THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 1B -
POWER LINE CARRIER COUPLING EQUIPMENT
FOR SUBSTATIONS / SWITCHING STATIONS
SUMMARY OF DATA
1. MANUFACTURER/CONTRACTOR
Manufacturer's offered data and parameters should be filled in against Purchaser's
required values – as well as in the absence thereof under all relevant paragraphs in
the free columns on the right hand side.
A definite answer (yes or no) or appropriate comments shall be given to all other
requirements.
Name of Contractor: __________________________________________________
REQUIRED OFFERED
1.1. Contractor's name and address……………
1.2. Manufacturer's name and address (If different from Contractor)……… ……….
1.3. Equipment type (denomination):
1.3.1. Item 1……………………………………………..
1.3.2. Item 2……………………………………………..
1.3.3. Item 3……………………………………………..
1.3.4. Item 4……………………………………………..
1.4. Contractor's offer number………………………
1.5. Validity of proposal………………………………
1.6. The offered types of Equipment (items 1- 4) are
not a prototype, have a proven design and high experience in work (Contractor's declaration
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 2B -
including reference list) ………….
1.7. List of main subcontractors or sub suppliers
including name, address and status of quality assurance (QA), versus ISO 9001-2000 with
attached copy of their QA certificate…………
1.8. The Contractor is requested to fill in the offered data in the specification hard copy attached to the bid as well as in the specification "Word"
format file on the compact disc. The a/m documents shall be attached to the bid at the
proposal submission term………………………….……..
2. SERVICE CONDITIONS
Manufacturer's offered data and parameters should be filled in against Purchaser's
required values – as well as in the absence thereof under all relevant paragraphs in
the free columns on the right hand side.
A definite answer (yes or no) or appropriate comments shall be given to all other
requirements.
Name of Contractor: __________________________________________________
REQUIRED OFFERED
2.1. CLIMATIC CONDITIONS
2.1.1. Long periods without rain, alternating with high humidity as experienced in coastal or desert
areas in this country………………………………
2.1.2. Permissible ambient air temperature:
2.1.2.1. Maximum (deg. C)………………………………… +50
2.1.2.2. Minimum (deg. C)………………………………… -5
2.1.2.3. Average value over a period of 24 hours not exceeds …………………………………..(°C)
+35
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 3B -
2. SERVICE CONDITIONS (cont.)
Name of Contractor: __________________________________________________
REQUIRED OFFERED
2.1.3. Permissible humidity:
2.1.3.1. Low relative/absolute humidity (%//g/ m³)………... 4/0.003
2.1.3.2. High relative/absolute humidity (%//g/ m³)……….. 100/36
2.1.4. Low/high air pressure (KPa)……………………. 70/106
2.1.5. Rain intensity (mm/min)………………………… 15
2.1.6. Keraunic level (thunderstorm)
(lightning / km² year)
2.1.6.1. Maximum keraunic level…………………………..
4
2.1.6.2. Minimum keraunic
level……………………………
0.1
2.1.7. Direct and continuous solar radiation for long period. Heating effects of solar radiation
(W/m²)…..
1120
2.1.8. Maximum wind velocity measured 10 m above ground (bare area) at 3 sec duration considering
a 50 years mean return period (m/sec)…………
44
2.2. ENVIRONMENTAL CONDITIONS
2.2.1. Environmental parameters according to: ……….
IEC 60721 3-4
2.2.2. Severe atmospheric and industrial air pollution,
dust, salt spray and sandstorms…………………
2.2.3. Permissible altitude over the sea level (m)………
1000
2.2.4. Water from sources other than rain: spraying
water and water jets with water velocity (m/sec)………….
15
2.2.5. Chemically active substances according to………..
IEC 60721 Table 4-4C3
2.2.6. Mechanically active substances according
to……..
