Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
C
OLO
RADO LICENSED
PROFESS IONAL EN
G I
NEER
JUSTIN
H.MONTGO
MERY42193
19 OLD TOWN SQUARE
SUITE 238
FT COLLINS, CO 80524
PH: (970) 430-5783
1623 CENTRAL AVE.
CHEYENNE, WY 82001
PH: (307) 222-9375
designpointengineering.com
DATE:
DESIGNED:
CHECKED:
SEAL:
ISSUES
DESCRIPTION DATE
PROJECT NUMBER:
02/13/2020
02/13/2020
ORD
JHM
G-001
TITLE SHEET
FOSSIL RIDGE
HS BOILER
REPLACEMENT5400 ZIEGLER RD
FORT COLLINS, CO 80528
CONSTRUCTION DOCUMENTS 02/13/2020
1918
POUDRE SCHOOL DISTRICT
FOSSIL RIDGE HIGH SCHOOL BOILER REPLACEMENT
5400 ZIEGLER ROAD
FORT COLLINS, CO 80528
VICINITY MAPNOT TO SCALE
BUILDING LOCATION
PRIME CONSULTANT/
MECHANICAL ENGINEER
19 OLD TOWN SQUARE SUITE 238
FORT COLLINS, CO 80524
PH: 970.430.5783
1623 CENTRAL AVE.
CHEYENNE, WY 82001
PH: 307.222.9375
DesignPointEngineering.com
ELECTRICAL ENGINEER:
3612 PIONEER AVENUE
CHEYENNE, WY 82001
PH: 307.638.2511
INDEX OF SHEETS:
G-001 TITLE SHEET
M-001 MECHANICAL NOTES & LEGENDS
M-101 MECHANICAL ROOM DEMO PLAN
M-201 MECHANICAL REMODEL PLANS
M-301 TEMPERATURE CONTROLS
M-401 MECHANICAL SCHEDULES & DETAILS
E-100 LEGEND AND SHEET INDEX
E-200 HVAC ELECTRICAL DEMO PLANS & SCHEDULES
E-201 ONE LINE AND HVAC ELEC. PLANS & SCHEDULES
E-300 PANELBOARD SCHEDULES AND LIGHTING PLANS
REVISIONS
# DESCRIPTION DATE
MECHANICAL LEGEND
NEW DUCTWORK (SHADED)
DUCT DOWN, DUCT UP
DUCT RISERS (SUPPLY, RETURN, EXHAUST)
90° ELBOW W/ TURNING VANES, 45° TAKE-OFF W/ MANUAL BALANCING DAMPER
THERMOSTAT
DUCTWORK DEMOLITION
DOMESTIC COLD WATERDCW
HEATING WATER SUPPLYHWS
HEATING WATER RETURNHWR
2-WAY CONTROL VALVE, 3-WAY CONTROL VALVE
BALL VALVE, GATE VALVE
ELBOW DOWN, TEE UP
PIPE UNION OR FLANGE
TEE DOWN, PIPE CONTINUATION
PIPE DEMOLITION
SWITCH, EMERGENCY POWER OFF
BUTTERFLY VALVE, BALANCE VALVE
CO SENSOR
MOTORIZED DAMPER
TEMPERATURE SENSOR
EXISTING PIPE
EXISTING DUCTWORK
CHILLED WATER RETURNCHWR
CHILLED WATER SUPPLYCHWS
T
TS
CO
S
EPO
SW
M
POINT OF CONNECTION
LIMIT OF DEMOLITION
REDUCER OR INCREASER
CHECK VALVE
MECHANICAL ABBREVIATIONS
AFF ABOVE FINISHED FLOORBLW BELOWCHW CHILLED WATERCHWS CHILLED WATER SUPPLYCHWR CHILLED WATER RETURNDN DOWN(E) EXISTINGEA EXHAUST AIREC ELECTRICAL CONTRACTOREF EXHAUST FANFD FLOOR DRAINHUH HYDRONIC UNIT HEATERHWR HEATING WATER RETURNHWS HEATING WATER SUPPLYMC MECHANICAL CONTRACTOR(N) NEWOA OUTSIDE AIRPOC POINT OF CONNECTIONRB REBALANCETAB TEST & BALANCETC TEMPERATURE CONTROLSTCC TEMPERATURE CONTROLS CONTRACTORTCP TEMPERATURE CONTROL PANELTSTAT THERMOSTATTYP TYPICALUNO UNLESS NOTED OTHERWISEW/ WITHW/O WITHOUT
FIRE/SMOKE DAMPERFS
LOW PRESSURE NATURAL GAS PIPE (
B
M
AIR INTAKE
D002
BOILER ROOM
D001
STAIR
D124
MPG
GG
(E) 1
6/16
(E) P-1 (E) P-2(E) 3"
(E)EF-D5
(E) ET-1(E) AS-1
(E) 6"
(E) 5"
(E) ET-2
(E) AS-2
(E) P-3
(E) P-4
(E) P-5
(E) P-6
(E) FD
(E) FD
(E) FD
(E) FD
(E) FD
(E) GAS PRV
(E) EMERGENCY GAS SOLENOID VALVE
1
(E) HUH
1 1
1
1
1
1
1
1
1
1(E) GLYCOL TANK(CHILLED WATER)
2 (E) INTAKE LOUVER
34
5 (E) PUMP
6
(E) BOILER(E) BOILER(E) BOILER
66
7(E) FLUE 7 (E) FLUE
1(E) 20"ø FLUE
(E) CHILLED WATER PUMPS
(E) HEATING WATER PUMPS
1
(E) DWH
11(E) STORAGE TANKS(DOMESTIC)
8
88
HW
S
HWR
HW
S
HWS
(E) 4"(E) 4"
9
9
9
9
(E) BAROMETRIC DAMPER
(E) 16/16 EA DUCT UP1
(E) 20"ø
CHWS
CHWR
CHWR
HW
S
HW
R
(E) 3/4"
(E) 3/4"
10
11
11
EPO
SW
CO
S
EPO
SW
12
13
14
14
15
(E) TC PANEL
(E) HEAT TIMER
(E) 3" MPG UP
(E) CHILLED WATER EXPANSION TANK AND AIR SEPARATOR
7
1
1
C
O
LORAD
O LICENSED
PR
OFESS I ONAL EN
G I
NE
ER
JUS
TIN
H.MONTGO
ME
RY42193
19 OLD TOWN SQUARE SUITE 238FT COLLINS, CO 80524PH: (970) 430-5783
1623 CENTRAL AVE.CHEYENNE, WY 82001PH: (307) 222-9375
designpointengineering.com
DATE:
DESIGNED:
CHECKED:
SEAL:
ISSUES
DESCRIPTION DATE
PROJECT NUMBER:
02/13/2020
02/13/2020
ORD
JHM
M-101
MECHANICALDEMO PLAN
FOSSIL RIDGEHS BOILER
REPLACEMENT5400 ZIEGLER RD
FORT COLLINS, CO 80528
CONSTRUCTION DOCUMENTS 02/13/2020
1918
1/4" = 1'-0"
MECHANICAL DEMO PLAN1
FLAG NOTES1 EXISTING EQUIPMENT TO REMAIN AS IS.
2 EXISTING LOUVER TO BE MODIFIED. REMOVE BLADES AND LEAVE FRAME IN PLACE TO BE USEDWITH NEW BOILER COMBUSTION AIR DUCTS.
3 EXISTING EXPANSION TANK TO BE DEMOLISHED.
4 EXISTING AIR SEPARATOR TO BE DEMOLISHED.
5 EXISTING BOILER PUMP TO BE DEMOLISHED. REMOVE CONCRETE BASE AND ELECTRICALCONDUIT ON THE FLOOR.
6 EXISTING BOILER, ASSOCIATED ACCESSORIES, CONTROLS, ETC. TO BE DEMOLISHED.
7 EXISTING FLUE FROM THE BOILER TO BE DEMOLISHED. LEAVE A POINT OF CONNECTION IN THEEXISTING COMMON 20"ø FLUE TO BE RE-USED WITH THE NEW BOILERS.
