESTRIAN CIRCULATION

EXIST. PEDESTRIAN CIRCULATION TO REMAIN

OUT

PROPOSED SECURITY

GARBAGE COLLECTION

PROPOSED PLAYING FIELD

EXIST. AGRICULTURE PLOT

COURT YARD

448A/16

THE WORKING DRAWING PHASE

PROPOSED ROAD & PARKING BY OTHER

BLOCK FBLOCK G

BLOCK H

BLOCK I

BLOCK J

REV.#1

REV.#1

REV.#1

11/16/16 REV.#1: SECURITY BOOTH RELOCATED B.O.

Page 63: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

5 6 7 8 9 10 11

IN

OUT

1 2 3 4

100.06tree

100.30tree

100.23tree

101.10tree

100.77tree

101.00tree

99.62tree

100.13tree

100.64tree

98.52tree

100.95tree

100.22lp

100.56lp

99.79lp

99.37lp

101.01lp

100.34lp

100.12lp

100.21lp100.10

lp

100.26lp

99.19lp

100.64lp

GREEN HOUSE

CHICKEN PENSCISTERN

SAND PIT

Z:99.73

Z:100.21

Z:100.12

Z:99.33

Z:99.33

Z:100.85

Z:100.63

Z:100.02

Z:101.09

Z:99.35

Z:99.32

Z:99.47Z:99.86

Z:99.95

Z:99.87

Z:100.31

Z:99.79

Z:99.72

Z:99.33

Z:99.51

Z:100.37

Z:99.70

Z:100.93

Z:100.85

Z:100.51

Z:99.08

Z:99.30

Z:100.39

Z:100.32

Z:99.49

Z:100.50

Z:100.98

Z:100.70

Z:99.82

Z:100.18

Z:99.76

Z:100.05

Z:99.93

Z:99.72

Z:99.68

Z:100.18

Z:99.94

Z:100.31

Z:100.51

Z:99.53Z:99.19

Z:101.01

CAFETERIA

BLOCK ADN.

DN.

ART RM.CLASS

RM. #3CLASS

RM. #4CLASS

RM. #5 CLASS RM. #6/STAGE

AUDITURIUM CLASS RM. #7

UP

COMPUTER

LAB. 452 s.f.

CHEMISTRY

604 s.f.

BIOLOGY

604 s.f.

M. WASH

RM.

F. WASH RM.MECH.

UP

INDUSTRIAL ARTS

906 s.f.

COUNTER

TOP FUME

CABINET

PROPOSED

COMPUTER

LAB. 602 s.f.

SEC.126 s.f.LOBBY/ WAITING

135 s.f.STO. 1

91 s.f.

STO. 175 s.f.

STAFF RM.

330 s.f. M. W

RM.

47 s.

f.F.

WRM

.47

s.f.

BLOCK B

RAMP

UP

PROPOSED

SCIENCE

LAB. 916 s.f.

CLASS RM. #1 498 s.f.

CLASS RM. #2 498 s.f.

DN.

OFFIC

E56

s.f.

STO.

53 s.

f.

STO.29 s.f.

KITCHEN345 s.f.

DEPUTY PRICIPAL

OFFICE 160 s.f.

BLOCK CRAMP DN.

DN

.

BLOCK D

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

M.MAS SHOWNBRANSON OLLIVIERRE

SIR MC CHESNEY GEORGE SECONDARY SCHOOL (BARBUDA ANTIGUA)

03/11/16

SITE PLAN

S2SITE PLANSCALE:1"=40'

EXISTING BUILDING REMAIN

PROPOSED BUILDINGREMAINING LANDS FOR PLAYING GROUND & AGRICULTURE E.T.C.

GARBAGE COLLECTION

PROPOSED PEDESTRIAN CIRCULATION

EXIST. PEDESTRIAN CIRCULATION TO REMAIN

OUT

PROPOSED SECURITY

GARBAGE COLLECTION

PROPOSED PLAYING FIELD

EXIST. AGRICULTURE PLOT

COURT YARD

448A/16

PROPOSED ROAD & PARKING BY OTHER

BLOCK D

BLOCK F

BLOCK E

BLOCK G

BLOCK H

BLOCK I

BLOCK J

BLOCK CCU

TLI

NE

#1

OPE

N T

O B

ELOW

BLOCK B

FIN

. RO

OF

LEVEL

21'-9

"

FIN

. ELE

VATOR

SHAFT

24'-9

"

BLOCK B

REV.#1

REV.#1

REV.#1

11/16/16 REV.#1: SECURITY BOOTH RELOCATED B.O.

