NATIONAL JOINT COUNCIL for the ENGINEERING CONSTRUCTION INDUSTRY POTENTIAL PROJECTS 30th NOVEMBER 2011

SECTION 36 GRANTED

NO CLIENT LOCATION PROJECT COMMENTS LAST UPDATED

DOUBLE CLICK ON THOSE CLIENTS UNDERLINED FOR GREATER DETAIL

001 Anglesey Aluminium

Anglesea 300MW Biomass Holyhead Town Council have supported plans. £600m project; 600 construction jobs. Plans to be online 2013. Jetty Xtension & PPC Permit in place. Permission granted 16.9.11. AA plan to sell the majority of the site. Preferred bidder should be announced in next few weeks. Lateral Power preferred bidder. 400 jobs could be created.

14.11.11

002 Barking Power Barking 1000 MW Extension Situation reviewed every 6 months but unlikely to commence before 2013. 14.11.11

003 Bio Energy Investments (BEI) Teesside 49MW Biomass Capital value £150m. Peak workforce 200. 2 yr construction. Local planning application approved 17.3.10. Failed to secure funding. No further news.

14.11.11

004 Centrica Leasing Kings Lynn CCGT 1020MW Approval received and have the option to extend. Decision on development mid 2012 . Tender package developed. Due to Centrica considering closing the Kings Lynn Energy Plant there is some doubt over the new build.

14.11.11

005 Covanta Energy Middlewich 38MW Waste to Energy Capital value £200m. Peak workforce 300. 14.11.11

006 2Co Energy Ltd (Powerfuel Power Ltd)

Hatfield Pk, Doncaster Don Valley Power Project (DVPP) 900MW IGCC

Capital Value £2801m. Peak workforce 1500. 2Co Energy acquired project May 2011. Seeking financial support from EU & UK Gov. If granted then decision will be made by mid-2013 for construction with completion in 2016.

14.11.11

007 DRAX/Siemens Immingham Heron Renewable Energy 299 MW Biomass

Peak workforce 850. £600m capital value. 3 year construction 14.11.11

008 DRAX Biomass (Selby) Ltd/Siemens Selby Ouse Renewable Energy 290MW Biomass

Peak workforce 850. 3 year construction. 14.11.11

009 Eco2 Biomass Ltd Sleaford 40MW Straw Biomass Capital value £100m. Peak workforce 200. Still waiting to appoint contractor which should be mid/end November. Work on main road for site access started October 2011 for 4 months.

14.11.11

010 Gateway Energy Centre Ltd (Intergen) Stanford le Hope 900MW CCGT Value £600m. 600 peak workforce. No new information 14.11.11

011 MGT Teesside Ltd Teesside 295MW Biomass Capital value £500. Peak workforce 600. Mobilising final phase of financing. Construction hoped to start within 6 months.

14.11.11

012 MGT Teesside Ltd Teesside Xtension to 295 MW PS Capital value £400m. Peak workforce 600. Commercial operation target 2014. 14.11.11

013 Prenergy Port Talbot 350MW Biomass Wood Burning PS

£400m capital value. Welsh Environment Agency approved increased emission limits. Construction work planned start 2012. Increased local opposition expected. No new application has been made following WEA approval of increased emission limits.

17.11.11

014 RWE Npower Willington 2000MW CCGT (4 x 500MW)

Capital value £1bn. 3 year construction. Peak workforce 2000. Section 36 approved 4.3.11. Project will proceed when pipeline approved – 2012 at earliest.

15.11.11

015 Scottish Power D’head Creek 2, Kingsnorth

1000MW CCGT 1,000 construction jobs over 3 years. Value £500m. Section 36 granted January 2011. No investment decision yet. Separate application for pipeline approved. No new information until end 2011.

15.11.11

016 Scottish Power Longannet 25MW Biomass Awaiting company approval 17.11.11

017 Spalding Energy Xpansion Ltd Spalding 900MW CCGT. Capital value £600m. Peak workforce of 600. Section 36 approved 11.11.10. Construction due to commence 2012. EPC contractor to be appointed in next few months.

