15
MAJOR & SELECTED document no: pre-pp-all/2015/011 document date: 12/06/2015 ENGINEERING DESIGN AND MANAGEMENT PROCUREMENT SUPPLY AND TRANSPORT CONSTRUCTION FABRICATION, INSTALLATION COMMISSIONING, START UP PLA NTS POWER

POWER - ENKA is the largest construction company in · PDF file8 ENK O ANTS JUNE 2015 2015 ENKA POWER PLANTS 9 Bazian 700 MW Combined Cycle Power Plant EPCC of 700 MW CCPP Engineering,

Embed Size (px)

Citation preview

MAJOR & SELECTED

document no: pre-pp-all/2015/011document date: 12/06/2015

ENGINEERING DESIGN AND MANAGEMENT

PROCUREMENT SUPPLY AND TRANSPORTCONSTRUCTION FABRICATION, INSTALLATIONCOMMISSIONING, START UP

PLANTSPOWER

2 ENKA POWER PLANTS JUNE 2015 3JUNE 2015 ENKA POWER PLANTS

01 06

08

10

12

05

07

09

11

02

03

04

ContentWEST QURNA 2 SCPP - BASRAH, IRAQ DOHUK CCPP - DOHUK, IRAQ

ZWITINA SCPP - ZWITINA, LIBYA

YAJVA STATE PP - PERM REGION, RUSSIA

ADAPAZARI/GEBZE/IZMIR CCPP - turkey

SULAYMANIYAH CCPP - IRAQ

BESMAYA CCPP - BAGHDAD, IRAQ

AWBARI SCPP - AWBARI, LIBYA

Rijnmond CCPP - ROTTERDAM, NETHERLANS

Al Najibiyah SCPP - BASRAH, IRAQ

Bazian CCPP - SULAYMANIYAH, IRAQ

ERBIL CCPP - ERBIL, IRAQ

4 ENKA POWER PLANTS JUNE 2015 5JUNE 2015 ENKA POWER PLANTS

West Qurna II Gas Treatment, Power Generation and Power Distribution Project

EPCC of 3x42 MW GTPP

Engineering, Procurement, Construction, Commissioning and initial operations for 3x42 MW Simple Cycle Power Generation Plant and Power Distribution System. Project includes three (3) GE MS6001B API Class Heavy Duty Dual Fuel Gas turbine Generators-Simple Cycle 42 MW each at ISO conditions, associated balance of plant, a gas treatment and compression system, a liquid fuel storage and transfer system and 33kV/132kV GIS switchyard, utilities and infrastructure.

Commencement Date : December 2011Completion Date : July 2014

Contract Value : USD 386 million (EPCC 3x42 MW plus supply only for additional 3x42 MW)

ENGINEERING,PROCUREMENT,CONSTRUCTION,COMMISIONING

ACCREDITEDACCREDITED

BSI BSI BSIAS

S A U U2

ME

ASME

ASME

ASME

TM TM

TM

(FS 57544 ISO 9001) (FS 71388 ISO 14001) (FS 71389 ISO 1001)

ClientLukoil Mid-East Limited and South Oil

Company of Iraq

LocationBasrah, IRAQ

Nature of OperationOil & Gas, Petrochemicals

Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349,

Beşiktaş İstanbul, Turkey Phone: + 90 (212) 376 10 00 (pbx)

E-mail: [email protected]

The Plant supplies electrical power to the West Qurna 2 Central Oil Processing Facility, the gas treatment plant, waste management complex and all well sites.

4,000,000 Man-hours without LTI

6 ENKA POWER PLANTS JUNE 2015 7JUNE 2015 ENKA POWER PLANTS

Al Najibiyah Simple Cycle Power Plant

EPCC of 4x125 MW GTPP

Engineering, procurement, construction, commissioning and start-up of a 4x125 MW Simple Cycle Power Generation plant on turn-key basis. Power Island of the plant will consist 4 units of GE Frame 9E Gas Turbine-Generator sets.

Power is generated at 15 kV in the CTGs and stepped up through main transformers to the grid voltage of 132 kV and 400 kV at the GIS Substations.

