Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
W 4th Ave.
W 16th Ave.
W 10th Ave. Broadway
Cornwall
Burrard Bridge
Jericho Beach Park
Kitsilano Beach Park
Tatlow Park
Bur
rard
St.
Gra
nvill
e St
.
Mac
do
nald
St.
Bal
acla
va S
t.
Alm
a St
.
Burra
rd S
t.
Davie St.English Bay
Kitsilano
Fairview
West End
Downtown
Point Grey
Dunbar
0th Ave.A e BroadwayaB aBroadway
ch Park
t.
W 4th Ave.
Cornwall
Kitsilano Beach Park
Tatlow Park Kitsilano
LegendExisting Bike Routes
Seaside Greenway
January 2013
For more information, visit vancouver.ca/pointgreycornwall
POINT GREY - CORNWALL CORRIDOR
The Point Grey Road - Cornwall Avenue Corridor Project aims to create a safe, convenient and comfortable connection for pedestrians and cyclists between Burrard Bridge and Jericho Beach.
The Transportation 2040 Plan was adopted by Vancouver City Council in October 2012. Walking and cycling were identifi ed as the highest transportation priorities. The Point Grey Road - Cornwall Ave Corridor was also identifi ed as a priority route for people of all ages and abilities.
We are currently in the early stages of this project, collecting and analyzing transportation data, and collecting input from you.
We want to hear from you!Please take a few moments to review the information boards and give us your feedback.
All the information you see tonight is available on the website: vancouver.ca/pointgreycornwall
Study Area
Welcome!
NORTH
January 2013
For more information, visit vancouver.ca/pointgreycornwall
POINT GREY - CORNWALL CORRIDOR
Project Overview
Project Goals
Given the complexity of this area, staff will undertake a rigorous analysis, consider alternative routes that meet project goals, and consult with residents, businesses and other stakeholders. Once staff have a recommended design, we will have a second round of public consultation to get further feedback before a design goes to Council for a decision.
Two-thirds of all trips on foot, bike, and transit by 2040
Pedestrians continue to be the City’s top transportation priority
Vancouver’s Transportation 2040 goals
Eliminate all fatalities from the transportation system
Encourage people of all ages and abilities to get around their city through active transportation (such as walking, cycling, running, inline-skating, wheelchairs, strollers, etc.) in a comfortable, convenient, and enjoyable way.
Create a walking and cycling route that is safe, convenient, and comfortable for people of all ages and abilities.
Address existing safety issues along Point Grey Road and Cornwall Avenue by reducing the volume and speed of motor vehicle traffi c.
Make the intersection of Burrard Street and Cornwall Avenue safer and more direct for pedestrians and cyclists.
The Point Grey Road - Cornwall Avenue Corridor Project, when complete, will link Downtown to Kitsilano and Point Grey and aims to create a safe, convenient and comfortable connection for pedestrians and cyclists between Burrard Bridge and Jericho Beach.
I’d cycle more but i’m worried about being hit
Vehicles are speeding
I would suggest removing parking
we have witnessed too many accidents
we would not be supportive
of removing any parking
The Project
January 2013
For more information, visit vancouver.ca/pointgreycornwall
POINT GREY - CORNWALL CORRIDOR
Vancouver Greenways Plan (1995)The Seaside Greenway is incomplete. There is a gap between Kitsilano Beach Park and Jericho Beach Park.
The Policy
We Listen
We Research
We Propose
Council Decides
Januaryto
March 2013
Januaryto
March 2013
April 2013
June 2013
1990sto
2012 Transportation Plan (1997)Walking and cycling are identifi ed as the City’s two highest transportation priorities.
Transportation 2040Supports a network of walking and cycling routes that feel safe, convenient, comfortable and fun for people of all ages and abilities.
Public Meetings: • Residents, children/youth, seniors• Businesses• Stakeholders• Users of the corridor• Website and survey
Using input from the fi rst round of public consultation, staff will present a recommended design through a second round of consultation for further feedback and refi nement.
The project team will report the feedback to Council.
City staff will carry out further analysis to develop the Point Grey Road - Cornwall Ave Corridor. Key areas:
• Transportation 2040 Plan • Emergency access• Parking and circulation• Traffi c counts and speed data• ICBC data• Business customer surveys
City staff will report to Council on what was heard from the community and provide a recommendation to approve a design and funding needed to proceed with construction.
Council will decide how the project will proceed.
