C O L O R A D O L I C E N S E D P R O F E S S I O N A L E N G I N E E R J U S T I N H. MO N T G O M E R Y 42193 19 OLD TOWN SQUARE SUITE 238 FT COLLINS, CO 80524 PH: (970) 430-5783 1623 CENTRAL AVE. CHEYENNE, WY 82001 PH: (307) 222-9375 designpointengineering.com DATE: DESIGNED: CHECKED: SEAL: ISSUES DESCRIPTION DATE PROJECT NUMBER: 02/13/2020 02/13/2020 ORD JHM G-001 TITLE SHEET FOSSIL RIDGE HS BOILER REPLACEMENT 5400 ZIEGLER RD FORT COLLINS, CO 80528 CONSTRUCTION DOCUMENTS 02/13/2020 1918 POUDRE SCHOOL DISTRICT FOSSIL RIDGE HIGH SCHOOL BOILER REPLACEMENT 5400 ZIEGLER ROAD FORT COLLINS, CO 80528 VICINITY MAP NOT TO SCALE BUILDING LOCATION PRIME CONSULTANT/ MECHANICAL ENGINEER 19 OLD TOWN SQUARE SUITE 238 FORT COLLINS, CO 80524 PH: 970.430.5783 1623 CENTRAL AVE. CHEYENNE, WY 82001 PH: 307.222.9375 DesignPointEngineering.com ELECTRICAL ENGINEER: 3612 PIONEER AVENUE CHEYENNE, WY 82001 PH: 307.638.2511 INDEX OF SHEETS: G - 001 TITLE SHEET M - 001 MECHANICAL NOTES & LEGENDS M - 101 MECHANICAL ROOM DEMO PLAN M - 201 MECHANICAL REMODEL PLANS M - 301 TEMPERATURE CONTROLS M - 401 MECHANICAL SCHEDULES & DETAILS E - 100 LEGEND AND SHEET INDEX E - 200 HVAC ELECTRICAL DEMO PLANS & SCHEDULES E - 201 ONE LINE AND HVAC ELEC. PLANS & SCHEDULES E - 300 PANELBOARD SCHEDULES AND LIGHTING PLANS REVISIONS # DESCRIPTION DATE

POUDRE SCHOOL DISTRICT · 2020. 3. 9. · general notes: 1. mechanical ... assembly as required with the existing roofing manufacturer's patching requirements for insulation anchors

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • C

    OLO

    RADO LICENSED

    PROFESS IONAL EN

    G I

    NEER

    JUSTIN

    H.MONTGO

    MERY42193

    19 OLD TOWN SQUARE

    SUITE 238

    FT COLLINS, CO 80524

    PH: (970) 430-5783

    1623 CENTRAL AVE.

    CHEYENNE, WY 82001

    PH: (307) 222-9375

    designpointengineering.com

    DATE:

    DESIGNED:

    CHECKED:

    SEAL:

    ISSUES

    DESCRIPTION DATE

    PROJECT NUMBER:

    02/13/2020

    02/13/2020

    ORD

    JHM

    G-001

    TITLE SHEET

    FOSSIL RIDGE

    HS BOILER

    REPLACEMENT5400 ZIEGLER RD

    FORT COLLINS, CO 80528

    CONSTRUCTION DOCUMENTS 02/13/2020

    1918

    POUDRE SCHOOL DISTRICT

    FOSSIL RIDGE HIGH SCHOOL BOILER REPLACEMENT

    5400 ZIEGLER ROAD

    FORT COLLINS, CO 80528

    VICINITY MAPNOT TO SCALE

    BUILDING LOCATION

    PRIME CONSULTANT/

    MECHANICAL ENGINEER

    19 OLD TOWN SQUARE SUITE 238

    FORT COLLINS, CO 80524

    PH: 970.430.5783

    1623 CENTRAL AVE.

    CHEYENNE, WY 82001

    PH: 307.222.9375

    DesignPointEngineering.com

    ELECTRICAL ENGINEER:

    3612 PIONEER AVENUE

    CHEYENNE, WY 82001

    PH: 307.638.2511

    INDEX OF SHEETS:

    G-001 TITLE SHEET

    M-001 MECHANICAL NOTES & LEGENDS

    M-101 MECHANICAL ROOM DEMO PLAN

    M-201 MECHANICAL REMODEL PLANS

    M-301 TEMPERATURE CONTROLS

    M-401 MECHANICAL SCHEDULES & DETAILS

    E-100 LEGEND AND SHEET INDEX

    E-200 HVAC ELECTRICAL DEMO PLANS & SCHEDULES

    E-201 ONE LINE AND HVAC ELEC. PLANS & SCHEDULES

    E-300 PANELBOARD SCHEDULES AND LIGHTING PLANS

    REVISIONS

    # DESCRIPTION DATE

  • MECHANICAL LEGEND

    NEW DUCTWORK (SHADED)

    DUCT DOWN, DUCT UP

    DUCT RISERS (SUPPLY, RETURN, EXHAUST)

    90° ELBOW W/ TURNING VANES, 45° TAKE-OFF W/ MANUAL BALANCING DAMPER

    THERMOSTAT

    DUCTWORK DEMOLITION

    DOMESTIC COLD WATERDCW

    HEATING WATER SUPPLYHWS

    HEATING WATER RETURNHWR

    2-WAY CONTROL VALVE, 3-WAY CONTROL VALVE

    BALL VALVE, GATE VALVE

    ELBOW DOWN, TEE UP

    PIPE UNION OR FLANGE

    TEE DOWN, PIPE CONTINUATION

    PIPE DEMOLITION

    SWITCH, EMERGENCY POWER OFF

    BUTTERFLY VALVE, BALANCE VALVE

    CO SENSOR

    MOTORIZED DAMPER

    TEMPERATURE SENSOR

    EXISTING PIPE

    EXISTING DUCTWORK

    CHILLED WATER RETURNCHWR

    CHILLED WATER SUPPLYCHWS

    T

    TS

    CO

    S

    EPO

    SW

    M

    POINT OF CONNECTION

    LIMIT OF DEMOLITION

    REDUCER OR INCREASER

    CHECK VALVE

    MECHANICAL ABBREVIATIONS

    AFF ABOVE FINISHED FLOORBLW BELOWCHW CHILLED WATERCHWS CHILLED WATER SUPPLYCHWR CHILLED WATER RETURNDN DOWN(E) EXISTINGEA EXHAUST AIREC ELECTRICAL CONTRACTOREF EXHAUST FANFD FLOOR DRAINHUH HYDRONIC UNIT HEATERHWR HEATING WATER RETURNHWS HEATING WATER SUPPLYMC MECHANICAL CONTRACTOR(N) NEWOA OUTSIDE AIRPOC POINT OF CONNECTIONRB REBALANCETAB TEST & BALANCETC TEMPERATURE CONTROLSTCC TEMPERATURE CONTROLS CONTRACTORTCP TEMPERATURE CONTROL PANELTSTAT THERMOSTATTYP TYPICALUNO UNLESS NOTED OTHERWISEW/ WITHW/O WITHOUT

    FIRE/SMOKE DAMPERFS

    LOW PRESSURE NATURAL GAS PIPE (

  • B

    M

    AIR INTAKE

    D002

    BOILER ROOM

    D001

    STAIR

    D124

    MPG

    GG

    (E) 1

    6/16

    (E) P-1 (E) P-2(E) 3"

    (E)EF-D5

    (E) ET-1(E) AS-1

    (E) 6"

    (E) 5"

    (E) ET-2

    (E) AS-2

    (E) P-3

    (E) P-4

    (E) P-5

    (E) P-6

    (E) FD

    (E) FD

    (E) FD

    (E) FD

    (E) FD

    (E) GAS PRV

    (E) EMERGENCY GAS SOLENOID VALVE

    1

    (E) HUH

    1 1

    1

    1

    1

    1

    1

    1

    1

    1(E) GLYCOL TANK(CHILLED WATER)

    2 (E) INTAKE LOUVER

    34

    5 (E) PUMP

    6

    (E) BOILER(E) BOILER(E) BOILER

    66

    7(E) FLUE 7 (E) FLUE

    1(E) 20"ø FLUE

    (E) CHILLED WATER PUMPS

    (E) HEATING WATER PUMPS

    1

    (E) DWH

    11(E) STORAGE TANKS(DOMESTIC)

    8

    88

    HW

    S

    HWR

    HW

    S

    HWS

    (E) 4"(E) 4"

    9

    9

    9

    9

    (E) BAROMETRIC DAMPER

    (E) 16/16 EA DUCT UP1

    (E) 20"ø

    CHWS

    CHWR

    CHWR

    HW

    S

    HW

    R

    (E) 3/4"

    (E) 3/4"

    10

    11

    11

    EPO

    SW

    CO

    S

    EPO

    SW

    12

    13

    14

    14

    15

    (E) TC PANEL

    (E) HEAT TIMER

    (E) 3" MPG UP

    (E) CHILLED WATER EXPANSION TANK AND AIR SEPARATOR

    7

    1

    1

    C

    O

    LORAD

    O LICENSED

    PR

    OFESS I ONAL EN

    G I

    NE

    ER

    JUS

    TIN

    H.MONTGO

    ME

    RY42193

    19 OLD TOWN SQUARE SUITE 238FT COLLINS, CO 80524PH: (970) 430-5783

    1623 CENTRAL AVE.CHEYENNE, WY 82001PH: (307) 222-9375

    designpointengineering.com

    DATE:

    DESIGNED:

    CHECKED:

    SEAL:

    ISSUES

    DESCRIPTION DATE

    PROJECT NUMBER:

    02/13/2020

    02/13/2020

    ORD

    JHM

    M-101

    MECHANICALDEMO PLAN

    FOSSIL RIDGEHS BOILER

    REPLACEMENT5400 ZIEGLER RD

    FORT COLLINS, CO 80528

    CONSTRUCTION DOCUMENTS 02/13/2020

    1918

    1/4" = 1'-0"

    MECHANICAL DEMO PLAN1

    FLAG NOTES1 EXISTING EQUIPMENT TO REMAIN AS IS.