DINING AREA

1068 s.f.

BLOCK A

DN.

DN.

DN.

BLOCK A

THE WORKING DRAWING PHASE

Page 64: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

WEST ELEVATIONEAST ELEVATIONSOUTH ELEVATIONNORTH ELEVATION

ELEVATIONSSCALE:1/4"=1'-0"

GRD. FL. PLAN SECURITY BOOTH(BLOCK E)

EA1

3'-0" 3'-0"

3'-0

"3'

-0"

3'-0"3'-0"

3'-0

"3'

-0"

TYP.1"x 10" FASCIA BD

TYP.2"x 6" COMMON RAFTER

TYP. 2"x 8" HIP

ADA1

ADA1

A B

5'-4"4" 4"

6'-0"

5'-4"4" 4"

6'-0"A B

1

2

5'-4"

4"4"

6'-0

"

5'-4"

4"4"

6'-0

"

1

2

1 2

24 GUAGE PVF2 GALV.SHEETING ON 1"x 4" TPP LATH ON 5/8"THK. 4"x 8" TREATED GROOVE PLY. ON TPP 2"x 6" RAFTERS ON 2"x 8" HIP

7"3'

-0"

4'-0"

6"1'-

3"3'

-5"

12'-9

"

RC RING BEAM

1"x 12" FASCIA BD.

6" RC BLK. WALL

SECTION A-ASCALE:1/2"=1'-0"

GRD. FL. PLANSCALE:1/2"=1'-0"

ROOF FRAMING PLANSCALE:1/2"=1'-0"

-GROSS: 36 s.f.

D1

W1

W1

W1

D1

3'-0"

7'-0"

WHITE AL. SINGLE FRENCH DOORW/ SADDLES/S HINGES & LEVER LOCKSGREY TINTED GLASS01 REQUIRED

W1

WHITE AL. SLIDING WIN. W/ GREY TINTED GLASS 03 REQUIRED.

3'-0"

4'-0"

DOOR & WINDOW SCHEDULESCALE:1/2"=1'-0"

SECURITY BOOTH

AL. WIN.

AL. DOOR

RC LINTEL

CONC. BLK. FND. WALL

RC FOOTING

RC FL. SLAB ON POLYTHENE ON SAND BED ONGRAVEL COURSE ON COMPACT SOIL

1

1

SECTION "DET" #1SCALE: 1/2" = 1'-0"1

45° 0' 0"

1'-0"

6"

9"6"

INFILL

RC RING BEAM

RC RING BEAM

DA1

FIN. GRD. FL.0'-7"

Page 65: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERS

MOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

McCHESNEY SECURITY BOOTH (BLOCK E)

CLA

Y T

ILE

S

ROOMS FLOORS MOLDINGS CEILINGS

PAIN

T (H

ARD

EN

ER

AD

DE

D IN

CO

NC

.)C

ER

AM

IC T

ILE

S (N

ON

-SK

ID)

CA

RPE

T (C

OM

ME

RC

IAL)

FAIR

FA

CE

CO

NC

.(HA

RD

EN

ER

AD

DE

D)

STU

DD

ED

VIN

YL

TILE

SQ

UA

RR

Y T

ILE

S

CE

ILIN

G (T

IMBE

R)

SKIR

TIN

G (T

IMBE

R)

BALUSTRADES WALLS & COLUMNS REMARKS

POR

CE

LAIN

TIL

ES

DO

OR

S (T

IMBE

R)W

IND

OW

S (T

IMBE

R)

