Potential Planning & Operations Enhancements
Luminant Energy
November 10, 2011
2
Executive SummaryOctober 21, 2011 Special ROS Meeting
• We learned that ERCOT has 30 minutes to develop a Mitigation Plan (MP) for SCED Irresolvable events
• If they can do so, then there is no reliability issue in Operations.
• If they do not, then a transmission watch is issued (and very few were ever issued).
• Most of these MPs involve post-contingency load shed plan of some sort.
Key Questions to Answer
• Are we all comfortable with a heavy reliance on MPs involving load shed?
• Is that how the Board wants us to plan to operate the system?
Purpose of this Presentation
• Illustrate operational exposure still being missed by 5-Year Plan process
• Suggestions to streamline RPG process for 5-Year Plan reliability projects
• Request that ROS pursue LCRA’s suggestion to form an ah-hoc task force to take a closer look at these issues.
Aug 2/2011 Aug 3/2011 Aug 4/2011 Aug 5/2011 Aug 23/2011 Aug 24/2011
Operational Exposure During August 2011 EEAs Review of Sample Post Contingency Loading During August 2011 EEA Events
3
95
100
105
110
115
120
125
130
135
1:40
PM
2:40
PM
3:40
PM
4:40
PM
5:40
PM
6:40
PM
% Lo
adin
g
Apollo-Richardson East 138 kV
95
100
105
110
115
120
125
130
135
1:40
PM
2:40
PM
3:40
PM
4:40
PM
5:40
PM
6:40
PM
% Lo
adin
g
Firewheel-Olinger 138 kV
Refer to slide 9 & 10 in the Appendix for more August 2011 EEA related post-contingency overloads
95
100
105
110
115
120
125
130
135
1:40
PM
2:40
PM
3:40
PM
4:40
PM
5:40
PM
6:40
PM
% Lo
adin
g
Jim Christal- West Denton 138 kV
95
100
105
110
115
120
125
130
135
1:40
PM
2:40
PM
3:40
PM
4:40
PM
5:40
PM
% Lo
adin
g
Fort Worth - West Denton 138 kV
Is the 5-Yr Plan Already Identifying These Issues?Examining data from 2PM to 8PM during July – August 2011 to minimize impact of transmission outages
4
One (1) of the 14 SCED non EEA “insecure” constraints1 were identified by the 5-Year Plan. Half have no TPIT project identified.
1) Insecure as described in Protocol Section 6.5.7.1.10 for 30 or more consecutive minutes
Note: non EEA related overloads in SCED
Count Overload FacilityCongestion
Cost
TotalInsecure
StateEpisodes
InsecureState
Duration(Hours)
5-YearPlan
ReliabilityProject
TPIT "FutureProject"
byPeak Of:
Total $38,501,943 26 37.01 CARROLLTON NORTHWEST - LAKEPOINTE 138 kV $8,797,767 6 9.0 20142 MORGAN CREEK SES - CHINA GROVE SWITCH 138 kV $3,527,538 2 5.53 SAGINAW SWITCH - AMERICAN MFG TAP 138 kV $3,479,618 3 5.0 20204 ALLEN SWITCH - PLANO CUSTER ROAD 138 kV $3,716,757 1 3.3 20135 PH ROBINSON Auto (PHR_AT1) $6,081,901 2 3.0 20126 LAKEMONT 1 TAP - LOMBARDY LANE 138 kV $1,842,986 3 2.37 SINTON - SKIDMORE 69 kV $168,394 2 1.88 SOUTH LANE CITY - NEW GULF 138 kV $1,638,167 1 1.5 2012 20129 BEN DAVIS TMPP - PKRMX 138 kV $1,151,822 1 1.5
10 SMITHERS - BELLAIRE 345 kV $7,144,154 1 1.311 ODESSA NORTH - NORTH COWDEN 69 kV $91,692 1 1.0 202012 CHAPPEL HILL - WALLER LCRA 138 kV $515,897 1 0.813 NALL LANE - BRIARCREST 69 kV $93,021 1 0.8 201214 CHINA GROVE SWITCH - BLUFF CREEK SWITCH 138 kV $252,229 1 0.5
Total Count 1 7
Congestion
Rent
How Long Do These Overloads Typically Last?View of Post Contingency Loading of NW Carrollton – Lake Point 138 kV Line on select SCED Irresolvable Days
5
Post contingency overload duration 2.5X longer than SCED Irresolvable
July 7, 2011
98
100
102
104
106
108
110
13:0
2
13:3
2
14:0
2
14:3
2
15:0
2
15:3
2
16:0
2
16:3
2
17:0
2
17:3
2
18:0
2
18:3
2
19:0
2
19:3
2
20:0
2
Time Of Day
% L
oad
ing
SCED Insecure ~45 minutes
July 8, 2011
98
100
102
104
106
108
110
13:0
2
13:3
2
14:0
2
14:3
2
15:0
2
15:3
2
16:0
2
16:3
2
17:0
2
17:3
2
18:0
2
18:3
2
19:0
2
19:3
2
20:0
2
Time Of Day
% L
oad
ing
SCED Insecure ~ 2 hrs & 15 minutes
July 14, 2011
98
100
102
104
106
108
110
13:0
2
13:3
2
14:0
2
14:3
2
15:0
2
15:3
2
16:0
2
16:3
2
17:0
2
17:3
2
18:0
2
18:3
2
19:0
2
19:3
2
20:0
2
Time Of Day
% L
oad
ing
SCED Insecure ~15 minutes
July 15, 2011
98
100
102
104
106
108
110
13:0
2
13:3
2
14:0
2
14:3
2
15:0
2
15:3
2
16:0
2
16:3
2
17:0
2
17:3
2
18:0
2
18:3
2
19:0
2
19:3
2
20:0
2
Time Of Day
% L
oad
ing
SCED Insecure ~4 hours
Are There Process Improvements That Can Help?
