Upload
jmant
View
216
Download
0
Embed Size (px)
Citation preview
8/12/2019 Policy8 Appendix Final 03 2008
http://slidepdf.com/reader/full/policy8-appendix-final-03-2008 1/7
Appendix 8 - Terminology
GENERAL CONCEPT Absolute error Acceptance tests Accuracy Accuracy class Active energy (WH) meter Actual value Admittance Air gap Alternating current
Alternating voltage Ammeter Amplifier Amplitude Analog(ic) Analog(ic)-digital convertor Anode Apparent … Arc, arcing Asynchrounous operation Automatic control Automatic regulation
Auxiliary circuitBand of regulationBand widthBeatBeat frequencyCalibrationCapacitive loadCapacitive reactanceCapacitorCathodeCharactetistic impedanceCharge (of capacitors or batteries)
Chart (graph)CoilConductanceConductivityConsumer: customerControlControl value (controller output)ControllerCorona effectCurrentCycleDamping
Dead bandDead timeDiagramDigitalDigital telemeteringDiodeDirect currentDirect voltageDischargeDynamic stability
Earth fault currentEfficiencyElectrical angle (of an alternator)Electrical CircuitElectrical fieldElectromagnetic inductionEnergyExcite (to), excitationFault currentFault impedanceFeedbackFerroresonance
FilterFossil energyFrequencyFrequency bandFrequency meterGainGeothermal energyHarmonicHigh frequencyHour meterHydraulic energyImpedance
Induced voltage (by electric or magneticinduction)InductorInput valueInsensitivity of control (dead band)InstabilityInstantaneous valueIntegral controllerIntensity of currentInterferenceLinear scaleLosses
8/12/2019 Policy8 Appendix Final 03 2008
http://slidepdf.com/reader/full/policy8-appendix-final-03-2008 2/7
UCTE OH – Appendix 8: Terminology Error! Unknown document property name. –2
Low frequencyMagnetic fieldMagnetizing current
Magnitude of disturbanceMean value (of a periodic quantity)MeasurementMeasurement errorMeasurement transducerModemModulationMutual inductanceNoise levelNominal (rated) value, nominal (rated)magnitudeNominal current
Nominal voltageNon-linear scaleNuclear energyNuclear fissionOperating valueOperating voltage, service voltageOscillationsOscillogramOutput valueParallel connectionPeriodPermissible load
Phase displacementPhase oppositionPhase sequencePhase, phase conductorPointerPowerPower factorPrimary …Proportional controllerProportional integral controllerPumpingRamp, slope
Range of regulationRated thermal currentReactiveReactive energy (VARH) meterRecovery timeReference valueRegulationRelative errorReliabilityRepairResidual magnetization (remanence)Resistance (in direct current)
ResistivityResonanceResponse time
Rotating fieldSaturationSchematic diagramSecondary …Self excitationSelf inductance, self inductionSeries connectionShuntSignalSignal levelSlipSolar energy
StabilityStableStatic stabilitySuperconductivitySusceptanceSynchronismTerminalTerminal voltageTestThree phase currentThreshold valueThyristor
Tidal energyTime constantTransient phenomenonTransient stabilityTransmitterTurnUnbalanced loadValveVarmeterVoltageVoltage DividerVoltmeter
WattmeterWave energyWind energyWindingWiring diagram
POWER STATIONS Alternator, generator Auxiliary (unit; station) transfomerBase load power stationBoiler
8/12/2019 Policy8 Appendix Final 03 2008
http://slidepdf.com/reader/full/policy8-appendix-final-03-2008 3/7
UCTE OH – Appendix 8: Terminology Error! Unknown document property name. –3
Boiling water reactor (BWR)BurnerCondenser
Control equipment, governing equipmentControl rodCooling system (for stator; for rotor)Cooling towerCooling water circuitDamDiesel engineDischargeExciterFast reactor, breeder reactorFuel- Natural gas
- Fuel oil- Coal- Lignite- WastesFurnaceGas turbineGenerating set, generating unitGeneratorGenerator transformerHydro-electric power stationLimiterNuclear power station
OverspeedOverspeed protection devicePeak load power stationPenstockPondage power stationPower station with reservoirPressurised water reactor (PWR)Pumped storage station / power plantRadioactive wasteReactor (nuclear)Reactor coreResersible pump-turbine
