Port Waratah Coal Services – Expansion Plansand Future ChallengesPort Waratah Coal Services – Expansion Plansand Future Challenges
Australian Coal Preparation Society Presentation
Shaun Sears, Manager Live Run and Operational Improvement
July 2008
2Commercial in Confidence © PWCS 2008. All Rights Reserved
Content
� Port Waratah Coal Services Ownership
� Recent Coal Chain Performance– Coal Chain Overview– 2007 Performance– 2008 Performance (year to date)
� Capacity Balancing System History
� Port Waratah Coal Services - Expansion and Improvement Plans– Expansion History– Future Expansion Options
3Commercial in Confidence © PWCS 2008. All Rights Reserved
� Port Waratah Coal Services Ownership
� Recent Coal Chain Performance– Coal Chain Overview– 2007 Performance– 2008 Performance (year to date)
� Capacity Balancing System History
� Port Waratah Coal Services - Expansion and Improvement Plans– Expansion History– Future Expansion Options
4Commercial in Confidence © PWCS 2008. All Rights Reserved
Coal & Allied
Newcastle Coal Shippers
3.5% BloomfieldImporters
2.8% Bloomfield1.7% BHP Billiton
Anglo Coal
PWCS
Coal & Allied
Xstrata
Other
Port Waratah Coal Services Effective Ownership Newca stle Coal Shippers Effective Ownership
30.0%
29.6%
36.9%
6.7%
20.0%22.7%
37.1%
PORT WARATAH COAL SERVICES OWNERSHIP STRUCTURE
9.0%
PWCS Ownership Structure
� PWCS is an unlisted public company owned by the Hunter Valley Coal Industry (70%) and Japanese Coal Customers (30%)
� PWCS is the World’s largest export coal handling facility and currently exports coal valued at well above $5 billion per year
� PWCS’ terminals are economically and socially an important part of regional, state and national economies
� PWCS owns and operates two coal handling facilities in the Port of Newcastle, Carrington Terminal at a capacity of 25 Mtpa and Kooragang Terminal at a current capacity of 77 Mtpa (incremental increases in capacity to Q1 2010)
No. of
Directors
Newcastle Coal Shippers 4
Bloomfield Collieries
Coal & Allied 3 (including
independent Chairman)
Japanese Trading 3
Japanese Power, Cement, Oil
Total 10
5Commercial in Confidence © PWCS 2008. All Rights Reserved
PWCS Coal Terminals
Carrington CoalTerminal
Kooragang CoalTerminal
6Commercial in Confidence © PWCS 2008. All Rights Reserved
� Port Waratah Coal Services Ownership
� Recent Coal Chain Performance– Coal Chain Overview– 2007 Performance– 2008 Performance (year to date)
� Capacity Balancing System History
� Port Waratah Coal Services - Expansion and Improvement Plans– Expansion History– Future Expansion Options
7Commercial in Confidence © PWCS 2008. All Rights Reserved
Hunter Valley Coal Chain - The Worlds Largest Coal Export Operation
• 40 Coal Mines • 16 Producers• 27 Load Points• > 80 Different Brands of Coal
• 2 Above Rail Operators• 30 Trains/15,000 trips per year• 2 Track Owner/Operators• Haulage distances up to 350km
• 2 Coal Loading Terminals • 5 Dump Stations• 2.2 Mt of Working Stockyard• 5 Ship Berths and Loaders
• Approx. 1000 vessels per year• Average vessel size is 89kt • Avg 2 Cargoes per Vessel• Tidal constrained river port
• 10% Domestic Consumption• 90% Export – mostly Thermal coal• 65% to Japanese & Korean
markets
Operating “Rules”
� Turn of arrival, cargo assembly vessel servicing
� Approx 1.2Mt to 1.5Mt of Terminal working stockpile capacity
� Approx 3.0Mt to 4.0Mt of total working washed coal stockpile capacity at mines
� Average cargo assembly task;– 260,000t/day, 42 train trips– 17 to 19 load points/day required
8Commercial in Confidence © PWCS 2008. All Rights Reserved
Hunter Valley Coal Chain Performance - 2007
98.895.7
88.284.6
3.10
0.930.13 4.34
1.88
0.15 0.04 0.1 1.60.5 0.9
0.7
80
85
90
95
100
105
Target P
lanned
Rat
e
Capacit
y Varia
ncePlanned
Rate
ARTCHVCCLT PN
PWCS
QRNational
RailCo rp
Member D
el ivere
d Capa
city
Roll-In/O
utCus
tome r
Over/U
nder L
oading
Wea
ther
Other
Throug
hput
Achieve
d(M
tpa)
2007 Operational Performance Summary
0.4Mt variance due to June storm included
2.1Mt variance due to June storm included
9Commercial in Confidence © PWCS 2008. All Rights Reserved
2007 Operational Performance Summary
� Set a new record safety performance as measured by number of consecutive days serious injury free
� Commissioned expansion of Project 3D under budget and ahead of schedule (March 2007)
� Commenced Project 3Exp whilst undertaking 3D expansion and operating at record levels
� Made major improvements in operational reliability, finished the year under budget.
