Upload
sheraaz87
View
170
Download
7
Embed Size (px)
Citation preview
Project List
Written by AdministratorSunday, 02 May 2010 11:21 - Last Updated Sunday, 02 May 2010 11:34
Project List
1. Project : Soot Blower Control System of Power Plant
System configuration : Siemens S5-115U with Operator Panel OP15
2. Project : Pumping Station
System configuration : Siemens S5-115U x 4 stations with SCADA WinCC
3. Project : Lube Tank Farm Control System
System configuration : Siemens S5-135U with SINEC L1 and SINEC L2 Network
4. Project : Demineralization Water System
System configuration : Siemens S5-135U with SINEC L1 Network
5. Project : Water Treatment System
System configuration : Siemens S5-155U with SCADA The Fix
6. Project : Air Water Washing Control System
1 / 12
Project List
Written by AdministratorSunday, 02 May 2010 11:21 - Last Updated Sunday, 02 May 2010 11:34
System configuration : Siemens S5-115U
7. Project : LPG Pump Control System
System configuration : Siemens S5-115U
8. Project : Remote Control System for Central Manifold
System configuration : Siemens S5-135U with Text Display TD390
9. Project : Tube Cleaning Control System
System configuration : Siemens S5-95U
10. Project : Salt Production Control System
System configuration : Siemens S5-135U x 2 stations, SINEC L2 Network with SCADAThe Fix
11. Project : Renovation of Siemens S5-130W & Siemens S5-150S of High
2 / 12
Project List
Written by AdministratorSunday, 02 May 2010 11:21 - Last Updated Sunday, 02 May 2010 11:34
Speed Paper Cutting Line
System configuration : Siemens S5-115U
12. Project : Asphalt Control System
System configuration : Siemens S7-200
13. Project : Paper Rolling Machine control system
System configuration : Siemens S7-300
14. Project : PWA Water Distribution System
System configuration : Siemens S5 with SCADA WinCC
15. Project : Paper Conveyor System
System configuration : Siemens S5-135U with SCADA WinCC
3 / 12
Project List
Written by AdministratorSunday, 02 May 2010 11:21 - Last Updated Sunday, 02 May 2010 11:34
16. Project : PWA Water Supply System
System configuration : Siemens S5-115U with TiMO11B, ET-200U on
Profibus Network, Radio Modem Network to SCADA The FIX
17. Project : Water Supply System
System configuration : Siemens S5-115U WinCC SINEC L1 Network
18. Project : S5 Migration of Siemens S5-115U with Servo Drive System
System configuration : Siemens S7-300 and Servo Drives System
19. Project : Software Redundant System for SEP SUP Project
System configuration : Siemens S7-200
20. Project : Replacement of PLC Siemens TI-425 for Packaging System
System configuration : Siemens S7-300
4 / 12
Project List
Written by AdministratorSunday, 02 May 2010 11:21 - Last Updated Sunday, 02 May 2010 11:34
21. Project : Cleaning System
System configuration : Siemens S7-200
22. Project : Database & Batching System of Plastic Sheet Production
System configuration : Siemens S5-115U with SCADA WinCC
23. Project : Mixing and Concrete Block Machine
System configuration : Siemens S7-300 and HMI
24. Project : Roller Machine
System configuration : SIMADYN and 6 units of Inverter 400KW.
25. Project : Wheel Machine
System configuration : Siemens S7-300 and HMI
5 / 12
Project List
Written by AdministratorSunday, 02 May 2010 11:21 - Last Updated Sunday, 02 May 2010 11:34
26. Project : Cyclotron Machine
System configuration : Siemens S7-300 and HMI
27. Project : Grease Production Process
System configuration : Siemens S7-300 with Operator Panel OP7
28. Project : Jib Crane Control System
System configuration : Siemens S7-200 and Fuji Inverter
29. Project : Pressing Machine
System configuration : Siemens S7-200
30. Project : Carton Transportation System
System configuration : Siemens S7-300 with Operator Panel OP37
31. Project : Molding Injection Machine
6 / 12
Project List
Written by AdministratorSunday, 02 May 2010 11:21 - Last Updated Sunday, 02 May 2010 11:34
System configuration : Siemens S7-300 with Touch Screen MP370
32. Project : S5 Migration of Siemens S5-115U for Weighing System
System configuration : S7-400 & SCADA WinCC V6.0
33. Project : Renovation of Control System for Packaging Machine
System configuration : Siemens S7-200 with CAM Control
34. Project : Demineralization Water System
System configuration : Siemens S7-200
35. Project : S5 Migration of Siemens S5-100U for Tension Testing Machine
System configuration : Siemens S7-300
36. Project : Renovation of Control System for Bale Press Machine
7 / 12
Project List
Written by AdministratorSunday, 02 May 2010 11:21 - Last Updated Sunday, 02 May 2010 11:34
System configuration : Siemens S5-103U with Operator Panel OP7
37. Project : Water Supply Control System for Glass Plant
System configuration : Siemens S7-300 with Touch Screen Proface
38. Project : Renovation of Control System for Separator Machine
System configuration : Siemens S7-200 with Operator Panel OP77A
39. Project : S5 Migration of Siemens S5-115U for Depallettizer
System configuration : Siemens S7-300 with Operator Panel OP7
40. Project : Renovation of Control System for Molding Injection Machine
System configuration : Siemens SIJECT 16i with Touch Screen MP277
41. Project : S5 Migration of Siemens S5-115U with Positioning Control
WF723 & WF706 for Cabinet Roll Forming Machine
8 / 12
Project List
Written by AdministratorSunday, 02 May 2010 11:21 - Last Updated Sunday, 02 May 2010 11:34
System configuration : Siemens S7-400 with Positioning Control
FM453 & FM451 with Touch Screen MP277
42. Project : S5 Migration of Siemens S5-115U for Demineralization
Water System
System configuration : Siemens S7-300 and SCADA WinCC
43. Project : Chain Conveyor Transportation System
System configuration : Siemens S7-300 with TP177B and Profibus
Network to Drive MM440 x 5 units
44. Project : Boiler Control System
System configuration : Siemens S7-300 Failsafe with TP177A and
SCADA WinCC V6.2
9 / 12
Project List
Written by AdministratorSunday, 02 May 2010 11:21 - Last Updated Sunday, 02 May 2010 11:34
45. Project : Chiller System
System configuration : Siemens S7-200 with TP177A micro
46. Project : Autoclave System
System configuration : Siemens S7-300 & TP177A
47. Project : S5 Migration of Siemens S5-115U for Steel Charging
Machine of Cold Mill Plant
System configuration : Siemens S7-300 & SCADA Wonderware
48. Project : Waste Water Treatment System
System configuration : Siemens S7-300
49. Project : S5 Migration of Siemens S5-103U of Separator Machine
10 / 12
Project List
Written by AdministratorSunday, 02 May 2010 11:21 - Last Updated Sunday, 02 May 2010 11:34
System configuration : Siemens S7-300 with TP177A
50. Project : S5 Migration of Siemens S5-115U for Extruder Machine
System configuration : Siemens S7-300
51. Project : Waste Water Treatment System
System configuration : Siemens S7-200
52. Project : Power Plant Control System
System configuration : Siemens S7-300 with Touch Screen Proface
53. Project : S5 Migration of Siemens S5-115U for Can Production Process
System configuration : Siemens S7-300
11 / 12