8 EXISTING HYDRONIC PIPING TO BE DEMOLISHED.
9 EXISTING CONCRETE HOUSEKEEPING PAD.
10 EXISTING MOTORIZED DAMPER TO BE DEMOLISHED. REMOVE ALL ASSOCIATED WIRING.
11 EXISTING 3/4" HWS/R SERVING THE HYDRONIC UNIT HEATER TO BE DEMOLISHED AS SHOWN.
12 EXISTING TEMPERATURE CONTROL PANEL TO REMAIN.
13 EXISTING HEAT TIMER PANEL TO BE DEMOLISHED.
14 EXISTING EPO SWITCH TO BE REPLACED IN SAME LOCATION. SEE REMODEL PLAN.
15 EXISTING CO SENSOR TO BE CAREFULLY REMOVED AND STORED FOR RELOCATION. SEEREMODEL PLAN.
#
REVISIONS
# DESCRIPTION DATE
MF
S
AIR INTAKE
D002
BOILER ROOM
D001
STAIR
D124
MPG
GG
(E) P-1 (E) P-2(E) 3"
(E) 6"
(E) 5"
(E) ET-2
(E) AS-2
(E) P-3
(E) P-4
(E) P-5
(E) P-6
B-1 B-2 B-3
BP-1 BP-2 BP-3
3"3"
3"
GT-11
(E) DWH
(E) HTR
(E) 4"(E) 4"
(E) 4"
(E) 4"
HW
S
HWR
HWS
2
ET-1
ADS-1
HW
RH
WS
4"6"
4" 4"
HW
R
HW
R
GGG5"
HW
R
HWS
HWR
1 1/2"
(E) FD
(E) FD
(E) FD
(E) FD
(E) FD
CH
WS
CH
WR
CHWS
CHWR
CHWR
HWS
HWR
3/4"
3/4"
5
5
EPO
SW
EPO
SW
CO
S
10
11
12
11
(E) TC PANEL
(E) CHW GLYCOL FILL TANK
4"5"
(E) CHILLED WATER EXP. TANK & AIR SEPARATOR
(E) CHILLED WATER PUMPS
(E) STORAGE TANKS (DOMESTIC)
(E) 4" HWS/R UP
6"
(E) 3" MPG UP
15
HWR
HWS
B-3
ET-1(E) P-1 (E) P-2
ADS-1
CONCRETE HOUSEKEEPING
PAD, TYP.
PT
12" MAX.
PRESSURE RELIEF VALVE SUPPLIED W/ BOILER. PIPE RELIEF TO NEAREST
FLOOR SINK, TYP.
(E) 4" HWR
BOILER DRAINVALVE, TYP.
1 1/2"
PT
PT
PT
PT
THERMOMETER, TYP.
HEATING WATER SYSTEM PIPING SCHEMATICSCALE: NONE
GF-1
HWS
HWR HEATING WATER RETURN
HEATING WATER SUPPLY
(E) 4" HWS/R
3/4"
PT
STRAINER W/BALL VALVE AND HOSE CONNECTION W/BRASS
CAP, TYP.
ACID NEUTRALIZATION BOILER CONDENSATE TRAP. PIPE TO NEAREST FLOOR DRAIN, TYP.
FLANGED VENTURI BALANCING VALVE W/BUTTERFLY SHUTOFF
VALVE, TYP.
NOTE: HEATING WATER SYSTEM CONTAINS 30% INHIBITED PROPYLENE GLYCOLCONTRACTOR IS RESPOSIBLE FOR REPLACING GLYCOL LOST DUE TO CONSTRUCTION. PROVIDE TEST RESULTS BEFORE AND AFTER CONSTRUCTION.
B-2
PT
PT
B-1
PT
PT
(E) MAKE-UP WATER
BP-1 BP-2 BP-3
6" HWR
4" HWR
4" HWS 5" HWS
4"
1/8"
ROUTE TO GLYCOL FEED TANK
PIPE SUPPORT, TYP.
N.C. VALVE
PT
PT
PT
PT
PT
PT
6" HWS
6"
(E) B&G MODEL # 1510200 GPM, 169 FT HD
(E) B&G MODEL # 1510200 GPM, 169 FT HD
VFD VFD
BALL VALVE W/ HOSE END CONNECTION, TYP.
PROVIDE SHUTOFF BALL VALVE FOR AIR VENT
3/4"
AIR INTAKE
D002
BOILER ROOM
D001
STAIR
D124
(E) 1
6/16
(E)EF-D5
B-1 B-2 B-3
(E) 20"ø FLUE UP
(E) DWH
20"ø
3
10"ø FLUE, TYP.
12"ø
12"ø
12"ø 444
24/2
4
6
7
8
9
IH-1
STAIRWELL WALL(ABOVE)
13
14 TYP. (3)
(E) 16/16 EA UPM M M
1617 TYP. (3)
18SDSD
C
O
LORAD
O LICENSED
PR
OFESS I ONAL EN
G I
NE
ER
JUS
TIN
H.MONTGO
ME
RY42193
19 OLD TOWN SQUARE SUITE 238FT COLLINS, CO 80524PH: (970) 430-5783
1623 CENTRAL AVE.CHEYENNE, WY 82001PH: (307) 222-9375
designpointengineering.com
DATE:
DESIGNED:
CHECKED:
SEAL:
ISSUES
DESCRIPTION DATE
PROJECT NUMBER:
02/13/2020
02/13/2020
ORD
JHM
M-201
MECHANICALREMODEL
PLANS
FOSSIL RIDGEHS BOILER
REPLACEMENT5400 ZIEGLER RD
FORT COLLINS, CO 80528
CONSTRUCTION DOCUMENTS 02/13/2020
1918
FLAG NOTES1 NEW GLYCOL FILL TANK. REFER TO THE HEATING WATER PIPING SCHEMATIC FOR DETAILED
INFORMATION FOR THIS DEVICE.
2 EXTEND CONCRETE PAD AS REQUIRED TO ACCOMMODATE NEW BOILERS FOOTPRINT &CLEARANCES.
3 CONNECT TO EXISTING 20" FLUE (HEATFAB MODEL # SAF-T CI) TO REMAIN.
4 THE ROUTING SHOWN ON THE PLANS FOR THE COMBUSTION AIR DUCTS IS APPROXIMATEAND BASED ON THE SPACE AVAILABLE IN THE EXISTING MECHANICAL ROOM. CONTRACTORSHALL FIELD VERIFY ROUTING AND MOVE PIPE HANGERS, LIGHTS, CONDUITS, AND SMALLERPIPES AS NEEDED. INSTALL THE COMBUSTION AIR DUCTS AS HIGH AS POSSIBLE AND OFFSET ASREQUIRED TO MISS EXISTING PIPES.
5 RELOCATED 3/4" HWS/R TO MAKE ROOM FOR THE COMBUSTION AIR DUCTS.
6 INTAKE HOOD INSTALLED ON THE ROOF. KEEP 10' MINIMUM FROM THE ROOF EDGE. INTAKEHOOD IS USED FOR DUAL PURPOSE, INTAKE WHEN EF-5D IS RUNNING, AND COMBUSTION AIRFOR THE EXISTING WATER HEATER DWH-1.
7 120 V LOW-LEAK MOTORIZED DAMPER INTERLOCKED WITH (E) EF-D5 AND (E) DWH. SEE DDCI/O POINTS LIST AND SEQUENCE OF OPERATION.
8 24/24 DUCT LOCATED HIGH UNDER THE ROOF IN STORAGE ROOM.
9 FIRE/SMOKE DAMPER WHERE THE DUCT PENETRATES THE WALL INTO THE STAIRWELL.
10 NEW TEMPERATURE CONTROL PANEL.
11 NEW EPO SWITCHES, RE: ELECTRICAL PLANS, PROVIDED BY MECHANICAL CONTRACTOR ANDINSTALLED BY ELECTRICAL CONTRACTOR.
12 RELOCATED CO SENSOR.
13 REMOVE THE EXISTING LOUVER BLADES FROM THE LOUVER FRAME TO ALLOW CA DUCTS TOPENETRATE THROUGH THE WALL. PROVIDE 18 GA. SHEET METAL COVER ON BOTH SIDES OFTHE REMAINING LOUVER FRAME. ATTACHED SHEET METAL TO THE FRAME BY SETTING IN A BEDOF SEALANT AND THEN ATTACHING WITH SCREWS. PROVIDE 2" RIGID INSULATION BETWEENTHE 2-LAYERS OF SHEET METAL. PROVIDE A STORM COLLAR AROUND EACH DUCT AND SET INA BED OF SEALANT AND THEN SEAL THE PERIMETER WATER TIGHT.
14 COMBUSTION AIR DUCT TO ELBOW DOWN AFTER LEAVING THE MECHANICAL ROOM. PROVIDEBIRD SCREEN AT THE END OF THE DUCT.
15 EXISTING GAS SOLENOID VALVE TO BE RE-CONNECTED TO THE NEW EPO SWITCHES TO SHUTOFF IN CASE OF EMERGENCY.
16 NEW DOUBLE WALL STAINLESS STEEL BOILER VENT. REFER TO SECTION 235100.
17 BOILER VENT ISOLATION DAMPER. INSTALL IN THE VERTICAL 10" FLUE AND WIRE BACK TO THEBOILER CONTROLLER. DAMPERS TO BE OPEN WHEN THE BOILER IS FIRING, CLOSED WHEN THEBOILER IS OFF.
