53
Flashcard Set Title: "PM-BOOK PMP Process Groups" Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419 Question: 4.1 Develop Project Charter Process Group Answer: • Initiating Question: 4.1 Develop Project Charter Knowledge Area Answer: • Project integration management Question: 4.1 Develop Project Charter Inputs Answer: • Project statement of work • Business case • Contract • Enterprise environmental factors • Organizational Process Assets (OPA) Question: 4.1 Develop Project Charter Tools & Techniques Answer: • Expert judgement page 1 / 53

PM-BOOK PMP Process Groups-large

Embed Size (px)

DESCRIPTION

pmp

Citation preview

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 4.1 Develop Project Charter

Process Group

Answer:

• Initiating

Question: 4.1 Develop Project Charter

Knowledge Area

Answer:

• Project integration management

Question: 4.1 Develop Project Charter

Inputs

Answer:

• Project statement of work• Business case

• Contract• Enterprise environmental factors

• Organizational Process Assets (OPA)

Question: 4.1 Develop Project Charter

Tools & Techniques

Answer:

• Expert judgement

page 1 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 4.1 Develop Project Charter

Outputs

Answer:

• Project charter

Question: 10.1 Identify Stakeholders

Process Group

Answer:

• Initiating

Question: 10.1 Identify Stakeholders

Knowledge Area

Answer:

• Project communicationsmanagement

Question: 10.1 Identify Stakeholders

Inputs

Answer:

• Project charter• Procurement documents

• Enterprise environmental factors• OPA

page 2 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 10.1 Identify Stakeholders

Tools & Techniques

Answer:

• Stakeholder analysis• Expert judgement

Question: 10.1 Identify Stakeholders

Outputs

Answer:

• Stakeholder register• Stakeholder management

strategy

Question: 4.2 Develop Project Management

PlanProcess Group

Answer:

• Planning

Question: 4.2 Develop Project Management

PlanKnowledge Area

Answer:

• Project integration management

page 3 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 4.2 Develop Project Management

PlanInputs

Answer:

• Project charter• Outputs from planning process

• Enterprise environmental factors (EEF)• OPA

Question: 4.2 Develop Project Management

PlanTools & Techniques

Answer:

• Expert judgement

Question: 4.2 Develop Project Management

PlanOutputs

Answer:

• Project management plan (PMP)

Question: 5.1 Collect Requirements

Process Group

Answer:

• Planning

page 4 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 5.1 Collect Requirements

Knowledge Area

Answer:

• Project scope management

Question: 5.1 Collect Requirements

Inputs

Answer:

• Project charter• Stakeholder register

Question: 5.1 Collect Requirements

Tools & Techniques

Answer:

• Interviews• Focus groups

• Facilitated workshops• Group creativity techniques• Questionnaires & surveys

• Observations• Prototypes

Question: 5.1 Collect Requirements

Outputs

Answer:

• Requirements documentation• Requirements management plan

• Requirements traceability matrix (RTM)

page 5 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 5.2 Define ScopeProcess Group

Answer:

• Planning

Question: 5.2 Define ScopeKnowledge Area

Answer:

• Project scope management

Question: 5.2 Define Scope

Inputs

Answer:

• Project charter• Requirements documentation

• OPA

Question: 5.2 Define Scope

Tools & Techniques

Answer:

• Expert judgement• Product analysis

• Alternatives identification• Facilitated workshops

page 6 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 5.2 Define Scope

Outputs

Answer:

• Project scope statement• Project document updates

Question: 5.3 Create WBSProcess Group

Answer:

• Planning

Question: 5.3 Create WBSKnowledge Area

Answer:

• Project scope management

Question: 5.3 Create WBS

Inputs

Answer:

• Project scope statement• Requirements documentation

• OPA

page 7 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 5.3 Create WBS

Tools & Techniques

Answer:

• Decomposition

Question: 5.3 Create WBS

Outputs

Answer:

