Upload
others
View
2
Download
1
Embed Size (px)
Citation preview
PMA
Logo
Here
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, 6 April 2017; 2017-246
PMA-262 Persistent Maritime Aircraft Systems
MQ-4C Triton UAS
Solutions Roadmap
Mr. Sean Burke, Program Manager
Donn Hynes ([email protected]) Drew Barrow ([email protected])
April 2017
PMA
Logo
Here
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, 6 April 2017; 2017-246
• Globally Responsive and Persistent Force -
24/7 coverage of maritime areas of interest
• Multi-Spectrum Intelligence Collection -
employ an array of sensors to provide the
COCOM Maritime Domain Awareness
• Fully Networked Platforms – collect and share
intelligence data to a wide variety of users
Why Triton?
• Triton is a key capability in the Navy’s
Intelligence, Surveillance, Reconnaissance &
Targeting (ISR&T) Transition
• Program approach delivers Baseline ISR
capability
• Upgrades to Signals Intelligence (SIGINT)
capability for Multiple intelligence (Multi-INT)
capabilities
• Multi-INT capability enables retirement of
EP-3
Transformational Mixed Force: Effective, Efficient Mission Capability Tailored to the Warfighter’s Requirements
2
PMA
Logo
Here
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, 6 April 2017; 2017-246
Operational Assessment (OA)
(December 2015)
Milestone C (September 2016)
Low Rate Initial Production (LRIP) 1
(September 2016)
• Early Operational Capability (EOC) FY2018
• Initial Operational Capability (IOC) FY2021
Hours and test events (as of 31 Mar 17)
• Total development and operational test hours:
114 flights/726 flight hours
• Ground test: 1,294 hours
Program is in flight test phase
• Continue SIL testing of software/hardware
• IFC 3 ground test complete
• IFC 3 flight test (March 2017)
3
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited 28 July 2016; 2016-593
Triton Baseline and Multi-INT Upgrades
9” CDL Dish Antenna
(Port and Starboard)
Hail and Bird Strike Resistance
De-icing
AN/ZPY-3 Multi-Function Active
Sensor (MFAS) Maritime Radar
360° X-Band 2D AESA Radar
Maritime and Air/Ground Modes
AN/ZLQ-1 ESM
360° FOR
High Band Upgrade Graphite
Wing
• External Stores Provisions
(each wing)
Automatic Identification
System (AIS)
Advanced Mission Management System (AMMS) Onboard Server Data Correlation Payload & Bandwidth Control
Graphite
Empennage
TCAS
ADS-B
WB Satcom
AN/DAS-3 EO/IR
360° Field of Regard
Auto-Target Tracking
Hi Res EO/IR at Multiple FOVs
Multi-Mode Color Video
Metallic Fuselage
Low Band
System
Rolls-Royce AE3007H
23+ Million hrs
Low Band Array (Wings and aft Fuselage)
ESM Antennas
SIGINT Antennas
NAS JAX Triton MCS
JAN 2015
Triton MCS
4
PMA
Logo
Here
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, 6 April 2017; 2017-246 5
• Mission Radar enhancements
• Sense and Avoid/Detect and Avoid
• Assured Precision Navigation & Timing (PNT) / Assured
Communications
• Maintenance / Sustainment
• Pace the threat / Agility in Electronic warfare (EW)
contested environments
• Fleet Interoperability for kill chain efficiencies
CAPABILITIES FY-15 FY-16 FY-17 FY-18 FY-19 FY-20 FY-21 FY-22 FY-23 FY-24
IFC 3.1 Development/Test IFC 4 / IFC 5 / Production
ZPY-3 ID
Enhanced High Range Resolution Mode ↗ TBD Potential FY-24 IOC w/POM-19 funding
• Long Range RF Find, Fix, ID (ONR FNC) LRRFFFID FNC
SURVEILLANCE/DETECT/TRACK/ID ♦
Survivability FY-24 IOC (IFC 5)
• Counter Electronic Attack IFC 5 Development/Integration
SURVEILLANCE/DETECT/TRACK/ID
Enhancements TBD Potential FY-24 IOC
• Increased Range (MSS/ISAR)
• Other Modes (TBD / RF Comms)
• Efficient 3-D Imaging SBIR PII
FLIGHT PLAN SUMMARY FOR ZPY-3 RADAR PMA-262 MISSION(S) EFFECTS CHAIN EXECUTIVE SUMMARY
• INT • SUW • STW • EW
PRE
SURVEIL
DETECT
TRACK
ID
LAUNCH
CONTROL
WEAPONS
ASSESS
POST
-Enhanced HRR - Software and algorithms to enhance the Triton’s High Range Resolution mode on the ZPY-3 Multi-Function Active System (MFAS) RADAR to enable automated classification and identification of surface ships at long range, day or night, in any weather. -Survivability for the ZPY-3. -Enhancements and future growth potential.