18 FIRE/SMOKE DAMPER AND DUCT DETECTOR PROVIDED BY M.C. COORDINATE WITH THE E.C.FOR POWER AND FIRE ALARM WIRING. INSTALL PER THE INTERNATIONAL MECHANICAL CODEAND PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. SEE SECTION 233300.
#
PLAN GENERAL NOTESA. CHILLED WATER AND DOMESTIC WATER PIPING PARTIALLY SHOWN FOR CLARITY.
CONTRACTOR TO FIELD COORDINATE ROUTING WITH THIS PIPING.
B. REFER TO THE HEATING WATER SYSTEM PIPING SCHEMATIC FOR MORE DETAILS REGARDING PIPE SIZES, VALVES, AND ACCESSORIES.
C. COORDINATE WITH THE ELCTRICAL CONTRACTOR TO MODIFY LIGHTING LAYOUT AS REQUIRED TO MAKE ROOM FOR THE NEW MECHANICAL WORK.
D. ALL WORK SHALL COMPLY WITH THE DETAILS ON SHEET M-401, INCLUDING BUT NOT LIMITED TO:• DUCT ELBOWS DETAIL• DUCT TRANSITION DETAIL• GAS-FIRED EQUIPMENT PIPING DETAIL
E. BOILER VENTING SYSTEM TO BE DESIGNED BY THE BOILER VENTING MANUFACTURING INCLUDING FINAL LAYOUT, FITTINGS, AND CALCULATIONS. SEE SECTION 235100.
1/4" = 1'-0"
MECHANICAL PLAN - HYDRONIC & GAS21/4" = 1'-0"
MECHANICAL PLAN - FLUE AND COMBUSTION AIR1
REVISIONS
# DESCRIPTION DATE
HOT WATER PUMP CONTROL (HWP-1 & HWP-2):1. START HEATING WATER PUMPS WHEN OAT < 65°F (ADJ.). WHEN THE OUTSIDE AIR TEMPERATURE RISES ABOVE THE SYSTEM ENABLE SET
POINT, THE PUMPS SHALL BE OFF.
2. WHEN ENABLED, THE PUMP VFDS WILL MODULATE THE SPEED TO MAINTAIN THE HEATING WATER DIFFERENTIAL PRESSURE SET POINT (ADJ.) AS SET BY THE TAB CONTRACTOR.
3. THE DDC SYSTEM SHALL MONITOR THE PUMP'S RUN STATUS VIA A CURRENT SWITCH. IF THE PUMP STATUS DOES NOT MATCH THE COMMAND AN ALARM WILL BE GENERATED.
SEQUENCE OF OPERATION:
DDC I/O POINTS LISTTAG TYPE DESCRIPTION UNITS REMARKS
HWS-T AI HEATING WATER SUPPLY TEMPERATURE °F
HWR-T AI HEATING WATER RETURN TEMPERATURE °F
OA-T AI OUTSIDE AIR TEMPERATURE °F
BLR1-A DI BOILER B-1 ALARM ALARM
BLR2-A DI BOILER B-2 ALARM ALARM
EPO-S DI EPO SWITCH STATUS ON/OFF
HWP1-S DI HW PUMP #1 STATUS ON/OFF
HWP2-S DI HW PUMP #2 STATUS ON/OFF
HW-DPL
H
HWR
HWS
HW-DP AI HEATING WATER DIFFERENTIAL PRESSURE IN. W.C.
HWP1-O AO HW PUMP #1 VFD OUTPUT %
HWP2-O AO HW PUMP #2 VFD OUTPUT %
HWR
HWS
B-3 B-2 BP-3
(E) P-1 (E) P-2GF-1
HOT WATER RETURN
HOT WATER SUPPLY
(E) HWP-1 VFD
HWP1-S
HWP1-OHWP1-A
(E) HWP-2 VFD
HWP2-S
HWP2-OHWP2-A
TS
TS
EPO-S
OA-T
BLR3-ABLR2-OBLR2-A
HWGF-A
ADS-1
HWR-THWS-T
VARIABLE SPEED BOILER PUMP CONTROLLED BY ITS ASSOCIATED BOILER, TYP. TCC TO WIRE TO EACH BOILER CONTROLLER
DCW FILL
REPLACEDEMERGENCY POWEROFF (EPO) SWITCH
NOTES: 1. THE TCC SHALL PROVIDE ANY ADDITIONAL POINTS REQUIRED TO MEET THE SEQUENCE OF OPERATION AND TO PROVIDE A FULLY
FUNCTIONAL SYSTEM.2. THE TCC SHALL REMOVE ANY POINTS AND GRAPHICS NO LONGER USED FOR THE BOILER SYSTEM SUCH AS THE THE EXISTING BOILER PUMP
(P-7), EXISTING BOILER MASTER CONTROLLER, ETC.
HWGF-A DI HEATING WATER GLYCOL FEEDER ALARM ALARM
ET-1
BP-2
1. ALL CONTROLS WORK SHALL COMPLY WITH THE POUDRE SCHOOL DISTRICT TECHNICAL CONTROLS SPECIFICATIONS. THE CONTRACTOR SHALL OBTAIN A COPY PRIOR TO THE BID AND NOTIFY THE ENGINEER OF ANY CONFLICTS OR DISCREPANCIES. WHERE A CONFLICT OCCURS, THE CONTRACTOR SHALL INCLUDE IN THEIR BID THE MORE STRINGENT (HIGHEST COST) REQUIREMENT.
2. THE APPROVED TEMPERATURE CONTROLS CONTRACTOR IS LONG BUILDING TECHNOLOGIES. THE SCHOOL DISTRICT WILL PROVIDE THE REQUIRED SCHNEIDER ELECTRIC CONTROLLERS, ALL OTHER CONTROLS COMPONENTS AND WORK SHALL BE BY THE TCC.
3. THE TEMPERATURE CONTROLS CONTRACTOR SHALL UPDATE THE GRAPHICS FOR THE BOILER SYSTEM FOR THE NEW SYSTEM.
4. ALL SET POINTS LISTED AS ADJUSTABLE SHALL BE EASILY ACCESSED FROM THE GRAPHICS SCREEN FOR EACH SYSTEM. THE GRAPHICS SHALL ALSO INCLUDE FLOOR PLANS OF THE BUILDING SHOWING EACH SYSTEM.
5. THE TCC SHALL COORDINATE THE INITIAL PARAMETERS OF THE SCHEDULES, ALARMS, AND TRENDS WITH THE OWNER DURING TRAINING. THE TCC SHALL ALSO MAKE ADJUSTMENTS TO THE GRAPHICS REQUESTED BY THE OWNER AT NO ADDITIONAL COST.
6. ALL CONTROL WIRING INSIDE THE MECHANICAL ROOM SHALL BE RUN IN CONDUIT.
7. THE TCC SHALL PROVIDE ALL CONTROL WIRING FOR THE BOILER INCLUDING WIRING BETWEEN EACH BOILER, WIRING TO THE HEADER SENSOR TO BOILER B-1 & B-2, AND WIRING TO THE PROTONODE DEVICES IN THE TC PANEL. FOLLOW THE BOILER MANUFACTURER'S INSTALLATION INSTRUCTIONS.
8. THE TCC SHALL INTEGRATE THE EACH BOILER CONTROLLER VIA THE LONWORKS PROTONODE COMMUNICATION CONVERTER PROVIDED WITH EACH BOILER. THE GRAPHICS SHALL INCLUDE A LIST OF POINTS FOR EACH BOILER.
9. THE TCC SHALL PROVIDE ANY OTHER BOILER FIELD WIRING REQUIRED BY THE BOILER INSTALLATION INSTRUCTIONS TO MAKE A FULLY OPERATIONAL SYSTEM.
10. THE USER INTERFACE SHALL INCLUDE EASY ACCESS TO TRENDING, ALARMS, AND SCHEDULING.
TEMPERATURE CONTROLS GENERAL NOTES:
B-1
BLR1-OBLR1-A
BP-1
MT-1
REPLACEDEMERGENCY POWEROFF (EPO) SWITCH
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
MASTER BOILER
BACK-UPMASTER BOILER
BLR3-A DI BOILER B-3 ALARM ALARM
BLR1-O AO BOILER B-1 TEMPERATURE RESET OUTPUT %
BLR2-O AO %
NEW
NEW
NEW
NEW
NEW
NEW
HWP1-C DO HW PUMP #1 START/STOP ON/OFF
HWP2-C DO HW PUMP #2 START/STOP ON/OFF
EXISTING
EXISTING
BOILER B-2 TEMPERATURE RESET OUTPUT (BACKUP)
COMBUSTION AIR
M
CAD-CCAD-S
CAD-S DO COMBUSTION AIR DAMPER STATUS (END SWITCH) OPEN/CLOSE NEW
CAD-C DO COMBUSTION AIR DAMPER COMMAND OPEN/CLOSE NEW
BOILER CONTROL:1. THE BOILERS HAVE INTERNAL CONTROLS WHICH SHALL INTEGRATE INTO THE DDC SYSTEM VIA LONWORKS PROTOCOL. THE TCC IS
RESPONSIBLE FOR COORDINATION WITH THE BOILER MANUFACTURER TO PROVIDE THE INTEGRATION FOR EACH BOILER. COORDINATE WITH THE OWNER ON WHICH POINTS FROM BOILER CONTROLLER THEY MAY WANT DISPLAYED ON THE FRONT-END GRAPHICS SCREEN.