• WBS• WBS dictionary• Scope baseline

• Project document updates

Question: 6.1 Define Activities

Process Group

Answer:

• Planning

Question: 6.1 Define Activities

Knowledge Area

Answer:

• Project time management

page 8 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 6.1 Define Activities

Inputs

Answer:

• Scope baseline• Enterprise environmental factors

• OPA

Question: 6.1 Define ActivitiesTools & Techniques

Answer:

• Decomposition• Rolling wave planning

• Templates• Expert judgement

Question: 6.1 Define Activities

Outputs

Answer:

• Activity list• Activity attributes

• Milestone list

Question: 6.2 Sequence Activities

Process Group

Answer:

• Planning

page 9 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 6.2 Sequence Activities

Knowledge Area

Answer:

• Project time management

Question: 6.2 Sequence Activities

Inputs

Answer:

• Activity list• Activity attributes

• Milestone list• Project scope statement

• OPA

Question: 6.2 Sequence Activities

Tools & Techniques

Answer:

• Precedence diagraming method (PDM)• Dependency determination

• Applying leads & lags• Schedule network templates

Question: 6.2 Sequence Activities

Outputs

Answer:

• Project schedule networkdiagrams

• Project document updates

page 10 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 6.3 Estimate Activity Resources

Process Group

Answer:

• Planning

Question: 6.3 Estimate Activity Resources

Knowledge Area

Answer:

• Project time management

Question: 6.3 Estimate Activity Resources

Inputs

Answer:

• Activity list• Activity attributres

• Resource calendars• Enterprise environmental factors (EEF)

• OPA

Question: 6.3 Estimate Activity Resources

Tools & Techniques

Answer:

• Expert judgement• Alternatives analysis

• Published estimating data• Bottom up estimating

• PM software

page 11 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 6.3 Estimate Activity Resources

Outputs

Answer:

• Activity resource requirements • Resource breakdown structure

• Project document updates

Question: 6.4 Estimate Activity

DurationsProcess Group

Answer:

• Planning

Question: 6.4 Estimate Activity Durations

Knowledge Area

Answer:

• Project time management

Question: 6.4 Estimate Activity Durations

Inputs

Answer:

• Activity list• Activity attributes

• Activity resource requirements• Resource calendars

• Project scope statement • EEF• OPA

page 12 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 6.4 Estimate Activity

DurationsTools & Techniques

Answer:

• Expert judgement• Analogous estimating• Parametric estimating

• 3 point estimates• Reserve analysis

Question: 6.4 Estimate Activity

DurationsOutputs

Answer:

• Activity duration estimates• Project document updates

Question: 6.5 Develop Schedule

Process Group

Answer:

• Planning

Question: 6.5 Develop Schedule

Knowledge Area

Answer:

• Project time management

page 13 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 6.5 Develop Schedule

Inputs

Answer:

• Activity list• Activity attributes

• Project schedule network diagrams• Activity resource requirements

• Resource calendars• Activity duration estimates

• PSS• EEF• OPA

Question: 6.5 Develop ScheduleTools & Techniques

Answer:

• Schedule network analysis• Critical path method• Critical chain method

• Resource leveling• What if scenario analysis

• Applying leads & lags• Schedule compression

• Scheduling tool

Question: 6.5 Develop Schedule

Outputs

Answer:

• Project schedule• Schedule baseline

• Schedule data• Project document updates

Question: 7.1 Estimate Costs

Process Group

Answer:

• Planning

page 14 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 7.1 Estimate CostsKnowledge Area

Answer:

• Project cost management

Question: 7.1 Estimate Costs

Inputs

Answer:

• Scope baseline• Project schedule

• HR plan• Risk register

• EEF• OPA

Question: 7.1 Estimate CostsTools & Techniques

Answer:

• Expert judgement• Analogous estimating• Parametric estimating• Bottom up estimating