Not Funded Partially Funded Funded Proposed $ All $ in Millions (P) = POM FYDP as of PRR ♦ - Expected IOC ////////// SCORING ////////// 6
PLACE LOGO HERE
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, 6 April 2017; 2017-246
CAPABILITIES FY-15 FY-16 FY-17 FY-18 FY-19 FY-20 FY-21 FY-22 FY-23 FY-24
IFC 3.1 Development/Test IFC 4 / IFC 5 / Production
COMMUNICATIONS TRACK/LAUNCH/WEAPONS (PMA-201) /////////////////////////////////////////////////////////////////////////////////////////
Link-16 NEW Weapons Messages TBD Potential FY-24 IOC w/POM-19 funding
• J11 Messages
PRE - POST (PMA-262) /////////////////////////////////////////////////////////////////////////////////////////
TACAIR Interoperability TBD Potential FY-24 IOC w/POM-19 funding
• Tactical Targeting Network Tech (TTNT)
PRE – ID / POST
Communications Survivability TBD
• Anti-Jam Modem / Protected Tactical Waveform
PRE – ID / POST (PEO(U&W)/CSI ////////////////////////////////////////////////////////////////////////////////////
CDL Transition Rev B TBD
• BE-CDL
PRE – ID / POST
Electro-Magnetic Maneuver Warfare
• RFI from Wireless Mobile Broadband SBIR PII
PRE – ID / POST
Alternative Comms TBD
• Mobile User Objective System
• Other
FLIGHT PLAN SUMMARY FOR COMMUNICATIONS PMA-262 MISSION(S) EFFECTS CHAIN EXECUTIVE SUMMARY
• INT • SUW • STW • EW
PRE
SURVEIL
DETECT
TRACK
ID
LAUNCH
CONTROL
WEAPONS
ASSESS
POST
- Link-16 message will give MQ-4C In-flight targeting updates capability to network enabled weapons -TACAIR interoperability - TTNT waveform enhances Link-16 and enables TDOA. -Communications survivability for protection of BLOS comms links critical to UAS -CDL Transition: The NTCDL CDD approved requirements apply to all Navy platforms, including aircraft. BE-CDL is a threshold KPP. -EMW investigation on RFI for SaAR from wireless mobile broadband -Alt Comms / MUOS waveform provides alternative WBSC link
Not Funded Partially Funded Funded Proposed $ All $ in Millions (P) = POM FYDP as of PRR ♦ - Expected IOC ////////// SCORING //////////
7
PLACE LOGO HERE
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, 6 April 2017; 2017-246
ENABLERS FY-15 FY-16 FY-17 FY-18 FY-19 FY-20 FY-21 FY-22 FY-23 FY-24
IFC 3.1 Development / Test IFC 4 / IFC 5 / Production
AIR VEHICLE - POWER
ENABLERS RMA/AFFORDABILITY/SUSTAINABILITY
(PMA-262) //////////////////////////////////////////////////////////////////////////////////////////
Durability Improvements TBD Potential FY-24 IOC w/POM-19 Funding
• 170 HPX Gearbox upgrade
• IGB Upgrade
• New Fan
• Compressor Vanes
• FADEC Software
ENABLER OTHER (PMA-262) //////////////////////////////////////////////////////////////////////////////////////////
Increased Electrical Power Generation TBD Potential FY-24 IOC w/POM-19 Funding
• New 40/65KVA Generator
• 400 A DC (PDA)
• IMMC mod 500 RPM idle spd increase
FLIGHT PLAN SUMMARY FOR AIR VEHICLE POWER PMA-262 MISSION(S) EFFECTS CHAIN EXECUTIVE SUMMARY
• INT • STW • SUW • EW
PRE
SURVEIL
DETECT
TRACK
ID
LAUNCH
CONTROL
WEAPONS
ASSESS
POST
-Durability improvement increase HP extraction, durability and extended engine overhaul objectives. -Increased electrical power generation to support future electrical requirements (payloads). Increasing electrical power generation requires increasing HP extraction which also includes durability improvements that enable affordability.