CLA

Y T

ILE

BA

SEC

ON

CR

ETE

PLA

STE

RE

D &

PA

INTE

D

GY

PSU

M B

OA

RD

PA

INTE

DPA

INTE

D C

ON

CRE

TESU

SPE

ND

ED

CE

ILIN

G (D

ROP-

IN T

ILE

S)M

ELA

MIN

E C

ED

AR

PA

NE

L

CO

NC

RE

TE B

LOC

KS

PLA

STE

RE

D &

PA

INTE

DPO

RC

ELA

IN T

ILE

SPR

EC

AST

CO

NC

RETE

CO

NC

RE

TE C

AST

IN P

LAC

E

PAIN

TED

GLA

SS B

LOC

KS

CE

RA

MIC

TIL

ES

GR

AN

ITE

TRA

VE

NTI

NE

(PO

LISH

)

CE

DA

R V

EN

EE

R P

AN

ELS

WIL

SON

ART

SO

LID

SU

RFA

CE

MO

LDIN

GS

1/2"

DIA

. S/S

PIP

E R

AIL

GRD.FL. PLANSECURITY BOOTH

GR

OO

VE

& T

ON

UG

E T

IMBE

R

EPO

XY

PA

INT

POR

CE

LAIN

BA

SE

T-11

PLY

BD

. TR

EA

TED

5/8

" TH

K P

AN

EL

PAIN

TED

YE

LLO

W P

INE

RA

IL

POR

CE

LAIN

(PO

LISH

ED

)

ROOF LEVELGALV. ROOFING

24 GAUGE PVF2 GALV. SHEETING

FINISHES SCHEDULESECURITY BOOTH(BLOCK E)

EA2

Page 66: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

T-11 TREATED 5/8" GROOVE PLY BD. ON 2"x4" TREATED YELLOW PINE

KEY

REFLECTIVE CEILING PLAN/GRD. FL. TILE PLAN

EC1/ET1

ADA1

ADA1

A B

A B

1

2

1

2

GRD. FL. TILE PLANSCALE:1/2"=1'-0"

36 s.f.

SECURITY BOOTH

CLG. REFLECTED PLANSCALE:1/2"=1'-0"

36 s.f.

ADA1

ADA1

A B

A B

1

2

1

2

5'-4"

5'-4

"

5'-4"

5'-4

"

DARK CLAY TILES ( 12"x12")

LIGHT CLAY TILE (12"x12")

KEY

Page 67: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

7. ELITE ARCHITECTURAL IRONMONGERY OR EQUAL & APPROVED, 3 HINGES PER DOOR, 2 FALLING HINGES PER TOILET DOOR

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitects

INTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

A B

A B

1

2

1

2

SECURITY BOOTH

GRD. FL. FURNITURE PLAN SECURITY BOOTH(BLOCK E)

FA1

KEY

FIRE EXTINQUISHER

GARBAGE BIN

Page 68: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

SCHEDULE OF WORKS - WOODEN CLASS ROOM BUILDING (BLOCK F)SIR MCCHESNEY GEORGE SECONDARY SCHOOL (EXISTING)

SPACE DESCRIPTION

SCOPE OF WORKS REMARKS

CLASSROOM #1

GROUND FLOOR

CLASSROOM #2

FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:

FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:

CLEAN AND PAINT

SPRAY PAINT METAL DR. AND INSTALL DR. PULL

PAINT TIMBER WIN.

SPRAY PAINT METAL DR. AND INSTALL DR. PULL

CLEAN AND PAINT TIMBER WIN.

CLEAN AND PAINT

CLEAN AND PAINT

CLEAN AND PAINT

CLEAN AND PAINT

CLEAN AND PAINT

FINISHES SCHEDULE WOODEN CLASS RM. (BLOCK F)

FA1

Page 69: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

SCHEDULE OF WORKS - CLASSROOM/ASSEMBLE HALL (BLOCK G)SIR MCCHESNEY GEORGE SECONDARY SCHOOL (EXISTING)

NOTES1. ALL COLOUR BY ARCHITECT

2. APPLY 2 COATS OF PAINT

3. GENERAL CLEANING

FINISHES SCHEDULE EXIST. CLASS RM. & ASSEMBLE HALL (BLOCK G)

GROUND FLOOR

SPACE DESCRIPTION SCOPE OF WORKS REMARKS

ART ROOM FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:

CLASSROOM #3

CLASSROOM #4

CLASSROOM #5

CLASSROOM #6/ AUDITORIUM

CLASSROOM #7

CLEAN, BUFF AND POLISH VINYL TILES

REMOVE POSTERS, CLEAN AND PAINT

CLEAN DOOR AND SPRAY PAINT

REPAIR WINDOWS

CLEAN AND PAINT

CLEAN, BUFF AND POLISH VINYL TILES

REMOVE POSTERS, CLEAN AND PAINT

CLEAN DOOR AND SPRAY PAINT

REPAIR THE WINDOWS

CLEAN AND PAINT

CLEAN, BUFF AND POLISH VINYL TILES

REMOVE POSTERS, CLEAN AND PAINT

CLEAN DOOR AND SPRAY PAINT

REPAIR THE WINDOWS

CLEAN AND PAINT W/ ONE COAT

CLEAN, BUFF AND POLISH VINYL TILES

REMOVE POSTERS, CLEAN AND PAINT

CLEAN DOOR AND SPRAY PAINT

REPAIR THE WINDOWS

CLEAN AND PAINT W/ ONE COAT

CLEAN, BUFF AND POLISH VINYL TILES

REMOVE POSTERS, CLEAN AND PAINT

CLEAN DOOR AND SPRAY PAINT

REPAIR THE WINDOWS

CLEAN AND PAINT W/ ONE COAT

CLEAN, BUFF AND POLISH VINYL TILES

CLEAN AND PAINT INCLUDING ACCORDIAN TIMBER WALL

CLEAN AND PAINT PLY BD. CLGS.

CLEAN DOOR AND SPRAY PAINT STEEL DOOR AND FRAME

REPAIR THE WINDOWS

CLEAN, BUFF AND POLISH TIMBER STAGE

GA1

Page 70: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

SCHEDULE OF WORKS - CLASSROOM/ASSEMBLE HALL (BLOCK G)SIR MCCHESNEY GEORGE SECONDARY SCHOOL (EXISTING)

NOTES1. ALL COLOUR BY ARCHITECT

2. APPLY 2 COATS OF PAINT

3. GENERAL CLEANING

FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:

COVERED SIDE WALK

FINISH EXIST. CONC. FL. WITH CLAY TILES

CLEAN AND PAINT

CLEAN AND PAINT PLY BD. CLGS.

CLEAN AND SPRAY PAINT STEEL LOLLY COLUMNS

FINISHES SCHEDULE EXIST. CLASS RM. & ASSEMBLE HALL (BLOCK G)

GA2

Page 71: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

FEMALE WASHROOM

GROUND FLOOR

SPACE DESCRIPTION SCOPE OF WORKS REMARKS

SIR MCCHESNEY GEORGE SECONDARY SCHOOL (EXISTING)SCHEDULE OF WORKS - TOILET BLOCK (BLOCK H)

MALE WASHROOM

FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:

FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:

CLEAN, BUFF AND POLISH CERAMIC TILES

CLEAN AND PAINT

CLEAN AND PAINT

CLEAN DOOR AND SPRAY PAINT

CLEAN WINDOWS

2 TOILET SEAT NEEDED

CLEAN, BUFF AND POLISH CERAMIC TILES

CLEAN AND PAINT

CLEAN AND PAINT

CLEAN DOOR AND SPRAY PAINT

CLEAN WINDOWS

CLEAN AND POLISH URINALS 1 TOILET SEAT NEEDED

NOTES1. ALL COLOUR BY ARCHITECT

2. APPLY 2 COATS OF PAINT

3. GENERAL CLEANING

FINISHES SCHEDULE EXIST. TOILET BLOCK (BLOCK H)

HA1

Page 72: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

SCHEDULE OF WORKS - EXIST. ADMIN. BUILDING (BLOCK I)SIR MCCHESNEY GEORGE SECONDARY SCHOOL (EXISTING)

GROUND FLOOR

SPACE DESCRIPTION SCOPE OF WORKS REMARKS

LOBBY/WAITING

STORAGE #1

STORAGE #2

PRINCIPAL'S OFICE

MALE WASHROOM

FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:

FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:

FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:

FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:

FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:

CLEAN, BUFF AND POLISH VINYL TILES

CLEAN AND PAINT W/ ONE COAT

CLEAN DOOR AND SPRAY PAINT

CLEAN WINDOWS

CLEAN AND PAINT W/ ONE COAT

CLEAN, BUFF AND POLISH VINYL TILES

CLEAN AND PAINT W/ ONE COAT

CLEAN DOOR AND SPRAY PAINT

CLEAN WINDOWS

CLEAN AND PAINT W/ ONE COAT

CLEAN, BUFF AND POLISH VINYL TILES

CLEAN AND PAINT

CLEAN DOOR AND SPRAY PAINT

CLEAN WINDOWS

CLEAN AND PAINT

CLEAN, BUFF AND POLISH VINYL TILES

CLEAN AND PAINT

CLEAN DOOR AND SPRAY PAINT

CLEAN WINDOWS

CLEAN AND PAINT

CLEAN, BUFF AND POLISH CERAMIC TILES

CLEAN AND PAINT

CLEAN DOOR AND SPRAY PAINT

CLEAN WINDOWS

CLEAN AND PAINT

FINISHES SCHEDULE EXIST. ADMIN. BLOCK (BLOCK I)

IA1

Page 73: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

SCHEDULE OF WORKS - EXIST. ADMIN. BUILDING (BLOCK I)SIR MCCHESNEY GEORGE SECONDARY SCHOOL (EXISTING)

GROUND FLOOR

SPACE DESCRIPTION SCOPE OF WORKS REMARKS

FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:

FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:

FEMALE WASHROOM

STAFF ROOM

CLEAN, BUFF AND POLISH VINYL TILES

CLEAN AND PAINT

CLEAN DOOR AND SPRAY PAINT

CLEAN WINDOWS

CLEAN AND PAINT

CLEAN, BUFF AND POLISH VINYL TILES

CLEAN AND PAINT

CLEAN DOOR AND SPRAY PAINT

CLEAN WINDOWS

CLEAN AND PAINT W/ ONE COAT

REPLACE 1 DOOR

FINISHES SCHEDULE EXIST. ADMIN. BLOCK (BLOCK I)

IA2

Page 74: PLAYING FIELD PROPOSED - ab...1. donot scale drawings 2. these drawings are to be read incojunction with all structural and services engineers’ drawings. 3. if you are in doubt please

M.M.

AS SHOWN

DRAWING NO:

DRAWING TITLE:

Moulton MayersArchitectsINTERIOR DESIGNERS,URBAN DESIGNERS,CONSTRUCTION MANAGERSMOULTON MAYERSDIP. ARCH. BS, ARCH. B,ARCH. MS, URBAN DESIGN.

P.O. BOX 79, McKIES HILL. ST.VINCENT, W.I.TEL: 784-457-2072E-MAIL:[email protected]

DATE REVISIONS BY

DRAWN BY:

SCALES:

CHECKED: APPROVED BY

JOB NO: DATE:

MM

PROJECT TITLE:

REVISION

NOTES1. DONOT SCALE DRAWINGS

2. THESE DRAWINGS ARE TO BE READ INCOJUNCTION WITH ALL STRUCTURAL AND SERVICES ENGINEERS' DRAWINGS.

3. IF YOU ARE IN DOUBT PLEASE ASK.

4. ALL EXTERIOR DOORS SHALL BE FITTED W/ S/S SADDLES

5. ALL LOCKS SHALL BE MASTER & SUB MASTER KEYED

6. ALL EXTERIOR DOORS & WINDOWS SHALL WITHSTAND 150MPH WIND MINIMUM GLAZING SHALL BE IMPACT GLASS

BRANSON OLLIVIERRE

SIR MC CHESNEY GEORGESECONDARY SCHOOL(BARBUDA ANTIGUA)

448C/16 02/23/16

THE WORKING DRAWING PHASE

SCHEDULE OF WORKS - INDUSTRIAL ARTS BUILDING (BLOCK J)

GROUND FLOOR

SPACE DESCRIPTION SCOPE OF WORKS REMARKS

SIR MCCHESNEY GEORGE SECONDARY SCHOOL (EXISTING)

INDUSTRIAL ARTS FLOOR:

WALLS:

CEILINGS:

DOORS:

WINDOWS:

OTHER:

CLEAN, BUFF AND POLISH VINYL TILES

CLEAN AND PAINT

CLEAN DOOR AND SPRAY PAINT

CLEAN WINDOWS

CLEAN AND PAINT

FINISHES SCHEDULE EXIST. INDUSTRIAL ARTS BLOCK (BLOCK J)

JA1