    Week 7: Project Management Communication and Information Systems - Discussion

    Project Communications (graded)

    Good project communication starts with a communications plan. This document is sometimes overlooked because

    the project manager feels like he or she knows how, when, and what to communicate so that he or she does not

    need to take the time to document it. What do you think of this action (or lack of action)? Have you experienced the

    use of a good communications plan? Have you experienced the result of the lack of a communications plan?

    Responses

    Response Author Date/Time

    Communication Plan Professor Orr 6/15/2013 2:01:04 PM

    Talking about a communications plan is interesting, but does your company use one for projects?

    Regards,

    Susan

    RE: Communication Plan Tanika Thom as 6/16/2013 1:05:07 PM

    I have experienced in 2 companies where the company uses communication plan

    but it is rarely ever followed as outlined.

    HOA - the president delegates that the information should always be sent from the

    secretary; however most of the time the president is the one who does all the

    communication and record keeping.This is not the best practice for several

    reasons, especially since now the president is no longer apart of the board andholds the majority of the records.

    School - The principal communicates the plans to the secretary and delegates that

    all correspondents go through the secretary. I have seen many times that most

    communication is spoken to others before the secretary has the opportunity to do

    her/his job and get the correct communication out. Best practice is to always have

    it in writing and keep records for future references. Team leads are sent to training

    and are required to come back and deliver what they learned at the training to the

    other team members but most of the time information is lost in translation/delivery.

    One change that the district has made is making the trainings on weekends so allteachers can attend and receive the information at the same time and not rely on

    one person to deliver it back to the group.

    RE:

    Communication

    PlanMaria Ventura 6/16/2013 5:48:19 PM

    Modified:6/16/2013 5:54 PM

  • 7/27/2019 PM592 Week 7 Discussion

    2/17

    7/11/13 Topic Print View

    threadcontent.next.ecollege.com/(NEXT(c2554bec91))/Main/CourseMode/Topic/TopicPrintView.ed?topicID=29456107&sortBy=Title&sortOrder=Ascending&i 2

    Nice post Tanika....

    Communication plan or sometimes called coordination procedure is essential for

    information exchange and interface relationships between parties involved within the

    project. There should be a clear plan that will state how information will be distributed

    and shared among team members including the stakeholders as well. This will include

    how change management and approval processes will be communicated.

    On my prespective, since sometimes team members have access to accurate

    information and others dont. It is a key responsibility of project or developmentmanagers to provide regular and consistent feedback, such as status reports, or

    meeting notes, where project information can be published. Developing a common

    repository for project information to avoid miscommunication and confusion on the team

    is also very useful.

    For example, for my Capstone class the communication plan is different for different

    levels and phases of the project. My group started to meet every Monday after class to

    make changes and enrichments for the project presentation that we are working on and

    need the assistance of the whole team.

    At first, the conference calls were twice a week since the work implementation was

    going smoothly. Sharing e-mails is the basic method of our communication... but as thephases progress then we started talking and meet every single day. Most

    documentation is stored on the Devry's web site (team area) for all to view and easier to

    get approvals when everything is centrally located.

    Thank you//

    RE:

    CommunicationPlan

    Espe ranca Rosa 6/16/2013 8:11:06 PM

    Great comments Maria!

    Certainly, these comments will help us throughout our capstones.

    In addition to that, I would say that communication is the exchange or

    transmission of ideas or thoughts, flow of information from one person to

    another. Communication involves a sender that transmits an idea, information,

    or feeling to a receiver. Moreover, communication could be effective or not.

    Effective communication could be formal or informal, periodic or as needed,

    and verbal or written. An effective communication happens when the receiver

    understands the exact information or idea that the sender intended to transmit.

    Many of the problems that occur in my organization and many others are

    directly related to peoples misunderstandings. This can deteriorate the points

    intended to be communicated for the success of the project. There are several

    communication types that organizations use or apply during a project. The two

    more effective types of communication my organization apply for projects are

    Verbal Communication or Face to Face Discussion and Written

    Communication.

    Regards,

    Esperanca

  • 7/27/2019 PM592 Week 7 Discussion

    3/17

    7/11/13 Topic Print View

    threadcontent.next.ecollege.com/(NEXT(c2554bec91))/Main/CourseMode/Topic/TopicPrintView.ed?topicID=29456107&sortBy=Title&sortOrder=Ascending&i 3

    RE:

    Communication

    PlanCauretta Bell 6/19/2013 4:28:02 PM

    Nice job Maria,

    The information exchange and interface relationships betw een parties involved w ithin the

    project can be deemed as the communication plan. In the restaurant industry, communication

    betw een the managers are extremely important before and after each shif t. you can say thateach shif t is a project on its ow n. Each manager should know w hat is going on before the

    shift like;is the checklist completed, number of servers, 86 list, back of house staff shortages,

    alcohol shortages, maintenance issues and many more. Without the communication plan you

    w ill notice little problems occuring unexpectly throughout the shift.