IEC 60721
Table 5-4S3
2.2.7. Dust (suspension) (mg/ m³)……………………….
15
2.2.8. Dust (sedimentation) (mg/ m³)………………….. 40
2.2.9. Sand (mg/m³)…………………………………….. 1000
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 4B -
2. SERVICE CONDITIONS (cont.)
Name of Contractor: __________________________________________________
REQUIRED OFFERED
2.3. SEISMICITY ON THE SITE
2.3.1. The seismic design of the CE shall be based on
the seismic qualification requirements stated in IEEE Std. 693.
The required seismic qualification level shall be…
Moderate
level
2.4. ACCELERATION DURING TRANSPORTATION
2.4.1. Vibrations and shocks (non stationary vibrations including shocks). The expected accelerations on the equipment transported on roads to be
considered:
2.4.1.1. Longitudinal
(m/sec²)………………………………...
2g
2.4.1.2. Transversal (m/sec²)…………………………….…...
1.2g
2.4.1.3. Vertical (m/sec²)……………………………………...
1.2g
2.5. OTHER REQUIREMENTS
2.5.1. The CE shall be vermin and bird proof………….
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 5B -
3. RATINGS
Manufacturer's offered data and parameters should be filled in against Purchaser's
required values – as well as in the absence thereof under all relevant paragraphs in
the free columns on the right hand side.
A definite answer (yes or no) or appropriate comments shall be given to all other
requirements.
Name of Contractor: __________________________________________________
REQUIRED OFFERED
Item 1 Item 2 Item 3 Item 4
3.1. Rated voltage (kV) ………
161 ©
3.2. Rated frequency (Hz) ……
50 ©
3.3. Rated insulation level (kVpeak/kVr.m.s.)….............
750/325
3.4. Rated short-time thermal withstand current for 1 sec ( kA
r.m.s. )
50 ©
3.5. Rated peak dynamic withstand current (kA peak)……………….
128
3.6. Arcing distance not less than
(mm)………….
1550
3.7. Creepage distance between phase to ground…………………
3.8. Radio interference level at 1.1
170/√3 kV……………………
3.9. Offeror shall indicate Emergency loading limit at
ambient temperature ( %rated current/min )
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 6B -
3. RATINGS (cont.)
Name of Contractor: __________________________________________________
REQUIRED OFFERED
Item 1 Item 2 Item 3 Item 4
3.10. Line Trap (LT)
3.10.1. Rated normal current at 45°c (A) ©
3.10.1.1. Item 1………………………. 2000 A
3.10.1.2. Item 2………………………. 2000 A
3.10.1.3. Item 3………………………. 2000 A
3.10.1.4. Item 4………………………. 3150 A
3.10.2. Inductance at 100 kHz (mH) ©
3.10.2.1. Item 1………………………. 0.5 (mH)
3.10.2.2. Item 2………………………. 1.0 (mH)
3.10.2.3. Item 3………………………. 2.0 (mH)
3.10.2.4. Item 4………………………. 0.5 (mH)
3.10.3. The Offeror shall specify the LT inductance at:
3.10.3.1. inductance at 1 KHz………..
3.10.3.2. inductance at 50 Hz……….
3.10.4. Rated frequency range (kHz) ©
3.10.4.1. Item 1………………………. 140 to 400
3.10.4.2. Item 2………………………. 87 to 500
3.10.4.3. Item 3………………………. 48 to 500
3.10.4.4. Item 4………………………. 140 to 400
3.10.5. Blocking action wide band tuned
3.10.6. Minimum blocking resistance
(Ohm)
600 ©
3.10.7. Minimum blocking impedance within frequency bandwidth
(Ohm)