    2 EXISTING LOUVER TO BE MODIFIED. REMOVE BLADES AND LEAVE FRAME IN PLACE TO BE USEDWITH NEW BOILER COMBUSTION AIR DUCTS.

    3 EXISTING EXPANSION TANK TO BE DEMOLISHED.

    4 EXISTING AIR SEPARATOR TO BE DEMOLISHED.

    5 EXISTING BOILER PUMP TO BE DEMOLISHED. REMOVE CONCRETE BASE AND ELECTRICALCONDUIT ON THE FLOOR.

    6 EXISTING BOILER, ASSOCIATED ACCESSORIES, CONTROLS, ETC. TO BE DEMOLISHED.

    7 EXISTING FLUE FROM THE BOILER TO BE DEMOLISHED. LEAVE A POINT OF CONNECTION IN THEEXISTING COMMON 20"ø FLUE TO BE RE-USED WITH THE NEW BOILERS.

    8 EXISTING HYDRONIC PIPING TO BE DEMOLISHED.

    9 EXISTING CONCRETE HOUSEKEEPING PAD.

    10 EXISTING MOTORIZED DAMPER TO BE DEMOLISHED. REMOVE ALL ASSOCIATED WIRING.

    11 EXISTING 3/4" HWS/R SERVING THE HYDRONIC UNIT HEATER TO BE DEMOLISHED AS SHOWN.

    12 EXISTING TEMPERATURE CONTROL PANEL TO REMAIN.

    13 EXISTING HEAT TIMER PANEL TO BE DEMOLISHED.

    14 EXISTING EPO SWITCH TO BE REPLACED IN SAME LOCATION. SEE REMODEL PLAN.

    15 EXISTING CO SENSOR TO BE CAREFULLY REMOVED AND STORED FOR RELOCATION. SEEREMODEL PLAN.

    #

    REVISIONS

    # DESCRIPTION DATE

  • MF

    S

    AIR INTAKE

    D002

    BOILER ROOM

    D001

    STAIR

    D124

    MPG

    GG

    (E) P-1 (E) P-2(E) 3"

    (E) 6"

    (E) 5"

    (E) ET-2

    (E) AS-2

    (E) P-3

    (E) P-4

    (E) P-5

    (E) P-6

    B-1 B-2 B-3

    BP-1 BP-2 BP-3

    3"3"

    3"

    GT-11

    (E) DWH

    (E) HTR

    (E) 4"(E) 4"

    (E) 4"

    (E) 4"

    HW

    S

    HWR

    HWS

    2

    ET-1

    ADS-1

    HW

    RH

    WS

    4"6"

    4" 4"

    HW

    R

    HW

    R

    GGG5"

    HW

    R

    HWS

    HWR

    1 1/2"

    (E) FD

    (E) FD

    (E) FD

    (E) FD

    (E) FD

    CH

    WS

    CH

    WR

    CHWS

    CHWR

    CHWR

    HWS

    HWR

    3/4"

    3/4"

    5

    5

    EPO

    SW

    EPO

    SW

    CO

    S

    10

    11

    12

    11

    (E) TC PANEL

    (E) CHW GLYCOL FILL TANK

    4"5"

    (E) CHILLED WATER EXP. TANK & AIR SEPARATOR

    (E) CHILLED WATER PUMPS

    (E) STORAGE TANKS (DOMESTIC)

    (E) 4" HWS/R UP

    6"

    (E) 3" MPG UP

    15

    HWR

    HWS

    B-3

    ET-1(E) P-1 (E) P-2

    ADS-1

    CONCRETE HOUSEKEEPING

    PAD, TYP.

    PT

    12" MAX.

    PRESSURE RELIEF VALVE SUPPLIED W/ BOILER. PIPE RELIEF TO NEAREST

    FLOOR SINK, TYP.

    (E) 4" HWR

    BOILER DRAINVALVE, TYP.

    1 1/2"

    PT

    PT

    PT

    PT

    THERMOMETER, TYP.

    HEATING WATER SYSTEM PIPING SCHEMATICSCALE: NONE

    GF-1

    HWS

    HWR HEATING WATER RETURN

    HEATING WATER SUPPLY

    (E) 4" HWS/R

    3/4"

    PT

    STRAINER W/BALL VALVE AND HOSE CONNECTION W/BRASS

    CAP, TYP.

    ACID NEUTRALIZATION BOILER CONDENSATE TRAP. PIPE TO NEAREST FLOOR DRAIN, TYP.

    FLANGED VENTURI BALANCING VALVE W/BUTTERFLY SHUTOFF

    VALVE, TYP.

    NOTE: HEATING WATER SYSTEM CONTAINS 30% INHIBITED PROPYLENE GLYCOLCONTRACTOR IS RESPOSIBLE FOR REPLACING GLYCOL LOST DUE TO CONSTRUCTION. PROVIDE TEST RESULTS BEFORE AND AFTER CONSTRUCTION.

    B-2

    PT

    PT

    B-1

    PT

    PT

    (E) MAKE-UP WATER

    BP-1 BP-2 BP-3

    6" HWR

    4" HWR

    4" HWS 5" HWS

    4"

    1/8"

    ROUTE TO GLYCOL FEED TANK

    PIPE SUPPORT, TYP.

    N.C. VALVE

    PT

    PT

    PT

    PT

    PT

    PT

    6" HWS

    6"

    (E) B&G MODEL # 1510200 GPM, 169 FT HD

    (E) B&G MODEL # 1510200 GPM, 169 FT HD

    VFD VFD

    BALL VALVE W/ HOSE END CONNECTION, TYP.

    PROVIDE SHUTOFF BALL VALVE FOR AIR VENT

    3/4"

    AIR INTAKE

    D002

    BOILER ROOM

    D001

    STAIR

    D124

    (E) 1

    6/16

    (E)EF-D5

    B-1 B-2 B-3

    (E) 20"ø FLUE UP

    (E) DWH

    20"ø

    3

    10"ø FLUE, TYP.

    12"ø

    12"ø

    12"ø 444

    24/2

    4

    6

    7

    8

    9

    IH-1

    STAIRWELL WALL(ABOVE)

    13

    14 TYP. (3)

    (E) 16/16 EA UPM M M

    1617 TYP. (3)

    18SDSD

    C

    O

    LORAD

    O LICENSED

    PR

    OFESS I ONAL EN

    G I

    NE

    ER

    JUS

    TIN

    H.MONTGO

    ME

    RY42193

    19 OLD TOWN SQUARE SUITE 238FT COLLINS, CO 80524PH: (970) 430-5783

    1623 CENTRAL AVE.CHEYENNE, WY 82001PH: (307) 222-9375

    designpointengineering.com

    DATE:

    DESIGNED:

    CHECKED:

    SEAL:

    ISSUES

    DESCRIPTION DATE

    PROJECT NUMBER:

    02/13/2020

    02/13/2020

    ORD

    JHM

    M-201

    MECHANICALREMODEL

    PLANS

    FOSSIL RIDGEHS BOILER

    REPLACEMENT5400 ZIEGLER RD

    FORT COLLINS, CO 80528

    CONSTRUCTION DOCUMENTS 02/13/2020

    1918

    FLAG NOTES1 NEW GLYCOL FILL TANK. REFER TO THE HEATING WATER PIPING SCHEMATIC FOR DETAILED

    INFORMATION FOR THIS DEVICE.

    2 EXTEND CONCRETE PAD AS REQUIRED TO ACCOMMODATE NEW BOILERS FOOTPRINT &CLEARANCES.

    3 CONNECT TO EXISTING 20" FLUE (HEATFAB MODEL # SAF-T CI) TO REMAIN.

    4 THE ROUTING SHOWN ON THE PLANS FOR THE COMBUSTION AIR DUCTS IS APPROXIMATEAND BASED ON THE SPACE AVAILABLE IN THE EXISTING MECHANICAL ROOM. CONTRACTORSHALL FIELD VERIFY ROUTING AND MOVE PIPE HANGERS, LIGHTS, CONDUITS, AND SMALLERPIPES AS NEEDED. INSTALL THE COMBUSTION AIR DUCTS AS HIGH AS POSSIBLE AND OFFSET ASREQUIRED TO MISS EXISTING PIPES.

    5 RELOCATED 3/4" HWS/R TO MAKE ROOM FOR THE COMBUSTION AIR DUCTS.

    6 INTAKE HOOD INSTALLED ON THE ROOF. KEEP 10' MINIMUM FROM THE ROOF EDGE. INTAKEHOOD IS USED FOR DUAL PURPOSE, INTAKE WHEN EF-5D IS RUNNING, AND COMBUSTION AIRFOR THE EXISTING WATER HEATER DWH-1.

    7 120 V LOW-LEAK MOTORIZED DAMPER INTERLOCKED WITH (E) EF-D5 AND (E) DWH. SEE DDCI/O POINTS LIST AND SEQUENCE OF OPERATION.

    8 24/24 DUCT LOCATED HIGH UNDER THE ROOF IN STORAGE ROOM.

