Outline Introduction
Data Acquisition & Basic Network Preparation Truing up of Yearly Transmission Charge
Computation of AC Load Flows on the Basic
Network Validation of Results
Network Reduction
Zoning of Nodes
Determination of Transmission Charges
7/28/2019 Point of Connection Transmission Charges
3/38
Introduction
What is Point of Connection Transmission charge?
, .
,thus the whole electricity market place.
7/28/2019 Point of Connection Transmission Charges
4/38
activity (generators, loads), pay a single chargein Rs/MW towards network usage. This chargeis decided by the connection level of that
particular entity [1].
7/28/2019 Point of Connection Transmission Charges
5/38
a a cqus on as c e wor repara on[2]
elements and the generation (MW) and load (MW &MVAr) at the various network nodes shall be submittedby all concerned entities including DICs, transmissionlicensees, as per the Regulations, and Procedure forObtainin data b Im lementin A enc fodetermination of PoC transmission charges.
7/28/2019 Point of Connection Transmission Charges
6/38
withdrawal forecast information based on thelong term and medium term contracts underrepresentative blocks of months for peak and
other than peak conditions.
7/28/2019 Point of Connection Transmission Charges
7/38
In the event of a DICs failin to rovide its
requisition for demand or injection for anApplication Period, the last demand or injection
by the Implementing Agency shall be considered
to be A roved Withdrawal o A rovedInjection, as the case may be, for the ApplicationPeriod.
7/28/2019 Point of Connection Transmission Charges
8/38
fails to provide its requisition for demand/Injection or Network Data, then IA shall assumethe data based on the following:
a) Long Term & Medium Term Datab) Database of RLDC/NLDC
c) CTU Database (If required)
7/28/2019 Point of Connection Transmission Charges
9/38
/group of nodes in a zone on which DICs shallsubmit the forecasted injection and withdrawal.
This shall be available on the website of
Implementing Agency.
7/28/2019 Point of Connection Transmission Charges
10/38
The list of lines which forms a art of the Inte
State Transmission System (ISTS) Network forthe next application period shall be furnished to
i. ISTS Lines
.
iii. Non-ISTS Lines (Certified by RPC as being
7/28/2019 Point of Connection Transmission Charges
11/38
list of lines in each financial year. In case ofDeemed ISTS and Certified non-ISTS lines, theowners shall also submit a copy of
approval/certificate obtained from thees gna e au or y as e case may e.
7/28/2019 Point of Connection Transmission Charges
12/38
(YTC) of the entire network along with thebreakup of substation cost shall be provided bythe Transmission Licensees of ISTS, Deemed
ISTS and Certified non-ISTS lines.
7/28/2019 Point of Connection Transmission Charges
13/38
In the subse uent ears Transmission
Licensees of ISTS, Deemed ISTS andCertified non-ISTS lines shall submit data and
transmission asset in the next financial year and
thei YTC a roved b Commission.
7/28/2019 Point of Connection Transmission Charges
14/38
rung up o eary ransmss on arge[2]
Truing up of YTC shall be done on yearly basisto adust unde o ove recover of the reviousapplication period.
As line wise YTC is an in ut fo calculation ofPoC charges, the truing up cost shall beadjusted to each line on pro-rata basis.
7/28/2019 Point of Connection Transmission Charges
15/38
ompu a on o oa ows on e as cNetwork [2]
IA shall run AC load flow on the Basic Network(separately fo NEW and SR Grid) based on the
technical data obtained from the DICs, NLDC,.
7/28/2019 Point of Connection Transmission Charges
16/38
The real owe eneration at the enerato
nodes in the Basic Network shall be based onthe long term and Approved medium term
the ISTS or the injection submitted by the DICs,
where such nodes are embedded in thenetworks of the DIC. Such contracts aregenerally with reference to the installed capacity
.
7/28/2019 Point of Connection Transmission Charges
17/38
on the basic network, the IA may require tomake certain adjustments in the load/generationat various buses to ensure load generation
balance.
7/28/2019 Point of Connection Transmission Charges
18/38
Validation of Results [2]
The Basic Network, nodal injection, nodalwithdrawal and the load flow results fo thesubsequent application period for each grid
condition shall be validated by the Validationcommittee.
7/28/2019 Point of Connection Transmission Charges
19/38
Subsequent to the validation from ValidationCommittee Basic Network nodal inectionnodal withdrawal and the load flow results shall
be presented to the Commission for its approval.