    RE:

    Communication

    PlanDwayne Grant 6/16/2013 10:36:06 PM

    Good Point Tanika,

    Companies use a communication plan as a valuable tool to make sure all the membersof the team are on the same page and essential deliverable pertaining to the project are

    getting completed in a time manner. I know that this fact was mentioned several times,

    and it is about non-profit organizations like schools adopting project management

    fundamentals. Education is adopting a system called primary learning communities and

    the goal is to manage that 180 to 200 day project called the next school year. A good

    communication plan is absolutely essential for having successful communication, and I

    can't say whether the communication plan in education is deliberate, but at least we can

    say that it is routine.

    RE:

    Communication

    PlanSerge Ndongo 6/17/2013 12:17:53 AM

    A good communication plan should serve as a road map, guiding our work

    toward specific outcomes (nothing more and nothing less). But as simple as

    that may sound, its critical to the company's success. A good plan ensures

    that we are doing the right work, pursuing the right goals, and doing it the best

    way when there are always other options and choices for the use of the

    available resources.

    The company I currently work for uses a communication plan indeed. The

    presence of the communication plan template here guides the way the project

    will be accomplished along with how the communication will be developedwithin all the parties involved in working on such project.

    RE: Communication Plan Philip Effiong 6/18/2013 4:43:01 AM

    Project communications are a coordinated effort by all team members, from the project managerwho is responsible for the overall message and how it is delivered, to individual team memberswho contribute to the process. Project communications plans follow the basic questions of whowill receive information, what information needs to be communicated, how will information bedisseminated and how often, and finally who on the project team will be responsible for deliveringthe information.

  • 7/27/2019 PM592 Week 7 Discussion

    4/17

    7/11/13 Topic Print View

    threadcontent.next.ecollege.com/(NEXT(c2554bec91))/Main/CourseMode/Topic/TopicPrintView.ed?topicID=29456107&sortBy=Title&sortOrder=Ascending&i 4

    Often than not , this is not always the case in the organization.

    RE: Communication Plan Bruce Foley 6/18/2013 11:18:18 PM

    We have one person w ho is in charge of each section or phase of the res toration projects.Those individuals only

    report to myself and my partner w ho have the ultimate last w ord and say so.

    RE: Communication Plan Herminio Dionisio 6/18/2013 11:45:15 PM

    At the heart of many of the top ten reasons w hy projects fail is poor communications. As many as 70% of the

    Information Systems/ Information Technology project failures can be tracked back to poor communications. It is not

    difficult to plan an effective communications management process, but it seems to be very difficult to execute that

    plan. Team members to be truly ef fective, they have to openly communicate w ith one another. For some, that w ill be

    diff icult, for others it is simply a matter of practice. Getting information to the correct team members at the right time in

    the project usually determines the success or failure of the project. The timing, content, and channel of information

    are critical.

    RE: Communication Plan Huyen Bui 6/20/2013 6:07:15 PM

    For our company, w ith any new launch projects, the main community channel is through email. Then, depends on the

    scope of the project as w ell as the responsibility matrix that w e w ill have appropriate communication channel to

    those individuals. Each month, w e have a tow n-hold meeting that broadcast to our nation branches and factories.

    Those main project w ill have a grand launch during these meetings.

    Tools f or Relaying Information betw een

    Team Members Professor Orr 6/17/2013 6:19:03 AM

    What tools w ould you use for relaying information betw een the team members?

    Regards,

    Susan

    RE: Tools for Relaying

    Information betw een Team

    MembersVarune Ramoutar 6/17/2013 8:41:22 AM

    On some of the projects I have worked on we have used a weekly news letter tocommunicate information to all team members. This can be in hard copy print form or

    electronic form emailed to all project participants. This news letter is usually no longer than 4

    pages. It contains all major progress statistics, safety bulletins, employee highlight, project

    photos and some social articles. It is presented in an informal manner to make it easy and

    acceptable for the entire project. It sometimes also contains comics to make the reading

    humorous. This tool is very effective because it encourages participants and stakeholders to

    read the document and get to know what's going on. Also they are not pressured to feel that it

    is an official work document.

  • 7/27/2019 PM592 Week 7 Discussion

    5/17

    7/11/13 Topic Print View

    threadcontent.next.ecollege.com/(NEXT(c2554bec91))/Main/CourseMode/Topic/TopicPrintView.ed?topicID=29456107&sortBy=Title&sortOrder=Ascending&i 5

    RE: Tools for Relaying

    Information between Team

    MembersNishan Ragoonanan 6/17/2013 11:09:45 AM

    One tool we utilized recently that w e had great success w ith was a blog site that we setup. Team members could

    post status updates on tasks they w ere w orking on, voice concerns or hurdles they w ere experiencing, post

    successes or results of tests that w ere conducted and on occasion, snapshots of team members in action. We

    found this to be very unintrusive (w e w ere suf fer ing from overzealous email use at the time) and a great

    communication tool for team members.