• 3 point estimates• Reserve analysis

• Cost of quality• PM estimating software

• Vendor bid analysis

Question: 7.1 Estimate Costs

Outputs

Answer:

• Activity cost estimates• Basis of Estimate (BOE)

• Project document updates

page 15 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 7.2 Determine Budget

Process Group

Answer:

• Planning

Question: 7.2 Determine Budget

Knowledge Area

Answer:

• Project cost management

Question: 7.2 Determine Budget

Inputs

Answer:

• Activity cost estimates• BOE

• Scope baseline• Project schedule

• Resource calendars• Contracts

• OPA

Question: 7.2 Determine BudgetTools & Techniques

Answer:

• Cost aggregation • Reserve analysis• Expert judgement

• Historical relationships• Funding limit reconciliation

page 16 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 7.2 Determine Budget

Outputs

Answer:

• Cost performance baseline• Project funding requirements

• Project document updates

Question: 8.1 Plan QualityProcess Group

Answer:

• Planning

Question: 8.1 Plan QualityKnowledge Area

Answer:

• Project quality management

Question: 8.1 Plan Quality

Inputs

Answer:

• Scope baseline• Stakeholder register

• Cost performance baseline• Schedule baseline

• Risk register• EEF• OPA

page 17 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 8.1 Plan Quality

Tools & Techniques

Answer:

• Cost benefit analysis• Cost of quality• Control charts• Benchmarking

• Design of experiments• Statistical sampling

• Flowcharting• Proprietary quality management methodologies

• Additional quality planning tools

Question: 8.1 Plan Quality

Outputs

Answer:

• Quality management plan• Quality metrics

• Quality checklist• Process improvement plan• Project document updates

Question: 9.1 Develop HR Plan

Process Group

Answer:

• Planning

Question: 9.1 Develop HR Plan

Knowledge Area

Answer:

• Project HR management

page 18 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 9.1 Develop HR Plan

Inputs

Answer:

• Activity resource requirements• EEF• OPA

Question: 9.1 Develop HR PlanTools & Techniques

Answer:

• Organization charts & Positiondescriptions• Networking

• Organizational theory

Question: 9.1 Develop HR Plan

Outputs

Answer:

• HR Plan

Question: 10.2 Plan Communications

Process Group

Answer:

• Planning

page 19 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 10.2 Plan Communications

Knowledge Area

Answer:

• Project Communicationsmanagement

Question: 10.2 Plan Communications

Inputs

Answer:

• Stakeholder register• Stakeholder management strategy

• EEF• OPA

Question: 10.2 Plan Communications

Tools & Techniques

Answer:

• Communication requirements analysis• Communication technology

• Communication models• Communication methods

Question: 10.2 Plan Communications

Outputs

Answer:

• Communications managementplan

• Project document updates

page 20 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 11.1 Plan Risk Management

Process Group

Answer:

• Planning

Question: 11.1 Plan Risk Management

Knowledge Area

Answer:

• Project risk management

Question: 11.1 Plan Risk Management

Inputs

Answer:

• PSS• Cost management plan

• Schedule management plan• Communications management plan

• EEF• OPA

Question: 11.1 Plan Risk Management

Tools & TechniquesAnswer:

• Planning meetings & analysis

page 21 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 11.1 Plan Risk Management

Outputs

Answer:

• Risk management plan

Question: 11.2 Identify Risks

Process Group

Answer:

• Planning

Question: 11.2 Identify RisksKnowledge Area

Answer:

• Project risk management

Question: 11.2 Identify Risks

Inputs

Answer:

• Risk management plan• Activity cost estimates

• Activity duration estimates• Scope baseline

• Stakeholder register• Cost management plan

• Schedule management plan• Quality management plan

• Project documents• EEF

page 22 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 11.2 Identify Risks

Tools & Techniques

Answer:

• Documentation reviews• Information gathering techniques

• Checklist analysis• Assumptions analysis

• Diagraming techniques• SWOT analysis

• Expert judgement

Question: 11.2 Identify Risks

Outputs

Answer:

• Risk register

Question: 11.3 Perform Qualitative Risk

AnalysisProcess Group

Answer:

• Planning

Question: 11.3 Perform Qualitative Risk

AnalysisKnowledge Area

Answer:

• Project risk management

page 23 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 11.3 Perform Qualitative Risk

AnalysisInputs

Answer:

• Risk register• Risk management plan

• PSS• OPA

Question: 11.3 Perform Qualitative Risk

AnalysisTools & Techniques

Answer:

• Risk probability & impact assessment• Probability & impact matrix

• Risk data quality assessment• Risk categorization

• Risk urgency assessment• Expert judgement

Question: 11.3 Perform Qualitative

Risk AnalysisOutputs

Answer:

• Risk register updates

Question: 11.4 Perform Quantitative Risk

AnalysisProcess Group

Answer:

• Planning

page 24 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 11.4 Perform Quantitative Risk

AnalysisKnowledge Area

Answer:

• Project risk management

11.4 Perform Quantitative RiskAnalysisInputs

Question:

Answer:

• Risk register• Risk management plan• Cost management plan

• Schedule management plan• OPA

Question: 11.4 Perform Quantitative Risk

AnalysisTools & Techniques

Answer:

• Data gathering & representationtechniques

• Quantitative risk analysis & modelingtechniques

• Expert judgement

Question: 11.4 Perform Quantitative Risk

AnalysisOutputs

Answer:

• Risk register updates

page 25 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 11.5 Plan Risk Responses

Process Group

Answer:

• Planning

Question: 11.5 Plan Risk Responses

Knowledge Area

Answer:

• Project risk management

Question: 11.5 Plan Risk Responses

Inputs

Answer:

• Risk register • Risk management plan

Question: 11.5 Plan Risk Responses

Tools & Techniques

Answer:

• Strategies for negative risks or threats• Strategies for positive risks or opportunities

• Contingent response strategies• Expert judgement

page 26 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 11.5 Plan Risk Responses

Outputs

Answer:

• Risk register updates• Risk related contract discussions

• PMP updates• Project document updates

Question: 12.1 Plan Procurements

Process Group

Answer:

• Planning

Question: 12.1 Plan Procurements

Knowledge Area

Answer:

• Project procurementmanagement

Question: 12.1 Plan Procurements

Inputs

Answer:

• Scope baseline• Requirements documentation

• Teaming agreements• Risk register

• Risk related contract decisions• Activity resource requirements

• Project schedule• Activity cost estimates

• Cost performance baseline• EEF

page 27 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 12.1 Plan Procurements

Tools & Techniques

Answer:

• Make or buy analysis• Expert judgement

• Contract types

Question: 12.1 Plan Procurements

Outputs

Answer:

• Procurement management plan• Procurement statements of work (SOW)

• Make or buy decisions• Procurement documents• Source selection criteria

• Change requests

Question: 4.3 Direct and Manage

Project ExecutionProcess Group

Answer:

• Executing

Question: 4.3 Direct and Manage Project

ExecutionKnowledge Area

Answer:

• Project integration management

page 28 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 4.3 Direct and Manage Project

ExecutionInputs

Answer:

• PMP• Approved change requests

• EEF• OPA

Question: 4.3 Direct and Manage Project

ExecutionTools & Techniques

Answer:

• Expert judgement• PM information system

Question: 4.3 Direct and Manage Project

ExecutionOutputs

Answer:

• Deliverables• Work performance information

• Change requests• PMP updates

• Project document updates

Question: 8.2 Perform Quality

AssuranceProcess Group

Answer:

• Executing

page 29 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 8.2 Perform Quality Assurance

Knowledge Area

Answer:

• Project quality management

Question: 8.2 Perform Quality Assurance

Inputs

Answer:

• PMP• Quality metrics

• Work performance information• Quality control measurements

Question: 8.2 Perform Quality

AssuranceTools & Techniques

Answer:

• Plan quality & perform quality tools &techniques

• Quality audits• Process analysis

Question: 8.2 Perform Quality

AssuranceOutputs

Answer:

• OPA assets updates• Change requests

• PMP updates• Project documentation updates

page 30 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 9.2 Acquire Project Team

Process Group

Answer:

• Executing

Question: 9.2 Acquire Project Team

Knowledge Area

Answer:

• Project HR Management

Question: 9.2 Acquire Project Team

Inputs

Answer:

• PMP• EEF• OPA

Question: 9.2 Acquire Project Team

Tools & Techniques

Answer:

• Pre-assignment• Negotiation• Acquisition

• Virtual teams

page 31 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 9.2 Acquire Project Team

Outputs

Answer:

• Project staff assignments• Resource calendars

• PMP updates

Question: 9.3 Develop Project Team

Process Group

Answer:

• Executing

Question: 9.3 Develop Project Team

Knowledge Area

Answer:

• Project HR management

Question: 9.3 Develop Project Team

Inputs

Answer:

• Project staff assignments• PMP

• Resource calendars

page 32 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 9.3 Develop Project Team

Tools & Techniques

Answer:

• Interpersonal skills• Training

• Team building activities• Ground rules• Co-location

• Recognition & rewards

Question: 9.3 Develop Project Team

Outputs

Answer:

• Team performance assessments• EEF updates

Question: 9.4 Manage Project Team

Process Group

Answer:

• Executing

Question: 9.4 Manage Project Team

Knowledge Area

Answer:

• Project HR management

page 33 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 9.4 Manage Project Team

Inputs

Answer:

• Project staff assignments• PMP

• Team performance assessments• Performance reports

• OPA

Question: 9.4 Manage Project Team

Tools & Techniques

Answer:

• Observation & conversation• Project performance appraisals

• Conflict management• Issue log

• Interpersonal skills

Question: 9.4 Manage Project Team

Outputs

Answer:

• EFF updates• OPA updates

• Change requests• PMP updates

Question: 10.3 Distribute Information

Process Group

Answer:

• Executing

page 34 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 10.3 Distribute Information

Knowledge Area

Answer:

• Project communicationsmanagement

Question: 10.3 Distribute Information

Inputs

Answer:

• PMP• Performance reports

• OPA

Question: 10.3 Distribute Information

Tools & Techniques

Answer:

• Communication methods• Information distribution tools

Question: 10.3 Distribute Information

Outputs

Answer:

• OPA updates

page 35 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 10.4 Manage Stakeholder

ExpectationsProcess Group

Answer:

• Executing

Question: 10.4 Manage Stakeholder

ExpectationsKnowledge Area

Answer:

• Project communicationsmanagement

Question: 10.4 Manage Stakeholder

ExpectationsInputs

Answer:

• Stakeholder register• Stakeholder management strategy

• PMP• Issue log

• Change log• OPA

Question: 10.4 Manage Stakeholder

ExpectationsTools & Techniques

Answer:

• Communication methods• Interpersonal skills• Management skills

page 36 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 10.4 Manage Stakeholder

ExpectationsOutputs

Answer:

• OPA updates• Change requests

• PMP updates• Project document updates

Question: 12.2 Conduct Procurements

Process Group

Answer:

• Executing

Question: 12.2 Conduct Procurements

Knowledge Area

Answer:

• Project procurementmanagement

Question: 12.2 Conduct Procurements

Inputs

Answer:

• PMP• Procurement documents• Source selection criteria

• Qualified seller list• Seller proposals

• Project documents• Make or buy decisions• Teaming agreements

• OPA

page 37 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 12.2 Conduct Procurements

Tools & Techniques

Answer:

• Bidder conferences• Proposal evaluation techniques

• Independent estimates• Expert judgement

• Advertising• Internet search

• Procurement negotiations

Question: 12.2 Conduct Procurements

Outputs

Answer:

• Selected sellers• Procurement contract award

• Resource calendars• Change requests

• PMP updates• Project document updates

Question: 4.4 Monitor & Control

Project WorkProcess Group

Answer:

• Monitoring & controlling

Question: 4.4 Monitor & Control Project

WorkKnowledge Area

Answer:

• Project integration management

page 38 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 4.4 Monitor & Control Project

WorkInputs

Answer:

• PMP• Performance reports

• EEF• OPA

Question: 4.4 Monitor & Control Project

WorkTools & Techniques

Answer:

• Expert judgement

Question: 4.4 Monitor & Control Project

WorkOutputs

Answer:

• Change requests• PMP updates

• Project document updates

Question: 4.5 Perform Integrated Change

ControlProcess Group

Answer:

• Monitoring & controlling

page 39 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 4.5 Perform Integrated Change

ControlKnowledge Area

Answer:

• Project integration management

Question: 4.5 Perform Integrated Change

ControlInputs

Answer:

• PMP• Work performance information

• Change requests• EEF• OPA

Question: 4.5 Perform Integrated Change

ControlTools & Techniques

Answer:

• Expert judgement• Change control meetings

Question: 4.5 Perform Integrated Change

ControlOutputs

Answer:

• Change request status updates• PMP updates

• Project document updates

page 40 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 5.4 Verify ScopeProcess Group

Answer:

• Monitoring & controlling

Question: 5.4 Verify ScopeKnowledge Area

Answer:

• Project scope management

5.4 Verify ScopeInputs

Question:

Answer:

• PMP• Requirements documentation

• Requirements traceability matrix• Validated deliverables

5.4 Verify ScopeTools & Techniques

Answer:

• Inspection

page 41 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

5.4 Verify ScopeOutputs

Answer:

• Accepted deliverables• Change requests

• Project document updates

Question: 6.6 Control Schedule

Process Group

Answer:

• Monitoring & controlling

Question: 6.6 Control Schedule

Knowledge Area

Answer:

• Project time management

Question: 6.6 Control Schedule

Inputs

Answer:

• PMP• Project schedule

• Work performance information• OPA

page 42 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 6.6 Control ScheduleTools & Techniques

Answer:

• Performance reviews• Variance analysis

• PM software• Resource leveling

• What if scenario analysis• Adjusting leads & lags• Schedule compression

• Scheduling tool

Question: 6.6 Control Schedule

Outputs

Answer:

• Work performance measurements• OPA updates

• Change requests• PMP updates

• Project document updates

Question: 7.3 Control CostsProcess Group

Answer:

• Monitoring & controlling

Question: 7.3 Control CostsKnowledge Area

Answer:

• Project cost management

page 43 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 7.3 Control Costs

Inputs

Answer:

• PMP• Project funding requirements

• Work performance information• OPA

Question: 7.3 Control Costs

Tools & Techniques

Answer:

• Earn Value Management (EVM)• Forecasting

• To-complete performance index (TCPI• Performance reviews

• Variance analysis• PM software

Question: 7.3 Control Costs

Outputs

Answer:

• Work performance measurements• Budget forecasts

• OPA updates• Change requests

• PMP updates• Project document updates

Question: 8.3 Perform Quality Control

Process GroupAnswer:

• Monitoring & controlling

page 44 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 8.3 Perform Quality Control

Knowledge Area

Answer:

• Project quality management

Question: 8.3 Perform Quality Control

Inputs

Answer:

• PMP• Quality metrics

• Quality checklist• Work performance measurements

• Approved change requests• Deliverables

• OPA

Question: 8.3 Perform Quality Control

Tools & Techniques

Answer:

• Cause & effect diagrams• Control charts• Flowcharting

• Histogram• Pareto chart• Run chart

• Scatter diagram• Statistical sampling

• Inspection• Approved change request review

Question: 8.3 Perform Quality Control

Outputs

Answer:

• Quality control measurements• Validated changes

• Validated deliverables• OPA updates

• Change requests• PMP updates

• Project document updates

page 45 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 10.5 Report Performance

Process Group

Answer:

• Monitoring & controlling

Question: 10.5 Report Performance

Knowledge Area

Answer:

• Project communicationsmanagement

Question: 10.5 Report Performance

Inputs

Answer:

• PMP• Work performance information

• Work performance measurements• Budget forecasts

• OPA

Question: 10.5 Report Performance

Tools & Techniques

Answer:

• Variance analysis• Forecasting methods

• Communication methods• Reporting systems

page 46 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 10.5 Report Performance

Outputs

Answer:

• Performance reports• OPA updates

• Change requests

Question: 11.6 Monitor & Control Risks

Process Group

Answer:

• Monitoring & controlling

Question: 11.6 Monitor & Control Risks

Knowledge Area

Answer:

• Project risk management

Question: 11.6 Monitor & Control Risks

Inputs

Answer:

• Risk register• PMP

• Work performance information• Performance reports

page 47 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 11.6 Monitor & Control

RisksTools & Techniques

Answer:

• Risk reassessment• Risk audits

• Variance & trend analysis • Technical performance measurement

• Reserve analysis• Status meetings

Question: 11.6 Monitor & Control

RisksOutputs

Answer:

• Risk register updates• OPA updates

• Change requests• PMP updates

• Project document updates

Question: 12.3 AdministerProcurementsProcess Group

Answer:

• Monitoring & controlling

Question: 12.3 Administer Procurements

Knowledge Area

Answer:

• Project procurementmanagement

page 48 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 12.3 Administer Procurements

Inputs

Answer:

• Procurement documents• PMP

• Contract• Performance reports

• Approved change requests• Work performance information

Question: 12.3 AdministerProcurements

Tools & Techniques

Answer:

• Contract change control system• Procurement performance reviews

• Inspections & audits• Performance reporting

• Payment systems• Claims administration

• Records management system

Question: 12.3 AdministerProcurements

Outputs

Answer:

• Procurement documentation• OPA updates

• Change requests• PMP updates

Question: 4.6 Close Project or Phase

Process Group

Answer:

• Closing

page 49 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 4.6 Close Project or Phase

Knowledge Area

Answer:

• Project integration management

Question: 4.6 Close Project or Phase

Inputs

Answer:

• PMP• Accepted deliverables

• OPA

Question: 4.6 Close Project or Phase

Tools & Techniques

Answer:

• Expert judgement

Question: 4.6 Close Project or Phase

Outputs

Answer:

• Final product, service, or resulttransition

• OPA updates

page 50 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 12.4 Close Procurements

Process Group

Answer:

• Closing

Question: 12.4 Close Procurements

Knowledge Area

Answer:

• Project procurementmanagement

Question: 12.4 Close Procurements

Inputs

Answer:

• PMP• Procurement documentation

Question: 12.4 Close Procurements

Tools & Techniques

Answer:

• Procurement audits• Negotiated settlements

• Records management system

page 51 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 12.4 Close Procurements

Outputs

Answer:

• Closed procurements• OPA updates

Question: 5.5 Control Scope

Process Group

Answer:

Question: 5.5 Control ScopeKnowledge Area

Answer:

Question: 5.5 Control Scope

Inputs

Answer:

• PMP• Work performance information• Requirements documentation

• Requirements traceability matrix• OPA

page 52 / 53

Flashcard Set Title: "PM-BOOK PMP Process Groups"Study this set online at: http://www.flashcardexchange.com/cards/pm-book-pmp-process-groups-2460419

Question: 5.5 Control Scope

Tools & Techniques

Answer:

• Variance analysis

Question: 5.5 Control Scope

Outputs

Answer:

• Work performance measurements• OPA updates

• Change requests• PMP updates

• Project document updates

Powered by TCPDF (www.tcpdf.org)