2. THE DDC POINTS LISTED SHALL BE HARD WIRED TO EACH BOILER, NOT PROVIDED THROUGH THE LONWORKS INTEGRATION. THE LONWORKS INTEGRATION SHALL BE USED FOR MONITORING ONLY.
3. WHEN THE LEAD HEATING WATER PUMP STATUS IS ESTABLISHED, THE DDC ENABLES THE BOILER PLANT.
4. BOILER B-1 IS THE LEAD/MASTER BOILER AND BOILERS B-2 AND B-3 ARE "MEMBER" BOILERS IN THE CASCADE. BOILER B-2 SHALL BE A BACKUP LEAD/MASTER BOILER IF B-1 LOSES COMMUNICATION, OTHERWISE IT SHALL OPERATE AS A "MEMBER" BOILER. THE BOILER INTERNAL CONTROLS WILL AUTOMATICALLY CONTROL BOILER CASCADING, FIRING RATES, AND BOILER RUNTIME MANAGEMENT.
5. THE DDC SYSTEM SHALL SEND A SIGNAL TO THE BOILER PLANT FOR SUPPLY WATER TEMPERATURE WHICH SHALL BE INVERSELY RESET IN ACCORDANCE WITH THE FOLLOWING LINEAR RESET SCHEDULE. • OAT = 60° F (ADJ.) --> HWS = 100° F (ADJ.).• OAT = -10° F (ADJ.) --> HWS = 160° F (ADJ.).
6. THE DDC SYSTEM SHALL MONITOR EACH BOILER'S ALARM CIRCUIT AND RELAY ANY ALARM TO THE DDC.
7. UPON ACTIVATION OF THE EMERGENCY POWER SWITCH, LOCATED AT THE BOILER ROOM DOORS, THE POWER TO THE BOILERS SHALL DISABLED, THE EMERGENCY GAS SOLENOID VALVE SHALL CLOSE, AND AN ALARM SHALL BE SENT TO THE DDC. THE TCC SHALL COORDINATE WIRING BETWEEN THE SWITCH AND THE BOILER POWER CIRCUIT. DISABLING THE BOILER THROUGH THE BOILER ALARM CIRCUIT IS NOTALLOWED.
8. THE DDC SYSTEM SHALL MONITOR THE GLYCOL FEEDER ALARM CONTACT AND SEND THE ALARM TO THE DDC SYSTEM.
9. THE DDC SYSTEM SHALL MONITOR THE BOILER ROOM TEMPERATURE. ALARM IF BELOW 45° F (ADJ.).
TS
BOILER HEADER SENSOR, TYP. (2)PROVIDED BY BOILER MANUF.INSTALL 10 FT DOWNSTREAM OF LAST BOILER CONNECTION
1. THE TCC SHALL WIRE EACH BOILER CONTROLLER TO THE PROTONODE CONTROLLER PROVIDED WITH THE BOILER. THE PROTONODE CONTROLLER SHALL BE LOCATED IN THE NEW TEMPERATURE CONTROL PANEL (SEE FLOOR PLANS). THE TCC SHALL ENSURE THAT THEY PROVIDE A PANEL WITH ADEQUATE SPACE FOR ALL (3) PROTONODES.
2. THE TCC SHALL OBTAIN A LIST OF AVAILABLE LONWORKS POINTS FROM THE BOILER MANUFACTURER AND COORDINATE WITH THE OWNER ON WHICH POINTS TO MONITOR ON THE FRONT-END GRAPHICS. THE MINIMUM POINTS TO INTEGRATE AND DISPLAY ARE LISTED BELOW:• BOILER ENABLE• BOILER PUMP ON/OFF• BOILER PUMP SPEED• ALARM CONTACTS• FLUE DAMPER OUTPUT• INLET TEMPERATURE• OUTLET TEMPERATURE• FLUE TEMPERATURE• FIRING RATE• SYSTEM SUPPLY TEMPERATURE (FROM BOILER HEADER SENSOR, NOT DDC SYSTEM)
LONWORKS INTEGRATION NOTES:
NEW TEMPERATURE
SENSOR W/ DIGITAL DISPLAY
ZN-T
ZN-T AI BOILER ROOM TEMPERATURE °F NEW
11. THE TCC SHALL REMOVE EXISTING CONTROLS, WIRING, CONDUITS NO LONGER USED FOR THE NEW EQUIPMENT.
12. THE TCC SHALL BE RESPONSIBLE FOR A COMPLETE WORKING SYSTEM AT THE END OF THE PROJECT WHICH MAY INCLUDE ADDING ADDITIONAL POINTS WHICH SHALL ALL BE INCLUDED IN THE BID. THE TCC SHALL COMMISSION ALL THE NEW CONTROLS TO VERIFY THAT THE ENTIRE SYSTEM IS PERFORMING PER THE SEQUENCE OF OPERATION. THE ENGINEER WILL PERFORM AN OPERATIONAL CHECK ON THE CONTROLS WITH THE TCC AFTER THE TCC HAS SENT IN WRITING THAT THEY HAVE COMPLETED COMMISSIONING OF THE CONTROLS AND ALL SEQUENCES ARE WORKING.
13. AFTER COMPLETION OF THE COMMISSIONING BY THE TCC AND OPERATIONAL CHECK BY THE ENGINEER, THE TCC SHALL PROVIDE OWNER TRAINING PER SECTION 230923.
14. THE TCC SHALL PROVIDE AN AS-BUILT SET OF TEMPERATURE CONTROLS DRAWINGS TO THE OWNER IN THE FINAL O&M MANUAL, PRINTED AND IN PDF FORMAT. THE TCC SHALL ALSO PROVIDE A PRINTED COPY OF THE AS-BUILT TEMPERATURE CONTROL DRAWINGS IN THE MECHANICAL ROOM NEAR THE TEMPERATURE CONTROL PANEL.
15. REFER TO SECTION 230923 FOR ADDITIONAL REQUIREMENTS.
BLR2-EN BLR1-ENBLR3-EN
CHWGF-A DI CHILLED WATER GLYCOL FEEDER ALARM ALARM NEW
BLR1-EN DO BOILER B-1 ENABLE ON/OFF NEW
BLR2-EN DO BOILER B-2 ENABLE ON/OFF NEW
BLR3-EN DO BOILER B-3 ENABLE ON/OFF NEW
(E) GF
CHWF-A
TO CHW SYSTEM
(E) GLYCOL FEEDER, INSTALLED BY OWNER. CONNECT TO CONTROLLER
ALARM CONTACT
TS(N) TEMPERATURE CONTROL
PANEL (SEE LONWORKS INTEGRATION NOTES-THIS SHEET)
DOMESTIC WATER HEATER AND (E) EF-D5 DAMPER:1. WHEN THE DOMESTIC WATER HEATER IS ENABLED, THE DAMPER SHALL OPEN TO PROVIDE COMBUSTION AIR. TCC SHALL WIRE INTO THE
COMBUSTION AIR TERMINALS OF THE WATER SIMILAR TO THE PREVIOUS DAMPER.
2. WHEN THE (E) EF-5D IS ENABLED DUE TO HIGH TEMPERATURE IN THE MECHANICAL ROOM (SUMMER CONDITION) THE DAMPER SHALL OPEN TO PROVIDE MAKE UP AIR.