    RE: Tools for Relaying

    Information betw een Team

    MembersDw ayne Grant 6/17/2013 8:43:41 PM

    Technology has changed the way we relay information, and there are so many different mediums.

    However, I will still continue with the core communication devices like, phone, email, and

    videoconferencing. Email is still the preferred form of business communications, and it leaves a

    digit foot print for tracking responses and information.

    RE: Tools for

    Relaying

    Information

    between Team

    Members

    Cauretta Bell 6/20/2013 12:17:48 PM

    Techology is an aw esome w ay to rekay and receive information to all team members. Google voice mail

    even has the ability to allow someone to leave you a message and you can play back the message. Other

    tools are company issued internet and for the resaurant w e have have a tol called hotschedules to help

    maintain labor and schedule hours.

    RE: Tools for Relaying

    Information betw een Team

    MembersEsperanca Rosa 6/17/2013 11:40:50 PM

    Modified:6/17/2013 11:43 PM

    Hi class,

    According to our lecture, a tool for identifying the stakeholders is a stakeholder interface map,which graphically depicts all the key interfaces where communication is required during theproject. We will need to know the requirements of each of the stakeholders.

    In addition to that, the article Project Management & Collaboration Tolls on ehow.com website,defines many tools that have been used for relaying information among team members

    1) Google Docs

    Google Docs is a word processing application that can be accessed from any computer with an

    Internet connection. Google Docs allows users to create documents, presentations and

    spreadsheets and to share documents with others, who can then view, edit and make

    suggestions via user notes. This can be a useful feature for a group that wishes to work on a

    project simultaneously and receive instantaneous feedback. You will need to open a Gmail or

    Google account in order to sign up for a free Google Docs account.

  • 7/27/2019 PM592 Week 7 Discussion

    6/17

    7/11/13 Topic Print View

    threadcontent.next.ecollege.com/(NEXT(c2554bec91))/Main/CourseMode/Topic/TopicPrintView.ed?topicID=29456107&sortBy=Title&sortOrder=Ascending&i 6

    2) WrikeWrike is a project management tool that allows multiple users to log onto the Wrike interface at

    the Wrike website and collaborate on a variety of projects. Once logged onto the interface, users

    can see the current projects that need to be completed, communicate in real time and upload

    files. Wrike includes features that allow users to assign different tasks to employees, send

    notifications, create timesheets and compile real time project reports. Wrike has the ability to

    integrate with Google Docs, RSS Feeds, Outlook and Windows Mobile. Wrike users must pay a

    small monthly fee.

    3) Creative Pro Office

    Creative Pro Office is a web-based account that allows either a single person or a small team to

    manage clients and employees, create projects, track t ime sheets and send invoices. Users log

    onto their Creative Pro Office account to see a snapshot of projects and important events from the

    Creative Pro Office dashboard. Users can keep track of clients by sending invoices, tracking bids,

    creating contact information and receiving notices when projects are due. Creative Pro Office also

    includes a time tracker to record billable hours and a calendar to take note of important dates.

    Creative Pro Office is free to use; register for the service at the Create Pro Office website.

    4) DimDim

    DimDim is another web-based collaboration tool that can be accessed directly from a web

    browser. DimDim works best for long distance meetings but can also serve as a way to relay

    information quickly between a team of collaborators. DimDim allows you to log onto the DimDim

    interface and share its desktops and screenshots, record events, and use webcams and

    microphones with up to 1,000 people. You can also use widgets to notify people of a meeting by

    leveraging social media websites and pasting a unique DimDim link that gives them instant

    access to your DimDim event. You must pay a monthly fee to use DimDim.

    Read more: Project Management & Collaboration Tools |eHowhttp://www.ehow.com/list_6606603_project-management-collaboration-tools.html#ixzz2WXii13vv

    Regards,

    Esperanca

    RE: Tools for

    Relaying

    Information

    between Team

    Members

    Tanika Thom as 6/18/2013 8:05:33 PM

    One tool I notice not mention is "an open mind"; being receptive to

    information whether you agree or disagree, like or dislike.

