Date: 04.09.2013File: SYH_03E.1
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Installation/Maintenance of a PLC
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 2/31
Date: 04.09.2013File: SYH_03E.2
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Components for the Configuration of an S7-300
Components Function
Rail ... is the rack for an S7-300
Power Supply(PS)
... converts the supply voltage (120/230 V) to 24 V DC operationvoltage to supply the S7-300
Central Processing Unit(CPU)
... executes the user programaccessories: memory module, back-up battery
Interface Modules
(IM)... connect the bus between the racks (tiers)
Signal Modules (SM)
(Digital/Analog)
... adapt various process levels to the S7-300.accessories: bus connector, front connector
Function Modules (FM)... make functions for positioning, closed-loop control etc.
available
CommunicationProcessors (CP)
... for connections between programmable logic controllers.accessories: cable, software, interface modules
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 3/31
Date: 04.09.2013File: SYH_03E.3
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Mounting Positions for an S7-300 Configuration
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 4/31
Date: 04.09.2013File: SYH_03E.4
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Expansion Capabilities for an S7-300
Slotnumber 1 2 3 4 5 6 7 8 9 10 11
CPUIMS
FM localPS
PS IMR
IMRPS
IMRPS
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 5/31
Date: 04.09.2013File: SYH_03E.5
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Installation Rules
For a horizontal configuration, the CPU and power supply must bearranged on the left. For a vertical configuration, the CPU and power supply must be arranged at the bottom
The following minimum clearances must be maintained:
20 mm to the right and left of the rack
40 mm above and below for a single-tier configuration and at least
80 mm between two racks
The interface module always occupies the space next to the CPU
There may be a maximum of eight I/O modules (signal modules,function modules, communication processors) inserted in a rack
A multi-tier configuration is possible only for the CPU 314/315/316
Please ensure that there is a low resistance connection between the railand the substructure, such as through contact washers.
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 6/31
Date: 04.09.2013File: SYH_03E.6
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Installation
Installation Aids
Check listHardware manuals
Parts list
1. ................
2. .................3. ..................
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 7/31
Date: 04.09.2013File: SYH_03E.7
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
• Are all the components available ? (see parts list)
• Install the rail !
• Install the power supply !
• Connect a bus connector to the CPU and install the module !
• Connect a bus connector to each of the I/O modulesand install the modules !
• Connect the front connectors and insert the labelling stripsand the slot number !
• Wire the modules (power supply, CPU and I/O modules)
Installation Check List
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 8/31
Date: 04.09.2013File: SYH_03E.8
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Installing the Rail (Part 1)
482 mm
530 mm830 mm
57.2mm
466 mm500 mm800 mm
• Screw the rail to the substructureusing M6 screws !
Protective ground connection
• Connect the protective ground conductor to therail (protective ground screw) !Note: Minimum cross section of the cable = 10mm2.
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 9/31
Date: 04.09.2013File: SYH_03E.9
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Installing the Rail (Part 2)
Rail
Bus connector
Hold-down screw
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 10/31
Date: 04.09.2013File: SYH_03E.10
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Check List for Electrical Configuration
1. Are analog signals or bus signalsused?
2. Do cables with > 60V exist?
3. Are inductances switched by additionalcontacts in the output circuit or independent of the programmablelogic controller?
4. Will cables be laid outside of buildings?
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 11/31
Date: 04.09.2013File: SYH_03E.11
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Wiring the Front Connector
Open the front door of the signal modules !
Bring the front connector into wiring position !
Thread the strain reliever in the front connector !
Strip the insulation from the wires (6 mm length) !
Connect the wires ! Tighten the strain relief for the cable loom !
Position the front connector in the operating position !
Close the front door !
Fill out the labeling strip and insert it in the front door !
Attach the slot number to the front door !
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 12/31
Date: 04.09.2013File: SYH_03E.12
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Preparing for Operation
Insert the keyswitch in the CPU !