3. WHEN THE WATER HEATER AND EXHAUST FAN EF-5D ARE OFF, THE DAMPER SHALL BE CLOSED.
SEQUENCE OF OPERATION - INTAKE HOOD IH-1:
EMERGENCY GAS SOLENOID
VALVE
S
(N) INTAKE HOOD (IH-1). USED FOR INTAKE AIR FOR (E) EF-D5 AND FOR COMBUSTION AIR FOR THE (E) DWH
INTERLOCK WITH (E) DWH & (E) EF-D5
C
O
LORAD
O LICENSED
PR
OFESS I ONAL EN
G I
NE
ER
JUS
TIN
H.MONTGO
ME
RY42193
19 OLD TOWN SQUARE SUITE 238FT COLLINS, CO 80524PH: (970) 430-5783
1623 CENTRAL AVE.CHEYENNE, WY 82001PH: (307) 222-9375
designpointengineering.com
DATE:
DESIGNED:
CHECKED:
SEAL:
ISSUES
DESCRIPTION DATE
PROJECT NUMBER:
02/13/2020
02/13/2020
ORD
JHM
M-301
TEMPERATURECONTROLS
FOSSIL RIDGEHS BOILER
REPLACEMENT5400 ZIEGLER RD
FORT COLLINS, CO 80528
CONSTRUCTION DOCUMENTS 02/13/2020
1918
REVISIONS
# DESCRIPTION DATE
G
UNION
GAS SUPPLY
APPLIANCE SHUTOFF VALVE
6" LONG DIRT LEG,FULL DIAMETER UP TO 2"
(SEE NOTE 2)
NOTES:1. APPLIANCE SHUTOFF VALVE SHALL BE INSTALLED IN AN ACCESSIBLE LOCATION.
2. REFER TO PLANS FOR PIPE SIZES. PROVIDE REDUCER/INCREASER AT THE EQUIPMENT CONNECTION AS REQUIRED.
GAS-FIRED EQUIPMENT PIPING DETAILSCALE: NONE
REDUCER/INCREASER
GAS-FIRED EQUIPMENT
FULL RADIUS ELBOW SHORT RADIUS ELBOW
NOTES:
1. FULL RADIUS ELBOWS SHALL BE USED AS THE STANDARD. SHORT RADIUS ELBOWS ARE ONLY PERMITTED WHERE FULL RADIUS ELBOWS WILL NOT FIT.
2. THE INTERIOR OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.
3. VANES SHALL BE CONSTUCTED, SUPPORTED AND FASTENED AS RECOMMENDED BY SMACNA.
NOTES:
1. DIMENSIONS 'W1' AND 'W2' SHALL BE EQUAL ON SQUARE ELBOWS, UNLESS NOTED OTHERWISE ON THE DRAWINGS.
2. VANES SHALL BE AIRFOIL VANE TYPE. VANES SHALL BE CONSTRUCTED, SUPPORTED AND FASTENED AS RECOMMENDED BY SMACNA.
SQUARE ELBOW WITH TURNING VANES
DUCT ELBOWS DETAILSCALE: NONE
1/3 × W
0.5 × W
W
W
W
VANE
W1
W2
CONVERGING AIRFLOW
DIVERGING
AIRFLOW
CONVERGING AIRFLOW
DIVERGING
AIRFLOW
θ
θ
θ = 15° MAX. CONVERGING AIRFLOWθ = 15° MAX. DIVERGING AIRFLOW
θ
θ = 30° MAX. CONVERGING AIRFLOWθ = 15° MAX. DIVERGING AIRFLOW
SCALE: NONE
DUCT TRANSITIONS DETAIL
C
O
LORAD
O LICENSED
PR
OFESS I ONAL EN
G I
NE
ER
JUS
TIN
H.MONTGO
ME
RY42193
19 OLD TOWN SQUARE SUITE 238FT COLLINS, CO 80524PH: (970) 430-5783
1623 CENTRAL AVE.CHEYENNE, WY 82001PH: (307) 222-9375
designpointengineering.com
DATE:
DESIGNED:
CHECKED:
SEAL:
ISSUES
DESCRIPTION DATE
PROJECT NUMBER:
02/13/2020
02/13/2020
ORD
JHM
M-401
MECHANICALSCHEDULES &
DETAILS
FOSSIL RIDGEHS BOILER
REPLACEMENT5400 ZIEGLER RD
FORT COLLINS, CO 80528
CONSTRUCTION DOCUMENTS 02/13/2020
1918
1.) ASME CSD-1 COMPLETE WITH FLOW SWITCH, RELIEF VALVE, PRESSURE/TEMPERATURE GAUGE 2.) CONDENSATE NEUTRALIZATION KIT 3.) COMPLETE BOILER CONTROLS - WITH LONGWORKS BMS GATEWAY 4.) 20:1 FULL MODULATION 5.) 50 PSIG RELIEF VALVE 6.) HIGH ALTITUDE MODEL 7.) SEE SPECIFICATION SECTION 235216
1.) INTERNAL FUSES TO RUN AT 208V, 1PH INPUT POWER
1.) 18" TALL ROOF CURB 2.) BIRD AND INSECT SCREEN 3.) 120 V MOTORIZED DAMPER
CONDENSING BOILER SCHEDULE
TAG MAKE MODEL INPUT
EFFICIENCY @
140° F RETURN
OUTPUT @
5000' ELEV HEAT EXCH. CAT. FUEL
GAS
CONN.
MIN./MAX.
GAS PRESS.
(W.C.)
WATER
CONN.
VENT
CONN. CA CONN.
OPERATING
WEIGHT
ELECTRICAL
REMARKSVOLTAGE PHASE FLA
B-1 LOCHINVAR FBN2501 2,500,000.0 Btu/h 88 % 1,980,000.0 Btu/h STAINLESS STEEL IV NAT. GAS 2" 4"-14" 4" 9" 8" 3600 208 V 3 4.5 A ALL
B-2 LOCHINVAR FBN2501 2,500,000.0 Btu/h 88 % 1,980,000.0 Btu/h STAINLESS STEEL IV NAT. GAS 2" 4"-14" 4" 9" 8" 3600 208 V 3 4.5 A ALL
B-3 LOCHINVAR FBN2501 2,500,000.0 Btu/h 88 % 1,980,000.0 Btu/h STAINLESS STEEL IV NAT. GAS 2" 4"-14" 4" 9" 8" 3600 208 V 3 4.5 A ALL
INTAKE HOOD SCHEDULETAG MANUFACTURER MODEL APPLICATION THROAT LENGTH THROAT WIDTH THROAT AREA CFM APD CONSTRUCTION REMARKS
IH-1 GREENHECK FGI INTAKE 24" 24" 4.00 ft² 2000 CFM 0.042 in-wg GALVANIZED ALL
PUMP SCHEDULE
TAG MAKE MODEL GPM
HEAD (FT.
OF W.C.) FLUID TYPE PUMP TYPE VOLTAGE PHASE MOTOR HP BODY IMPELLER
SUCTION
SIZE
DISCHARGE
SIZE REMARKS
BP-1 TACO VR30-3 160 GPM 20 30% P. GLYCOL IN LINE 208 V 1 2.175 C.I. STAINLESS STEEL 3" 3" ALL
BP-2 TACO VR30-3 160 GPM 20 30% P. GLYCOL IN LINE 208 V 1 2.175 C.I. STAINLESS STEEL 3" 3" ALL
BP-3 TACO VR30-3 160 GPM 20 30% P. GLYCOL IN LINE 208 V 1 2.175 C.I. STAINLESS STEEL 3" 3" ALL
HYDRONIC SYSTEM ACCESSORIES SCHEDULETAG MAKE MODEL DESCRIPTION
ADS-1 CALEFFI NA546100AM MAGNETIC AIR/DIRT SEPARATOR, WITH AUTOMATIC AIR VENT, BLOWDOWN VALVE, AND FLUSH VALVE, EPOXY COATED STEEL CONSTRUCTION. 4" FLANGED CONNECTIONS. ASME CERTIFIED. RATED TO 150 PSI AT 270°F.
ET-1 AMTROL 600-L BLADDER TYPE EXPANSION TANK, 158 GAL. VOLUME FULL ACCEPTANCE,, ASME RATED, AND AIR CHARGING VALVE, SET TO 24 PSIG.
GT-1 AXIOM SF100 PACKAGED GLYCOL FEEDER SYSTEM. 55 GAL. STORAGE TANK, PUMP, PUMP CONTROLS, AND ALARM CONTACTS FOR REMOTE MONITORING BY THE BAS SYSTEM. 115V PLUG.
REVISIONS
# DESCRIPTION DATE
3
WIRING
WIRING IN CONDUIT, GROUND WIRE IS LINE WITH HOOK
SYMBOL, HOT WIRE IS LONG LINE, NEUTRAL IS SHORT
LINE. NUMBER OF WIRES AS SHOWN. WIRE SHALL BE
#12 MINIMUM AND CONDUIT SHALL BE 1/2" MINIMUM
UNLESS AS NOTED ON THE CIRCUIT SCHEDULE(S).
0-10 VOLT DIMMING WIRES ARE NOT SHOWN ON THE
COUNT BUT ARE REQUIRED WHEN 0-10 VOLT DIMMING
IS USED. SEE MANUFACTURER'S 0-10 VOLT DIMMING
SCHEMATIC FOR NUMBER OF WIRES REQUIRED.