    9 FIRE/SMOKE DAMPER WHERE THE DUCT PENETRATES THE WALL INTO THE STAIRWELL.

    10 NEW TEMPERATURE CONTROL PANEL.

    11 NEW EPO SWITCHES, RE: ELECTRICAL PLANS, PROVIDED BY MECHANICAL CONTRACTOR ANDINSTALLED BY ELECTRICAL CONTRACTOR.

    12 RELOCATED CO SENSOR.

    13 REMOVE THE EXISTING LOUVER BLADES FROM THE LOUVER FRAME TO ALLOW CA DUCTS TOPENETRATE THROUGH THE WALL. PROVIDE 18 GA. SHEET METAL COVER ON BOTH SIDES OFTHE REMAINING LOUVER FRAME. ATTACHED SHEET METAL TO THE FRAME BY SETTING IN A BEDOF SEALANT AND THEN ATTACHING WITH SCREWS. PROVIDE 2" RIGID INSULATION BETWEENTHE 2-LAYERS OF SHEET METAL. PROVIDE A STORM COLLAR AROUND EACH DUCT AND SET INA BED OF SEALANT AND THEN SEAL THE PERIMETER WATER TIGHT.

    14 COMBUSTION AIR DUCT TO ELBOW DOWN AFTER LEAVING THE MECHANICAL ROOM. PROVIDEBIRD SCREEN AT THE END OF THE DUCT.

    15 EXISTING GAS SOLENOID VALVE TO BE RE-CONNECTED TO THE NEW EPO SWITCHES TO SHUTOFF IN CASE OF EMERGENCY.

    16 NEW DOUBLE WALL STAINLESS STEEL BOILER VENT. REFER TO SECTION 235100.

    17 BOILER VENT ISOLATION DAMPER. INSTALL IN THE VERTICAL 10" FLUE AND WIRE BACK TO THEBOILER CONTROLLER. DAMPERS TO BE OPEN WHEN THE BOILER IS FIRING, CLOSED WHEN THEBOILER IS OFF.

    18 FIRE/SMOKE DAMPER AND DUCT DETECTOR PROVIDED BY M.C. COORDINATE WITH THE E.C.FOR POWER AND FIRE ALARM WIRING. INSTALL PER THE INTERNATIONAL MECHANICAL CODEAND PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. SEE SECTION 233300.

    #

    PLAN GENERAL NOTESA. CHILLED WATER AND DOMESTIC WATER PIPING PARTIALLY SHOWN FOR CLARITY.

    CONTRACTOR TO FIELD COORDINATE ROUTING WITH THIS PIPING.

    B. REFER TO THE HEATING WATER SYSTEM PIPING SCHEMATIC FOR MORE DETAILS REGARDING PIPE SIZES, VALVES, AND ACCESSORIES.

    C. COORDINATE WITH THE ELCTRICAL CONTRACTOR TO MODIFY LIGHTING LAYOUT AS REQUIRED TO MAKE ROOM FOR THE NEW MECHANICAL WORK.

    D. ALL WORK SHALL COMPLY WITH THE DETAILS ON SHEET M-401, INCLUDING BUT NOT LIMITED TO:• DUCT ELBOWS DETAIL• DUCT TRANSITION DETAIL• GAS-FIRED EQUIPMENT PIPING DETAIL

    E. BOILER VENTING SYSTEM TO BE DESIGNED BY THE BOILER VENTING MANUFACTURING INCLUDING FINAL LAYOUT, FITTINGS, AND CALCULATIONS. SEE SECTION 235100.

    1/4" = 1'-0"

    MECHANICAL PLAN - HYDRONIC & GAS21/4" = 1'-0"

    MECHANICAL PLAN - FLUE AND COMBUSTION AIR1

    REVISIONS

    # DESCRIPTION DATE

  • HOT WATER PUMP CONTROL (HWP-1 & HWP-2):1. START HEATING WATER PUMPS WHEN OAT < 65°F (ADJ.). WHEN THE OUTSIDE AIR TEMPERATURE RISES ABOVE THE SYSTEM ENABLE SET

    POINT, THE PUMPS SHALL BE OFF.

    2. WHEN ENABLED, THE PUMP VFDS WILL MODULATE THE SPEED TO MAINTAIN THE HEATING WATER DIFFERENTIAL PRESSURE SET POINT (ADJ.) AS SET BY THE TAB CONTRACTOR.

    3. THE DDC SYSTEM SHALL MONITOR THE PUMP'S RUN STATUS VIA A CURRENT SWITCH. IF THE PUMP STATUS DOES NOT MATCH THE COMMAND AN ALARM WILL BE GENERATED.

    SEQUENCE OF OPERATION:

    DDC I/O POINTS LISTTAG TYPE DESCRIPTION UNITS REMARKS

    HWS-T AI HEATING WATER SUPPLY TEMPERATURE °F

    HWR-T AI HEATING WATER RETURN TEMPERATURE °F

    OA-T AI OUTSIDE AIR TEMPERATURE °F

    BLR1-A DI BOILER B-1 ALARM ALARM

    BLR2-A DI BOILER B-2 ALARM ALARM

    EPO-S DI EPO SWITCH STATUS ON/OFF

    HWP1-S DI HW PUMP #1 STATUS ON/OFF

    HWP2-S DI HW PUMP #2 STATUS ON/OFF

    HW-DPL

    H

    HWR

    HWS

    HW-DP AI HEATING WATER DIFFERENTIAL PRESSURE IN. W.C.

    HWP1-O AO HW PUMP #1 VFD OUTPUT %

    HWP2-O AO HW PUMP #2 VFD OUTPUT %

    HWR

    HWS

    B-3 B-2 BP-3

    (E) P-1 (E) P-2GF-1

    HOT WATER RETURN

    HOT WATER SUPPLY

    (E) HWP-1 VFD

    HWP1-S

    HWP1-OHWP1-A

    (E) HWP-2 VFD

    HWP2-S

    HWP2-OHWP2-A

    TS

    TS

    EPO-S

    OA-T

    BLR3-ABLR2-OBLR2-A

    HWGF-A

    ADS-1

    HWR-THWS-T

    VARIABLE SPEED BOILER PUMP CONTROLLED BY ITS ASSOCIATED BOILER, TYP. TCC TO WIRE TO EACH BOILER CONTROLLER

    DCW FILL

    REPLACEDEMERGENCY POWEROFF (EPO) SWITCH

    NOTES: 1. THE TCC SHALL PROVIDE ANY ADDITIONAL POINTS REQUIRED TO MEET THE SEQUENCE OF OPERATION AND TO PROVIDE A FULLY

    FUNCTIONAL SYSTEM.2. THE TCC SHALL REMOVE ANY POINTS AND GRAPHICS NO LONGER USED FOR THE BOILER SYSTEM SUCH AS THE THE EXISTING BOILER PUMP

    (P-7), EXISTING BOILER MASTER CONTROLLER, ETC.

    HWGF-A DI HEATING WATER GLYCOL FEEDER ALARM ALARM

    ET-1

    BP-2

    1. ALL CONTROLS WORK SHALL COMPLY WITH THE POUDRE SCHOOL DISTRICT TECHNICAL CONTROLS SPECIFICATIONS. THE CONTRACTOR SHALL OBTAIN A COPY PRIOR TO THE BID AND NOTIFY THE ENGINEER OF ANY CONFLICTS OR DISCREPANCIES. WHERE A CONFLICT OCCURS, THE CONTRACTOR SHALL INCLUDE IN THEIR BID THE MORE STRINGENT (HIGHEST COST) REQUIREMENT.

    2. THE APPROVED TEMPERATURE CONTROLS CONTRACTOR IS LONG BUILDING TECHNOLOGIES. THE SCHOOL DISTRICT WILL PROVIDE THE REQUIRED SCHNEIDER ELECTRIC CONTROLLERS, ALL OTHER CONTROLS COMPONENTS AND WORK SHALL BE BY THE TCC.

    3. THE TEMPERATURE CONTROLS CONTRACTOR SHALL UPDATE THE GRAPHICS FOR THE BOILER SYSTEM FOR THE NEW SYSTEM.

    4. ALL SET POINTS LISTED AS ADJUSTABLE SHALL BE EASILY ACCESSED FROM THE GRAPHICS SCREEN FOR EACH SYSTEM. THE GRAPHICS SHALL ALSO INCLUDE FLOOR PLANS OF THE BUILDING SHOWING EACH SYSTEM.

    5. THE TCC SHALL COORDINATE THE INITIAL PARAMETERS OF THE SCHEDULES, ALARMS, AND TRENDS WITH THE OWNER DURING TRAINING. THE TCC SHALL ALSO MAKE ADJUSTMENTS TO THE GRAPHICS REQUESTED BY THE OWNER AT NO ADDITIONAL COST.

    6. ALL CONTROL WIRING INSIDE THE MECHANICAL ROOM SHALL BE RUN IN CONDUIT.

    7. THE TCC SHALL PROVIDE ALL CONTROL WIRING FOR THE BOILER INCLUDING WIRING BETWEEN EACH BOILER, WIRING TO THE HEADER SENSOR TO BOILER B-1 & B-2, AND WIRING TO THE PROTONODE DEVICES IN THE TC PANEL. FOLLOW THE BOILER MANUFACTURER'S INSTALLATION INSTRUCTIONS.

    8. THE TCC SHALL INTEGRATE THE EACH BOILER CONTROLLER VIA THE LONWORKS PROTONODE COMMUNICATION CONVERTER PROVIDED WITH EACH BOILER. THE GRAPHICS SHALL INCLUDE A LIST OF POINTS FOR EACH BOILER.