    RE: Tools for

    Relaying Information

    betw een Team

    Members

    Huyen Bui 6/23/2013 11:51:59 AM

    Google Docs is a great sharing tool that all team members can present online and collaborate at the same

    time.

    http://www.ehow.com/list_6606603_project-management-collaboration-tools.html#ixzz2WXii13vvhttp://www.ehow.com/list_6606603_project-management-collaboration-tools.html#ixzz2WXii13vv
  • 7/27/2019 PM592 Week 7 Discussion

    7/17

    7/11/13 Topic Print View

    threadcontent.next.ecollege.com/(NEXT(c2554bec91))/Main/CourseMode/Topic/TopicPrintView.ed?topicID=29456107&sortBy=Title&sortOrder=Ascending&i 7

    Personally, I prefer dropbox because it allow s to share large documents

    Also, Skype is a great communication tool

    RE: Tools for Relaying

    Information between Team

    MembersHerminio Dionisio 6/20/2013 11:13:49 PM

    There are so many w ays now adays that w e can use in our communication and collaboration. The old system of

    letters, memos and correspondence through black and white has been replaced by the most advance and reliableemail technology that w e have now . Transmittal are being sent in a matter of seconds w ithout any limitations on the

    number of recipients, all at the same time. There is no boundaries w ith regards to time, but the most important of all,

    location is not a barrier anymore. Because of the current trend of global operations, virtual meetings are so popular.

    During the early days , w e use only the method of teleconferenc ing, meeting by talking, but at present time, not only

    that w e can talk to them but w e can also see them even to the most remote areas anyw here in the world.

    Collaboration is so important in global operations, and there are many tools and techniques that w e can utilize to keep

    our team members updated on how the project progresses.

    RE: Tools for Relaying

    Information between Team

    MembersBruce Foley 6/20/2013 11:22:08 PM

    Modern problems are solved by modern conveniences. The main tool used in communication is of course the cell

    phone. Along w ith that, there is also email and texting to help w ith our communications concerns. Any

    communications how ever should be established at the beginning of a project w ith a communications plan.

    Ensuring People are Getting and Using

    the Information Profess or Orr6/18/2013 7:35:09 AM

    Good comments I agree that some tools can be too passive. How do you make sure people are getting (and using) the

    information?

    Regards,

    Susan

    RE: Ensuring People are

    Getting and Using the

    InformationEspe ranca Rosa 6/18/2013 11:39:22 AM

    Hi Professor and class,

    Communication is the most efficient and effective way to maintain people informed during a

    project.In order to ensure people are getting and using the information, the PM has to make sure that all

    the stakeholders and people involved in the project are getting the information they need in an

    adequate manner using specific programs or softwares such as MS Project, web-based tools or

    applications, etc. The PM has to monitor and control our communication plan to have the

    necessary information ready and make further decisions. In Addition, the best way to make sure

    everyone is getting informed; we need to communicate using the benefits of the tools we are

    using. For instance, the PMIS is frequently supported by a software system that is controlled and

    monitored by the project manager and can be shared among people. The use of the software is a

    high quality communication way that contains all the project information.

    Regards,

  • 7/27/2019 PM592 Week 7 Discussion

    8/17

    7/11/13 Topic Print View

    threadcontent.next.ecollege.com/(NEXT(c2554bec91))/Main/CourseMode/Topic/TopicPrintView.ed?topicID=29456107&sortBy=Title&sortOrder=Ascending&i 8

    Esperanca

    RE: Ensuring People are

    Getting and Using the

    InformationNishan Ragoonanan 6/18/2013 11:45:26 AM

    I think the f irst s tep in ensuring the people use the information they're given is getting them the right information they

    need to do the job at hand, be it a status update, delay in schedule, resource allocation etc. If w e bombard our entireproject team w ith mass emails sent to huge project distribution lists, it's not long before emails start to get overlooked,

    status updates are neglected and vital information is lost. A good communications plan is the foundation for ensur ing

    the right people are given only the information they require ensuring they w ill pay attention to w hat's important to their

    role in the project.

    RE: Ensuring

    People are Getting

    and Using the

    Information

    Cauretta Bell 6/23/2013 9:03:08 PM

    There are many tools availabke to insure that the infornation about the project gets to theclient/management. One of the most ef fective w ays to get the update across are status meeting. Not only

    w ill meetings be effec tive but having access to the project progress tool. Sending reports on a w eekly

    basis or bi w eekly basis to infprm the stakeholders aboit the progress if the project.

    RE: Ensuring People are

    Getting and Using the

    InformationMaria Ventura 6/18/2013 5:09:23 PM

    Modified:6/18/2013 5:10 PM

    Hello class,

    I think the PM should make periodic inspections to make sure that the information is being used

    correctly. Regular project meetings and project reports will help the PM to see if the information is

    actually being understood and used the intended way. People can have different ways of seeing

    things and what may be understood by one person may not be so clear, or may mean something

    totally different, to someone else. So, the PM should take on the duty to perform project meetings

    and collect project reports to make sure everybody is on the right track.

    Thank you//

    RE: Ensuring People are

    Getting and Using the

    InformationMary Hart 6/18/2013 5:37:09 PM

    I find that a PM may also monitor the effectiveness of the project communication plan as verifying

    that the intended user is getting and using the information.

    Adjustments to the communication plan may be required and also the presentation of information

    in order to make them understandable by all users, hence effective.