LP12-1ARROW(S) INDICATE HOME RUN(S) WITH PANEL AND
CIRCUIT NUMBER(S) INDICATED
ARROW INDICATES CIRCUIT HOME RUNS THROUGH
ADDITIONAL CIRCUIT(S) CONDUIT
ELECTRICAL FIXTURES
DUPLEX RECEPTACLE, TYPE
AS SCHEDULED
LIGHTING DEVICES
THREE WAY SNAP SWITCH
ELECTRICAL EQUIPMENT
T#
ELECTRICAL PANEL, TYPE AS SCHEDULED
DISCONNECT SWITCH, TYPE AS
SCHEDULED
DRY TYPE STEP DOWN TRANSFORMER,
TYPE AS SCHEDULED
ELECTRIC METER
LIGHT FIXTURES
EXISTING CHAIN HUNG
LIGHT FIXTURE
MECHANICAL DEVICES
GLYCOL FEEDER
INLINE PUMP
EPO EMERGENCY POWER OFF SWITCH
CONTROL PANEL
WATER PUMP
BASE MOUNTED PUMP
UNIT HEATER
BOILER
EXHAUST FAN
NEW CHAIN HUNG STRIP
LIGHT FIXTURE
MYRON GUST
GNELANOISS
E
FO
RP
CO
LORA
DO L I
RE
ENI
CENSED
18304
19 OLD TOWN SQUARE
SUITE 238
FT COLLINS, CO 80524
PH: (970) 430-5783
1623 CENTRAL AVE.
CHEYENNE, WY 82001
PH: (307) 222-9375
designpointengineering.com
DATE:
DESIGNED:
CHECKED:
SEAL:
ISSUES
DESCRIPTION DATE
PROJECT NUMBER:
02/13/20
02/13/2020
MHG
MHG
E-100
LEGEND AND
SHEET INDEX
FOSSIL RIDGE
HS BOILER
REPLACEMENT5400 ZIEGLER RD
FORT COLLINS, CO 80528
CONTRUCTION DOCUMENTS 02/13/2020
1918
SHEET LIST
Sheet Number Sheet Name
E-100 LEGEND AND SHEET INDEX
E-200 HVAC ELECTRICAL DEMO PLANS & SCHEDULES
E-201 ONE LINE AND HVAC ELECT. PLANS & SCHEDULES
E-300 PANELBOARD SCHEDULES AND LIGHTING PLANS
No ScaleWIRING LEGEND
No Scale1
ELECTRICAL LEGEND
REVISIONS
# DESCRIPTION DATE
M1D1
M1D1-2
M1D2
MSB1
MSB1-1
MSB1-3
PARTIAL ELECT.
RM INFO
R1D1
R1D1-2
DROP CEILING
OPEN
CEILING
OPEN
CEILING
MSB1-4
TC1
UHD1
(E)
P-1
(E)
P-2
P7DHWP-2
RP-2
RP-1
R2
R2
R2
B-1 B-2 B-3 EBCP
EF-D5
R2
(E)
P-3(E)
P-4
(E)
P-5
(E)
P-6
EPO
EPO
WH
MYRON GUST
GNELANOISS
E
FO
RP
CO
LORA
DO L I
RE
ENI
CENSED
18304
19 OLD TOWN SQUARE
SUITE 238
FT COLLINS, CO 80524
PH: (970) 430-5783
1623 CENTRAL AVE.
CHEYENNE, WY 82001
PH: (307) 222-9375
designpointengineering.com
DATE:
DESIGNED:
CHECKED:
SEAL:
ISSUES
DESCRIPTION DATE
PROJECT NUMBER:
02/13/20
02/13/2020
MHG
MHG
E-200
HVAC
ELECTRICAL
DEMO PLANS &
SCHEDULES
FOSSIL RIDGE
HS BOILER
REPLACEMENT5400 ZIEGLER RD
FORT COLLINS, CO 80528
CONTRUCTION DOCUMENTS 02/13/2020
1918
1/8" = 1'-0"1
FIRST FLOOR - POWER DEMOLITIONPLAN
1/8" = 1'-0"2
BASEMENT - POWER DEMOLITION PLAN
EXISTING ELECTRICAL EQUIPMENT SCHEDULE
Type Mark Count Description
M1D1 1 480/277V SURFACE MOUNT PANELBOARD WITH MAIN LUGS ONLY
M1D1-2 1 480/277V SURFACE MOUNT PANELBOARD WITH MAIN LUGS ONLY
M1D2 1 480/277V SURFACE MOUNT PANELBOARD WITH MAIN LUGS ONLY
MSB1 1 MAIN SWITCH 4000 AMP, 277/480 VOLT
MSB1-1 1 SECTION ONE MAIN GEAR, 4000 AMP, 277/480 VOLT
MSB1-3 1 SECTION THREE MAIN GEAR, 4000 AMP, 277/480 VOLT
MSB1-4 1 SECTION FOUR MAIN GEAR, 4000 AMP, 277/480 VOLT
R1D1 1 120/208V SURFACE MOUNT PANELBOARD
R1D1-2 1 120/208V SURFACE MOUNT PANELBOARD WITH MAIN LUGS ONLY
EXISTING ELECTRICAL FIXTURE SCHEDULE
Type
Mark Count Description
R2 4 EXISTING GFCI RECEPTACLE TO REMAIN, NO WORK
Grand total: 4
EXISTING MECHANICAL EQUIPMENT SCHEDULE
Type
Mark Count Description
(E) P-1 1 EXISTING PUMP, DISCONNECT AND STARTER TO REMAIN. REMOVE WIRE BACK TO M1D1-2-49,51,53. REWIRE TO NEW PANEL HP11
(E) P-2 1 EXISTING PUMP, DISCONNECT AND STARTER TO REMAIN. REMOVE WIRE BACK TO M1D1-2-55,57,59. REWIRE TO NEW PANEL HP11
(E) P-3 1 EXISTING PUMP, DISCONNECT AND STARTER TO REMAIN. REMOVE WIRE BACK TO M1D1-2-61,63,65. REWIRE TO NEW PANEL HP11
(E) P-4 1 EXISTING PUMP, DISCONNECT AND STARTER TO REMAIN. REMOVE WIRE BACK TO M1D1-2-56,58,60. REWIRE TO NEW PANEL HP11
(E) P-5 1 EXISTING PUMP, DISCONNECT AND STARTER TO REMAIN. REMOVE WIRE BACK TO M1D1-2-50,52,54. REWIRE TO NEW PANEL HP11
(E) P-6 1 EXISTING PUMP, DISCONNECT AND STARTER TO REMAIN. REMOVE WIRE BACK TO M1D1-2-62,64,66. REWIRE TO NEW PANEL HP11
B-1 1 EXISTING BOILER TO BE REMOVED. REMOVE WIRE BACK TO M1D1-2-67-69-71. REMOVE EXPOSED CONDUIT
B-2 1 EXISTING BOILER TO BE REMOVED. REMOVE WIRE BACK TO M1D1-2-73,75,77. REMOVE EXPOSED CONDUIT
B-3 1 EXISTING BOILER TO BE REMOVED. REMOVE WIRE BACK TO M1D1-2-68,70,72. REMOVE EXPOSED CONDUIT
DHWP-2 1 HOT WATER RECIRCULATING PUMP AND DISCONNECT FOR DHWP-2 TO REMAIN. REMOVE WIRES TO R1DR-51. REWIRE TO NEW PANELLP11
EBCP 1 EXISTING BOILER CONTROL PANEL TO BE REMOVED EC TO DISCONNECT CRKT. R1D4-79, 81 AND REMOVE WIRE BACK TO PANEL
EF-D5 1 EXISTING EXHAUST FAN, DISCONNECT AND STARTER TO REMAIN. REMOVE WIRE BACK TO M1D1-2-43,45,57. REWIRE TO NEW PANELHP11
EPO 2 EXISTING EMERGENCY POWER OFF SWITCH TO REMAIN IN THE SAME LOCATION. EC TO REWIRE TO NEW BOILER CONTROLS ANDPOWER TO SHUT DOWN BOILERS. MUSHROOM TYPE HEAD, SHALL STAY OFF WHEN PUSHED AND CAN ONLY BE RESET MANUALLY. MC
TO PROVIDE SWITCH, EC TO WIRE.
