Upload
others
View
9
Download
0
Embed Size (px)
Citation preview
POLYETHYLENE PIPE SYSTEMS FOR WASTEWATER
PRESENTATION MODULES
Mill-Pro provides a wide range of free presentations on PE pipe systems for pressure sewer and gravity drainage in HK
These presentations are in modules that can be selected to tailor the material for the audience and time, from basic overview to detailed discussion on specific topics that include:
• Introduction & overview of PE • Burial design • Installation methods • Joining methods • Materials & products • Manhole connections & liners • Traceability & GIS
Refer to the presentation topics list attached, complete the form and email back to [email protected] we will call to arrange a suitable presentation time.
Presenters:
Ian Jacob – 29 years manufacturing, sales, design of Steel, PE, DI, Concrete pipe & fittings manufacture, valve systems, including working for Tyco Water, Tyco Valves & Controls, Hume Industries, working in New Zealand, Australia, US, Singapore, Indonesia.
Avery Hui - 15 years in sales of Steel, PE, DI, pipe & fittings manufacture, valve systems, including working for Tyco Water HK and Bunkee.
www.mill-pro.com.hk
2
2
PE WASTEWATER PRESENTATION TOPICS Discussion Topic Topic Description Level Duration 1 Introduction
Introduction to PE Wastewater Systems, history of PE, global trends
Introduction ~ 12 Slides ~ 6 Min
2 PE Pipe & fittings overview
Understanding pipe sizes, OD vs. DN, SDR, SN, PN ratings, Push in joints vs. welded joints, bends in sewers.
Basic ~ 12 Slides ~ 8 Minutes
3 Pricing - PE vs. other materials
PE unit costs and installed costs compared to other materials
Basic ~ 2 Slides ~ 2 Minutes
Specification & enforcement
Specifications for supply of PE, risks, site enforcement, WSD failures & lessons in PE
Introduction ~ 8 Slides ~ 5 Minutes
4 Installation methods Trenchless design, pipe jacking, directional
drilling, micro tunneling, interactive vs. load design pulling PE into jacking casings, grouting
Introduction ~10 Slides ~ 6 Minutes
5 Burial Design level (i) Overview of flexible PE pipes vs. Rigid traditional pipes, burial design, main differences, backfill
Introduction ~ 10 Slides ~ 8 Minutes
6 Burial Design level (ii) (includes session above)
Static, Dynamic and soil loads, Soil Modulus and side support design, settlement, long term design, standards, Structural and partial structural liners for pipe jacking
Intermediate Detailed
~ 40 Slides ~ 25 Minutes
7 Operation & Maintenance of PE gravity & rising main systems
CCTV inner layer, Jet cleaning, Pigging, abrasion performance, maintenance reduction strategies, experience in other markets, Repair to PE systems, making future intake connections
Basic Overview
~ 12 Slides ~ 10 min
8 PE Compounds (i) PE100 RC compounds, why they work, benefits, cheating & risks in PE, why use PE100 RC?
Basic Overview
~ 10 Slides ~ 8 Minutes
9 PE Compounds (ii) (includes session above)
Detailed discussion on PE100 RC compounds, Benefits, site testing, compliance, PE failure modes, Slow Crack Growth testing & failures
Intermediate, Detailed
~ 45 Slides ~ 30 Minutes
10 Interconnection PE to other products
Connecting PE to existing DI, CI, VCP, RCP pipes
Basic ~ 3 Slides ~2 Minutes
11 Joining pipes & fittings (i) Overview of the various joining methods for PE
in sewers - Electrofusion, Butt Fusion, Mechanical, Push in joints.
Basic Overview
~ 6 Slides ~ 4 minutes
12 Joining pipes & fittings (ii) Understanding PE joining principals, how
Electrofusion products work and why they fail, butt welding limitations and risks
Intermediate Detailed
~ 20 slides ~15 minutes
13 Rising main overview Surge, water hammer, cyclic fatigue, operational
life, chamber design, pigging, chamber connections & design
Intermediate Overview
~8 Slides ~6 Minutes
14 Live Sewer Rehabilitation Introduction to live sewer rehabilitation techniques using PE
Overview ~ 3 Slides ~ 3 minutes
15 Traceability & GIS of drainage systems
PE has a 100+ year life, traceability of installation & recording data into GIS systems is essential for future Maintenance & Operations
Basic Introduction
~ 4 Slides ~ 3 minutes
16 Traceability GIS - Mobile install & Stock App’s
Introduction to the Mill-Pro mobile app for stock & installation management of PE pipes & fittings
Basic Detailed
~ 25 Slides ~ 20 Minutes
17 Manhole connections Connecting PE to manholes, products, methods, tensile & thermal loads
Basic Detailed
~ 15 Slides ~ 12 Minutes
18 PE in Reclaimed land, performance & design
Designing PE for reclaimed land applications for pressure & gravity. Deflection, Fatigue, earthquake & impact performance
Intermediate, Overview
~ 10 Slides ~ 8 Minutes
19 Fittings for PE pipes Drainage & pressure fittings overview, product range, applications, possibilities
Introduction ~ 12 Slides ~ 9 Minutes
20 Site testing NDT Fusion weld testing, site pressure testing, CCTV installation inspection
Introduction & overview
~ 6 Slides ~ 3 minutes
21 PE Manhole Liners New installations (i)
PE liners for concrete sewer manholes, Installation in new manholes, 100+ year service life without maintenance.
Basic Introduction
~ 19 Slides ~ 12 Minutes
22 PE Manhole Liners Rehabilitation (ii) (includes session above)
Rehabilitating existing manholes using PE liners, for both new & rehabilitation work, installation methods international case studies, specifications
Intermediate, detailed
~ 50 Slides ~ 35 Minutes
3
3
Request for presentation 1. Highlight & Copy the data below 2. Click on the email link and past it into the email 3. Complete the details & send Email: [email protected] Phone: 2543 6100 Fax: 2544 9342 To: Avery Hui / Ian Jacob Subject: Request for PE presentation Company name: Enter your company name Contact Name: Enter the contact person Presentation Address: Enter the address for the presentation Proposed time: Enter your proposed date & time Topics: Enter the topic numbers from the sheet