ReservoirRun-of-river power stationSpeed regulatorSpillwaySteam turbineSynchronous compensatorThermal power stationTidal power stationTurbineTurbine governorTurbine shaftTurbogenerator
Voltage regulatorWind farm
TRANSMISSION Angle tower Auto reclosing relay Auto-transformer Auxiliary services supplyBank of accumulatorsBank of capacitorsBayBreaking capacity, rupturing capacityBuchholz relayBundle conductors
BusbarBusbar connectionBusbar isolatorBusbar sectionBy pass isolator (over a circuit breaker)Cable armourCable sheathCircuitCircuit breakerClosing mechanismCombined instrument transformerConductor
Conductor failureConductor jointControl deskControl panelControl roomCoupling bay, bus couplerCurrent transformerDouble-circuit lineEarthing switchEarth wireFACTS (Flexible Alternating CurrentTransmission System)
FlashoverImmobilization, immobilize (to)InsulatorInsulator stringInterlockInvertorInsulatorIsolatorJunction boxLineLine isolatorLine trap
8/12/2019 Policy8 Appendix Final 03 2008
http://slidepdf.com/reader/full/policy8-appendix-final-03-2008 4/7
UCTE OH – Appendix 8: Terminology Error! Unknown document property name. –4
Load breaking switchLocked in close/open positionMetal-clad installation, capsulated
installationMimic boardMultiple-circuit lineNeutral isolatorOil-filled cableOn-load tap-changerOver ... RelayOverhead linePhase discrepancyPosition indicatorPush buttonQuadruple conductor
Quick break switchReceiverRectifierRelayRelay cubicleSagSelector isolatorSeparated windings transformerShort- circuit between phasesShort- circuit to earthShort-circuit (single- two- three- phase)Shunt circuit breaker
Shunt compensatorSingle conductorSingle-circuit lineSpacer (for bundle conductors)Span (of an overhead line)Static compensatorStatic convertorStraight line towerSubstationSurge arrester, surge strikeSwinging (galloping) of conductorSwitch
Synchronous couplerTerminal block, terminal boxTerminal tower, tension towerThree windings transformerTower, pylonTransfer barsTransformer ratioTransformer tapTransformer with off-load tap changingTransformer with on-load tap changingTrimmingTriple conductor
Twin conductorUnder frequency relayUndergrouded link / line
Visual signalVoltage transformerWireWiring
SYSTEM OPERATION Active power flow Alarm Attempt to reclose the line Automatic reclosing, automatic reclosureBack up protection
Black start capabilityBlackoutBusbar protectionCascading line trippingClosing (manual or automatic)Closing instruction
CongestionConnection of outgoing feeder to busbarContingencyContingency analysisContinuous operating conditionsContinuous operation
Control instructionControl, orderDay-ahead (D-1)Dead-end circuitDead-end supplyDefence planDevice, automatic deviceDifferencial protectionDirectional protection by signal comparisonDirect-wire telephonyDisconnection (of a generating unit)Dispatcher
Distance protectionDisturbanceDrop in voltageDuration of non-availability(on) Duty engineerEarth faultEmergencyEnergize, apply voltage (to)Extra high voltage networkFailure, breaker failureFaultFault location
8/12/2019 Policy8 Appendix Final 03 2008
http://slidepdf.com/reader/full/policy8-appendix-final-03-2008 5/7
UCTE OH – Appendix 8: Terminology Error! Unknown document property name. –5
Fault clearance timeFinal tripping, definitive trippingFlow (power flows, loop flows, parallel path
flows, unscheduled flows)Gradual increase of voltageGrid, networkIn service, in operationInadvertent operationIncidentInfluence factorIn service, in operationInterconnected networkInterconnection line, tie-line, cross borderlineIntermittent fault
Interruption of supplyIntradayIslandIslandingIsolated network operationIsolationIssuing of permit to work (by the personresponsible)Line protectionLoad flow calculationsLocal controlLoss of voltage
Main protectionMaintenanceMake a ring connection (to)Manual controlManual regulationMaximum capacityMeshed networkN-1 rule or criterionNetwork diagramNetwork lossesNetwork with earthed neutralNetwork with isolated neutral