P7 1 EXISTING PUMP, DISCONNECT AND STARTER TO BE REMOVED. REMOVE WIRE BACK TO M1D1-2-79,81,83. REMOVE EXPOSED CONDUIT
RP-1 1 EXISTING PUMP, DISCONNECT AND STARTER TO REMAIN. REMOVE WIRE BACK TO R1D4-48. REWIRE TO NEW PANEL LP11
RP-2 1 EXISTING PUMP, DISCONNECT AND STARTER TO REMAIN. REMOVE WIRE BACK TO R1D4-50. REWIRE TO NEW PANEL LP11
TC1 1 EXISTING TEMPERATURE CONTROL PANEL. EC TO DISCONNECT CRKT. R1D1-24 AND REWIRE TO NEW PANEL LP11. REMOVE WIRE BACKTO PANEL
UHD1 1 EXISTING UNIT HEATER TO REMAIN. EC TO REMOVE WIRE BACK TO PANEL R1D1-16. EC TO REWIRE TO PANEL LP11
WH 1 EXISTING WATER HEATER. REMOVE WIRING AND REWIRE TO NEW PANEL LP11
Grand total: 20
REVISIONS
# DESCRIPTION DATE
J1
J1
H11LP11
LP11 -
13,15,17
B-1 B-2
B-3
BP-1 BP-2BP-3
LP11 -
9,11
LP11 -
12,14
R1
LP11 - 2
2"ø
(E)
P-3(E)
P-4(E)
P-5(E)
P-6
UHD1
GFT-1
(E)
P-1
(E)
P-2
D33 D33 D33
R2
TC1
LP11 - 3
T45
H11 -
1,3,5H11 -
7,9,11
H11 -
8,10,12
H11 -
13,15,17
H11 -
14,16,18
H11 -
20,22,24
EF-D5
R2
R2
DHWP-2
RP-2
LP11 - 4
RP-1
LP11 - 7
LP11 - 6
LP11 -
8,10
R1
EPO
R2
NOTE: CONDUIT SHALL NOT BE RUN ON THE FLOOR
EPO
LP11 - 5
WH
LP11 -
16
TC2
R1D1-2
R1D1
M1D2
M1D1-2
M1D1
MSB1
MSB1-1
MSB1-3
MSB1-4
DROP CEILING
OPEN
CEILING
OPEN CEILING
SUGGESTED CONDUIT ROUTE.
EC TO ADJUST AS REQUIRED
AND PROVIDE PULL BOXES
AS REQUIRED.
2"ø
USE SPARE
200 AMP, 3P
BREAKER
FOR NEW
PANEL HP11
PARTIAL ELECT.
RM INFO
MSB1-2
FS
MD
LP11 -
19
LP11
HP11MSB1-2
SPARE 200 AMP, 3P BREAKER
TO FEED NEW PANEL HP11
T45
MYRON GUST
GNELANOISS
E
FO
RP
CO
LORA
DO L I
RE
ENI
CENSED
18304
19 OLD TOWN SQUARE
SUITE 238
FT COLLINS, CO 80524
PH: (970) 430-5783
1623 CENTRAL AVE.
CHEYENNE, WY 82001
PH: (307) 222-9375
designpointengineering.com
DATE:
DESIGNED:
CHECKED:
SEAL:
ISSUES
DESCRIPTION DATE
PROJECT NUMBER:
02/13/20
02/13/2020
MHG
MHG
E-201
ONE LINE AND
HVAC ELECT.
PLANS &
SCHEDULES
FOSSIL RIDGE
HS BOILER
REPLACEMENT5400 ZIEGLER RD
FORT COLLINS, CO 80528
CONTRUCTION DOCUMENTS 02/13/2020
1918
ELECTRICAL EQUIPMENT SCHEDULE
Type Mark Count Description
D33 3 208 VOLT, 3 PHASE, 30 AMP, NEMA 1 FUSED DISCONNECT. FUSE WITH 3-FRN-R FUSES TO MATCH CONNECTED EQUIPMENTREQUIREMENTS
H11 1 480/277V SURFACE MOUNT PANELBOARD WITH MAIN LUGS ONLY
LP11 1 120/208V SURFACE MOUNT PANELBOARD
MSB1-2 1 SECTION TWO MAIN GEAR, 4000 AMP, 277/480 VOLT
T45 1 45kVA DRY TYPE 480-208V STEP DOWN TRANSFORMER, NEMA TYPE 2
Grand total: 7 7
ELECTRICAL FIXTURE SCHEDULE
Type
Mark Count Manufacturer Model Description
FS 1 SMOKE DAMPER BY MC, WIRED BY EC. EC TO SUPPLY AND INSTALL ASto FOR OVERLOAD PROTECTION AND DISCONNECTION
MD 1 MOTORIZED DAMPER BY MC, WIRED BY EC. EC TO SUPPLY ANDINSTALL A Sto FOR OVERLOAD PROTECTION AND DISCONNECTION
R1 2 HUBBELL OR EQUAL GFTRST20 GFCI TAMPER RESISTANT BROWN RECEPTACLE FOR GFT PLUG IN
Grand total: 4
ELECTRICAL CIRCUIT SCHEDULE
Panel Load Name
Circuit
Number Wire Size
Conduit
Size Voltage
Voltage
Drop VD%
T45 LP11 1 3-#3/0, 1-#3/0, 1-#6 2" 208 V 0 V 0.043641
MSB1-1 H11 1 3-#3/0, 1-#3/0, 1-#6 2" 480 V 2 V 0.2458
LP11 BOILERS B1, B2 AND B3.PROVIDE SHUNT TRIP
BREAKER. TO BE WIREDTHROUGH EPO
SWITCHES
13,15,17 3-#12, 1-#12, 1-#12 1/2" 208 V 2 V 0.681214
LP11 PUMP BP-2 9,11 2-#10, 1-#10 3/4" 208 V 1 V 0.556036
LP11 PUMP BP-3 12,14 2-#10, 1-#10 3/4" 208 V 1 V 0.609849
LP11 Receptacle for Glycolfeeders
2 1-#12, 1-#12, 1-#12 1/2" 120 V 0 V 0.274158
LP11 TEMPERATURE CONTROLPANEL TC1
3 1-#12, 1-#12, 1-#12 1/2" 120 V 1 V 0.73263
LP11 Receptacle 1 1-#12, 1-#12, 1-#12 1/2" 120 V 1 V 0.529916
LP11 RP-2 4 1-#12, 1-#12, 1-#12 1/2" 120 V 2 V 1.556629
LP11 RP-1 7 1-#12, 1-#12, 1-#12 1/2" 120 V 2 V 1.653071
LP11 UHD1 6 1-#12, 1-#12, 1-#12 1/2" 120 V 1 V 1.060394
LP11 PUMP BP-1 8,10 2-#12, 1-#12 1/2" 208 V 2 V 0.96033
LP11 WATER HEATER 5 1-#12, 1-#12, 1-#12 120 V 1 V 0.540158
LP11 TEMPERATURE CONTROLPANEL TCP-2
16 1-#12, 1-#12, 1-#12 120 V 1 V 0.774297
LP11 FIRE SMOKE DAMPERAND MOTORIZED DAMPER
19 1-#12, 1-#12, 1-#12 120 V 0 V 0.107843
H11 P-1 1,3,5 3-#6, 1-#10 1" 480 V 0 V 0.041031
H11 P-2 2,4,6 3-#6, 1-#10 1" 480 V 0 V 0.047348
H11 P-3 7,9,11 3-#8, 1-#10 3/4" 480 V 1 V 0.071279
H11 P-4 8,10,12 3-#8, 1-#10 3/4" 480 V 1 V 0.076841
H11 P-5 13,15,17 3-#6, 1-#10 1" 480 V 1 V 0.080214
H11 P-6 14,16,18 3-#6, 1-#10 1" 480 V 1 V 0.085628
H11 T45 19,21,23 3-#4, 1-#4, 1-#8 1 1/4" 480 V 0 V 0.031129
H11 EF-D5 20,22,24 3-#12, 1-#12 1/2" 480 V 0 V 0.03149
H11 Lighting 37 1-#12, 1-#12, 1-#12 277 V 0 V 0.088218
Grand total: 24
1/8" = 1'-0"1
BASEMENT - POWER PLAN1/8" = 1'-0"
2FIRST FLOOR - POWER PLAN
MECHANICAL EQUIPMENT SCHEDULE
Type
Mark Count Description
B-1 1 NEW BOILER BY MC, WIRED BY EC
B-2 1 NEW BOILER BY MC, WIRED BY EC
B-3 1 NEW BOILER BY MC, WIRED BY EC
BP-1 2 NEW PUMP BY MC, WIRED BY EC
BP-2 1 NEW PUMP BY MC, WIRED BY EC
BP-3 1 NEW PUMP BY MC, WIRED BY EC
GFT-1 1 PACKAGED GLYCOL FEEDER SYSTEM BY MC. EC TO PROVIDE RECEPTACLE FOR POWER TO THE UNIT
TC2 1 NEW TEMPERATURE CONTROL PANEL BY TC POWER PROVIDED BY EC.
Grand total: 9
No Scale3
NEW PARTIAL ONE LINE
EC TO PROVIDE MONITOR MODULE
FOR FIRE SMOKE AND CONNECT
INTO EXISTING FIRE ALARM SYSTEM.