� New Certified Agreement for employees covered under award – Christmas Day is now a normal “Working Day”
� Formed new operating department, Live Run and Operational Improvement group
� From June 2007 worked closely with NPC, Vessel Owners / Agents / Operators to improve ship loading performance. Significant improvements in Vessel and Gross Load rates achieved;
– VLR up from average 5,100tph in 2006 to 5,800 tph – GLR up from average 3,800tph in 2006 to 4,800 tph
KCT Load Rates 2007
3000
3500
4000
4500
5000
5500
6000
6500
Jan-0
7
Feb-07
Mar-07
Apr-07
May-07
Jun-0
7
Jul-0
7
Aug-07
Sep-07
Oct-07
Nov-0
7
Dec-0
7
Tonn
es p
er h
our
Average Gross Load Rate Average Vessel Load Rate
Vessel suitability & performance monitoring
commenced
PWCS Days Cancellation Free
0
5
10
15
20
25
30
Jan-
05
Apr-0
5
Jul-0
5
Oct-05
Jan-
06
Apr-0
6
Jul-0
6
Oct-06
Jan-
07
Apr-0
7
Jul-0
7
Oct-07
Day
s
Control system issues
3.13 conveyor issues
Power outage, stacker & conveyor issues
10Commercial in Confidence © PWCS 2008. All Rights Reserved
2007 Operational Performance Summary
Numerous receivals and shiploading records established.
1,224102Dec-07Total number of vessels loaded
Vessels/YrVesselsMonthRecord
1018,438Dec-07PWCS monthly total shiploading
97.68,137Dec-07PWCS monthly total receivals
MtpaKtMonthRecord
11Commercial in Confidence © PWCS 2008. All Rights Reserved
2008 Operational Performance Summary
Hunter Valley Coal Chain Performance - 2008 YTD (End May 2008)
106.0103.8
93.290.6
2.13
1.260.19
0.08 0.19
0.70.30.11.7
2.58
6.37
80
85
90
95
100
105
110
115
Targe
t Pla
nned
Rate
Capac
ity V
arian
cePlann
ed R
a te
ARTCHVCCLT PN
PWCS
QRNation
alLiv
eRun
Mem
ber D
elive
red C
apac
ityRoll
-In/O
utCus
tomer
Over/U
nder
Loadin
gW
eath
er
Other
Throu
ghpu
t Ach
ieved
(Mtp
a)
12Commercial in Confidence © PWCS 2008. All Rights Reserved
� Port Waratah Coal Services Ownership
� Recent Coal Chain Performance– Coal Chain Overview– 2007 Performance– 2008 Performance (year to date)
� Capacity Balancing System History
� Port Waratah Coal Services - Expansion and Improvement Plans– Expansion History– Future Expansion Options
13Commercial in Confidence © PWCS 2008. All Rights Reserved
Historical Vessel Queues
Offshore Queue at Newcastle
0
10
20
30
40
50
60
70
80
90
1 Ja
n 04
1 M
ar 0
41
May
04
1 Ju
l 04
1 Sep
04
1 Nov
04
1 Ja
n 05
1 M
ar 0
51
May
05
1 Ju
l 05
1 Sep
05
1 Nov
05
1 Ja
n 06
1 M
ar 0
61
May
06
1 Ju
l 06
1 Sep
06
1 Nov
06
1 Ja
n 07
1 M
ar 0
71
May
07
1 Ju
l 07
1 Sep
07
1 Nov
07
1 Ja
n 08
1 M
ar 0
8
Ves
sels
Offs
hore
Capacity Distribution System introduced in April 2004
Capacity Balancing System introduced in January 2005
Producers voted to switch off Capacity Balancing System in September 2006
Modified Capacity Balancing System reinstated for 2007
Major storms / flooding causing port closure and impact rail track
14Commercial in Confidence © PWCS 2008. All Rights Reserved
History of Allocation Systems
99 Mt
2005
� PWCS introduced 1 year binding take or pay demand nominations.