7/28/2019 Point of Connection Transmission Charges
20/38
The approved Basic Network, nodal injection,nodal withdrawal alon with the load flow resultsshall be made available on the website of the IA
immediately after its approval by theCommission.
7/28/2019 Point of Connection Transmission Charges
21/38
e wor e uc on [2]
The Basic network for each grid condition andseason shall be reduced as e the uidelinesset out by the Commission.
7/28/2019 Point of Connection Transmission Charges
22/38
computation of Marginal Participation Factor.The simulations shall be carried out by the IA byusing software duly audited and made available
by CERC.
7/28/2019 Point of Connection Transmission Charges
23/38
7/28/2019 Point of Connection Transmission Charges
24/38
Annual Average YTC (after truing up) of eachline shall then be attributed to eak and othethan peak periods of each season depending
upon the hours of peak and other than peak.
7/28/2019 Point of Connection Transmission Charges
25/38
The annual average YTC (of each period in
attributed to the total change in flow in each line.
Rs/MW/Hour at each node in each block of
months shall then be com uted.
7/28/2019 Point of Connection Transmission Charges
26/38
Zoning of Nodes [2]
Based on the charges fo each node, IA shallaggregate the charges for geographically and
create zones. Zones shall contain relevant
nodes whose costs are within the same ran e.
7/28/2019 Point of Connection Transmission Charges
27/38
The demand zones shall normally be the statecontrol areas exce t in the case of NorthEastern States, which are considered as a single
demand zone. Generation zones are formed bycombining the generators connected to theISTS.
7/28/2019 Point of Connection Transmission Charges
28/38
Transmission char es fo thermal owe
generators either directly connected with ISTS orthrough pooling stations that are designed to
MW for inter-state transfer shall be determined
as char es at these s ecific nodes (such nodesshall be considered as separate generationzones) and not clubbed with other generator
.
7/28/2019 Point of Connection Transmission Charges
29/38
generators either directly connected with ISTS orthrough pooling stations that are designed tohandle generation capacity of more than 500
MW for inter-state transfer shall be determinedas c arges a ese spec c no es suc no esshall be considered as separate generation
nodes in the area.
7/28/2019 Point of Connection Transmission Charges
30/38
Zone shall normally be fixed for an applicationeriod. Howeve in case of si nificant chan es
in power system during a year, rezoning shall be
done with prior approval fromthe Commission.
7/28/2019 Point of Connection Transmission Charges
31/38
e ermna on o ransmss on arges [2]
shall be determined by computing the weightedaverage of nodal charges at each node in thezone. This shall be used to calculate the PoC
charges of a zone.
7/28/2019 Point of Connection Transmission Charges
32/38
the respective node in the 400 kV truncatednetwork.
Ten (10) such values shall be first obtained for
each zone corresponding to peak and off peakconditions fo the five seasons. These ten valuesshall then be used to determine the annual POC
.
7/28/2019 Point of Connection Transmission Charges
33/38
The PoC charge of a zone shall be sum ofn orm c arge an ona arge n e
proportion as specified by the Commission.
Example:
PoC Charge (PoC) = m * Uniform Charge (UC) + n *Zonal Charge(ZC)
where m and n are the constants specified in the regulation
w c s . or n a wo years.
7/28/2019 Point of Connection Transmission Charges
34/38
The Uniform Char e com onent of PoC char e shall becalculated as follows:
UC = Total ARR/ (Sum of Approved Injection +Sum of Approved
Withdrawal)
This shall be worked out separately for the NEW grid.
7/28/2019 Point of Connection Transmission Charges
35/38
Unless or otherwise revised by the Commission,PoC Char e shall com rise of 50% of UniformCharge and 50% Zonal Charge.
7/28/2019 Point of Connection Transmission Charges
36/38
The under/over recovery on account of revenuere uirement of intervenin assets PoC char esshall be scaled on pro-rata basis.
7/28/2019 Point of Connection Transmission Charges
37/38
Generating stations connected at 220 kV andbelow which are not featurin in the reducednetwork shall be charged at the zonal charges
determined for the regions where suchgenerators are physically located.
7/28/2019 Point of Connection Transmission Charges
38/38
e erences
[1] Anjan Roy, A. R. Abhyankar, P. Pentayya, S. A. Khaparde,Electricity transmission pricing :Tracing based Point of Connection
tariff for Indian power system, Power Engineering Society GeneralMeeting,2006.
[2] Report on Procedure for computation of point of connection (PoC)
transmission charges, prepared by National Load Despatch Centreew e mpemen ng gency n accor ance w en ra