Commencement Date : April 2013Completion Date : May 2015

Contract Value : USD 275 million (excluding cost of GTGs which are free issued by the Client)

ENGINEERING,PROCUREMENT,CONSTRUCTION,COMMISIONING

ClientMinistry of Electricity of Iraq

LocationBasrah, IRAQ

Nature of OperationPower Industry

Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349,

Beşiktaş İstanbul, Turkey Phone: + 90 (212) 376 10 00 (pbx)

E-mail: [email protected]

Power plant control system (CTGs and BOP) is based on a distributed control system (DCS). Complete power plant operation is conducted and monitored via SCADA HMI Sstem located in the central control room.

5,000,000 Man-hours without LTI

ACCREDITEDACCREDITED

BSI BSI BSIAS

S A U U2

ME

ASME

ASME

ASME

TM TM

TM

(FS 57544 ISO 9001) (FS 71388 ISO 14001) (FS 71389 ISO 1001)

8 ENKA POWER PLANTS JUNE 2015 9JUNE 2015 ENKA POWER PLANTS

Bazian 700 MW Combined Cycle Power Plant

EPCC of 700 MW CCPP

Engineering, procurement, construction, commissioning works of the Phase 1 (simple cycle) of the Bazian Combined Cycle Power Plant of 700 MW. Scope of works include the design, supply, construction, commission, operation and maintenance of a simple cycle power plant with a capacity of 500 MW with GE gas turbines, bypass stacks, fuel conditioning system and 132 kV switchyard with expansion capability.

Main Quantities:Piping Erection : 220 tonsEquipment Erection : 12,000 tonsCabling : 350,000 metersConcrete : 25,000 m3

Structural Steel : 500 tons

Commencement Date : September 2014Completion Date : December 2015

ClientQaiwan Group

LocationSulaymaniyah, IRAQ

Nature of OperationPower Industry

Contract Value : USD 240 million

ENGINEERING,PROCUREMENT,CONSTRUCTION,COMMISIONING

Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349,

Beşiktaş İstanbul, Turkey Phone: + 90 (212) 376 10 00 (pbx)

E-mail: [email protected]

The simple cycle plant will consist of four gas turbine generators and all auxiliaries. Project is located in the Chamchamal area, about 25 km outside of Sulaymaniyah City, Northern Iraq.

1,000,000 Man-hours without LTI

ACCREDITEDACCREDITED

BSI BSI BSIAS

S A U U2

ME

ASME

ASME

ASME

TM TM

TM

(FS 57544 ISO 9001) (FS 71388 ISO 14001) (FS 71389 ISO 1001)

10 ENKA POWER PLANTS JUNE 2015 11JUNE 2015 ENKA POWER PLANTS

Erbil Combined Cycle Power Plant

EPCC of 1,500 MW CCPP

Engineering, Procurement, Construction works for the conversion of the 1000 MW Erbil Gas Power Station into a combined cycle of 1500 MW. The station has 8 GE - Frame 9E Gas Turbines burning natural gas. ENKA will design, procure, install and start-up 8 HRSG’S and 2 STG’s and all other equipment to convert the simple cycle plant into 4 x 1 configuration combined cycle project.

Main Quantities:Piping Erection : 1,350 tonsEquipment Erection : 36,000 tonsCabling : 1,050,000 metersConcrete : 45,000 m3

Structural Steel : 6,000 tons

Commencement Date : April 2012Completion Date : January 2015

ClientMass Group Holding

LocationErbil, IRAQ

Nature of OperationPower IndustryContract Value : USD 481 million

ENGINEERING,PROCUREMENT,CONSTRUCTION,COMMISIONING

Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349,

Beşiktaş İstanbul, Turkey Phone: + 90 (212) 376 10 00 (pbx)

E-mail: [email protected]

The Plant shall be capable of being dispatched for any combination of base-load operation throughout its design service life. life. A direct Air Cooled Condense system is being used for the cooling system which consists of two blocks each with approximately 40 cells.