    The lecture suggest as best practices that "The project team should be a part of the planning as

    with other parts of the project plan. Stakeholder who are to receive the communications should

  • 7/27/2019 PM592 Week 7 Discussion

    9/17

    7/11/13 Topic Print View

    threadcontent.next.ecollege.com/(NEXT(c2554bec91))/Main/CourseMode/Topic/TopicPrintView.ed?topicID=29456107&sortBy=Title&sortOrder=Ascending&i 9

    also be asked about their communication requirements and expectations."

    The text suggests that "The communication plan should be distributed to the project team and

    discussed before the project begins. To make sure that everyone understands the forms of

    required written communication and the content and format of each, the plan should include

    example of good and bad documentation from previous projects." (p.455)

    References:

    Lecture week 7

    John M Nicholas/Herman Steyn, Project Management for business, Engineering, and Technology, 3rd Edition,2012

    RE: Ensuring

    People are Getting

    and Using the

    Information

    Varune Ramoutar 6/18/2013 7:28:13 PM

    Mary makes and excellent point on the communication plan.

    I think that regular communication meetings and follow up are essential to ensure thatteam members are getting information and using it in a way that the project intends,

    Audits are a normal practice of following up to ensure that the project is doing

    what the plans state should be done e.g. on my project I was in charge of the

    construct-ability program. This is where meetings are held with work group leads to

    ensure that what they are designing can easily be constructed (hence construct-

    ability). The project had a specific construct-ability plan where ideas on

    constructability could be submitted by any team member and then reviewed by a

    panel and then implemented and reviewed once again. Part of this process was to

    maintain a tracking log where the status of each idea submitted could be seen. I was

    audited several times to ensure that the log was up to date and that the process was

    working as it should and that participants of the program were receiving the

    information and using it the way it was intended.

    RE:

    Ensuring

    People are

    Getting and

    Using the

    Information

    Tanika Thomas 6/18/2013 8:13:03 PM

    One method I used with my team after all agreed was "REPLY"

    that you received the information. There have been many of times

    when too much time is wasted on repeating information that have

    been given and should have been read. After sending out

    correspondents, follow up with a phone call or text message to

    remind team members that something needs to be read/their

    attention. Many of times technology have failed for one reason or

    another so allowing one the benefit of the doubt by just simply

    following up with reminder, can help reduce those failures.

  • 7/27/2019 PM592 Week 7 Discussion

    10/17

    7/11/13 Topic Print View

    threadcontent.next.ecollege.com/(NEXT(c2554bec91))/Main/CourseMode/Topic/TopicPrintView.ed?topicID=29456107&sortBy=Title&sortOrder=Ascending& 10

    I have witness people logging off when messages/replies are sent

    that needs immediate attention and attitudes have flown off the

    handle due to lack of knowledge of what happen. "I just saw you

    online and sent you a message, why didn't you reply?" When

    actually the person was shutting down or something...

    RE: Ensuring People are

    Getting and Using the

    InformationDwayne Grant 6/18/2013 10:21:06 PM

    If you are sending information via email you can use a read receipt. However, the method for

    making sure that people are getting the information is good old fashioned follow-up and follow-thru.

    No matter what medium you used to disseminate information follow-up with a phone call to make

    sure the information was received. The final thing you could do if the site is close is drop in to see

    if the information was received and the appropriate action has been taken.

    RE: Ensuring People are Getting

    and Using the Information Philip Effiong6/19/2013 4:26:24 AM

    According to our lecture for the week, procedures must be established to gather and evaluate key

    project information

    1. Update period length and communicate to project personnel.

    2. Gather information from project participants.

    3. Accumulate data.

    4. Analyze results.

    5. Distribute information.

    6. Prepare to answer questions; gather additional information.

    7. If necessary, insist on more frequent reviews, communications, meetings, and so on.

    Progress Activities

    a. Incorporate formal phase or milestone reviews as part of project plan.

    b. Encourage functional areas to address variances early, outside of regular meetings and

    reports.

    c. Require objective feedback on progress regularly.

    d. Communicate status with customer, project team, and functional areas.

    RE: Ensuring People are

    Getting and Using the

    InformationHerminio Dionisio 6/20/2013 11:28:52 PM

    Effec tive communication means that the information is provided in the r ight format, at the right time, and w ith the right

    impact. If you w ill noticed the last phrase "w ith the right impact" it means to say that the information as relayed has

    been received and implemented. Without this result, there w ill be an issue if the message has reached the recipient,

    or it may reached them but the information is not implemented or w as not understood. In cases like this, rec ipient

    acknow ledgement is very important every time w e sent information to any of our team members. This w ay, the

    sender is assured that the message w as received by the recipient.

