PLYMOUTH STEAM BOILER SERIES 2 GAS-FIRED STEAM BOILERS NEAR BOILER PIPING Manufactured by: ECR International Inc. 2201 Dwyer Avenue, Utica, NY 13501 Tel. 800 253 7900 www.ecrinternational.com PN 615000243 REV. A [06/30/2018]

PLYMOUTH STEAM BOILER SERIES 2 GAS-FIRED ... REV A...PLYMOUTH STEAM BOILER SERIES 2 GAS-FIRED STEAM BOILERS NEAR BOILER PIPING Mactur y: ECR Ineninl In. 221 Dye Avene Ui NY 1351 Tel

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PLYMOUTH STEAM BOILER SERIES 2 GAS-FIRED ... REV A...PLYMOUTH STEAM BOILER SERIES 2 GAS-FIRED STEAM BOILERS NEAR BOILER PIPING Mactur y: ECR Ineninl In. 221 Dye Avene Ui NY 1351 Tel

PLYMOUTH STEAM BOILER SERIES 2

GAS-FIREDSTEAM BOILERS

NEAR BOILER PIPING

Manufactured by: ECR International Inc.

2201 Dwyer Avenue, Utica, NY 13501 Tel. 800 253 7900

www.ecrinternational.com PN 615000243 REV. A [06/30/2018]

Page 2: PLYMOUTH STEAM BOILER SERIES 2 GAS-FIRED ... REV A...PLYMOUTH STEAM BOILER SERIES 2 GAS-FIRED STEAM BOILERS NEAR BOILER PIPING Mactur y: ECR Ineninl In. 221 Dye Avene Ui NY 1351 Tel

2

ONE SUPPLY TAPPING

• All installations shall follow National/Local codes and requirements mentioned in boiler installation manual.• It is recommended to apply Teflon tape or quality pipe dope on all threaded connections.• Engagement depth for all piping is normally around 19/32” per threaded connection.• Engagement depth of threaded connection depends on quality and supplier of parts. Installer is responsible for

making sure each connection is fully engaged, secure, and leak free.• General guide only. Check dimensions of specific install location and adjust piping as needed to meet

requirements in IOM.• This guide is not intended to require replacement of existing piping. Existing piping may meet the requirements

outlined in the IOM.

FOR 3 AND 4 - SECTION BOILERS ONLY

P/N 615000243, Rev. A [06/30/2018]

Assembly 1

Assembly 2

34

5

6

Assembly 314

14

14

21

21

21

23

24

13

22

22

28

22

26

26

27

1213

18

20 19

1414

14

25

12

1415

16

2

2

2

1

7

79

8

8

12

12

13

13

10 11

21

18

21

18

21

2123

Page 3: PLYMOUTH STEAM BOILER SERIES 2 GAS-FIRED ... REV A...PLYMOUTH STEAM BOILER SERIES 2 GAS-FIRED STEAM BOILERS NEAR BOILER PIPING Mactur y: ECR Ineninl In. 221 Dye Avene Ui NY 1351 Tel

3

PipingItem # Description Length Quantity

Required1 2 1/2" NPT,Nipple 9" 12 2 1/2" NPT,Tee Connector n/a 33 2 1/2” NPT,Plug n/a 14 2 1/2" NPT,Nipple 7" 15 2 1/2" NPT,Union n/a 16 2 1/2" NPT,Nipple 8" 17 2 1/2" NPT,Elbow Connector n/a 28 2 1/2" NPT,Nipple 3" 29 2 1/2” NPT,Nipple 14” 1

10 2 1/2" NPT,Nipple 4 1/2" 111 2 1/2” to 1 1/2” NPT,Elbow Reducer n/a 112 1 1/2” NPT,Nipple 14” 413 1 1/2” NPT,Union n/a 414 1 1/2” NPT,Tee Connector n/a 715 1 1/2” NPT,Nipple 2 1/2” 116 1 1/2” NPT,Nipple 18" 118 1 1/2" NPT,Nipple 7” 319 2”-1 1/2” Bushing Reducer n/a 120 2 1/2”-2” Bushing Reducer n/a 121 1 1/2" NPT,Nipple 1 3/4" 722 1 1/2” NPT,Elbow Connector n/a 323 1 1/2” NPT,Gate/Ball Valve n/a 224 1 1/2” NPT,Cap n/a 225 1 1/2” NPT,Nipple 3” 126 1 1/2” NPT,Nipple 24” 227 1 1/2” NPT,Nipple 16” 128 Air Vent n/a 1

ONE SUPPLY TAPPING - LIST OF PARTS

P/N 615000243, Rev. A [06/30/2018]

Page 4: PLYMOUTH STEAM BOILER SERIES 2 GAS-FIRED ... REV A...PLYMOUTH STEAM BOILER SERIES 2 GAS-FIRED STEAM BOILERS NEAR BOILER PIPING Mactur y: ECR Ineninl In. 221 Dye Avene Ui NY 1351 Tel