5,000,000 Man-hours without LTI

ACCREDITEDACCREDITED

BSI BSI BSIAS

S A U U2

ME

ASME

ASME

ASME

TM TM

TM

(FS 57544 ISO 9001) (FS 71388 ISO 14001) (FS 71389 ISO 1001)

12 ENKA POWER PLANTS JUNE 2015 13JUNE 2015 ENKA POWER PLANTS

SulaymaniyahCombined Cycle Power Plant

EPCC of 1,500 MW CCPP

Engineering, Procurement, Construction works for the conversion of the 1000 MW Sulaymaniyah Gas Power Station into a combined cycle of 1500 MW. The station has 8 GE - Frame 9E Gas Turbines burning natural gas. ENKA will design, procure, install and start-up 8 HRSG’S and 2 STG’s and all other equipment to convert the simple cycle plant into 4 x 1 configuration combined cycle project.

Main Quantities:Piping Erection : 1,460 tonsEquipment Erection : 36,000 tonsCabling : 1,100,000 metersConcrete : 45,000 m3

Structural Steel : 5,800 tons

Commencement Date : July 2013Completion Date : March 2016

ClientMass Group Holding

LocationSulaymaniyah, IRAQ

Nature of OperationPower IndustryContract Value : USD 424 million

ENGINEERING,PROCUREMENT,CONSTRUCTION,COMMISIONING

Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349,

Beşiktaş İstanbul, Turkey Phone: + 90 (212) 376 10 00 (pbx)

E-mail: [email protected]

The Plant shall be capable of being dispatched for any combination of base-load operation throughout its design service life. life. A direct Air Cooled Condense system is being used for the cooling system which consists of two blocks each with approximately 40 cells.

1,000,000 Man-hours without LTI

ACCREDITEDACCREDITED

BSI BSI BSIAS

S A U U2

ME

ASME

ASME

ASME

TM TM

TM

(FS 57544 ISO 9001) (FS 71388 ISO 14001) (FS 71389 ISO 1001)

14 ENKA POWER PLANTS JUNE 2015 15JUNE 2015 ENKA POWER PLANTS

DohukCombined Cycle Power Plant

EPCC of 1,500 MW CCPP

Engineering, Procurement, Construction works for the conversion of the 1000 MW Dohuk Gas Power Station into a combined cycle of 1500 MW. The station has 8 GE - Frame 9E Gas Turbines burning natural gas. ENKA will design, procure, install and start-up 8 HRSG’S and 2 STG’s and all other equipment to convert the simple cycle plant into 4 x 1 configuration combined cycle project.

Main Quantities:Piping Erection : 1,350 tonsEquipment Erection : 36,000 tonsCabling : 1,050,000 metersConcrete : 45,000 m3

Structural Steel : 5,800 tons

Commencement Date : October 2013Completion Date : May 2016

ClientMass Group Holding

LocationDohuk, IRAQ

Nature of OperationPower Industry

Contract Value : USD 431 million

ENGINEERING,PROCUREMENT,CONSTRUCTION,COMMISIONING

Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349,

Beşiktaş İstanbul, Turkey Phone: + 90 (212) 376 10 00 (pbx)

E-mail: [email protected]

The Plant shall be capable of being dispatched for any combination of base-load operation throughout its design service life. life. A direct Air Cooled Condense system is being used for the cooling system which consists of two blocks each with approximately 40 cells.

ACCREDITEDACCREDITED

BSI BSI BSIAS

S A U U2

ME

ASME

ASME

ASME

TM TM

TM

(FS 57544 ISO 9001) (FS 71388 ISO 14001) (FS 71389 ISO 1001)

16 ENKA POWER PLANTS JUNE 2015 17JUNE 2015 ENKA POWER PLANTS

BesmayaCombined Cycle Power Plant

EPCC of 2x1,500 MW CCPP

Engineering, procurement, construction, commissioning works of the 1,500 MW combined cycle power plant. The project is configured as 2 blocks of 2x2x1 combined cycle which will produce 1,500 MW of power at 132 kV transmission level, with an option to expand it to a 4-block power plant (3,000 MW).

Other facilities which will support the power block operation include oil unloading, storage and transfer system; fuel gas conditioning and pressure reduction; plant electrical system including generator step-up transformers; main control system – DCS; water treatment plant; and administrative/O&M areas.