  • 7/27/2019 PM592 Week 7 Discussion

    11/17

    7/11/13 Topic Print View

    threadcontent.next.ecollege.com/(NEXT(c2554bec91))/Main/CourseMode/Topic/TopicPrintView.ed?topicID=29456107&sortBy=Title&sortOrder=Ascending& 1

    RE: Ensuring People are

    Getting and Using the

    InformationBruce Foley 6/22/2013 5:54:05 PM

    There is only one w ay to ensure that the communications tools are being used, and that is to hold periodic meetings

    or checks at pre-designated intervals. These communications checkpoints should be set forth at the beginning of the

    project by the PM and enforced by the PM. There should also be a protocol in place for emergency communications.

    Structure for Update Meeting Professor Orr 6/19/2013 8:21:10 AM

    More good responses. How w ould you structure an update meeting for project stakeholders? What w ould be on the agenda

    and w hat presentation tools w ould you use?

    Regards,

    Susan

    RE: Structure for Update Meeting Maria Ventura 6/19/2013 9:46:20 AM

    Hello class,

    Successful meetings use structure. Procedures and structure help groups perform significantly

    better in meetings. Meeting structures are the solid foundation upon

    which effective meetings are built.

    The structure for update meetings for stakeholders will vary from project to project depending on

    the technology available among all the stakeholders. Ideally, a face-to-face meeting would be

    preferable, but that is seldom possible. Videoconferencing can also be used, but clients seldom

    have compatible capabilities. The most effective tool for updates has been teleconferencing.

    The Project Manager usually just schedules a conference call on a toll free line. This allows even

    those not in the office to participate.

    However, unless there is some sort of white boarding or similar presentation software available to

    everyone, this makes showing figures difficult, so some planning is required.

    Emailing the participants an agenda the necessary displays so they can be discussed over the

    phone is necessary.

    The structure of the meeting, in general would be like this:

    1. Discuss the agenda ( estimate times for each agenda item )

    2. Discuss any solutions or answers to issues or questions brought up previously

    3. Update on progress, or lack thereof and reasons for the lack

    4. Discuss any changes to cost, schedule or scope

    4. Ask stakeholders for information needed to complete the project

    5. Allow stakeholders to ask questions

    6. Discuss plans going forward and necessary action items

    7. Close the meeting with an agreed upon date for the next meeting with suggested agenda

    items.

    Successful meetings have a format. Knowing what will be happening in the meeting creates a

    sense of comfort. A format that is the same for every meeting allows the group to quickly take

    care of critical, mundane business, leaving the majority of the time to work on important agenda

    items.

  • 7/27/2019 PM592 Week 7 Discussion

    12/17

    7/11/13 Topic Print View

    threadcontent.next.ecollege.com/(NEXT(c2554bec91))/Main/CourseMode/Topic/TopicPrintView.ed?topicID=29456107&sortBy=Title&sortOrder=Ascending& 12

    Thank you//

    RE: Structure for

    Update Meeting Varune Ramoutar6/19/2013 12:17:33 PM

    Maria, Excellent post.

    To add I would say that stakeholder meetings should be held on a regular schedule

    and at major milestones e.g. first Monday of every month and end of each quarter.

    Presentation tools would include power point presentations that indicate the project

    progress, items of concern and project highlights. Also actual hands on viewing of

    the project could take place e.g. visit to project site or review of programming code

    etc. Sharing of photos can also be included. Test reports could also be reviewed to

    show the progress of the project.

    Also each meeting would be formally minuted. The minutes would state the names of

    the attendees along with their responsibility and organization they belong to. Also

    each item discussed would be listed with a summary of the discussion, actionsrequired, required completion date and person responsible. The meeting minutes

    would then be circulated to all the attendees as well as other persons that require it.

    RE:

    Structure

    for

    Update

    Meeting

    Mary Hart 6/19/2013 3:01:35 PM

    Modified:6/19/2013 3:13 PM

    Maria and Varune, excellent posts.

    On this matter the text gives use guidelines for the content of the progress report as:

    - A brief statement summarizing the project status.

    - Red f lags items w here correc tive action has or should be taken.

    - Accomplishment to date, changes to schedule, and projections for schedule and cost at

    completion.

    - Current and potential problem areas and actions required.

    - Current cost situation and cost performance.

    - Manpower plan and limitations. (p. 458)

    From experience I would suggest w hen informing in a meeting the topic "Current and potential

    problem areas and ac tions required" the PM should prepare in advance an action plan for

    problem solving, as Upper management w ould ask for these. Most times this is the opportunityto get his/her in-sight of the problem situation, hence approval, denial or changes.

    Reference:

    J. Nicholas / H. Steyn, Project Management for Business, Engineering, and Technology-

    Principles and Practice, 3rd Edition, 2012.

    RE:

    Structure

    for 6/19/2013 11:13:03 PM

  • 7/27/2019 PM592 Week 7 Discussion

    13/17

    7/11/13 Topic Print View

    threadcontent.next.ecollege.com/(NEXT(c2554bec91))/Main/CourseMode/Topic/TopicPrintView.ed?topicID=29456107&sortBy=Title&sortOrder=Ascending& 13

    Update

    Meeting Chukie Okunzua

    Structure of stakeholders meeting with depend on whether it a

    formative evaluation meeting or a summary evaluation meeting. If it is

    a formative evaluation meeting the meeting may take an informal

    approach that is convened as needed or a formal and scheduled

    approached at key project milestones. The key functions of these

    meetings is to identify deviations from the project plan and effectquick corrections. The agenda will be the project progress, current

    and anticipated problems and the oppotunities identified.