Not Funded Partially Funded Funded Proposed $ All $ in Millions (P) = POM FYDP as of PRR ♦ - Expected IOC ////////// SCORING ////////// 8
PLACE LOGO HERE
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, 6 April 2017; 2017-246
ENABLERS FY-15 FY-16 FY-17 FY-18 FY-19 FY-20 FY-21 FY-22 FY-23 FY-24
IFC 3.1 Development/Test IFC 4 / IFC 5 / Production
AIR VEHICLE IMPROVEMENTS
ENABLERS SUSTAINMENT / AFFORDABILITY
PMA-262 //////////////////////////////////////////////////////////////////////////////////////////
NDI and Maintenance Efficiencies
• Bolted Joints / Bonded Joints SBIR PII.e PIII TBD
• Bond-line Monitoring SBIR PII.E
ENABLERS AFFORDABILITY / TESTABILITY PMA-262 //////////////////////////////////////////////////////////////////////////////////////////
Structural Design Tools
• Isogeometric Design SBIR PII
ENABLER SUSTAINMENT PMA-262 //////////////////////////////////////////////////////////////////////////////////////////
Aircraft Composite Repair
• Composite Repair Process SBIR PI SBIR PII
ENABLER PHS&T PMA-262 //////////////////////////////////////////////////////////////////////////////////////////
Prognostic Health Management
• Analysis of AC Recovery Data SBIR PII
FLIGHT PLAN SUMMARY FOR AIR VEHICLE IMPROVEMENTS PMA-[XXX] MISSION(S) EFFECTS CHAIN EXECUTIVE SUMMARY
• INT • STW • SUW • EW
PRE
SURVEIL
DETECT
TRACK
ID
LAUNCH
CONTROL
WEAPONS
ASSESS
POST
-NDI and maintenance efficiencies increase AV availability with composite joint design and maintenance tools and bond-line monitoring tool (decrease NDI cycle times). -Structural design tool incorporates isogeometric analysis techniques for accurate transition to and from CAD and FEM -Aircraft composite repair process that provides equivalent or better strength while reducing support equipment requirements
Not Funded Partially Funded Funded Proposed $ All $ in Millions (P) = POM FYDP as of PRR ♦ - Expected IOC ////////// SCORING ////////// 9
PLACE LOGO HERE
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, 6 April 2017; 2017-246
FLIGHT PLAN SUMMARY FOR SENSE AND AVOID PMA-[XXX] MISSION(S) EFFECTS CHAIN EXECUTIVE SUMMARY
• INT • SUW • STW • EW
PRE
SURVEIL
DETECT
TRACK
ID
LAUNCH
CONTROL
WEAPONS
ASSESS
POST
-Software modification to SaAR to improve terminal area, transit, and on-station flight safety/mission availability. Supports safe aircraft descent on-station during adverse weather conditions to conduct ISR (FMV, imagery, etc.) tasks. -Non-hermetic seal protects SaAR electronics in harsh environments and improves reliability and sustainability of the system -Collision avoidance algorithms, HCI algorithms increases safety of AV operations
10
PLACE LOGO HERE
CAPABILITIES FY-15 FY-16 FY-17 FY-18 FY-19 FY-20 FY-21 FY-22 FY-23 FY-24
IFC 3.1 Development/Test IFC 4 / IFC 5 / Production
SENSE AND AVOID
ENABLER SAFETY (PMA-262) /////////////////////////////////////////////////////////////////////////////♦///////////
Sense and Avoid Radar Wx Detection TBD Potential FY-24 IOC w/POM-19 funding
• Weather Radar Mode
ENABLER SUSTAINABILITY (PMA-262) /////////////////////////////////////////////////////////////////////////////♦////////////
Sense and Avoid Radar IFC 5 Development / Integration
• Non-hermetic Seal SBIR-PII ↗
ENABLER SAFETY (PMA-262) //////////////////////////////////////////////////////////////////////////////♦///////////
Collision Avoidance Algorithms (SaAR) IFC 5 Development / Integration
• Radar Autonomous Collision Avoidance RIF ↗
• Automated Collision Avoidance System FNC ↑
• Collision Avoidance Decision Making PII ↑
• Human Computer Interfacing SBIR PI
• RNP RNAV
Not Funded Partially Funded Funded Proposed $ All $ in Millions (P) = POM FYDP as of PRR ♦ - Expected IOC ////////// SCORING ////////// 10
NARG #2 Pri
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, 6 April 2017; 2017-246
ENABLERS FY-15 FY-16 FY-17 FY-18 FY-19 FY-20 FY-21 FY-22 FY-23 FY-24
IFC 3.1 Development/Test IFC 4 / IFC 5 / Production
ASSURED PNT
