POWER AUTHORITY OF THE STATE OF NEW YORK POST BID FOLLOW-UP NO. 1 REQUEST FOR PROPOSAL NO. Q13-5441LW FOR CONTINGENCY PROCUREMENT OF GENERATION AND TRANSMISSION JUNE 12, 2013 TO ALL CONCERNED: The original Bid Document, Bid Addendum No. 1 dated May 6, 2013, and Bid Addendum No. 2 date May 8, 2013 for RFP No. Q13-5441LW are amended as noted in this Post Bid Follow-up No. 1 date June 12, 2013 and the Post Bid Follow-up shall become a part of the Bid Document.

POWER AUTHORITY OF THE STATE OF NEW YORK POST BID FOLLOW-UP NO

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: POWER AUTHORITY OF THE STATE OF NEW YORK POST BID FOLLOW-UP NO

POWER AUTHORITY OF THE STATE OF NEW YORK

POST BID FOLLOW-UP NO. 1

REQUEST FOR PROPOSAL NO. Q13-5441LW

FOR

CONTINGENCY PROCUREMENT OF GENERATION AND TRANSMISSION

JUNE 12, 2013

TO ALL CONCERNED:

The original Bid Document, Bid Addendum No. 1 dated May 6, 2013, and Bid Addendum No. 2 date May 8,

2013 for RFP No. Q13-5441LW are amended as noted in this Post Bid Follow-up No. 1 date June 12, 2013

and the Post Bid Follow-up shall become a part of the Bid Document.

Page 2: POWER AUTHORITY OF THE STATE OF NEW YORK POST BID FOLLOW-UP NO

NEW YORK POWER AUTHORITY

CONTINGENCY PROCUREMENT OF GENERATION AND TRANSMISSION

REQUEST FOR PROPOSAL NO. Q13-5441LW

POST BID FOLLOW-UP NO. 1 DATED JUNE 12, 2013

The original Bid Document, Bid Addendum No. 1, Bid Addendum No. 2, and Bid Addendum No. 3 for Request

For Proposals (RFP) No. Q13-5441LW, are amended as noted in this Post Bid Follow-up No. 1 dated June 12,

2013 and the Post Bid Follow-up shall become a part of the bid document.

Each Proposer/Bidder shall note the following instruction and submit their response to the undersigned:

A. Instructions for Completing Attachments:

The attached Excel documents are similar to the original Attachment documents provided with the Bid Documents, and submitted by you with your bid proposal on May 20, 2013. However, the Attachments contain additional or revised information that NYPA request Proposer submit. Accordingly, Proposers are requested to complete each attachment in its entirety. The new information requested is highlighted in yellow. However, Proposer is requested to re-include all the data it previously submitted in the fields not highlighted in yellow, as follow:

1. The Updated Attachment 2 contains some additional information we need highlighted in yellow. However, fill out the entire document (i.e., include both the original and additional information highlighted).

2. The Updated Attachment 4 contains additional and revised information we need, highlighted in yellow, in both tabs of the Excel document. Proposers are requested to redo and fill out the entire document.

3. The Updated Attachment 6 contains some additional information we need highlighted in yellow. However, fill out the entire document (i.e., include both the original and additional information highlighted).

4. Proposer is requested to include its Excel formulas in all applicable fields.

During the Restricted Period the Proposer must communicate only with the Designated Contract Person for

the RFP. The "Restricted Period" is defined to be the period of time commencing with the earliest written

notice, advertisement or solicitation of a request for proposal, invitation for bids or solicitation of

proposals, or any other method for soliciting a response from Proposers intending to result in selection of a

proposal.

The Authority's Designated Contact Person during the formal bid period is the undersigned (Mr. Len

Walker). No others are authorized to receive, initiate, or communicate information of any kind regarding

this RFP during the "Restricted Period." All inquiries regarding this RFP must be directed to the

undersigned. Failure of prospective Proposer/Bidder to fully comply with this requirement may result in the

rejection of its Bid Proposal.

Page 2 of 3

Page 3: POWER AUTHORITY OF THE STATE OF NEW YORK POST BID FOLLOW-UP NO

If there are any questions regarding this Post Bid Follow-Up No. 1, under §§ 139-.1 and 139-K of the State Finance Law (SIT), all questions must be directed in writing to:

Mr. Len Walker

Manager of Special Projects New York Power Authority 123 Main Street White Plains, New York 10601. 914-681-6627 (Phone) 914-681-6783 (Fax)

1/j6 (reo I,

Manager of Special Projects

This Post Bid Follow-up No. 1 dated June 12, 2013 must be executed and returned to the above no later than:

5:00 pm, Friday June 21, 2013.

I have received this Post Bid Follow-up No. 1, for Q13-5441LW for Contingency Procurement of Generation and Transmission, and have considered it in my submittal.

COMPANYNAME: Selkirk Cogen Partners, L.P.

(Typed) By: JMC Selkirk, LLC,

Managing General Partner

BY:

(Name-Signed)

BY: Michelle Brauner

(Name-Typed)

TITLE: Vice President

DATE: June 21, 2013

Page 3 of 3