PROGRAM SYSTEM TO ACCEPT
ADDITIONAL DEVICE. UPDATE
PLAN MAP TO INCLUDE NEW
DEVICE
REVISIONS
# DESCRIPTION DATE
3
3
3
3
NOTE: EC SHALL COMPLY WITH NEC110.22a "EACH DISCONNECTING MEANS SHALL BE LEGIBLY MARKED TO INDICATE ITS PURPOSE UNLESS
LOCATED AND ARRANGED SO THE PURPOSE IS EVIDENT. THE MARKING SHALL BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT
INVOLVED." AND 408.4A, "CIRCUIT DIRECTORY OR CIRCUIT IDENTIFICATION. EVERY CIRCUIT AND CIRCUIT MODIFICATIONS SHALL BE LEGIBLY
IDENTIFIED AS TO ITS CLEAR, EVIDENT AND SPECIFIC PURPOSE OR USE. ETC." EC SHALL MEET ALL REQUIREMENTS OF THESE ENTIRE SECTIONS.
SCHEDULES SHOWN ON THESE PLANS ARE SHORT HAND DESIGNATIONS FOR THE DESIGN AND ARE ONLY TO BE USED FOR CONSTRUCTION. FINAL
SCHEDULES SHALL MEET THE REQUIREMENTS OF THE TWO CODE SECTIONS INDICATED IN THIS NOTE.
H HS3
H
H
S3
H
H
ON EMERGENCY
CIRCUIT
H11 -
37
S3
S3
A
A
A
A
A
AN
AE
AE
H11
LP11
T45
NOTE: COORDINATE NEW LIGHT
FIXTURE LOCATIONS WITH EXISTING
MECHANICAL PIPING.
MYRON GUST
GNELANOISS
E
FO
RP
CO
LORA
DO L I
RE
ENI
CENSED
18304
19 OLD TOWN SQUARE
SUITE 238
FT COLLINS, CO 80524
PH: (970) 430-5783
1623 CENTRAL AVE.
CHEYENNE, WY 82001
PH: (307) 222-9375
designpointengineering.com
DATE:
DESIGNED:
CHECKED:
SEAL:
ISSUES
DESCRIPTION DATE
PROJECT NUMBER:
02/13/20
02/13/2020
MHG
MHG
E-300
PANELBOARD
SCHEDULES
AND LIGHTING
PLANS
FOSSIL RIDGE
HS BOILER
REPLACEMENT5400 ZIEGLER RD
FORT COLLINS, CO 80528
CONTRUCTION DOCUMENTS 02/13/2020
1918
No Scale1
DIRECTIVE FOR PANEL SCHEDULES
Notes:
Load Classification 500 VA 100.00% 500 VA
Receptacle 720 VA 100.00% 720 VA
Power 100 VA 100.00% 100 VA
Other 0 VA 0.00% 0 VA Total Est. Demand: 141 A
Motor 105070 VA 104.21% 109492 VA Total Conn.: 136 A
Lighting 294 VA 125.00% 368 VA Total Est. Demand: 117152 VA
Heating 1500 VA 100.00% 1500 VA Total Conn. Load: 112672 VA
HVAC 5866 VA 100.00% 5866 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 137 A 136 A 134 A
Total Load: 37787 VA 37693 VA 37193 VA
41 Space -- -- 0 VA 0 VA -- -- Space 42
39 Space -- -- 0 VA 0 VA -- -- Space 40
37 Lighting 20 A 1 294 VA 0 VA -- -- Space 38
35 0 VA 0 VA 36
33 0 VA 0 VA 34
31
Spare 30 A 3
0 VA 0 VA
3 30 A Spare
32
29 0 VA 0 VA 30
27 0 VA 0 VA 28
25
Spare 20 A 3
0 VA 0 VA
3 20 A Spare
26
23 7201... 400 VA 24
21 7736... 400 VA 22
19
T45 70 A 3
7574... 400 VA
3 20 A EF-D5
20
17 5579... 5579... 18
15 5579... 5579... 16
13
P-5 50 A 3
5579... 5579...
3 50 A P-6
14
11 3719... 3719... 12
9 3719... 3719... 10
7
P-3 35 A 3
3719... 3719...
3 35 A P-4
8
5 5579... 5579... 6
3 5579... 5579... 4
1
P-1 50 A 3
5579... 5579...
3 50 A P-2
2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating:
Mounting: Surface Wires: 4 Mains Rating: 225 A
Supply From: MSB1-1 Phases: 3 Mains Type:
Location: BOILER ROOM D001 Volts: 480/277 Wye A.I.C. Rating: 14000
Branch Panel: H11
Notes:
Load Classification 500 VA 100.00% 500 VA
Receptacle 720 VA 100.00% 720 VA Total Est. Demand: 65 A
Power 100 VA 100.00% 100 VA Total Conn.: 62 A
Motor 14844 VA 106.55% 15817 VA Total Est. Demand: 23465 VA
Heating 1500 VA 100.00% 1500 VA Total Conn. Load: 22510 VA
HVAC 5866 VA 100.00% 5866 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 64 A 65 A 60 A
Total Load: 7574 VA 7736 VA 7201 VA
41 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 42
39 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 40
37 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 38
35 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 36
33 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 34
31 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 32
29 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 30
27 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 28
25 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 26
23 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 24
21 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 22
19 FIRE SMOKE DAMPER AND MOTORIZED... 20 A 1 100 VA 0 VA 1 20 A Spare 20
17 1622... 0 VA 1 20 A Spare 18
15 1622... 500 VA 1 20 A TEMPERATURE CONTROL PANEL TCP-2 16
13 BOILERS B1, B2 AND B3. PROVIDE SHUNTTRIP BREAKER. TO BE WIRED THROUGH EPOSWITCHES
20 A 3
1622... 1945... 14
11 1945... 1945...2 30 A PUMP BP-3
12
9PUMP BP-2 30 A 2
1945... 1945... 10
7 RP-1 20 A 1 1587... 1945...2 20 A PUMP BP-1
8
5 WATER HEATER 20 A 1 500 VA 1500... 1 20 A UHD1 6
3 TEMPERATURE CONTROL PANEL TC1 20 A 1 500 VA 1587... 1 20 A RP-2 4
1 Receptacle 20 A 1 360 VA 360 VA 1 20 A Receptacle for Glycol feeders 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating: 225 A
Mounting: Surface Wires: 4 Mains Rating: 200 A
Supply From: T45 Phases: 3 Mains Type:
Location: BOILER ROOM D001 Volts: 120/208 Wye A.I.C. Rating: 10000
Branch Panel: LP11
1/8" = 1'-0"2
BASEMENT - LIGHTING DEMOLITIONPLAN
1/8" = 1'-0"3
BASEMENT - LIGHTING PLAN
EXISTING LIGHTING FIXTURE SCHEDULE
Type
Mark Count Description
H 6 EXISTING CEILING FIXTURE, REPLACE WITH NEW FIXTURE, REMOVE FROM CIRCUIT L1F1-4. REMOVE WIRE BACK TO THE PANEL. REWIRETO NEW PANEL HP11
Grand total: 6
LIGHTING FIXTURE SCHEDULE
Type
Mark Count Manufacturer Model Description Image
A 5 HE WILLIAMS 75R-4-L65/835-VBY-DRV-UNV 4'0" CHAIN HUNG, LED, 6600 LUMENS, 3500 K, 49 WATTS, REPLACEEXISTING FIXTURE AND HANG WITH CHAINS FROM THE CEILING
AE 2 HE WILLIAMS 75R-4-L65/835-VBY-DRV-UNV 4'0" CHAIN HUNG, LED, 6600 LUMENS, 3500 K, 49 WATTS, REPLACEEXISTING FIXTURE. HANG WITH CHAINS FROM THE CEILING. WIRED TO
EXISTING EMERGENCY CIRCUIT
AN 1 HE WILLIAMS 75R-4-L65/835-VBY-DRV-UNV 4'0" CHAIN HUNG, LED, 6600 LUMENS, 3500 K, 49 WATTS, ADD FIXTUREAS SHOWN. HANG WITH CHAINS FROM THE CEILING
Grand total: 8
REVISIONS
# DESCRIPTION DATE
SheetsG-001 - TITLE SHEETM-001 - MECHANICAL NOTES & LEGENDSM-101 - MECHANICAL DEMO PLANM-201 - MECHANICAL REMODEL PLANSM-301 - TEMPERATURE CONTROLSM-401 - MECHANICAL SCHEDULES & DETAILSE-100 - LEGEND AND SHEET INDEXE-200 - HVAC ELECTRICAL DEMO PLANS & SCHEDULESE-201 - ONE LINE AND HVAC ELECT. PLANS & SCHEDULESE-300 - PANELBOARD SCHEDULES AND LIGHTING PLANS