17.11.11

Page 2: Potential Projects Timeline - 30.11.11

NO CLIENT LOCATION PROJECT COMMENTS LAST UPDATED

DOUBLE CLICK ON THOSE CLIENTS UNDERLINED FOR GREATER DETAIL

018 Scottish & Southern Energy Ltd Ferrybridge Multi Fuel 108MW Section 36 approved 31.10.11. Enabling works early 2012, main construction to start October 2012, completion Q4/14. Peak workforce 300.

15.11.11

019 SSE Generation Ltd Fiddlers Ferry SCR Section 36 approved 23.2.11. 4 year build. £100m capital value. Project on hold. 15.11.11

020 Thorpe Marsh Ltd (Acorn Power Developments)

Thorpe Marsh, Doncaster

1500MW CCGT Section 36 approved 31.10.11. Project to be developed on old Thorpe Marsh Power Station site. Capital value £600m. Three year construction period. Peak workforce 800.

15.11.11

021 Wainstones Energy Ltd Carrington 1520MW CCGT 30 month construction. No further information. 17.11.11

Total Approval Granted 21

TOTAL POTENTIAL/FUTURE PROJECTS 63

THIS DATA IS TAKEN FROM A NUMBER OF SOURCES AND IS THE BEST AVAILABLE. ITS ACCURACY RELIES UPON FEEDBACK FROM CLIENTS & INDUSTRY CONTACTS.

PLEASE ADVISE OF ANY UPDATES OR NEW INFORMATION YOU MAY HAVE OR OF OTHER POTENTIAL PROJECTS NOT MENTIONED.

NJC Copyright – Not to be reproduced without the express permission of the NJC

Page 3: Potential Projects Timeline - 30.11.11

NATIONAL JOINT COUNCIL for the ENGINEERING CONSTRUCTION INDUSTRY POTENTIAL PROJECTS 30th NOVEMBER 2011

AWAITING SECTION 36 APPROVAL

NO CLIENT SUBMITTED LOCATION PROJECT COMMENTS LAST UPDATED

DOUBLE CLICK ON THOSE CLIENTS UNDERLINED FOR GREATER DETAIL

022 Blythe Park Power Ltd 9.10.09 Draycott, Staffs 950MW CCGT Capital value £600m. Peak workforce 1000. 15.11.11

023 E.ON Energy 25.2.10 Lostock, Cheshire 900MW Waste to Energy £300m capital value. A public meeting was held on 18.1.11. Local authority objection resulted in a public enquiry which commenced 11.10.11. TAT Chemicals (was known as Brunner Mond) in partnership with E.ON Energy – project to be developed and operated by E.ON Energy.

15.11.11

024 Dalkia BioEnergy Plc 16.12.09 Pollington 52MW Biomass Peak workforce 200. Capital value £120m. 18 – 24 month construction phase. Contracts not yet awarded.

15.11.11

025 EDF Energy 23.12.05 Sutton Bridge CCGT Power Station 1260MW + 20MW 1260 + 20 MW ‘Black Start’. No new information

15.11.11

026 E.ON 28.8.09 Portbury Dock, Bristol 150MW Biomass Plant Value £300m. Construction planned for 2012. 15.11.11

027 Wyre Power (Welsh Power) 13.8.09 Fleetwood 850MW CCGT + 25MW OCGT Completion 2014. Peak workforce 650. Capital value £600m.Grid connection date of August 2016.

15.11.11

Total Awaiting Approval 6

TOTAL POTENTIAL/FUTURE PROJECTS 63

THIS DATA IS TAKEN FROM A NUMBER OF SOURCES AND IS THE BEST AVAILABLE. ITS ACCURACY RELIES UPON FEEDBACK FROM CLIENTS & INDUSTRY CONTACTS.

PLEASE ADVISE OF ANY UPDATES OR NEW INFORMATION YOU MAY HAVE OR OF OTHER POTENTIAL PROJECTS NOT MENTIONED.