Install the back-up battery !
if the user program is not stored in a power failure-proof way in the memory module
if larger data areas must remain retentive during apower failure
Insert the memory module if required !
so that the user program and the data are retainedduring Power OFF and without a back-up battery
to have a larger "load memory" available.
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 13/31
Date: 04.09.2013File: SYH_03E.13
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Exercise: Using the Manual. Configuration of an S7-300
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 14/31
Date: 04.09.2013File: SYH_03E.14
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Exercise: Installing the Modules
Dismantle the modules in slots 8-9 (Version A) or 4-5 inVersion B !
Install the input module in slot 8 (4) and the outputmodule in slot 9 (5)!
Check whether you can switch the front connector between the input module and the output module(interchange protection) !
Connect a new front connector on both the digital inputand digital output module and bring them into wiringposition!
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 15/31
Date: 04.09.2013File: SYH_03E.15
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Exercise: Wiring the Signal Modules
Term.No.: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
S1 S4 H4 L- L+
conveyor model
modules 16 channel ->
32 channel ->
I 17.1 I 17.4 Q 21.1 L- L+
(I 3.1) (I 3.4) (Q 7.1)
L+ L+ L-
To supply the input/output modules
(see manual or the labelon the front door of the modules)
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 16/31
Date: 04.09.2013File: SYH_03E.16
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Installing an S7-400
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 17/31
Date: 04.09.2013File: SYH_03E.17
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Components of an S7-400
Components Function
Rack for receiving and establishing an electricalconnection to the modules
Power Supply(PS)
converts the supply voltage to 5V DC and 24V DCto supply the modules
Central Processing Unit(CPU)
executes the user programaccessories: Memory Card
Interface Modules
(IM)
connect the racks with one another.accessories: connector cables, terminators
Signal Modules (SM)
(Digital/Analog)
adapt various process signals to the S7-400.accessories: front connector
Function Modules (FM)
make functions available for positioning, closed-loop control
etc.
CommunicationProcessors (CP)
for connections between programmable logic controllers.accessories: cable, software, interface modules
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 18/31
Date: 04.09.2013File: SYH_03E.18
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Racks and Connection Possibilities
Type of Rack Centralrack
Extensionrack
Useable in
UR1 / UR2(Universal Rack)
Yes Yes
P bus
K bus
CR2(Central Rack)
NoYes
P bus, Segment 1
K bus
P bus, Segment 2
P bus
ER1 / ER2
(Extension Rack) No Yes
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 19/31
Date: 04.09.2013File: SYH_03E.19
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Installation Rules
The following minimum clearances must be maintained:
20 mm to the right and left of the rack
40 mm above and 22 mm below the rack
110 mm between two racks
The power supply must be inserted on the far left (slot 1) and
the receive IM must be inserted on the far right Please ensure that there is a low-resistance connection
between the rack and substructure, such as through contactwashers
Connect the rack to building ground with at least 10 mm2
Remove the slot covers before you install the modules
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 20/31
Date: 04.09.2013File: SYH_03E.20
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Installation Check List
• Are all components available? (see parts list)
• Install the rack !
• Install the power supply !
• Remove the slot covers and install the modules !
• Connect the front connectors and insert thelabeling strips !
• Wire the modules (power supply and I/O modules) !
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 21/31
Date: 04.09.2013File: SYH_03E.21
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Installing Racks
Screw the rack to the substructure (M6 machine
screws) !
Connect the rack to building ground. A stud bolt is
provided on the lower left for this purpose. Theminimum cross section of the cable is 10 mm2 !
Install additional racks with a minimum clearance of
110 mm !
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 22/31
Date: 04.09.2013File: SYH_03E.22
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Installing Modules
Remove the slot covers.Grasp the cover at the indicated locations and pull thecover forward to remove it !
Hang in the first module and swing it down !
Screw the module tight on the top and the bottom.Three-fold modules and the power supply each havetwo screws on the top and on the bottom !
Install the other modules as before !