    9. THE TCC SHALL PROVIDE ANY OTHER BOILER FIELD WIRING REQUIRED BY THE BOILER INSTALLATION INSTRUCTIONS TO MAKE A FULLY OPERATIONAL SYSTEM.

    10. THE USER INTERFACE SHALL INCLUDE EASY ACCESS TO TRENDING, ALARMS, AND SCHEDULING.

    TEMPERATURE CONTROLS GENERAL NOTES:

    B-1

    BLR1-OBLR1-A

    BP-1

    MT-1

    REPLACEDEMERGENCY POWEROFF (EPO) SWITCH

    EXISTING

    EXISTING

    EXISTING

    EXISTING

    EXISTING

    EXISTING

    EXISTING

    EXISTING

    EXISTING

    MASTER BOILER

    BACK-UPMASTER BOILER

    BLR3-A DI BOILER B-3 ALARM ALARM

    BLR1-O AO BOILER B-1 TEMPERATURE RESET OUTPUT %

    BLR2-O AO %

    NEW

    NEW

    NEW

    NEW

    NEW

    NEW

    HWP1-C DO HW PUMP #1 START/STOP ON/OFF

    HWP2-C DO HW PUMP #2 START/STOP ON/OFF

    EXISTING

    EXISTING

    BOILER B-2 TEMPERATURE RESET OUTPUT (BACKUP)

    COMBUSTION AIR

    M

    CAD-CCAD-S

    CAD-S DO COMBUSTION AIR DAMPER STATUS (END SWITCH) OPEN/CLOSE NEW

    CAD-C DO COMBUSTION AIR DAMPER COMMAND OPEN/CLOSE NEW

    BOILER CONTROL:1. THE BOILERS HAVE INTERNAL CONTROLS WHICH SHALL INTEGRATE INTO THE DDC SYSTEM VIA LONWORKS PROTOCOL. THE TCC IS

    RESPONSIBLE FOR COORDINATION WITH THE BOILER MANUFACTURER TO PROVIDE THE INTEGRATION FOR EACH BOILER. COORDINATE WITH THE OWNER ON WHICH POINTS FROM BOILER CONTROLLER THEY MAY WANT DISPLAYED ON THE FRONT-END GRAPHICS SCREEN.

    2. THE DDC POINTS LISTED SHALL BE HARD WIRED TO EACH BOILER, NOT PROVIDED THROUGH THE LONWORKS INTEGRATION. THE LONWORKS INTEGRATION SHALL BE USED FOR MONITORING ONLY.

    3. WHEN THE LEAD HEATING WATER PUMP STATUS IS ESTABLISHED, THE DDC ENABLES THE BOILER PLANT.

    4. BOILER B-1 IS THE LEAD/MASTER BOILER AND BOILERS B-2 AND B-3 ARE "MEMBER" BOILERS IN THE CASCADE. BOILER B-2 SHALL BE A BACKUP LEAD/MASTER BOILER IF B-1 LOSES COMMUNICATION, OTHERWISE IT SHALL OPERATE AS A "MEMBER" BOILER. THE BOILER INTERNAL CONTROLS WILL AUTOMATICALLY CONTROL BOILER CASCADING, FIRING RATES, AND BOILER RUNTIME MANAGEMENT.

    5. THE DDC SYSTEM SHALL SEND A SIGNAL TO THE BOILER PLANT FOR SUPPLY WATER TEMPERATURE WHICH SHALL BE INVERSELY RESET IN ACCORDANCE WITH THE FOLLOWING LINEAR RESET SCHEDULE. • OAT = 60° F (ADJ.) --> HWS = 100° F (ADJ.).• OAT = -10° F (ADJ.) --> HWS = 160° F (ADJ.).

    6. THE DDC SYSTEM SHALL MONITOR EACH BOILER'S ALARM CIRCUIT AND RELAY ANY ALARM TO THE DDC.

    7. UPON ACTIVATION OF THE EMERGENCY POWER SWITCH, LOCATED AT THE BOILER ROOM DOORS, THE POWER TO THE BOILERS SHALL DISABLED, THE EMERGENCY GAS SOLENOID VALVE SHALL CLOSE, AND AN ALARM SHALL BE SENT TO THE DDC. THE TCC SHALL COORDINATE WIRING BETWEEN THE SWITCH AND THE BOILER POWER CIRCUIT. DISABLING THE BOILER THROUGH THE BOILER ALARM CIRCUIT IS NOTALLOWED.

    8. THE DDC SYSTEM SHALL MONITOR THE GLYCOL FEEDER ALARM CONTACT AND SEND THE ALARM TO THE DDC SYSTEM.

    9. THE DDC SYSTEM SHALL MONITOR THE BOILER ROOM TEMPERATURE. ALARM IF BELOW 45° F (ADJ.).

    TS

    BOILER HEADER SENSOR, TYP. (2)PROVIDED BY BOILER MANUF.INSTALL 10 FT DOWNSTREAM OF LAST BOILER CONNECTION

    1. THE TCC SHALL WIRE EACH BOILER CONTROLLER TO THE PROTONODE CONTROLLER PROVIDED WITH THE BOILER. THE PROTONODE CONTROLLER SHALL BE LOCATED IN THE NEW TEMPERATURE CONTROL PANEL (SEE FLOOR PLANS). THE TCC SHALL ENSURE THAT THEY PROVIDE A PANEL WITH ADEQUATE SPACE FOR ALL (3) PROTONODES.

    2. THE TCC SHALL OBTAIN A LIST OF AVAILABLE LONWORKS POINTS FROM THE BOILER MANUFACTURER AND COORDINATE WITH THE OWNER ON WHICH POINTS TO MONITOR ON THE FRONT-END GRAPHICS. THE MINIMUM POINTS TO INTEGRATE AND DISPLAY ARE LISTED BELOW:• BOILER ENABLE• BOILER PUMP ON/OFF• BOILER PUMP SPEED• ALARM CONTACTS• FLUE DAMPER OUTPUT• INLET TEMPERATURE• OUTLET TEMPERATURE• FLUE TEMPERATURE• FIRING RATE• SYSTEM SUPPLY TEMPERATURE (FROM BOILER HEADER SENSOR, NOT DDC SYSTEM)

    LONWORKS INTEGRATION NOTES:

    NEW TEMPERATURE

    SENSOR W/ DIGITAL DISPLAY

    ZN-T

    ZN-T AI BOILER ROOM TEMPERATURE °F NEW

    11. THE TCC SHALL REMOVE EXISTING CONTROLS, WIRING, CONDUITS NO LONGER USED FOR THE NEW EQUIPMENT.

    12. THE TCC SHALL BE RESPONSIBLE FOR A COMPLETE WORKING SYSTEM AT THE END OF THE PROJECT WHICH MAY INCLUDE ADDING ADDITIONAL POINTS WHICH SHALL ALL BE INCLUDED IN THE BID. THE TCC SHALL COMMISSION ALL THE NEW CONTROLS TO VERIFY THAT THE ENTIRE SYSTEM IS PERFORMING PER THE SEQUENCE OF OPERATION. THE ENGINEER WILL PERFORM AN OPERATIONAL CHECK ON THE CONTROLS WITH THE TCC AFTER THE TCC HAS SENT IN WRITING THAT THEY HAVE COMPLETED COMMISSIONING OF THE CONTROLS AND ALL SEQUENCES ARE WORKING.

    13. AFTER COMPLETION OF THE COMMISSIONING BY THE TCC AND OPERATIONAL CHECK BY THE ENGINEER, THE TCC SHALL PROVIDE OWNER TRAINING PER SECTION 230923.

    14. THE TCC SHALL PROVIDE AN AS-BUILT SET OF TEMPERATURE CONTROLS DRAWINGS TO THE OWNER IN THE FINAL O&M MANUAL, PRINTED AND IN PDF FORMAT. THE TCC SHALL ALSO PROVIDE A PRINTED COPY OF THE AS-BUILT TEMPERATURE CONTROL DRAWINGS IN THE MECHANICAL ROOM NEAR THE TEMPERATURE CONTROL PANEL.

    15. REFER TO SECTION 230923 FOR ADDITIONAL REQUIREMENTS.

    BLR2-EN BLR1-ENBLR3-EN

    CHWGF-A DI CHILLED WATER GLYCOL FEEDER ALARM ALARM NEW

    BLR1-EN DO BOILER B-1 ENABLE ON/OFF NEW

    BLR2-EN DO BOILER B-2 ENABLE ON/OFF NEW

    BLR3-EN DO BOILER B-3 ENABLE ON/OFF NEW

    (E) GF

    CHWF-A

    TO CHW SYSTEM

    (E) GLYCOL FEEDER, INSTALLED BY OWNER. CONNECT TO CONTROLLER

    ALARM CONTACT

    TS(N) TEMPERATURE CONTROL

    PANEL (SEE LONWORKS INTEGRATION NOTES-THIS SHEET)

    DOMESTIC WATER HEATER AND (E) EF-D5 DAMPER:1. WHEN THE DOMESTIC WATER HEATER IS ENABLED, THE DAMPER SHALL OPEN TO PROVIDE COMBUSTION AIR. TCC SHALL WIRE INTO THE

    COMBUSTION AIR TERMINALS OF THE WATER SIMILAR TO THE PREVIOUS DAMPER.

    2. WHEN THE (E) EF-5D IS ENABLED DUE TO HIGH TEMPERATURE IN THE MECHANICAL ROOM (SUMMER CONDITION) THE DAMPER SHALL OPEN TO PROVIDE MAKE UP AIR.