� In January 2005, PWCS introduced a medium term Capacity Balancing System (CBS). The CBS was authorised by the ACCC until the end of 2007. The CBS required the support of producers to continue each year.
� Producers voted to continue the CBS in 2006.
� PWCS provided the opportunity for producers to reduce their existing binding take or pay demand nominations.
� In April 2004, PWCS introduced a Capacity Distribution System (CDS) with ACCC authorisation until the end of 2004.
2004 2005 2006
� PWCS introduced 3 year binding take or pay demand nominations.
� Producers voted notto continue the CBS in 2007.
� PWCS sought indicative long term demand forecasts from producers.
165 Mt150 Mt132 Mt119 Mt103 Mt
2010 *2009 *200820072006
116 Mt107 Mt
20082007
* Indicative only12 Mt 16 Mt
15Commercial in Confidence © PWCS 2008. All Rights Reserved
� Port Waratah Coal Services Ownership
� Recent Coal Chain Performance– Coal Chain Overview– 2007 Performance– 2008 Performance (year to date)
� Capacity Balancing System History
� Port Waratah Coal Services - Expansion and Improvement Plans– Expansion History– Future Expansion Options
16Commercial in Confidence © PWCS 2008. All Rights Reserved
0
20
40
60
80
100
120
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
PWCS Expansion Ahead of Coal Chain Throughput Over Last 15 Years
PW
CS
Thr
ough
put C
apac
ity (
Mtp
a)
46 to 57 Mtpa
1993-1994Stage 2A Kooragang Terminal Expansion
• 2nd berth – K5
57 to 66 Mtpa
1995-1996Stage 2B Kooragang Terminal Expansion
• Stockyard extension• 2nd rail receival – DS 2• 2nd ship loader – 7.09
66 to 77 Mtpa
1997-1999Stage 3A Kooragang Terminal Expansion
• 3rd berth – K6
1999-2002Stage 3B &C Kooragang
Terminal Expansion• 3rd rail receival – DS 3
• Additional stockyard – Pad C• 3rd reclaimer – 4.11
• 3rd ship loader – 7.10
A$330m77 to 89 Mtpa
2005-2007Stage 3D KooragangTerminal Expansion
• 4th stacking stream – 3.22• Additional stockyard - Pad D
A$175m89 to 102 Mtpa
2007-2010Stage 3Exp (Phase 1) Kooragang
Terminal Expansion• Additional stacking stream – 3.21
• Belt upgrades – 8500tph• 4th reclaimer – 4.12
• Integrity Works
A$458m102 to 113 Mtpa
PWCS CapacityActual Throughput
17Commercial in Confidence © PWCS 2008. All Rights Reserved
Project 3D - Completed in March 2007
New half Pad Dconstructed
New Stacker 3.22constructed
18Commercial in Confidence © PWCS 2008. All Rights Reserved
Project 3D - Completed in March 2007
New Stacker3.22
19Commercial in Confidence © PWCS 2008. All Rights Reserved
Project 3Exp – Update
04.12
03.18
03.21
03.17 03.16