4

• Assembly 1

1. Secure Pipe 1 to boiler2. Tee 2 to pipe 13. Plug 3 to tee 24. Pipe 4 to tee 25. Union 5 to pipe 46. Pipe 6 onto other side of union 57. Elbow 7 to pipe 68. Pipe 8 to elbow 79. Elbow 7 to pipe 810. Pipe 9 to elbow 711. Tee 2 to pipe 912. Pipe 10 to tee 213. Tee 2 to pipe 1014. Pipe 8 to reducer 1115. Pipe 12 to elbow reducer 1116. Half union 13 to pipe 12

• Assembly 2

1. Secure pipe 10 to boiler2. Elbow 7 to pipe 103. Pipe 4 to elbow 74. Union 5 to pipe 4

• Assembly 3

1. Half of union 13 to pipe 122. Tee 14 to pipe 123. Pipe 15 to tee 144. Tee 14 to pipe 155. Pipe 18 to tee 146. Cap 24 to pipe 187. Pug 24 to tee 148. Tee 14 to pipe 169. Pipe 12 to tee 1410. Tee 14 to pipe 1211. Pipe 12 to tee 1412. Half of union 13 to pipe 12

• Attach assembly 3 to both assembly 1 & 2

ONE SUPPLY TAPPING - ASSEMBLY PROCEDURE

• Finish near boiler piping

1. Pipe 21 to tee 14 from assy 32. Elbow 22 to pipe 213. Pipe 21 to elbow 224. Union 13 to pipe 215. Pipe 21 to union 136. Valve 23 to pipe 217. Pipe 21 to valve 238. Tee 14 to pipe 219. Pipe 21 to tee 1410. Cap 24 to pipe 2111. Pipe 25 to tee 1412. Tee 14 to pipe 2513. Pipe 21 to tee 1414. Vlave 23 to pipe 2115. Pipe 21 to tee 1416. Elbow 22 to pipe 2117. Pipe 26 to elbow 2218. Union 13 to pipe 2619. Pipe 26 to union 1320. Elbow 22 to pipe 2621. Pipe 27 to elbow 2222. Tee 14 to pipe 2723. Pipe 18 to tee 1424. Air Vent 28 to pipe 18

P/N 615000243, Rev. A [06/30/2018]

Page 5: PLYMOUTH STEAM BOILER SERIES 2 GAS-FIRED ... REV A...PLYMOUTH STEAM BOILER SERIES 2 GAS-FIRED STEAM BOILERS NEAR BOILER PIPING Mactur y: ECR Ineninl In. 221 Dye Avene Ui NY 1351 Tel

5

TWO SUPPLY TAPPING

• All installations shall follow National/Local codes and requirements mentioned in boiler installation manual.

• It is recommended to apply Teflon tape or quality pipe dope on all threaded connections.

• Engagement depth for all piping is normally around 19/32” per threaded connection.

• Engagement depth of threaded connection depends on quality and supplier of parts. Installer is responsible for making sure each connection is fully engaged, secure, and leak free.

• General guide only. Check dimensions of specific install location and adjust piping as needed to meet requirements in IOM.

• This guide is not intended to require replacement of existing piping. Existing piping may meet the requirements outlined in the IOM.

APPLICABLE FOR ALL MODELS. REQUIRED FOR 5 SECTION OR LARGER BOILERS

P/N 615000243, Rev. A [06/30/2018]

Assembly 5

Assembly 4

3

4

5

5

6

6

2

29

7

4

1

7

7

7

8

8

2

10

211

8

13

12

12

22

2829

27 14

14 2124 22

26

26

14

23

13

1421

21

23

22

1415

16

1412

13

18

1412

Assembly 1

Assembly 2

Assembly 3

1920

5

18

Assembly 2

21

30

18

21

13

25

24

21

Page 6: PLYMOUTH STEAM BOILER SERIES 2 GAS-FIRED ... REV A...PLYMOUTH STEAM BOILER SERIES 2 GAS-FIRED STEAM BOILERS NEAR BOILER PIPING Mactur y: ECR Ineninl In. 221 Dye Avene Ui NY 1351 Tel

6

TWO SUPPLY TAPPING - LIST OF PARTS

Item # Description Length Quantity Required

1 2 1/2" NPT,Nipple 9" 12 2 1/2" NPT,Tee Connector n/a 33 2 1/2” NPT,Plug n/a 14 2 1/2" NPT,Nipple 7" 25 2 1/2" NPT,Union n/a 26 2 1/2" NPT,Nipple 8" 27 2 1/2" NPT,Elbow Connector n/a 48 2 1/2" NPT,Nipple 3" 39 2 1/2” NPT,Nipple 14” 1