6
Of the 26 transmission upgrades recommended by the 5-Year Plan for summer 2011, few were implemented due to process barriers
Operations
Proj.#
2010 5-Year Plan: Reliability Projects Needed by Summer 2011TPITProj
InterimRAP / MP
Implemented
InsecureState in RT Observed
R2 Victoria – North Victoria 69 kV line upgrade 2012 MP (6/1/11)
R3 Texas City Water Treatment Sub – Intercity – LaMarque 69 kV line upgrade 2012
R7 Odessa 69 kV: Odessa North - Odessa Basin SS - MP (6/30/11)
R7 Odessa 69 kV: Odessa Basin SS - Odessa Basin - MP (6/30/11)R7 Odessa 69 kV: Odessa Basin - Goldsmith - MP (6/30/11)R7 Odessa 69 kV: Goldsmith - Ector Shell - MP (6/30/11)R7 Odessa 69 kV: Ector Shell - Holt - MP (6/30/11)
R7 Odessa 69 kV: Holt - Emma Tap - MP (6/30/11)R8 Odessa 138 kV: Moss - Westover - -R8 Odessa 138 kV: Westover - Amoco S. Foster - -R8 Odessa 138 kV: Amoco S. Foster - Odessa North - -R8 Odessa 138 kV: Odessa North - Odessa #2 2014 -
R9 Pegasus – South Pegasus Tap 138 kV line conversion 2011 -R10 Midland East – Windwood 138 kV line upgrade 2013 -R12 Denton area: West Denton - Jim Christal 138 kV Line - MP (8/20/11)
R12 Denton area: Jim Christal - North Denton 138 kV Line - MP (8/20/11)
R12 Denton area: West Denton - Fort Worth 138 kV Line - -R12 Denton area: Fort Worth - Teasley 138 kV Line - -R12 Denton area: Teasley - Pockrus 138 kV Line - -R20 Apollo – East Richardson 138 kV line upgrade 2013 -
R23 Northaven – Welch Road 138 kV double circuit upgrade 2014 -R33 San Angelo Concho 138/69 kV autotransformer upgrade - -R34 Leakey – Campwood 69 kV line terminal equipment upgrade - -R37 General Motors – Great Southwest #1 circuit upgrade 2013 -R38 Handley – Hurst 138 kV line upgrade 2012 -R40 Roanoke Switch – Southlake 138 kV line upgrade 2012 -
Risk mitigated prior to July 1st 8Risk mitigated after July 1st 2Risk not mitigated 16
TSP Response
Are There Some Process Improvements That Can Help?Timely 5-Year Plan – Establish an earlier, consistent publishing date for the 5-year plan.
– The 2010 5-Year Plan was published in March 2011.– 17 of 26 projects needed by summer 2011 had been newly identified
in the 2010 Plan.Optimize RPG Review Process – Streamline RPG approval process
– RPG review was required for many of the aforementioned projects (6-9 month delay)
– Exempt all 5-Year Plan ‘reliability’ endorsed projects costing less than $50 million
– Grant ‘urgent’ RPG review of all remaining projects with a need date of less than 36 months.
Facilitate RAP Development – Clarify assignment of responsibility for RAP development
– No clear linkage of RAP recommendation in 5-Year Plan to implementation
These suggested improvements can be reviewed further in the ad-hoc ROS task force.