Commencement Date : September 2014Completion Date : August 2017

ClientMass Group Holding

LocationBaghdad, IRAQ

Nature of OperationPower Industry

Contract Value : USD 555 million

ENGINEERING,PROCUREMENT,CONSTRUCTION,COMMISIONING

Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349,

Beşiktaş İstanbul, Turkey Phone: + 90 (212) 376 10 00 (pbx)

E-mail: [email protected]

Main Quantities:Piping Erection : 3,500 tonsEquipment Erection : 50,000 tonsCabling : 3,000,000 metersConcrete : 100,000 m3

Structural Steel : 20,000 tons

ACCREDITEDACCREDITED

BSI BSI BSIAS

S A U U2

ME

ASME

ASME

ASME

TM TM

TM

(FS 57544 ISO 9001) (FS 71388 ISO 14001) (FS 71389 ISO 1001)

Main Quantities:Earth Works : 29,975 m3

Buildings : 5,872 m2

A/C Piping : 203 tonsConcrete : 14,091 m3

Structural Steel : 1,600 tons

18 ENKA POWER PLANTS JUNE 2015 19JUNE 2015 ENKA POWER PLANTS

Zwitina Simple Cycle Power Plant

EPCC of 2x285 MW GTPP

Engineering, procurement, construction, commissioning and start-up of a 2x285 MW Simple Cycle Power Generation plant on turn-key basis.

Power island of the plant consists of 2 x Siemens SGT5-PAC 4000F Combustion Turbine Generator sets complete with auxiliary system which was supplied by the Owner free-issue at site.

Commencement Date : April 2008Completion Date : July 2010

ClientGeneral Electricity Company of Libya

LocationZwitina, LIBYA

Nature of OperationPower Industry

Contract Value : EUR 90 million (excluding cost of GTGs which are free issued by the Client)

ENGINEERING,PROCUREMENT,CONSTRUCTION,COMMISIONING

Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349,

Beşiktaş İstanbul, Turkey Phone: + 90 (212) 376 10 00 (pbx)

E-mail: [email protected]

BSI BSI BSIAS

S A U U2

ME

ASME

ASME

ASME

TM TM

TM

(FS 57544 ISO 9001) (FS 71388 ISO 14001) (FS 71389 ISO 1001)

Main Quantities:Earth Works : 95,114 m3

Buildings : 11,000 m2

A/C Piping : 253 tonsConcrete : 31,791 m3

Structural Steel : 5,300 tons

20 ENKA POWER PLANTS JUNE 2015 21JUNE 2015 ENKA POWER PLANTS

Awbari Simple Cycle Power Plant

EPCC of 4x160 MW GTPP

Engineering, procurement, construction, commissioning and start-up of a 4x160 MW Simple Cycle Power Generation plant on turn-key basis. Power Island of the plant will consist 4 units of Siemens SGT5-PAC 2000E Combustion Turbine + SGen5-100A Generator sets.

The project is On Hold due to the political turmoil in Libya.

Commencement Date : December 2010Completion Date : -

ClientGeneral Electricity Company of Libya

LocationAwbari, LIBYA

Nature of OperationPower Industry

Contract Value : EUR 170 million

ENGINEERING,PROCUREMENT,CONSTRUCTION,COMMISIONING

Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349,

Beşiktaş İstanbul, Turkey Phone: + 90 (212) 376 10 00 (pbx)

E-mail: [email protected]

BSI BSI BSIAS

S A U U2

ME

ASME

ASME

ASME

TM TM

TM

(FS 57544 ISO 9001) (FS 71388 ISO 14001) (FS 71389 ISO 1001)

Main Quantities:Earth Works : 50,000 m3

Buildings : 2,774 m2

A/C Piping : 1,278 tonsConcrete : 11,427 m3

Structural Steel : 3,074 tons

22 ENKA POWER PLANTS JUNE 2015 23JUNE 2015 ENKA POWER PLANTS

Yajva State District Power Plant

EPCC of 411 MW CCPP

Engineering, procurement, construction, commissioning and start-up of a 4x160 MW combined cycle power plant on lump sum turn-key basis. Project included a single shaft Siemens 1xSCC5-4000F-1S power train comprising a gas turbine, a steam turbine, a generator and a condenser. Project also included all auxiliary equipment such as the steam/water cycle, a water treatment plant, controls systems, electrical systems, instrumentation, gas compressors, and an administration building.

Awarded the “Best Project in the Power/Industrial category” in 2013 Global Best Projects Competition of ENR (Engineering News-Record).