NJC Copyright – Not to be reproduced without the express permission of the NJC

Page 4: Potential Projects Timeline - 30.11.11

NATIONAL JOINT COUNCIL for the ENGINEERING CONSTRUCTION INDUSTRY POTENTIAL PROJECTS 30th NOVEMBER 2011

POTENTIAL PROJECTS

NO CLIENT LOCATION PROJECT COMMENTS LAST UPDATED

DOUBLE CLICK ON THOSE CLIENTS UNDERLINED FOR GREATER DETAIL

028 Air Products Tees Valley 49MW Waste to Energy 700 peak workforce. Local planning consent granted. Construction due to commence 2012 for completion 2014. Not able to confirm any other info at present.

15.11.11

029 AmeyCespa York Energy Recovery Unit Vinci Environment and Vinci Construction UK appointed contractors. Work to start autumn 2012 with completion late 2015.

15.11.11

030 Ayrshire Power Hunterston 1600MW Multifuel PS Plans submitted to Scottish Government prior to Section 36 Application being made. Capital value £3b. 1600 peak workforce. Application made for EU funding – decision end 2012. Public enquiry will follow before Scottish Government makes its final decision.

15.11.11

031 Bio Energy Investments (BEI) No 2

Teesside 49 MW Biomass The company being wound up due to lack of Government funding. Management would consider restarting under another name if funding was forthcoming.

15.11.11

032 Bio Energy Investments (BEI) No 3

Teesside 50 MW Biomass The company being wound up due to lack of Government funding. Management would consider restarting under another name if funding was forthcoming.

15.11.11

033 British Sugar Wissington, Norfolk Bioenergy Planned Q3/12 start. 18 month build. Peak workforce 200. Full planning application submitted to Norfolk CC and validated. Case Officer to make decision by end 2011.

15.11.11

034 Centrica Barrow, Cumbria 80MW Biomass Plant Located on site of existing Roosecote Gas Fired PS which will be decommissioned once Biomass running. Construction scheduled to start in 2013 with commissioning in 2016. Formal planning application to IPC to be submitted mid 2012.

16.11.11

035 C.GEN Killingholme 570MW IGCC Detailed design & engineering in 2011. Construction planned for 2013 with projected start-up 2015/2016. Application for EU funding May 2011. Final award decision expected second half of 2012.

16.11.11

037 Covanta Rookery South Ltd Rookery South Pit 65MW Waste to Energy IPC approval granted 17.10.11. 16.11.11

039 EDF Hinkley Point Nuclear PS Following planning approval main construction should start 2014/2015 with first reactor operational end 2019 and the second 19 months later. Peak workforce 2,000. Site preparation contract awarded to Kier-BAM.

16.11.11

040 E.ON High Marnham, Notts 1600MW CCGT ‘Scoping Opinion’ request submitted to DECC 16.11.11

041 Gaia Power Billingham, Teesside 50MW Biomass PS £200m. Jacobs (Aker) already appointed. 400 Peak workforce. Following Section 36 approval construction 30/36 months to commissioning.

16.11.11

042 GE Oil & Gas/Ternergis Tees Valley Oil Refinery + CCGT + Harbour Facilities

£2b capital value. IPC expect an application Summer 2012. Peak workforce 2,500.

16.11.11

043 Halite Energy Group Ltd Preesall Saltfield, Lancs Underground Gas Storage Formal consultation underway. Application to IPC expected 3Q/11. 16.11.11

044 Helius Energy Southampton Docks 100MW Biomass PS £300m capital value. 450 peak workforce. Project delayed until 2Q/12. Submission to IPC end 2011 following public consultation.

16.11.11

045 Horizon Wylfa 3300MW Nuclear PS Project due start 2015. 16.11.11

046 MGT Power Tyneside Renewable Energy Plant This project was announced in August 2011. £500m capital value. Peak workforce 600. 18.11.11

047 Palm Paper Ltd Kings Lynn 162MW CCGT Application to IPC expected Q1/12 16.11.11

Page 5: Potential Projects Timeline - 30.11.11

NO CLIENT LOCATION PROJECT COMMENTS LAST UPDATED

DOUBLE CLICK ON THOSE CLIENTS UNDERLINED FOR GREATER DETAIL

048 Portland Gas Ltd Portland 35b cubic ft Gas Storage £450m capital value. No further information. 16.11.11

049 Progressive Energy Onllwyn 450MW Drym IGCC IGCC Under development. £375m capital value. 4 year construction. 18.11.11

050 Progressive Energy Teesside CCS Project Carbon capture & storage project submitted by DECC to the EU Commission in May 2011 under the NER300 Process. £1.5b capital value. 1500 peak workforce.