SURVEILLANCE - ID PMW/A—170 //////////////////////////////////////////////////////♦////////////////////////////////
GPS AJ Upgrade $Partial POM-17 End Game - Expected FY-20 IOC w/IFC 4.0
• ADAP AE and GAS-1N Polar Antenna
SURVEILLANCE - ID PMW/A-170 ///////////////////////////////////////////////////////////////////////////////////////
M-Code Modernization TBD Potential FY-24 IOC w/POM-19 Funding
• LN-351 EGI (LN-251 replacement)
SURVEILLANCE - ID (PMA-262) /////////////////////////////////////////////////////////////////////////////////////////
Alternative Navigation ↗ TBD Potential FY-24 IOC w/POM-19 Funding
• Synthetic Digital Sextant TBD
• Stellar Inertial Start Tracker RIF ↑ TBD
FLIGHT PLAN SUMMARY FOR ASSURED PNT PMA-262 MISSION(S) EFFECTS CHAIN EXECUTIVE SUMMARY
• INT • STW • SUW • EW
PRE
SURVEIL
DETECT
TRACK
ID
LAUNCH
CONTROL
WEAPONS
ASSESS
POST
-GPS Anti-Jam Upgrade (ADAP AE (digital) and SPA Antenna) addresses vulnerabilities in navigation architecture and ensures continued availability of GPS signals in contested environments - M-Code Modernization for LN-251 EGI (LN-351) provides more robust PNT in GPS degraded environments -Synthetic Digital Sextant provides alternative navigation source (GPS-like) for contested environments utilizing the MTS-D EO/IR system (requires upgrade to the MTS-D). -Stellar inertial star tracker provides alternative navigation source (reduces drift in EGIs)
Not Funded Partially Funded Funded Proposed $ All $ in Millions (P) = POM FYDP as of PRR ♦ - Expected IOC ////////// SCORING ////////// 11
PLACE LOGO HERE
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, 6 April 2017; 2017-246
CAPABILITIES FY-15 FY-16 FY-17 FY-18 FY-19 FY-20 FY-21 FY-22 FY-23 FY-24
IFC 3.1 Development/Test IFC 4 / IFC 5 / Production
EO/IR
DETECT/TRACK PMA-262 ///////////////////////////////////////////////////////////////////////////////////////////
Enhanced Detect / Track Algorithms TBD
• Multi-Target Detect / Track
SURVEILLANCE/DETECT/TRACK PMA-262 ///////////////////////////////////////////////////////////////////////////////////////////
Wide Area Surveillance TBD
• WAMI
FLIGHT PLAN SUMMARY FOR MTS-B (EO/IR) PMA-262 MISSION(S) EFFECTS CHAIN EXECUTIVE SUMMARY
• INT • SUW • STW • EW
PRE
SURVEIL
DETECT
TRACK
ID
LAUNCH
CONTROL
WEAPONS
ASSESS
POST
-Enhanced algorithms for the MTS-B enable multi-target detection and tracking capability. -Wide area surveillance enhancement for MTS-B enables EO/IR coverage of large areas with fine resolution, providing operators increased situational awareness
Not Funded Partially Funded Funded Proposed $ All $ in Millions (P) = POM FYDP as of PRR ♦ - Expected IOC ////////// SCORING ////////// 12
PLACE LOGO HERE
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, 6 April 2017; 2017-246
ENABLERS FY-15 FY-16 FY-17 FY-18 FY-19 FY-20 FY-21 FY-22 FY-23 FY-24
TEST AFFORDABILITY IFC 3.1 Development/Test IFC 4 / IFC 5 / Production
ENABLERS TESTABLE/SAFETY/OTHER PMA-262 ////////////////////////////////////////////////////////// ♦ //////////////////////////////
Sys Level Test Risk Reduction ↗ FY-20 IOC IFC 4
• Test & Cert Techniques for Algorithms SBIR PII
• Track to Track Data Fusion Test bed PII/PII.5 PIIE ↑
FLIGHT PLAN SUMMARY FOR TEST AFFORDABILITY PMA-262 MISSION(S) EFFECTS CHAIN EXECUTIVE SUMMARY
• INT • SUW • STW • EW
PRE
SURVEIL
DETECT
TRACK
ID
LAUNCH
CONTROL
WEAPONS
ASSESS
POST
-Test/certification techniques for algorithms increases safety of AV operations -Track to Track Data Fusion Testbed reduces risk for Minotaur integration in IFC 4
Not Funded Partially Funded Funded Proposed $ All $ in Millions (P) = POM FYDP as of PRR ♦ - Expected IOC ////////// SCORING ////////// 13
PLACE LOGO HERE
Minotaur Integration Risk Reduction
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, 6 April 2017; 2017-246
PMA
Logo
Here
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, 6 April 2017; 2017-246
• Reduced cost Test and Certification support
14
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited 28 July 2016; 2016-593 15