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 23/31
Date: 04.09.2013File: SYH_03E.23
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Wiring the Power Supply
Open the power supply cover !
Adjust the power selection switch to the correct supply voltage !
User a screw driver as a lever to loosen the power plug !
Pull out the power plug !
Shorten both wires (not PE) by 10 mm !
Strip the insulation to a length of 7 mm !
Open the power plug (screw in the cover) and the strain relief device !
Connect the wires and tighten the strain relief device !
Close the power plug cover !
Push the power plug into the guide notch on the power supply andthen to a dead stop !
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 24/31
Date: 04.09.2013File: SYH_03E.24
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Wiring the Front Connector
Use a lever motion on the lower part of the front connector cover toloosen it. Open the cover and pull it up to remove it !
Strip the insulation from the wires !
Connect the wires !
Install the strain relief device on the lower side of the front connector !
Fill out the labeling strip and insert it in the front connector !
Place the cover on the front connector !
Latch the front connector onto the module‘s coding key !
Swing the front connector up !
Screw the front connector tightly in place !
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 25/31
Date: 04.09.2013File: SYH_03E.25
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Preparing for Operation
Insert the keyswitch in the CPU !
Insert the back-up battery (batteries) !
Adjust the BATT INDIC switch for monitoring thebattery on the power supply !
Insert the memory card in the CPU !(always required for the S7-400)
Connect the racks using the correct connector cables !
Set the rack number (1 to 21) on the coding key of every receive IM !
Connect a terminator to the last receive IM of everycoupling phase !
Perform a CPU memory reset !
Connect the programming device !
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 26/31
Date: 04.09.2013File: SYH_03E.26
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Maintaining the Programmable Logic Controller
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 27/31
Date: 04.09.2013File: SYH_03E.27
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Changing the Back-up Battery in the S7-300
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 28/31
Date: 04.09.2013File: SYH_03E.28
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Exchanging Signal Modules in the S7-300
Switch the CPU to Stop !
Switch the load voltage off !
Open the front door !
Release the front connector and take it out !
Loosen the hold-down screw on the module !
Swing the module out ! On the new module, remove the upper portion of the front
connector coding !
Insert the new module and screw it down tightly !
Connect the front connector and bring it into operatingposition !
Close the front door !
Switch the load voltage on again !
Perform a complete restart on the CPU !
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 29/31
Date: 04.09.2013File: SYH_03E.29
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Changing the Fuse in Digital Output Modules of the S7-300
Switch the CPU to Stop !
Switch the load voltage off !
Remove the front connector !
Loosen the hold-down screw on the module !
Swing the module out ! Screw the fuse support out of the module !
Change the fuse !
Screw the fuse support down again tightly !
Install the module !
Insert the front connector !
Switch the load voltage on again !
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 30/31
Date: 04.09.2013File: SYH_03E.30
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Changing the Back-up Battery in the S7-400
Open the power supply cover !
Use the ribbon loop to pull the battery (batteries) out of the batterycompartment !
Insert the new battery and pay attention to the battery‘s polarity !
Set the BATTINDIC switch for battery monitoring:
BAT position for a single-width power supply
1BAT position for a double or triple-width PS and one battery
2BAT position for a double or triple-width PS and two batteries
Use the FMR acknowledgement pushbutton to cancel the error
message !
Close the cover to the power supply !
7/30/2019 PLC siemens2
http://slidepdf.com/reader/full/plc-siemens2 31/31
Date: 04.09.2013File: SYH_03E.31
SIMATIC S7Siemens AG 1999. All rights reserved.
Information and Training Center
Knowledge for Automation
Exchanging Signal Modules in the S7-400
Switch the CPU to Stop or make sure that the user program permitsmodules to be exchanged in the RUN state !
Loosen the hold-down screws of the front connector and remove thefront connector !
Loosen the hold-down screw on the module and swing the module out !
Hang in the new module and swing it down !
Use both screws to screw the module down tightly !
Remove the front part of the coding key in the front connector !
Connect the wired front connector and tighten it !