27
TOS SYSTEM TOS SYSTEM Terminal Operating System

Porto de Israel - ESALQ-LOG

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Porto de Israel - ESALQ-LOG

TOS SYSTEMTOS SYSTEM

Terminal Operating System

Page 2: Porto de Israel - ESALQ-LOG

TARGETS:TARGETS:- Reduced vessel working hours: Improved service = more vessels.

- Waterfront management of the vessels.- Direct contact between the port and the ship agent while operating the vessel.

- Greater utilization of port’s equipment (i.e. shorecranes, tugs, yard etc.).

- Improved service to trailers / trucks.- Technology of the 21st century – no papers and

certificates – precision and professionalism.

Page 3: Porto de Israel - ESALQ-LOG

IMPORT

EXPORT

Page 4: Porto de Israel - ESALQ-LOG

How the system operates?How the system operates?-- Yard PlanningYard Planning-- Gate operationGate operation-- Ship Planning and coordinating (waterfront)Ship Planning and coordinating (waterfront)-- Vessel & Yard operationVessel & Yard operation

Page 5: Porto de Israel - ESALQ-LOG

Planning the

yard/blocks by grouping

factors –export

based on booking,

Import by yard layout

Planning the Blocks

Page 6: Porto de Israel - ESALQ-LOG

TOS system models:TOS system models:

Yard planning

Gate system:

trucks

Page 7: Porto de Israel - ESALQ-LOG

REJECT OPTION

GATE – precheck

truck, driver,

container data.

Driver receive

Job card with yard position

Page 8: Porto de Israel - ESALQ-LOG

GATE – main gate

Checking actual data of driver, data,

container

Reject option

SealDamage

IMDG

Page 9: Porto de Israel - ESALQ-LOG

TOSTOSמודולים ועקרונות במערכת מודולים ועקרונות במערכת

Ship

planning

Yard planning

Gate system:

trucks

Page 10: Porto de Israel - ESALQ-LOG

Ship planning0.Vessel definition – Technical and physical data of all vessels: Holds, Hatches, stability, weight capacity etc.

deck

Page 11: Porto de Israel - ESALQ-LOG

Ship planner will determine discharging Ship planner will determine discharging sequence & shifting for each bay according sequence & shifting for each bay according to the general plan and agentto the general plan and agent’’s instructions.s instructions.

Ship planning1.Discharge planning process and determining discharging sequence:

Page 12: Porto de Israel - ESALQ-LOG

Ship planning2.Planning the loading for the vessel upon receiving loading profile from agent.

HONG KONG

20 RG

20-25 TONS

Page 13: Porto de Israel - ESALQ-LOG

Ship planner will place containers from the yard to the specificslots in the vessel. This is how the loading sequence is determined for each bay.

Ship planning2. Planning the loading –Determining the loading sequence.

BLOCKVESSEL

Page 14: Porto de Israel - ESALQ-LOG

3. Determining Crane working sequence: Ship planning

LoadingDischarge

Page 15: Porto de Israel - ESALQ-LOG

4.Master/Chief signature on the Discharging and loading plans.

Ship planning

פריקהטעינה

Page 16: Porto de Israel - ESALQ-LOG

TOSTOSמודולים ועקרונות במערכת מודולים ועקרונות במערכת Yard

planningGate

operation

Checking data and Ship planning

Page 17: Porto de Israel - ESALQ-LOG

All port’s equipment will be provisioned with wireless terminals.

The jobs will be sent to the wireless terminals from TOS system.

All working stations are dependant on each other.

operationOperating the employees and equipment – ON-LINE

Page 18: Porto de Israel - ESALQ-LOG

CHECKER screen:

Page 19: Porto de Israel - ESALQ-LOG

Yard crane/Forklift operator screen:

קבלת מכולה לערוגה

4572

Page 20: Porto de Israel - ESALQ-LOG

YARD TRACTOR SCREEN:

Page 21: Porto de Israel - ESALQ-LOG

TOSTOSמודולים ועקרונות במערכת מודולים ועקרונות במערכת

CONTROLINGFrom TOS room

Yard planning

GATE

OPERATION

Checking data and Ship planning

Page 22: Porto de Israel - ESALQ-LOG

Monitoring the productivity,

identifying and solving

operational problems

CONTROLING actual

Discharging and Loading

operations as per the sequence.

SHIPMONIORING

Page 23: Porto de Israel - ESALQ-LOG

Identifying equipment location and monitoring job sequence

Resource monitoring

Controlling the jobs and yard location

Page 24: Porto de Israel - ESALQ-LOG

REAL TIME DECISION MAKING

YARD MONITORING

REAL TIME YARD

CONDITION

Page 25: Porto de Israel - ESALQ-LOG

GATE MONITORING

REAL TIME OPERATION

Page 26: Porto de Israel - ESALQ-LOG

SOME ASHDODSOME ASHDOD’’S PORT S PORT STATISTICSSTATISTICS

VESSELS IN 2010VESSELS IN 20102820 VESSELS 2820 VESSELS 18.000.000 Tons divided into 18.000.000 Tons divided into charge and discharge:charge and discharge:

General charges ( cars, General charges ( cars, metals, fruits and metals, fruits and vegetables, wood, etc)vegetables, wood, etc)

Bulk charges (sugar, Bulk charges (sugar, sulphur, phosphate, sulphur, phosphate, concrete , etc.)concrete , etc.)

Container chargesContainer charges

CONTAINER CHARGESCONTAINER CHARGES((in TEU in TEU –– Twenty Equivalent Units A Twenty Equivalent Units A 40 feet container = 2 containers of 40 feet container = 2 containers of 20 feet)20 feet)

2009 = 893.080 containers2009 = 893.080 containers2010 = 1.017.480 containers2010 = 1.017.480 containers

13,9% enlargment13,9% enlargment

25 CONTAINERS CHARGING 25 CONTAINERS CHARGING AND DISCHARGING PER AND DISCHARGING PER

HOUR IN AVERAGEHOUR IN AVERAGE

Page 27: Porto de Israel - ESALQ-LOG

INTELLIGENT AND INTELLIGENT AND OPTMIZED PLANNING OPTMIZED PLANNING

SYSTEMSYSTEM

NAVIS (USA)NAVIS (USA)200 PORTS200 PORTS

CATOS CATOS (KOREA)(KOREA)

100 PORTS100 PORTS