    3. WHEN THE WATER HEATER AND EXHAUST FAN EF-5D ARE OFF, THE DAMPER SHALL BE CLOSED.

    SEQUENCE OF OPERATION - INTAKE HOOD IH-1:

    EMERGENCY GAS SOLENOID

    VALVE

    S

    (N) INTAKE HOOD (IH-1). USED FOR INTAKE AIR FOR (E) EF-D5 AND FOR COMBUSTION AIR FOR THE (E) DWH

    INTERLOCK WITH (E) DWH & (E) EF-D5

    C

    O

    LORAD

    O LICENSED

    PR

    OFESS I ONAL EN

    G I

    NE

    ER

    JUS

    TIN

    H.MONTGO

    ME

    RY42193

    19 OLD TOWN SQUARE SUITE 238FT COLLINS, CO 80524PH: (970) 430-5783

    1623 CENTRAL AVE.CHEYENNE, WY 82001PH: (307) 222-9375

    designpointengineering.com

    DATE:

    DESIGNED:

    CHECKED:

    SEAL:

    ISSUES

    DESCRIPTION DATE

    PROJECT NUMBER:

    02/13/2020

    02/13/2020

    ORD

    JHM

    M-301

    TEMPERATURECONTROLS

    FOSSIL RIDGEHS BOILER

    REPLACEMENT5400 ZIEGLER RD

    FORT COLLINS, CO 80528

    CONSTRUCTION DOCUMENTS 02/13/2020

    1918

    REVISIONS

    # DESCRIPTION DATE

  • G

    UNION

    GAS SUPPLY

    APPLIANCE SHUTOFF VALVE

    6" LONG DIRT LEG,FULL DIAMETER UP TO 2"

    (SEE NOTE 2)

    NOTES:1. APPLIANCE SHUTOFF VALVE SHALL BE INSTALLED IN AN ACCESSIBLE LOCATION.

    2. REFER TO PLANS FOR PIPE SIZES. PROVIDE REDUCER/INCREASER AT THE EQUIPMENT CONNECTION AS REQUIRED.

    GAS-FIRED EQUIPMENT PIPING DETAILSCALE: NONE

    REDUCER/INCREASER

    GAS-FIRED EQUIPMENT

    FULL RADIUS ELBOW SHORT RADIUS ELBOW

    NOTES:

    1. FULL RADIUS ELBOWS SHALL BE USED AS THE STANDARD. SHORT RADIUS ELBOWS ARE ONLY PERMITTED WHERE FULL RADIUS ELBOWS WILL NOT FIT.

    2. THE INTERIOR OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.

    3. VANES SHALL BE CONSTUCTED, SUPPORTED AND FASTENED AS RECOMMENDED BY SMACNA.

    NOTES:

    1. DIMENSIONS 'W1' AND 'W2' SHALL BE EQUAL ON SQUARE ELBOWS, UNLESS NOTED OTHERWISE ON THE DRAWINGS.

    2. VANES SHALL BE AIRFOIL VANE TYPE. VANES SHALL BE CONSTRUCTED, SUPPORTED AND FASTENED AS RECOMMENDED BY SMACNA.

    SQUARE ELBOW WITH TURNING VANES

    DUCT ELBOWS DETAILSCALE: NONE

    1/3 × W

    0.5 × W

    W

    W

    W

    VANE

    W1

    W2

    CONVERGING AIRFLOW

    DIVERGING

    AIRFLOW

    CONVERGING AIRFLOW

    DIVERGING

    AIRFLOW

    θ

    θ

    θ = 15° MAX. CONVERGING AIRFLOWθ = 15° MAX. DIVERGING AIRFLOW

    θ

    θ = 30° MAX. CONVERGING AIRFLOWθ = 15° MAX. DIVERGING AIRFLOW

    SCALE: NONE

    DUCT TRANSITIONS DETAIL

    C

    O

    LORAD

    O LICENSED

    PR

    OFESS I ONAL EN

    G I

    NE

    ER

    JUS

    TIN

    H.MONTGO

    ME

    RY42193

    19 OLD TOWN SQUARE SUITE 238FT COLLINS, CO 80524PH: (970) 430-5783

    1623 CENTRAL AVE.CHEYENNE, WY 82001PH: (307) 222-9375

    designpointengineering.com

    DATE:

    DESIGNED:

    CHECKED:

    SEAL:

    ISSUES

    DESCRIPTION DATE

    PROJECT NUMBER:

    02/13/2020

    02/13/2020

    ORD

    JHM

    M-401

    MECHANICALSCHEDULES &

    DETAILS

    FOSSIL RIDGEHS BOILER

    REPLACEMENT5400 ZIEGLER RD

    FORT COLLINS, CO 80528

    CONSTRUCTION DOCUMENTS 02/13/2020

    1918

    1.) ASME CSD-1 COMPLETE WITH FLOW SWITCH, RELIEF VALVE, PRESSURE/TEMPERATURE GAUGE 2.) CONDENSATE NEUTRALIZATION KIT 3.) COMPLETE BOILER CONTROLS - WITH LONGWORKS BMS GATEWAY 4.) 20:1 FULL MODULATION 5.) 50 PSIG RELIEF VALVE 6.) HIGH ALTITUDE MODEL 7.) SEE SPECIFICATION SECTION 235216

    1.) INTERNAL FUSES TO RUN AT 208V, 1PH INPUT POWER

    1.) 18" TALL ROOF CURB 2.) BIRD AND INSECT SCREEN 3.) 120 V MOTORIZED DAMPER

    CONDENSING BOILER SCHEDULE

    TAG MAKE MODEL INPUT

    EFFICIENCY @

    140° F RETURN

    OUTPUT @

    5000' ELEV HEAT EXCH. CAT. FUEL

    GAS

    CONN.

    MIN./MAX.

    GAS PRESS.

    (W.C.)

    WATER

    CONN.

    VENT

    CONN. CA CONN.

    OPERATING

    WEIGHT

    ELECTRICAL

    REMARKSVOLTAGE PHASE FLA

    B-1 LOCHINVAR FBN2501 2,500,000.0 Btu/h 88 % 1,980,000.0 Btu/h STAINLESS STEEL IV NAT. GAS 2" 4"-14" 4" 9" 8" 3600 208 V 3 4.5 A ALL

    B-2 LOCHINVAR FBN2501 2,500,000.0 Btu/h 88 % 1,980,000.0 Btu/h STAINLESS STEEL IV NAT. GAS 2" 4"-14" 4" 9" 8" 3600 208 V 3 4.5 A ALL

    B-3 LOCHINVAR FBN2501 2,500,000.0 Btu/h 88 % 1,980,000.0 Btu/h STAINLESS STEEL IV NAT. GAS 2" 4"-14" 4" 9" 8" 3600 208 V 3 4.5 A ALL

    INTAKE HOOD SCHEDULETAG MANUFACTURER MODEL APPLICATION THROAT LENGTH THROAT WIDTH THROAT AREA CFM APD CONSTRUCTION REMARKS

    IH-1 GREENHECK FGI INTAKE 24" 24" 4.00 ft² 2000 CFM 0.042 in-wg GALVANIZED ALL

    PUMP SCHEDULE

    TAG MAKE MODEL GPM

    HEAD (FT.

    OF W.C.) FLUID TYPE PUMP TYPE VOLTAGE PHASE MOTOR HP BODY IMPELLER

    SUCTION

    SIZE

    DISCHARGE

    SIZE REMARKS

    BP-1 TACO VR30-3 160 GPM 20 30% P. GLYCOL IN LINE 208 V 1 2.175 C.I. STAINLESS STEEL 3" 3" ALL

    BP-2 TACO VR30-3 160 GPM 20 30% P. GLYCOL IN LINE 208 V 1 2.175 C.I. STAINLESS STEEL 3" 3" ALL

    BP-3 TACO VR30-3 160 GPM 20 30% P. GLYCOL IN LINE 208 V 1 2.175 C.I. STAINLESS STEEL 3" 3" ALL

    HYDRONIC SYSTEM ACCESSORIES SCHEDULETAG MAKE MODEL DESCRIPTION

    ADS-1 CALEFFI NA546100AM MAGNETIC AIR/DIRT SEPARATOR, WITH AUTOMATIC AIR VENT, BLOWDOWN VALVE, AND FLUSH VALVE, EPOXY COATED STEEL CONSTRUCTION. 4" FLANGED CONNECTIONS. ASME CERTIFIED. RATED TO 150 PSI AT 270°F.

    ET-1 AMTROL 600-L BLADDER TYPE EXPANSION TANK, 158 GAL. VOLUME FULL ACCEPTANCE,, ASME RATED, AND AIR CHARGING VALVE, SET TO 24 PSIG.

    GT-1 AXIOM SF100 PACKAGED GLYCOL FEEDER SYSTEM. 55 GAL. STORAGE TANK, PUMP, PUMP CONTROLS, AND ALARM CONTACTS FOR REMOTE MONITORING BY THE BAS SYSTEM. 115V PLUG.

    REVISIONS

    # DESCRIPTION DATE

  • 3

    WIRING

    WIRING IN CONDUIT, GROUND WIRE IS LINE WITH HOOK

    SYMBOL, HOT WIRE IS LONG LINE, NEUTRAL IS SHORT

    LINE. NUMBER OF WIRES AS SHOWN. WIRE SHALL BE

    #12 MINIMUM AND CONDUIT SHALL BE 1/2" MINIMUM

    UNLESS AS NOTED ON THE CIRCUIT SCHEDULE(S).