16.11.11

051 Real Ventures Immingham 49.5MW Wood Pellet Biomass

£130 capital value. 250 peak workforce. Expect planning permission end 2011, construction 2012 with completion 2014.

16.11.11

052 RES Blyth 100MW Biomass Planning application submitted. If granted construction to start in 2012, operational 2015. Peak workforce 200-300.

16.11.11

053 RES UK & Ireland Port of Liverpool 100/150MW Biomass Capital value £300m. Application to IPC expected Q3/12. Peak workforce 200-300.

17.11.11

054 Resource Recovery Solutions Derby Waste Treatment Facility (gasification plant)

Capital value £500m. Interserve the preferred bidder. July 2011 Court Judgement overruled decision to refuse application. Now referred to Sec of State. New Public enquiry may be held.

16.11.11

055 Richborough A Ltd Sandwich Demolition of PS & construction of recycling plant/biomass & gasification plants

Capital value £750m. Public consultations commenced May 2011. Peak workforce 500. 5-10 years construction. Demolition of towers & chimneys early 2012. Subject to planning consent construction planned for summer 2012. Operational 2016.

17.11.11

056 RWE Npower Fawley 300MW OCGT Application to IPC expected 3Q/12. RWE considering plans for Fawley site as a whole and have put plans for OCGT on hold at present.

17.11.11

057 Scottish Power Bristol 950MW CCGT To be called the Avon Power Station. First stage of consultation in progress. Application to IPC scheduled for early October 2011.

17.11.11

059 Sembcorp/Sita UK Wilton 35MW Wilton 11 Waste to Energy

Capital value £200m. Peak workforce 150-200. Proposed start 2012 – finish 2015. Project covered by Wilton’s existing planning consent.

17.11.11

060 Solena Group/British Airways Rainham Marshes Jet Fuel Plant + 20MW Start Q1/12. Completion Q1/14. 17.11.11

061 South London Waste Partnership Croydon Residual Waste Treatment Facilities(2 x mech bio & 12 x energy from waste with combined heat & power)

Capital value £990m. Final bids received by Viridor and Waste Recycling Group. Preferred bidder appointed end Nov/early Dec 2011. Start date June 2012, finish June 2016.

17.11.11

062 SSE Generation Ltd Uskmouth 360MW Conversion Coal to Biomass

Feasibility studies taking place. 17.11 .11

066 SSE/Shell Peterhead CCS SSE & Shell have signed a joint development agreement to progress a proposed CCS project at SSE’s PS in Peterhead. Application currently being considered by the EU NER.

18.11.11

063 Tees Refining Ltd Teesside 200/250MW Synthetic Gas PS Application to IPC expected mid-2012. 17.11.11

064 Veolia Environmental Services Hatfield Waste Treatment Centre Vinci Environment UK have been appointed contractors. Start late 2013, completion spring 2016.

17.11.11

065 Welsh Power Newport 49.9MW Biomass Final planning being undertaken. Peak workforce 200. Construction – 28 months duration. Capital Value £140m. Awaiting planning permission by Newport City Council.

17.11.11

Total Pending further info 36

TOTAL POTENTIAL/FUTURE PROJECTS 63

THIS DATA IS TAKEN FROM A NUMBER OF SOURCES AND IS THE BEST AVAILABLE. ITS ACCURACY RELIES UPON FEEDBACK FROM CLIENTS & INDUSTRY CONTACTS.

PLEASE ADVISE OF ANY UPDATES OR NEW INFORMATION YOU MAY HAVE OR OF OTHER POTENTIAL PROJECTS NOT MENTIONED.