    In a summary evaluation meeting where the project has been

    completed the stakeholderts will be receiving report of what

    happened and what results were obtained. This is a formal meeting

    with clear agenda formal written report.

    RE: Structure for Update

    Meeting Philip Effiong6/21/2013 7:46:50 AM

    To be an effective project manager, prepare for every project status meeting by checkingwith each of your key project team members before the meeting. If youre managing theproject correctly, youre in close contact with team members throughout the week, andthere should be no surprises during the project status meeting. Surprises can undermineyour ability to manage the project and cause team members to lose confidence in you.

    Detail project review. A detail walk-through will always generate questions or provide

    insight on the projects pressure points that youll need to cover in the status meeting.

    Identify the bottlenecks: Ability to identify the projects bottlenecks and develop

    options to eliminate them..

    Prepare a list of key points: Attend the meeting with a list of key points to discuss with

    the entire team or an individual. Lead by example. Your preparedness transfers over to

    the team and will reinforce the need for each member to be prepared for status meetings.

    RE: Structure for Update

    Meeting Herminio Dionisio6/22/2013 1:14:11 PM

    Project update meeting are normally held on a fix day and time to assure each attendees mill not miss the regular

    once a w eek meeting. It is an informal meeting for all the project team to know the progress of the project. The main

    purpose of the meeting is to encourage the f ree f low of information, and that means ensuring that the people w ho

    need to have information to do their jobs get the information at the status meeting. Action items, change orders, open

    issues are just some of the most important topics that must be discussed in the meeting. It is also important to report

    on the overall health of the project and the impact of earlier problems, changes,and corrective actions at the project

    level.

    Pow erPoint vs . Handouts Professor Orr 6/20/2013 9:27:18 AM

    Pow erPoint can be too structured. What about handouts? Do you hand them out before, during, or af ter the meeting? Are they

    really different from Pow erPoint? What are the pros and cons?

  • 7/27/2019 PM592 Week 7 Discussion

    14/17

    7/11/13 Topic Print View

    threadcontent.next.ecollege.com/(NEXT(c2554bec91))/Main/CourseMode/Topic/TopicPrintView.ed?topicID=29456107&sortBy=Title&sortOrder=Ascending& 14

    Regards,

    Susan

    RE: Pow erPoint vs. Handouts Nishan Ragoonanan 6/20/2013 12:31:18 PM

    I think there's a place for handouts and I prefer to hand them out before the meeting so people can attend the meeting

    prepared. I'll attach the handout to the meeting invite and note it's appropriate place for discussion in the agenda. This

    w ay attendees are prepared ahead of time to discuss issues and have solutions and ideas ready f or discussion, asopposed to taking meeting time to read a handout and attempt to digest during the meeting.

    RE: Power Point vs.

    Handouts Serge Ndongo6/20/2013 8:45:57 PM

    I totaly agree w ith Nishan. Handouts are very helpful especially in meetings preparations. Therefore it is

    better to hand them before the meeting. The PROS of a handout include the highly detailed explanations

    that can be followed along by the audience. Furthermore the figures, stats repeated from the stage w ill

    have the audience members nodding their heads along w ith the speaker, always a good appearance.

    This implies that the audience is in agreement w ith the speaker, w hich is a good thing. Another good thing

    is that they can be taken away by the audience after the meeting, just in case they w ant to look at the

    notes again later.

    The CONS of a handout could be for instance w hen they carry too much information preventing the

    audience to fully hear what you have to say next. Some people may get so focus by w hat you have on a

    hard copy that they don't hear anything else you have to say. They feel like there is nothing else to get on

    top of w hat is on a hard copy. Therefore, be covering everything on the handout can hurt the attention of

    the audience.

    RE:

    PowerPoint

    vs.

    Handouts

    Mary Hart 6/20/2013 9:17:01 PM

    Good point Serge, that is why PM may be careful in selecting the content of

    the handouts. The content of handout may avoid information that may cause

    distraction and/or conflicts among project team members.

    I would add that another positive aspect of the handouts is that team members

    are informed in advance of updates of the project, and most time you may get

    in advance feedbacks and quetions that will help in prepareing answers and/or

    solutions. This contributes in making the meetings more effective.

    RE:

    PowerPoint

    vs.