Timeline
Project Timeline
January 2013
For more information, visit vancouver.ca/pointgreycornwall
POINT GREY - CORNWALL CORRIDOR
Cycling in traffi c is uncomfortable for most as well as potentially dangerous
Riding on quiet local streets or separated from traffi c is preferred by most
Walking
Cycling
Ample, even sidewalks make walking much more pleasant and attractiveWalking on narrow sidewalks with obstructions is challenging,
particularly for seniors
Active Transportation Corridors
Vanier Park
3rd Ave
Point Grey Road
Cornwall Ave
York Ave1stAve
4thAve
Mac
Do
nald
St
Traf
alg
ar S
t
Cyp
ress
St
Arb
utus
St
Bur
rard
St
Bal
acla
va S
t
Alm
a St
Broadway
Jericho Beach Park
Kitsilano Beach Park
Tatlow Park
Vanier Park
3rd Aver v
Point Grey RoaadGre
Point Grey RPoint Grey Road
AveCornwall ll A
York Avek1stAvev
4thAveA
Mac
Do
nald
St
Da
ad
S
Traf
alg
ar S
tg
ra
t
Cyp
ress
St
yre
s
Arb
utus
St
rt
s
Bur
rard
St
ua
d
Bal
acla
va S
tc
aa
St
Alm
a St
a m
Broadwayo ay
Parkericho Beach PJe P
Kitsilano Beach Park
Tatlow Parko99
00
306
00
970
0
10600 13300
110070015000
2012 Vehicle Volume Data (Vehicles/day)
17800
22800
22000
19500
19800 234001000400
Vanier Park
3rd Ave
Point Grey Road
Cornwall Ave
York Ave1stAve
4thAve
Mac
Do
nald
St
Traf
alg
ar S
t
Cyp
ress
St
Arb
utus
St
Bur
rard
St
Bal
acla
va S
t
Alm
a St
Broadway
Jericho Beach Park
Kitsilano Beach Park
Tatlow Park
Vanier Park
3rd Aver v
Point Grey RoaadGre
Point Grey RPoint Grey Road
AveCornwall ll A
York Avek1stAvev
4thAveA
Mac
Do
nald
St
Da
ad
S
Traf
alg
ar S
tg
ra
t
Cyp
ress
St
yre
s
Arb
utus
St
rt
s
Bur
rard
St
ua
d
Bal
acla
va S
tc
aa
St
Alm
a St
m
Broadwayo ay
Parkericho Beach PJe P
Kitsilano Beach Park
Tatlow Parko
Speed Limit: 50km/hSpeed Limit: 30km/h (Dawn to dusk)
27km/h
#km/h
85th percentile speed: All vehicles
38km/h 48
km/h
54km/h
56km/h
55km/h
54km/h
52km/h
52km/h
Vanier Park
3rd Ave
Point Grey Road
Cornwall Ave
York Ave1stAve
4thAve
Mac
Do
nald
St
Traf
alg
ar S
t
Cyp
ress
St
Arb
utus
St
Bur
rard
St
Bal
acla
va S
t
Alm
a St
Broadway
Jericho Beach Park
Kitsilano Beach Park
Tatlow Park
Vanier Park
3rd Aver v
Point Grey RoaadGre
Point Grey RPoint Grey Road
AveCornwall ll A
York Avek1stAvev
4thAveA
Mac
Do
nald
St
Da
ad
S
Traf
alg
ar S
tg
ra
t
Cyp
ress
St
yre
s
Arb
utus
St
rt
s
Bur
rard
St
ua
d
Bal
acla
va S
tc
aa
St
Alm
a St
a m
Broadwayo ay
Parkericho Beach PJe P
Kitsilano Beach Park
Tatlow Parko
5
3
3 3 3
3
3
52
1
1
1 11
1
1
11
111
# Collisions involving pedestrians 2007 - 2011
#
1
1
11
1
1 1 1
1 1
1
1
1
1
1
1
1
4 4 2
22
33
34
5
48
111
2
Collisions involving cyclists 2007 - 2011
January 2013
For more information, visit vancouver.ca/pointgreycornwall
POINT GREY - CORNWALL CORRIDOR
How do people travel?Commute trips by residentsAlma to Macdonald(North of Broadway)
Commute trips by residentsMacdonald to Burrard(North of Broadway)
Vehicle volumes
Vehicle speeds
Safety
CoAl(N
Motor Vehicles52%
Walking10%
Cycling9%
Transit29%
ntss
Motor Vehicles50%
Walking15%
Cycling5%
Transit30%
Source: Stats Canada 2006 Census
Source: City of Vancouver
Source: City of Vancouver
Source: ICBC
Key Data
Vanier Park
W 3rd Ave
Point Grey Road
Cornwall Ave
Mac
Do
nald
St
Cyp
ress
St
Bur
rard
St
Bal
acla
va S
t
Alm
a St
Broadway
York Ave
Jericho Beach Park
Kitsilano Beach Park
Tatlow Park Kitsilano
Point GreyLegend
Existing Bike Routes
Existing Seaside Greenway
Possible active transportation corridor
Possible future seawall extension
January 2013
For more information, visit vancouver.ca/pointgreycornwall
POINT GREY - CORNWALL CORRIDOR
Criteria
Possible Routes
• Vehicle volumes and speeds
• Emergency access/response
• Parking
• Vehicle re-routing
• Transit
• Street and driveway crossings
• Business operations
• Safety of pedestrians, cyclists and drivers
• Access to waterfront and park space
• Access to schools and commercial areas
• Topography - hills
• Convenience and comfort
Route selection will depend upon a variety of considerations, including (but not limited to):
We have identifi ed a number of potential routes and solutions to achieve the project goals. We welcome your comments.
Route Selection
NORTH
January 2013
For more information, visit vancouver.ca/pointgreycornwall
POINT GREY - CORNWALL CORRIDOR
We want to hear from you!
• Given the complexity of this area, staff will undertake a rigorous analysis, consider alternative routes that meet project goals, and consult with residents, businesses and other stakeholders.
• Please take a few moments to review the information boards and give us your feedback through the online survey.
• Using the input from the fi rst round of public consultation,
staff will present a recommended design through a second round of consultation for further feedback.
• Feedback will be considered with fi nancial and technical considerations, and refi nements will be made to the design.
• Staff will report to City Council on what was heard from the community and with a recommendation to approve a design and funding needed to proceed with construction.
• Council will decide how the project will proceed.
Next Steps