    0-10 VOLT DIMMING WIRES ARE NOT SHOWN ON THE

    COUNT BUT ARE REQUIRED WHEN 0-10 VOLT DIMMING

    IS USED. SEE MANUFACTURER'S 0-10 VOLT DIMMING

    SCHEMATIC FOR NUMBER OF WIRES REQUIRED.

    LP12-1ARROW(S) INDICATE HOME RUN(S) WITH PANEL AND

    CIRCUIT NUMBER(S) INDICATED

    ARROW INDICATES CIRCUIT HOME RUNS THROUGH

    ADDITIONAL CIRCUIT(S) CONDUIT

    ELECTRICAL FIXTURES

    DUPLEX RECEPTACLE, TYPE

    AS SCHEDULED

    LIGHTING DEVICES

    THREE WAY SNAP SWITCH

    ELECTRICAL EQUIPMENT

    T#

    ELECTRICAL PANEL, TYPE AS SCHEDULED

    DISCONNECT SWITCH, TYPE AS

    SCHEDULED

    DRY TYPE STEP DOWN TRANSFORMER,

    TYPE AS SCHEDULED

    ELECTRIC METER

    LIGHT FIXTURES

    EXISTING CHAIN HUNG

    LIGHT FIXTURE

    MECHANICAL DEVICES

    GLYCOL FEEDER

    INLINE PUMP

    EPO EMERGENCY POWER OFF SWITCH

    CONTROL PANEL

    WATER PUMP

    BASE MOUNTED PUMP

    UNIT HEATER

    BOILER

    EXHAUST FAN

    NEW CHAIN HUNG STRIP

    LIGHT FIXTURE

    MYRON GUST

    GNELANOISS

    E

    FO

    RP

    CO

    LORA

    DO L I

    RE

    ENI

    CENSED

    18304

    19 OLD TOWN SQUARE

    SUITE 238

    FT COLLINS, CO 80524

    PH: (970) 430-5783

    1623 CENTRAL AVE.

    CHEYENNE, WY 82001

    PH: (307) 222-9375

    designpointengineering.com

    DATE:

    DESIGNED:

    CHECKED:

    SEAL:

    ISSUES

    DESCRIPTION DATE

    PROJECT NUMBER:

    02/13/20

    02/13/2020

    MHG

    MHG

    E-100

    LEGEND AND

    SHEET INDEX

    FOSSIL RIDGE

    HS BOILER

    REPLACEMENT5400 ZIEGLER RD

    FORT COLLINS, CO 80528

    CONTRUCTION DOCUMENTS 02/13/2020

    1918

    SHEET LIST

    Sheet Number Sheet Name

    E-100 LEGEND AND SHEET INDEX

    E-200 HVAC ELECTRICAL DEMO PLANS & SCHEDULES

    E-201 ONE LINE AND HVAC ELECT. PLANS & SCHEDULES

    E-300 PANELBOARD SCHEDULES AND LIGHTING PLANS

    No ScaleWIRING LEGEND

    No Scale1

    ELECTRICAL LEGEND

    REVISIONS

    # DESCRIPTION DATE

  • M1D1

    M1D1-2

    M1D2

    MSB1

    MSB1-1

    MSB1-3

    PARTIAL ELECT.

    RM INFO

    R1D1

    R1D1-2

    DROP CEILING

    OPEN

    CEILING

    OPEN

    CEILING

    MSB1-4

    TC1

    UHD1

    (E)

    P-1

    (E)

    P-2

    P7DHWP-2

    RP-2

    RP-1

    R2

    R2

    R2

    B-1 B-2 B-3 EBCP

    EF-D5

    R2

    (E)

    P-3(E)

    P-4

    (E)

    P-5

    (E)

    P-6

    EPO

    EPO

    WH

    MYRON GUST

    GNELANOISS

    E

    FO

    RP

    CO

    LORA

    DO L I

    RE

    ENI

    CENSED

    18304

    19 OLD TOWN SQUARE

    SUITE 238

    FT COLLINS, CO 80524

    PH: (970) 430-5783

    1623 CENTRAL AVE.

    CHEYENNE, WY 82001

    PH: (307) 222-9375

    designpointengineering.com

    DATE:

    DESIGNED:

    CHECKED:

    SEAL:

    ISSUES

    DESCRIPTION DATE

    PROJECT NUMBER:

    02/13/20

    02/13/2020

    MHG

    MHG

    E-200

    HVAC

    ELECTRICAL

    DEMO PLANS &

    SCHEDULES

    FOSSIL RIDGE

    HS BOILER

    REPLACEMENT5400 ZIEGLER RD

    FORT COLLINS, CO 80528

    CONTRUCTION DOCUMENTS 02/13/2020

    1918

    1/8" = 1'-0"1

    FIRST FLOOR - POWER DEMOLITIONPLAN

    1/8" = 1'-0"2

    BASEMENT - POWER DEMOLITION PLAN

    EXISTING ELECTRICAL EQUIPMENT SCHEDULE

    Type Mark Count Description

    M1D1 1 480/277V SURFACE MOUNT PANELBOARD WITH MAIN LUGS ONLY

    M1D1-2 1 480/277V SURFACE MOUNT PANELBOARD WITH MAIN LUGS ONLY

    M1D2 1 480/277V SURFACE MOUNT PANELBOARD WITH MAIN LUGS ONLY

    MSB1 1 MAIN SWITCH 4000 AMP, 277/480 VOLT

    MSB1-1 1 SECTION ONE MAIN GEAR, 4000 AMP, 277/480 VOLT

    MSB1-3 1 SECTION THREE MAIN GEAR, 4000 AMP, 277/480 VOLT

    MSB1-4 1 SECTION FOUR MAIN GEAR, 4000 AMP, 277/480 VOLT

    R1D1 1 120/208V SURFACE MOUNT PANELBOARD

    R1D1-2 1 120/208V SURFACE MOUNT PANELBOARD WITH MAIN LUGS ONLY

    EXISTING ELECTRICAL FIXTURE SCHEDULE

    Type

    Mark Count Description

    R2 4 EXISTING GFCI RECEPTACLE TO REMAIN, NO WORK

    Grand total: 4

    EXISTING MECHANICAL EQUIPMENT SCHEDULE

    Type

    Mark Count Description

    (E) P-1 1 EXISTING PUMP, DISCONNECT AND STARTER TO REMAIN. REMOVE WIRE BACK TO M1D1-2-49,51,53. REWIRE TO NEW PANEL HP11

    (E) P-2 1 EXISTING PUMP, DISCONNECT AND STARTER TO REMAIN. REMOVE WIRE BACK TO M1D1-2-55,57,59. REWIRE TO NEW PANEL HP11

    (E) P-3 1 EXISTING PUMP, DISCONNECT AND STARTER TO REMAIN. REMOVE WIRE BACK TO M1D1-2-61,63,65. REWIRE TO NEW PANEL HP11

    (E) P-4 1 EXISTING PUMP, DISCONNECT AND STARTER TO REMAIN. REMOVE WIRE BACK TO M1D1-2-56,58,60. REWIRE TO NEW PANEL HP11

    (E) P-5 1 EXISTING PUMP, DISCONNECT AND STARTER TO REMAIN. REMOVE WIRE BACK TO M1D1-2-50,52,54. REWIRE TO NEW PANEL HP11

    (E) P-6 1 EXISTING PUMP, DISCONNECT AND STARTER TO REMAIN. REMOVE WIRE BACK TO M1D1-2-62,64,66. REWIRE TO NEW PANEL HP11

    B-1 1 EXISTING BOILER TO BE REMOVED. REMOVE WIRE BACK TO M1D1-2-67-69-71. REMOVE EXPOSED CONDUIT

    B-2 1 EXISTING BOILER TO BE REMOVED. REMOVE WIRE BACK TO M1D1-2-73,75,77. REMOVE EXPOSED CONDUIT

    B-3 1 EXISTING BOILER TO BE REMOVED. REMOVE WIRE BACK TO M1D1-2-68,70,72. REMOVE EXPOSED CONDUIT

    DHWP-2 1 HOT WATER RECIRCULATING PUMP AND DISCONNECT FOR DHWP-2 TO REMAIN. REMOVE WIRES TO R1DR-51. REWIRE TO NEW PANELLP11

    EBCP 1 EXISTING BOILER CONTROL PANEL TO BE REMOVED EC TO DISCONNECT CRKT. R1D4-79, 81 AND REMOVE WIRE BACK TO PANEL

    EF-D5 1 EXISTING EXHAUST FAN, DISCONNECT AND STARTER TO REMAIN. REMOVE WIRE BACK TO M1D1-2-43,45,57. REWIRE TO NEW PANELHP11

    EPO 2 EXISTING EMERGENCY POWER OFF SWITCH TO REMAIN IN THE SAME LOCATION. EC TO REWIRE TO NEW BOILER CONTROLS ANDPOWER TO SHUT DOWN BOILERS. MUSHROOM TYPE HEAD, SHALL STAY OFF WHEN PUSHED AND CAN ONLY BE RESET MANUALLY. MC

    TO PROVIDE SWITCH, EC TO WIRE.