03.1303.19
03.12
03.14
03.0
8
03.0
9
03.1
0
01.20
01.21
01.3501.26
01.22
02.01
01.27
01.28
01.36
01.37
Up-rating works
New plant works
04.18
� The expansion involves:– Upgrade the in-loading rate from 6,600 tph to 8,500 tph and the stacker travel time from 25
metres per minute to 40 metres per minute on two conveyor streams – One conveyor stream to remain at 6,600 tph to minimise operational impact– New reclaimer on Berm D and new stacker on Berm E– Replacement of two original reclaimers and two original stackers
20Commercial in Confidence © PWCS 2008. All Rights Reserved
Project 3Exp – Schedule Summary
F M A M J J A S O N D J M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
GEN General Site Works
4.18 New Half Conveyor
3.21 New Stacker 03.21
3.58 New Stacker 03.58
3.18 Deconstruct Stacker 03.18
3.59 New Stacker 03.59
3.19 Deconstruct Stacker 03.19
4.12 New Reclaimer 04.12
4.59 New Reclaimer 04.59
4.60 New Reclaimer 04.60
4.09 Deconstruct Reclaimer 04.09
4.10 Deconstruct Reclaimer 04.10
2010
SCHEDULE SUMMARY
PWCS PROJECT 3EXP
STATUS LINE
Outage G. 0309/0313
Outage J. 0310/0314
2007 2009
GENERAL WORKS
2008F
MAJOR OUTAGES
EXPANSION SCOPE
ON SITE CONSTRUCTION, ISOLATIONS & PRE COM AWARD/FABRICATE PERIOD
21Commercial in Confidence © PWCS 2008. All Rights Reserved
Project 3Exp – Cost Summary
� $220M forecast to be spent in the local area
� $360M total forecast to be spent in Australia
� Remainder being spent on procurement of reclaimer and stacker components from overseas vendors
� Site engineering, construction, and supervisory work force will peak at around 230
� Major focus of the project team is to eliminate unplanned impact on capacity
$458MTOTAL
$148MReplacement of reclaimers
$82MReliability work on existing plant
$228MNew capacity
22Commercial in Confidence © PWCS 2008. All Rights Reserved
04.12
03.18
03.21
03.17 03.16
03.1303.19
03.12
03.14
03.0
803
.09
03.1
0
01.20
01.21
01.3501.26
01.22
02.01
01.27
01.28
01.36
01.37
03.15
04.18
Phase 2 Expansion works in BLUE
07.04
K7
Pad C West
Pad D West
Beyond Project 3Exp – Future KCT Expansion Options
23Commercial in Confidence © PWCS 2008. All Rights Reserved
Beyond Project 3Exp - Sequence and Delivered Capacity
145Future Full Expansion Part 2
– 4th Receival and 4th Ship Loading Stream (with Wait to Sail delays)
128
Future Full Expansion Part 1– 4th Arrival Road– Stacking Stream 1 upgrade– K7 Berth– Full Pads C & D
113Project 3Exp
Delivered PWCS Capacity (Mtpa)Expansion Option
24Commercial in Confidence © PWCS 2008. All Rights Reserved
Questions?