Appendix
Aug 2/2011 Aug 3/2011 Aug 4/2011 Aug 5/2011 Aug 23/2011 Aug 24/2011
Operational Exposure During August 2011 EEAs Review of Sample Post Contingency Loading During August 2011 EEA Events
9
95
100
105
110
115
120
125
130
135
1:40
PM
2:40
PM
3:40
PM
4:40
PM
5:40
PM
% Lo
adin
g
Terrell Sw 138/69 kV Autotransformer
95
100
105
110
115
120
125
130
135
2:55
PM
3:55
PM
4:55
PM
5:55
PM
% Lo
adin
g
Glen Rose-Meridian 69 kV
95
100
105
110
115
120
125
130
135
2:25
PM
3:25
PM
4:25
PM
5:25
PM
% Lo
adin
g
Formosa 138/69 kV Autotransformer
95
100
105
110
115
120
125
130
135
1:50
PM
2:50
PM
3:50
PM
4:50
PM
5:50
PM
6:50
PM
7:50
PM
% Lo
adin
g
Sinton-Skidmore 69 kV
10
Four (4) of the top 20 EEA post-contingency overloads were identified
Note: this is the top 20 (in max loading) out of 72 EEA related overloads
Is the 5-Yr Plan Already Identifying These Issues?Examining data from EEA time periods during of August 2011 to minimize impact of transmission outages
Count Binding FacilityMaximum Loading
(%)
5-Year Plan
Reliability Project
TPIT "Future Project" by
peak of:1 SINTON--SKIDMORE 69 KV 133.82 TERRELL SWITCH 138/69 KV AUTOTRANSFORMER 132.53 LON HILL--SMITH 69 KV 126.74 APOLLO--RICHARDSON EAST 138 KV 125.6 2011 20135 GLEN ROSE--MERIDIAN 69 KV 123.86 CHASE FIELD TAP--SKIDMORE 69 KV 123.37 FIREWHEEL--OLINGER 138 KV 123.18 FORMOSA 138/69 KV AUTOTRANSFORMER 121.09 BARCLAY--SILVER CITY 69 KV 120.5 201210 AIRLINE CSW--CABANISS 138 KV 120.211 EDROY--SMITH 69 KV 120.212 JIM CHRISTAL SUBSTATION--WEST DENTON 138 KV 118.5 2011 201413 EDROY--MATHIS 138 KV 116.514 DENTON STEAM 138/69 KV AUTOTRANSFORMER 115.615 SPENCER TMPP--DENTON STEAM 69 KV 115.516 HIWAY 9--AIR LIQUID AEP 69 KV 115.517 REAGOR SPRINGS--BARRY TMPP 69 KV 115.518 FORT WORTH SUBSTATION--WEST DENTON 138 KV 115.4 2011 201419 BEEVILLE--CHASE FIELD TAP 69 KV 115.120 JIM CHRISTAL SUBSTATION--NORTH DENTON 138 KV 114.8 2011 2014
How Long Do These Overloads Typically Last?
11
During a sample 2 week period in July1, the NSA2 > 100% for ~32 hours1) By late July, Luminant proposed a RAP that ERCOT implemented on August 2, 2011. 2) NSA is Network Security Analyzer
Post Contingency Loading of NW Carrollton - Lake Point 138 kV LineAssociated with Lewisville 345/138 kV Contingency
100.00
102.00
104.00
106.00
108.00
110.00
112.0011
:07
11:2
7
11:4
7
12:0
7
12:2
7
12:4
7
13:0
7
13:2
7
13:4
7
14:0
7
14:2
7
14:4
7
15:0
7
15:2
7
15:4
7
16:0
7
16:2
7
16:4
7
17:0
7
17:2
7
17:4
7
18:0
7
18:2
7
18:4
7
19:0
7
19:2
7
19:4
7
20:0
7
Time Of Day
% L
oad
ing
7/3/2011
7/4/2011
7/5/2011
7/6/2011
7/7/2011
7/8/2011
7/12/2011
7/13/2011
7/14/2011
7/15/2011
7/16/2011
$190,600,000 , 32%
$397,400,000 , 68%
Non EEA SCED Irresolvable >30 Minutes
All other SCED Congestion
$38,500,000 , 20%
$152,100,000 , 80%
Non EEA SCED Irresolvable - July / Aug 2PM to 8PM
Non EEA SCED Irresolvable - All Other Hours
12
Co-Benefits Of Increased Operational Efficiency
During the first 10 months after Nodal Go-Live, 32% of all congestion cost occurred due to SCED irresolvable episodes lasting 30+ minutes
$588 Million total congestion rent
$191 Million SCED Irresolvable congestion rent