    Handouts

    Tanika Thom as 6/22/2013 1:51:18 PM

    Excellent point. I have dealt with all types

    discussed. I would definitely say it depends on the

    type of meeting, the audience on how/when to

    provide handouts. In my HOA, handouts are given

    at the beginning of the meeting to let them know

    what is on the agenda. However, when you know

  • 7/27/2019 PM592 Week 7 Discussion

    15/17

    7/11/13 Topic Print View

    threadcontent.next.ecollege.com/(NEXT(c2554bec91))/Main/CourseMode/Topic/TopicPrintView.ed?topicID=29456107&sortBy=Title&sortOrder=Ascending& 15

    there will disruption, I use caution on passing out

    financial information at the time it will be

    discussed. I would suggest make sure you know

    your audience to know how/when to deliver the

    information.

    Handouts can go hand and hand with

    powerpoints to allow notes to be taken; also for

    seating arrangements. If the meeting space is

    very large and the screen is not very visible to all,

    you can say refer to page/slide to follow along. So

    again knowing your audience and location will

    help in determining which form to use and when to

    use them.

    RE: Power Point vs.

    Handouts Chukie Okunzua6/20/2013 8:59:19 PM

    Power point are good for meetings where members step out to present their report. The

    disadvantage is that the attendees will have to rely on their ability to recall what was

    said at presentation. If they loose concentration during the presentation they have no

    chance of being able to re-visit what was said. Handout are physical copies that can be

    read and be referred to as often as one has them. As Nishan pointed out if made

    available prior to meeting that helps in preparing well in advance for the meeting.

    RE:

    PowerPoint

    vs.

    Handouts

    Espe ranca Rosa 6/20/2013 11:33:09 PM

    Chuckie, great post!

    I totally agree with you and our other classmates that preparing a power point

    presentation requires certain ability to present in a clear and effective way.

    True that presenter should bring presentation copies or handouts to use as

    further reference. Additionally, he has to inform team members and

    stakeholders of the project objectives in a very efficient and effective manner in

    order to get everyone well informed and involved. For instance, I have seenmany people losing their focus or attention during presentations. In most

    cases, this happens when the presenter doesnt grab audiences attention or

    the topic is not as interesting as they expected. Regarding project status

    presentation, graphs, maps, and all the information on the presentation should

    be in a clear, concise, and organized manner.

    Some people strive to present and sometime they lose focus too. For

    example, when I was at Chevron, weve had a presentation called

    toastmasters. This presentation is an informal presentation that takes place

    during lunch break for people who want to improve their presentations skills.

    Several employees have improved their presentation skills with the

  • 7/27/2019 PM592 Week 7 Discussion

    16/17

    7/11/13 Topic Print View

    threadcontent.next.ecollege.com/(NEXT(c2554bec91))/Main/CourseMode/Topic/TopicPrintView.ed?topicID=29456107&sortBy=Title&sortOrder=Ascending& 16

    toastmasters practices. It is an excellent way of improving presentation skills.

    Ive noticed that Devry is offering the same program to help students.

    Regards,

    Esperanca

    RE: Pow erPoint vs. Handouts Huyen Bui 6/21/2013 6:14:02 PM

    Depends on w hat type of meetings that the handout may come handy. If it's an important meeting, handout w ill help

    the audience to catch up w ith the content, as w ell as take note.

    How ever, w ith small meetings like w eekly meeting, just sending out the agenda for the meeting 3 days before should

    be enough than printing out the whole powerpoint

    RE: PowerPoint vs. Handouts Herminio Dionisio 6/22/2013 1:02:00 PM

    It is alw ays a standard procedure that the minutes of meeting or an agenda be distributed before the meeting start

    for the attendees review . This advance distribution is especially important if decisions w ill be made during themeeting. It is a w ay of preparing them for open issues that w as discussed from the previous meeting and for any

    new issues and items that is deemed necessary to discuss in the meeting. People are very uncomfortable w hen

    they are given important information for the f irst time and are immediately expected to read and unders tand it, and

    then make a decision about it. Minutes are part of the formal project documentation and must be updated right after

    the meeting is done based on the issues discussed for immediate distribution to enable those concerned to make the

    required needed actions.

    Designing and Implementing a PMIS Professor Orr 6/21/2013 9:47:22 AM

    How w ould you design and implement a PMIS for your organization?

    Regards,

    Susan

    RE: Designing and

    Implem enting a PMIS Chukie Okunzua6/22/2013 9:51:50 AM

    To design a PMIS the first step is to determine the need of the stackholders, identify adequate

    monitoring input for the project team and what will provide sufficient directional capabilities for

    control effort. In addition the system should be able to supply the capacity for managing change

    control and escalation procedures and provide adequate output to help management make wellinformed decisions.

    The design and implementation would be dependent on the scope and complexity and the type of

    organization. For large and complex projects it is recommended to walk with IT professional in

    design and implementing the PMIS using well known software that can be adapted or modified to

    suite the project and that has capability for integrating with the organization's system.

    RE: Designing and

    Implem enting a PMIS Herminio Dionisio6/22/2013 2:22:18 PM