    P7 1 EXISTING PUMP, DISCONNECT AND STARTER TO BE REMOVED. REMOVE WIRE BACK TO M1D1-2-79,81,83. REMOVE EXPOSED CONDUIT

    RP-1 1 EXISTING PUMP, DISCONNECT AND STARTER TO REMAIN. REMOVE WIRE BACK TO R1D4-48. REWIRE TO NEW PANEL LP11

    RP-2 1 EXISTING PUMP, DISCONNECT AND STARTER TO REMAIN. REMOVE WIRE BACK TO R1D4-50. REWIRE TO NEW PANEL LP11

    TC1 1 EXISTING TEMPERATURE CONTROL PANEL. EC TO DISCONNECT CRKT. R1D1-24 AND REWIRE TO NEW PANEL LP11. REMOVE WIRE BACKTO PANEL

    UHD1 1 EXISTING UNIT HEATER TO REMAIN. EC TO REMOVE WIRE BACK TO PANEL R1D1-16. EC TO REWIRE TO PANEL LP11

    WH 1 EXISTING WATER HEATER. REMOVE WIRING AND REWIRE TO NEW PANEL LP11

    Grand total: 20

    REVISIONS

    # DESCRIPTION DATE

  • J1

    J1

    H11LP11

    LP11 -

    13,15,17

    B-1 B-2

    B-3

    BP-1 BP-2BP-3

    LP11 -

    9,11

    LP11 -

    12,14

    R1

    LP11 - 2

    2"ø

    (E)

    P-3(E)

    P-4(E)

    P-5(E)

    P-6

    UHD1

    GFT-1

    (E)

    P-1

    (E)

    P-2

    D33 D33 D33

    R2

    TC1

    LP11 - 3

    T45

    H11 -

    1,3,5H11 -

    7,9,11

    H11 -

    8,10,12

    H11 -

    13,15,17

    H11 -

    14,16,18

    H11 -

    20,22,24

    EF-D5

    R2

    R2

    DHWP-2

    RP-2

    LP11 - 4

    RP-1

    LP11 - 7

    LP11 - 6

    LP11 -

    8,10

    R1

    EPO

    R2

    NOTE: CONDUIT SHALL NOT BE RUN ON THE FLOOR

    EPO

    LP11 - 5

    WH

    LP11 -

    16

    TC2

    R1D1-2

    R1D1

    M1D2

    M1D1-2

    M1D1

    MSB1

    MSB1-1

    MSB1-3

    MSB1-4

    DROP CEILING

    OPEN

    CEILING

    OPEN CEILING

    SUGGESTED CONDUIT ROUTE.

    EC TO ADJUST AS REQUIRED

    AND PROVIDE PULL BOXES

    AS REQUIRED.

    2"ø

    USE SPARE

    200 AMP, 3P

    BREAKER

    FOR NEW

    PANEL HP11

    PARTIAL ELECT.

    RM INFO

    MSB1-2

    FS

    MD

    LP11 -

    19

    LP11

    HP11MSB1-2

    SPARE 200 AMP, 3P BREAKER

    TO FEED NEW PANEL HP11

    T45

    MYRON GUST

    GNELANOISS

    E

    FO

    RP

    CO

    LORA

    DO L I

    RE

    ENI

    CENSED

    18304

    19 OLD TOWN SQUARE

    SUITE 238

    FT COLLINS, CO 80524

    PH: (970) 430-5783

    1623 CENTRAL AVE.

    CHEYENNE, WY 82001

    PH: (307) 222-9375

    designpointengineering.com

    DATE:

    DESIGNED:

    CHECKED:

    SEAL:

    ISSUES

    DESCRIPTION DATE

    PROJECT NUMBER:

    02/13/20

    02/13/2020

    MHG

    MHG

    E-201

    ONE LINE AND

    HVAC ELECT.

    PLANS &

    SCHEDULES

    FOSSIL RIDGE

    HS BOILER

    REPLACEMENT5400 ZIEGLER RD

    FORT COLLINS, CO 80528

    CONTRUCTION DOCUMENTS 02/13/2020

    1918

    ELECTRICAL EQUIPMENT SCHEDULE

    Type Mark Count Description

    D33 3 208 VOLT, 3 PHASE, 30 AMP, NEMA 1 FUSED DISCONNECT. FUSE WITH 3-FRN-R FUSES TO MATCH CONNECTED EQUIPMENTREQUIREMENTS

    H11 1 480/277V SURFACE MOUNT PANELBOARD WITH MAIN LUGS ONLY

    LP11 1 120/208V SURFACE MOUNT PANELBOARD

    MSB1-2 1 SECTION TWO MAIN GEAR, 4000 AMP, 277/480 VOLT

    T45 1 45kVA DRY TYPE 480-208V STEP DOWN TRANSFORMER, NEMA TYPE 2

    Grand total: 7 7

    ELECTRICAL FIXTURE SCHEDULE

    Type

    Mark Count Manufacturer Model Description

    FS 1 SMOKE DAMPER BY MC, WIRED BY EC. EC TO SUPPLY AND INSTALL ASto FOR OVERLOAD PROTECTION AND DISCONNECTION

    MD 1 MOTORIZED DAMPER BY MC, WIRED BY EC. EC TO SUPPLY ANDINSTALL A Sto FOR OVERLOAD PROTECTION AND DISCONNECTION

    R1 2 HUBBELL OR EQUAL GFTRST20 GFCI TAMPER RESISTANT BROWN RECEPTACLE FOR GFT PLUG IN

    Grand total: 4

    ELECTRICAL CIRCUIT SCHEDULE

    Panel Load Name

    Circuit

    Number Wire Size

    Conduit

    Size Voltage

    Voltage

    Drop VD%

    T45 LP11 1 3-#3/0, 1-#3/0, 1-#6 2" 208 V 0 V 0.043641

    MSB1-1 H11 1 3-#3/0, 1-#3/0, 1-#6 2" 480 V 2 V 0.2458

    LP11 BOILERS B1, B2 AND B3.PROVIDE SHUNT TRIP

    BREAKER. TO BE WIREDTHROUGH EPO

    SWITCHES

    13,15,17 3-#12, 1-#12, 1-#12 1/2" 208 V 2 V 0.681214

    LP11 PUMP BP-2 9,11 2-#10, 1-#10 3/4" 208 V 1 V 0.556036

    LP11 PUMP BP-3 12,14 2-#10, 1-#10 3/4" 208 V 1 V 0.609849

    LP11 Receptacle for Glycolfeeders

    2 1-#12, 1-#12, 1-#12 1/2" 120 V 0 V 0.274158

    LP11 TEMPERATURE CONTROLPANEL TC1

    3 1-#12, 1-#12, 1-#12 1/2" 120 V 1 V 0.73263

    LP11 Receptacle 1 1-#12, 1-#12, 1-#12 1/2" 120 V 1 V 0.529916

    LP11 RP-2 4 1-#12, 1-#12, 1-#12 1/2" 120 V 2 V 1.556629

    LP11 RP-1 7 1-#12, 1-#12, 1-#12 1/2" 120 V 2 V 1.653071

    LP11 UHD1 6 1-#12, 1-#12, 1-#12 1/2" 120 V 1 V 1.060394

    LP11 PUMP BP-1 8,10 2-#12, 1-#12 1/2" 208 V 2 V 0.96033

    LP11 WATER HEATER 5 1-#12, 1-#12, 1-#12 120 V 1 V 0.540158

    LP11 TEMPERATURE CONTROLPANEL TCP-2

    16 1-#12, 1-#12, 1-#12 120 V 1 V 0.774297

    LP11 FIRE SMOKE DAMPERAND MOTORIZED DAMPER

    19 1-#12, 1-#12, 1-#12 120 V 0 V 0.107843

    H11 P-1 1,3,5 3-#6, 1-#10 1" 480 V 0 V 0.041031

    H11 P-2 2,4,6 3-#6, 1-#10 1" 480 V 0 V 0.047348

    H11 P-3 7,9,11 3-#8, 1-#10 3/4" 480 V 1 V 0.071279

    H11 P-4 8,10,12 3-#8, 1-#10 3/4" 480 V 1 V 0.076841

    H11 P-5 13,15,17 3-#6, 1-#10 1" 480 V 1 V 0.080214

    H11 P-6 14,16,18 3-#6, 1-#10 1" 480 V 1 V 0.085628

    H11 T45 19,21,23 3-#4, 1-#4, 1-#8 1 1/4" 480 V 0 V 0.031129

    H11 EF-D5 20,22,24 3-#12, 1-#12 1/2" 480 V 0 V 0.03149

    H11 Lighting 37 1-#12, 1-#12, 1-#12 277 V 0 V 0.088218

    Grand total: 24

    1/8" = 1'-0"1

    BASEMENT - POWER PLAN1/8" = 1'-0"

    2FIRST FLOOR - POWER PLAN

    MECHANICAL EQUIPMENT SCHEDULE

    Type

    Mark Count Description

    B-1 1 NEW BOILER BY MC, WIRED BY EC

    B-2 1 NEW BOILER BY MC, WIRED BY EC

    B-3 1 NEW BOILER BY MC, WIRED BY EC

    BP-1 2 NEW PUMP BY MC, WIRED BY EC

    BP-2 1 NEW PUMP BY MC, WIRED BY EC

    BP-3 1 NEW PUMP BY MC, WIRED BY EC

    GFT-1 1 PACKAGED GLYCOL FEEDER SYSTEM BY MC. EC TO PROVIDE RECEPTACLE FOR POWER TO THE UNIT

    TC2 1 NEW TEMPERATURE CONTROL PANEL BY TC POWER PROVIDED BY EC.

    Grand total: 9

    No Scale3

    NEW PARTIAL ONE LINE

    EC TO PROVIDE MONITOR MODULE

    FOR FIRE SMOKE AND CONNECT

    INTO EXISTING FIRE ALARM SYSTEM.