10 2 1/2" NPT,Nipple 2 1/2" 111 2 1/2” to 1 1/2” NPT,Elbow Reducer n/a 112 1 1/2” NPT,Nipple 14” 413 1 1/2” NPT,Union n/a 314 1 1/2” NPT,Tee Connector n/a 715 1 1/2” NPT,Nipple 2 1/2” 116 1 1/2” NPT,Nipple 18" 118 1 1/2" NPT,Nipple 7” 319 2”-1 1/2” Bushing Reducer n/a 120 2 1/2”-2” Bushing Reducer n/a 121 1 1/2" NPT,Nipple 1 3/4" 722 1 1/2” NPT,Elbow Connector n/a 323 Gate/Ball Valve n/a 224 1 1/2” NPT,Cap n/a 225 1 1/2” NPT,Nipple 3” 126 1 1/2” NPT,Nipple 24” 227 1 1/2” NPT,Nipple 16” 128 Air Vent n/a 129 2 1/2” NPT,Nipple 3 Sec - 16”

4 Sec - 19”5 Sec - 22 1/2”

6 Sec - 26”7 Sec - 29”8 Sec - 32”

9 Sec - 35 1/2”

1

30 2 1/2” NPT,Nipple 4 1/2” 1

P/N 615000243, Rev. A [06/30/2018]

Page 7: PLYMOUTH STEAM BOILER SERIES 2 GAS-FIRED ... REV A...PLYMOUTH STEAM BOILER SERIES 2 GAS-FIRED STEAM BOILERS NEAR BOILER PIPING Mactur y: ECR Ineninl In. 221 Dye Avene Ui NY 1351 Tel

7

TWO SUPPLY TAPPING - ASSEMBLY PROCEDURE

• Assembly 1

1. Secure Pipe 1 to boiler2. Tee 2 to pipe 13. Plug 3 to tee 24. Pipe 4 to tee 25. Union 5 to pipe 4

• Assembly 2

1. Secure pipe 10 to boiler2. Elbow 7 to pipe 103. Pipe 4 to elbow 74. Union 5 to pipe 4

• Assembly 3

1. Half of union 5 to pipe 62. Elbow 7 to pipe 63. Pipe 8 to elbow 74. Tee 2 to pipe 85. Pipe 29 to tee 26. Elbow 7 to pipe 297. Pipe 8 to elbow 78. Elbow 7 to pipe 89. Pipe 6 to elbow 710. Half of union 5 to pipe 611. Pipe 9 to tee 212. Tee 2 to pipe 913. Pipe 30 to Tee 214. Tee 2 to pipe 3015. Pipe 8 to tee 216. Elbow reducer 11 to pipe 817. Pipe 12 to elbow reducer 1118. Half of union 13 to pipe 12.

• Attach assembly 3 to both assembly 1 & 2

• Assembly 4

1. Secure reducer 20 to boiler2. Reducer 19 to reducer 203. Pipe 18 to reducer 194. Half union 13 to pipe 18

• Assembly 5

1. Half of union 13 to pipe 122. Tee 14 to pipe 123. Pipe 15 to tee 144. Tee 14 to pipe 155. Pipe 18 to tee146. Cap 24 to pipe 187. Pipe 16 to tee 148. Tee 14 to pipe 169. Pipe 12 to tee 1410. Tee 14 to pipe 1211. Pipe 12 to tee 1412. Half of union 13 to pipe 12

• Attach assembly 5 to both assembly 3 & 4

• Finish near boiler piping

1. Pipe 21 to tee 14 from assy 52. Elbow 22 to pipe 213. Pipe 21 to elbow 224. Union 13 to pipe 215. Pipe 21 to union 136. Valve 23 to pipe 217. Pipe 21 to valve238. Tee 14 to pipe 219. Pipe 21 to tee 1410. Cap 24 to pipe 2111. Pipe 25 to tee 1412. Tee 14 to pipe 2513. Pipe 21 to tee 1414. Valve 23 to pipe 2115. Pipe 21 to tee 1416. Elbow 22 to pipe 2117. Pipe 26 to elbow 2218. Union 13 to pipe 2619. Pipe 26 to union 1320. Elbow 22 to pipe 2621. Pipe 27 to elbow 2222. Tee 14 to pipe 2723. Pipe 18 to tee 1424. Air Vent 28 to pipe 18

P/N 615000243, Rev. A [06/30/2018]

Page 8: PLYMOUTH STEAM BOILER SERIES 2 GAS-FIRED ... REV A...PLYMOUTH STEAM BOILER SERIES 2 GAS-FIRED STEAM BOILERS NEAR BOILER PIPING Mactur y: ECR Ineninl In. 221 Dye Avene Ui NY 1351 Tel

All specifications subject to change without notice. ©2018 ECR International, Inc.

2201 Dwyer Avenue, Utica, NY 13501 Tel. 800 253 7900 www.ecrinternational.com