25Commercial in Confidence © PWCS 2008. All Rights Reserved
HVCC Capacity Master Plan Summary
Q407
Q108
Q208
Q308
Q408
Q109
Q209
Q309
Q409
Q110
Q210
Q310
Q410
Q111
Q211
Q311
Trains:� PN: - 330 additional wagons on order� Terminal capacity at KCT (i.e. 6 Dep. Rds)
Track:ARTC/RIC:� Muswellbrook Yard� Ulan CTC� Antiene to Grasstree duplication
� 3 Ulan loop extensions� 5 Gunnedah loop extensions � Werris Creek Gap - Alternative Route� Werris Creek to Gunnedah CTC (RIC)
� Bi-di signalling Maitland to Branxton � Minimbah 3rd road � Newdell junction � St Heliers-M’brook duplication � Bi-di signalling Grasstree - St Heliers� Allandale re-signalling for 8-minute headways� 2 Ulan loop extensions� Gunnedah - Narrabri CTC (RIC)� 6 Gunnedah loop extensions � Drayton Junction upgrade
� 3rd Road Maitland to Mininbah� 3 Ulan loop extensions� 2 Gunnedah loop extension� Muswellbrook – Koolbury duplication
PortPWCS:� Project 3D� Project 3Exp – Phase 1� Project 3Exp - Phase 2� Phase 2 Expansion OptionNCIG� Phase 1
Planned Infrastructure Investments, Statusand Capacity Benefits
~*105Mtpa~** 115Mtpa
CommencedCommitted
105 Mtpa
110 Mtpa?
115 Mtpa?
145 Mtpa?
CompleteCommencedCommenced
CommittedCommittedCommittedCommitted
PlannedPlannedPlannedPlannedPlannedPlannedPlannedPlannedPlannedPlanned
Under EvalUnder EvalUnder EvalUnder Eval
Capacity:
102 Mtpa113 Mtpa123 Mtpa
+30 Mtpa
Status:
CompleteCommencedUnder Eval.
Planned
Note(*): Rolling stock system capacity at end of 2007 is approx 105 Mtpa in a stand alone configuration as modelled by HVCCLTNote(**): Refuelling and other terminal activities at KCT are being reviewed. Anticipated that sufficient capacity will enable 2008 target of 95Mt
Q411
Under Eval: B eing modelled/ designed or evaluated
Planned: Intended, but not yet at commitment
Committed: Final board approval, funding & other approvals in place
Commenced: Construction is underway
Completed: Project completed and commissioned
26Commercial in Confidence © PWCS 2008. All Rights Reserved
Industry discussions 2007/2008
� In January 2007, Producers formed a Producer Working Group (PWG) to urgently consider options to reduce queue and demurrage costs.
Jan Mar May Aug Oct Nov Dec Jan 07 07 07 07 07 07 07 08
� The ACCC granted CBS authorisation for 2007 only.
� Recommendations of the PWG included;
� PWCS apply to the ACCC to reinstate the CBS for 2007.
� The PWG continue to investigate short term systems to address potential demand and capacity imbalances for 2008.
� A number of Producers would only support the reinstatement of the CBS in its current form for 2007.
� PWG considered a number of options to respond to the capacity and demand imbalance for 2008.
� PWCS independently develops principles for a compromise solution.
� PN attempted to broker a solution around a lesser of port or rail.
� Producers could not reach agreement� It appeared that, based on the interpretation
of rail contracts by rail providers, some mines may not be able to deliver their coal to the port.
� PWCS compromise solution circulated to producers for their meeting on 10 October 2008 in a further attempt to reach industry agreement.
� Whilst some producers indicated willingness to compromise collectively producers still could not reach agreement.
� PWG was disbanded.� In the absence of a solution from producers the
default position is effectively the lesser of port or rail contracts.
� In the absence of a solution, PWCS, PN and QRNational jointly develop a Vessel Queue Management System (VQMS) and seek ACCC authorisation.
Con
sequ
ence
s
A
ctio
ns
� Newcastle Port Corporation (NPC) and Donaldson Coal make application to the ACCC to continue the CBS in 2008.
� ACCC does not grant interim authorisation for the VQMS.
� ACCC grants interim authorisation to continue the CBS in 2008.
� Producers surveyed in relation to Coal Chain allocation for 2008 and beyond.
� Based on support from Producers, PWCS Board agrees to implement the NPC’s proposal to continue the CBS in 2008.
� NSW Government announce the appointment of the Hon. Nick Greiner to assist the Hunter Valley coal industry to develop a new allocation system.