Commencement Date : July 2008Completion Date : August 2011

ClientOGK-4 (E.ON)

LocationYajva District, Perm Region, Russia

Nature of OperationPower Industry

Contract Value : USD 460 million

ENGINEERING,PROCUREMENT,CONSTRUCTION,COMMISIONING

Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349,

Beşiktaş İstanbul, Turkey Phone: + 90 (212) 376 10 00 (pbx)

E-mail: [email protected]

2,000,000 Man-hours without LTI

ACCREDITEDACCREDITED

BSI BSI BSIAS

S A U U2

ME

ASME

ASME

ASME

TM TM

TM

(FS 57544 ISO 9001) (FS 71388 ISO 14001) (FS 71389 ISO 1001)

Main Quantities:Earth Works : 146,449 m3

Buildings : 2,774 m2

A/C Piping : 12,955 tonsConcrete : 17,382 m3

Structural Steel : 2,381 tons

24 ENKA POWER PLANTS JUNE 2015 25JUNE 2015 ENKA POWER PLANTS

Rijnmond Combined Cycle Power Plant

EPCC of 790 MW CCPP

Design, engineering, equipment supply, construction and commissioning works of 790 MW Natural Gas Combined Cycle Cogeneration Power Plant consisting of a 2x2x1 combined cycle arrangement. There are two combustion turbine generators, two duct-fired heat recovery steam generators and a single steam turbine generator in the power island.

The plant is capable of supplying 350 ton/hour export steam to the neighboring Shell Netherlands Refinery and the initial 125 ton/hour capability has been installed in the first phase. A mechanical draft cooling tower is utilized. The plant fires natural gas only. 2 Siemens CTG + 2 SFL HRSG + 1 Alstom STG

Commencement Date : August 2002Completion Date : June 2004

ClientRijnmond Energie CV

LocationRotterdam, Netherlands

Nature of OperationPower Industry

Contract Value : USD 362 million

ENGINEERING,PROCUREMENT,CONSTRUCTION,COMMISIONING

Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349,

Beşiktaş İstanbul, Turkey Phone: + 90 (212) 376 10 00 (pbx)

E-mail: [email protected]

2,000,000 Man-hours without LTI

ACCREDITEDACCREDITED

BSI BSI BSIAS

S A U U2

ME

ASME

ASME

ASME

TM TM

TM

(FS 57544 ISO 9001) (FS 71388 ISO 14001) (FS 71389 ISO 1001)

In 2011, ENKA’s AdapazarI

Power Plant was selected

as the Power Plant of the

Year with an availability of

99.8 %

by the Power Magazine.

26 ENKA POWER PLANTS JUNE 2015 27JUNE 2015 ENKA POWER PLANTS

İzmir AliağaAdapazarı & Gebze Natural Gas Combined Cycle Power Plantİzmir Aliağa EPCC of 1523 MW CCPP

Design, engineering, equipment supply, construction, commissioning and putting into operation of the natural gas fired combined cycle power plants with a capacity of 1523 MW. 4 GE CTGs, + 4 CMI HRSGs + 2 Alstom SGs

Adapazarı & Gebzee

EPCC of 1,554 MW CCPP

Design, engineering, equip-ment supply, construction, commissioning and putting into operation of the natural gas fired combined cycle power plant with a capacity of 1,554 MW. 4 GE CTGs, + 4 CMI HRSGs + 2 Alstom SGs

Commencement Date : Arpil 2000Completion Date : March 2003

ClientBuilt, Owned, Operated (BOO) by ENKA

Locationİzmir Aliağa, Adapazarı & Gebze, Turkey

Nature of OperationPower Industry

Contract Value : USD 1 billion

ENGINEERING,PROCUREMENT,CONSTRUCTION,COMMISIONING

TOTAL 3077 MW

Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349,

Beşiktaş İstanbul, Turkey Phone: + 90 (212) 376 10 00 (pbx)

E-mail: [email protected]

BSI BSI BSIAS

S A U U2

ME

ASME

ASME

ASME

TM TM

TM

(FS 57544 ISO 9001) (FS 71388 ISO 14001) (FS 71389 ISO 1001)

28

Address: Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349, Beşiktaş İstanbul, Turkey Phone: + 90 (212) 376 10 00 (pbx)

E-mail: [email protected]

Design &Technical Support: Corporate Quality Dept.