No load operationNode (electrical)Non-availability- For breakdown, outage- For maintenanceNon-successful reclosingNotice for planned outageNotice of completion of work, cancellation ofpermit to workOff loadOn load
Opening instruction (from protectionequipment)Opening of a ring connection
Operating conditionsOperating testOutageOutgoingOut of operation for maintenanceOut of serviceOvercurrentOvercurrent protectionOver-excitationOverhaulOverloadOverload protection
OvervoltageParallel (to)Parallel operationPeak loadPermanent / remaining faultPermit to workPhase anglePhase sequence indicatorPhase shifter ransformer (PST)Pilot wire protectionProtection against loss of synchronismRadial network
Radial operationReactive power flowRegional (RCC) or national (NCC) controlcentreRelease from service or operation (to)Remote controlRemote supervision. TelemonitoringRestore to service (to)Ring connectionRing networkRing operationRisk of failure
SCADA system (Supervisory Control AndData Acquisition)Security of supplySeparate networkShift engineer, switching engineerShort-circuit currentShort-circuit current calculationsShort-circuit powerShort-circuit protectionSingle - three-phase reclosingStand- by reserveState estimation
8/12/2019 Policy8 Appendix Final 03 2008
http://slidepdf.com/reader/full/policy8-appendix-final-03-2008 6/7
UCTE OH – Appendix 8: Terminology Error! Unknown document property name. –6
Sticking snowSuccessful reclosingSwitching
Switching centre, remote control centreSwitching instructionSwitching out, switch (to)Synchronise (to), synchronisationSynchroscopeSynchrounous operationTelemetering, telemeasurment (TM)Telesignalisation (TS)Test voltageTransfer protection of a circuit to the couplerbreaker (to)Transformer protection
Transient faultTransit, powerflowTransmission lossesTransmission System Operator (TSO)TrippingUnder-excitationUnintentional deviation, inadvertentdeviationVoltage collapseVoltage dropVoltage lackVoltage range
WAMS (Wide inter-Area MeasurementSystem)Withdrawal from serviceWorking zone
OFFER-DEMAND BALANCING Already Allocated Capacity (AAC) Ancillary services Area Control Error (ACE) Auctions Automatic Generation Control (AGC)
Availability Available capacity Available Transfer Capacity (ATC)Balance perimeterBalance responsible entityBalancing mecanismBilling periodBilling pointBreakdown, shutdownCheck meteringCold reserve (stand-by)Consumer
Consumption of electricityContract priceControl area, control block
Control DeviationController (primary, secondary)Controlling power rangeCost of no-load operationCost of start-upCountermeasureCouple (to)Curtailment (factor)DemandDeviationDeviation from synchronous timeDroop
Duration of the contractElectricity accountElectricity billingElectricity tariffEnergy reserveError correctionError detectionExchange deviationExchange power controlExchange program / scheduleExpiration of the contractExtension of the contract
Frequency bias, K-factorFrequency controlFrequency deviationFrequency offset (+ / - 0,1 Hz)Frequency reduction / dropFrequency setpointGate (of market)Hot reserve (stand-by)Hydraulic reserveIncremental (marginal) cost of generation.Load (to)Load curve
Load sheddingMarginMarginal generationMatching, cross checkingMaximum demand- Daily- Weekly- Monthly- AnnualMeter readingMeter registrationMetering
8/12/2019 Policy8 Appendix Final 03 2008
http://slidepdf.com/reader/full/policy8-appendix-final-03-2008 7/7
UCTE OH – Appendix 8: Terminology Error! Unknown document property name. –7
(15) Minute reserveNet Transfer Capacity (NTC)Network Power-Frequency characteristic
Off peak load hoursOutput powerPeak-load hoursPower deviationPower reservePower-factor meterPower-Frequency controlPrimary controlPurchaseRegulating point, setpoint valueReserve (primary, secondary, tertiary)Revision of the contract
Seasonal tariffSecondary frequency control / loadfrequency controlSelf-regulation of loadSetting up of actual valueSpinning reserveStand- by reserveSupplierTender / offerThermal reserveTime deviation with UTC (Universal Timeco-ordinated)
Total Transfer Capacity (TTC)Transit chargeTransmission Reliability Margin (TRM)Unload (to)Load reduction