    PROGRAM SYSTEM TO ACCEPT

    ADDITIONAL DEVICE. UPDATE

    PLAN MAP TO INCLUDE NEW

    DEVICE

    REVISIONS

    # DESCRIPTION DATE

  • 3

    3

    3

    3

    NOTE: EC SHALL COMPLY WITH NEC110.22a "EACH DISCONNECTING MEANS SHALL BE LEGIBLY MARKED TO INDICATE ITS PURPOSE UNLESS

    LOCATED AND ARRANGED SO THE PURPOSE IS EVIDENT. THE MARKING SHALL BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT

    INVOLVED." AND 408.4A, "CIRCUIT DIRECTORY OR CIRCUIT IDENTIFICATION. EVERY CIRCUIT AND CIRCUIT MODIFICATIONS SHALL BE LEGIBLY

    IDENTIFIED AS TO ITS CLEAR, EVIDENT AND SPECIFIC PURPOSE OR USE. ETC." EC SHALL MEET ALL REQUIREMENTS OF THESE ENTIRE SECTIONS.

    SCHEDULES SHOWN ON THESE PLANS ARE SHORT HAND DESIGNATIONS FOR THE DESIGN AND ARE ONLY TO BE USED FOR CONSTRUCTION. FINAL

    SCHEDULES SHALL MEET THE REQUIREMENTS OF THE TWO CODE SECTIONS INDICATED IN THIS NOTE.

    H HS3

    H

    H

    S3

    H

    H

    ON EMERGENCY

    CIRCUIT

    H11 -

    37

    S3

    S3

    A

    A

    A

    A

    A

    AN

    AE

    AE

    H11

    LP11

    T45

    NOTE: COORDINATE NEW LIGHT

    FIXTURE LOCATIONS WITH EXISTING

    MECHANICAL PIPING.

    MYRON GUST

    GNELANOISS

    E

    FO

    RP

    CO

    LORA

    DO L I

    RE

    ENI

    CENSED

    18304

    19 OLD TOWN SQUARE

    SUITE 238

    FT COLLINS, CO 80524

    PH: (970) 430-5783

    1623 CENTRAL AVE.

    CHEYENNE, WY 82001

    PH: (307) 222-9375

    designpointengineering.com

    DATE:

    DESIGNED:

    CHECKED:

    SEAL:

    ISSUES

    DESCRIPTION DATE

    PROJECT NUMBER:

    02/13/20

    02/13/2020

    MHG

    MHG

    E-300

    PANELBOARD

    SCHEDULES

    AND LIGHTING

    PLANS

    FOSSIL RIDGE

    HS BOILER

    REPLACEMENT5400 ZIEGLER RD

    FORT COLLINS, CO 80528

    CONTRUCTION DOCUMENTS 02/13/2020

    1918

    No Scale1

    DIRECTIVE FOR PANEL SCHEDULES

    Notes:

    Load Classification 500 VA 100.00% 500 VA

    Receptacle 720 VA 100.00% 720 VA

    Power 100 VA 100.00% 100 VA

    Other 0 VA 0.00% 0 VA Total Est. Demand: 141 A

    Motor 105070 VA 104.21% 109492 VA Total Conn.: 136 A

    Lighting 294 VA 125.00% 368 VA Total Est. Demand: 117152 VA

    Heating 1500 VA 100.00% 1500 VA Total Conn. Load: 112672 VA

    HVAC 5866 VA 100.00% 5866 VA

    Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

    Legend:

    Total Amps: 137 A 136 A 134 A

    Total Load: 37787 VA 37693 VA 37193 VA

    41 Space -- -- 0 VA 0 VA -- -- Space 42

    39 Space -- -- 0 VA 0 VA -- -- Space 40

    37 Lighting 20 A 1 294 VA 0 VA -- -- Space 38

    35 0 VA 0 VA 36

    33 0 VA 0 VA 34

    31

    Spare 30 A 3

    0 VA 0 VA

    3 30 A Spare

    32

    29 0 VA 0 VA 30

    27 0 VA 0 VA 28

    25

    Spare 20 A 3

    0 VA 0 VA

    3 20 A Spare

    26

    23 7201... 400 VA 24

    21 7736... 400 VA 22

    19

    T45 70 A 3

    7574... 400 VA

    3 20 A EF-D5

    20

    17 5579... 5579... 18

    15 5579... 5579... 16

    13

    P-5 50 A 3

    5579... 5579...

    3 50 A P-6

    14

    11 3719... 3719... 12

    9 3719... 3719... 10

    7

    P-3 35 A 3

    3719... 3719...

    3 35 A P-4

    8

    5 5579... 5579... 6

    3 5579... 5579... 4

    1

    P-1 50 A 3

    5579... 5579...

    3 50 A P-2

    2

    CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

    Notes:

    Enclosure: Type 1 MCB Rating:

    Mounting: Surface Wires: 4 Mains Rating: 225 A

    Supply From: MSB1-1 Phases: 3 Mains Type:

    Location: BOILER ROOM D001 Volts: 480/277 Wye A.I.C. Rating: 14000

    Branch Panel: H11

    Notes:

    Load Classification 500 VA 100.00% 500 VA

    Receptacle 720 VA 100.00% 720 VA Total Est. Demand: 65 A

    Power 100 VA 100.00% 100 VA Total Conn.: 62 A

    Motor 14844 VA 106.55% 15817 VA Total Est. Demand: 23465 VA

    Heating 1500 VA 100.00% 1500 VA Total Conn. Load: 22510 VA

    HVAC 5866 VA 100.00% 5866 VA

    Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

    Legend:

    Total Amps: 64 A 65 A 60 A

    Total Load: 7574 VA 7736 VA 7201 VA

    41 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 42

    39 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 40

    37 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 38

    35 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 36

    33 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 34

    31 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 32

    29 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 30

    27 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 28

    25 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 26

    23 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 24

    21 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 22

    19 FIRE SMOKE DAMPER AND MOTORIZED... 20 A 1 100 VA 0 VA 1 20 A Spare 20

    17 1622... 0 VA 1 20 A Spare 18

    15 1622... 500 VA 1 20 A TEMPERATURE CONTROL PANEL TCP-2 16

    13 BOILERS B1, B2 AND B3. PROVIDE SHUNTTRIP BREAKER. TO BE WIRED THROUGH EPOSWITCHES

    20 A 3

    1622... 1945... 14

    11 1945... 1945...2 30 A PUMP BP-3

    12

    9PUMP BP-2 30 A 2

    1945... 1945... 10

    7 RP-1 20 A 1 1587... 1945...2 20 A PUMP BP-1

    8

    5 WATER HEATER 20 A 1 500 VA 1500... 1 20 A UHD1 6

    3 TEMPERATURE CONTROL PANEL TC1 20 A 1 500 VA 1587... 1 20 A RP-2 4

    1 Receptacle 20 A 1 360 VA 360 VA 1 20 A Receptacle for Glycol feeders 2

    CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

    Notes:

    Enclosure: Type 1 MCB Rating: 225 A

    Mounting: Surface Wires: 4 Mains Rating: 200 A

    Supply From: T45 Phases: 3 Mains Type:

    Location: BOILER ROOM D001 Volts: 120/208 Wye A.I.C. Rating: 10000

    Branch Panel: LP11

    1/8" = 1'-0"2

    BASEMENT - LIGHTING DEMOLITIONPLAN

    1/8" = 1'-0"3

    BASEMENT - LIGHTING PLAN

    EXISTING LIGHTING FIXTURE SCHEDULE

    Type

    Mark Count Description

    H 6 EXISTING CEILING FIXTURE, REPLACE WITH NEW FIXTURE, REMOVE FROM CIRCUIT L1F1-4. REMOVE WIRE BACK TO THE PANEL. REWIRETO NEW PANEL HP11

    Grand total: 6

    LIGHTING FIXTURE SCHEDULE

    Type

    Mark Count Manufacturer Model Description Image

    A 5 HE WILLIAMS 75R-4-L65/835-VBY-DRV-UNV 4'0" CHAIN HUNG, LED, 6600 LUMENS, 3500 K, 49 WATTS, REPLACEEXISTING FIXTURE AND HANG WITH CHAINS FROM THE CEILING

    AE 2 HE WILLIAMS 75R-4-L65/835-VBY-DRV-UNV 4'0" CHAIN HUNG, LED, 6600 LUMENS, 3500 K, 49 WATTS, REPLACEEXISTING FIXTURE. HANG WITH CHAINS FROM THE CEILING. WIRED TO

    EXISTING EMERGENCY CIRCUIT

    AN 1 HE WILLIAMS 75R-4-L65/835-VBY-DRV-UNV 4'0" CHAIN HUNG, LED, 6600 LUMENS, 3500 K, 49 WATTS, ADD FIXTUREAS SHOWN. HANG WITH CHAINS FROM THE CEILING

    Grand total: 8

    REVISIONS

    # DESCRIPTION DATE

    SheetsG-001 - TITLE SHEETM-001 - MECHANICAL NOTES & LEGENDSM-101 - MECHANICAL DEMO PLANM-201 - MECHANICAL REMODEL PLANSM-301 - TEMPERATURE CONTROLSM-401 - MECHANICAL SCHEDULES & DETAILSE-100 - LEGEND AND SHEET INDEXE-200 - HVAC ELECTRICAL DEMO PLANS & SCHEDULESE-201 - ONE LINE AND HVAC ELECT. PLANS & SCHEDULESE-300 - PANELBOARD SCHEDULES AND LIGHTING PLANS