600 ©
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 7B -
3. RATINGS (cont.)
Name of Contractor: __________________________________________________
REQUIRED OFFERED
Item 1 Item 2 Item 3 Item 4
3.10.8. The Offeror shall specify the following for all item LTs:
3.10.8.1. DC resistance at 20°C
(Ohm)
3.10.8.2. Quality factor at 100 (kHz) at least 30 ©
3.10.8.3. Tapping (incretion) losses, (dB)
3.10.8.4. Total losses (DC resistance
and eddy current losses) at rated frequency current and
75°C (kW)
3.10.8.5. Self resonant frequency (kHz)
3.10.8.6. Self capacitance (pF)
3.10.9. The Offeror shall indicate
Lightning arrestor specification:
3.10.9.1. Manufacturer
3.10.9.2. Type designation
3.10.9.3. Rated voltage (kV)
3.10.9.4. Rated discharged current (kA)
3.10.10. The Offeror shall indicate
Tuning pack specification:
3.10.10.1. Manufacturer
3.10.10.2. Type designation
3.10.10.3. Rated impulse protective level (kV)
3.10.10.4. device values
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 8B -
3. RATINGS (cont.)
Name of Contractor: __________________________________________________
REQUIRED OFFERED
Item 1 Item 2 Item 3 Item 4
3.11. Coupling Capacitor (CC)
3.11.1. Manufacturer
3.11.2. Type designation
3.11.3. The Offeror shall proposed
capacitor according to IEC 60358-1, 60358-2 standards.
3.11.4. Rated capacitance ( pF ) 6000 ±10% ©
3.11.5. Change in capacitance
between -5°C to +45°C, less than ( % )
3.11.6. Creepage distance between
phase to ground
3.11.7. Arcing distance not less than ( mm)
1550
3.11.8. Substitute parallel loss
impedance between Radio Frequency (RF) bushing and ground at normal operating
conditions shall be equal or less than (pF)
100
3.11.9. The Offeror shall specify
Substitute series resistance at carrier frequencies between 35 to 500 kHz measured between
HV terminal and RF terminal, (Ohm).
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 9B -
4. DESIGN AND CONSTRUCTION
Manufacturer's offered data and parameters should be filled in against Purchaser's required
values – as well as in the absence thereof under all relevant paragraphs in the free columns
on the right hand side.
A definite answer (yes or no) or appropriate comments shall be given to all other
requirements.
Name of Contractor: __________________________________________________
REQUIRED OFFERED
Item 1 Item 2 Item 3 Item 4
4.1. GENERAL REQUIREMENTS
4.1.1. All the CE equipment shall be
suitable for outdoor installation, and for connections to overhead transmission line.
©
4.1.2. All the CE equipment shall be capable of withstanding electrical, mechanical and
thermal ratings of the specified system ……………
4.1.3. The CE shall be of proven
design with established service operation ……..……
4.1.4. Field assembly of the CE should be done by bolting. Field
welding is not acceptable ……
4.1.5. All electrical safety clearances shall conform to IEC
Recommendations as appropriate for the service
conditions described under subcl. 2.1 and 2.2….
4.1.6. The CE shall be without wheels and minimum four mounting
holes shall be provided on the base…..
4.1.7. The Line trap shall be equipped
with the bird barrier on it's upper and bottom ends….
4.1.8. All LT's(in items 1-4) can be
mounted on the CC (preferred erection) or on the insulators. In addition the Contractor shall
provide the option for hanging of 2000 A LT (in items 1,2,3)…
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 10B -
4. DESIGN AND CONSTRUCTION (cont.)
Name of Contractor: __________________________________________________
REQUIRED OFFERED
Item 1 Item 2 Item 3 Item 4
4.2. TERMINALS
4.2.1. Aluminum terminal on the line side shall be provided. he
primary terminal shall be connected directly to the LT
without any intermediate connection
4.2.2. Earth copper terminal marked with appropriate graphical
symbol shall be provided
4.2.3. The earthling connections shall be designed to withstand a
short circuit current during 1 sec.
4.2.4. Maximum permissible
conductor size connected to line terminal (mm²)…………………
4.3. INSULATOR
4.3.1. The insulator shall be porcelain
type. Other types of the insulator (for example: composite type, porcelain
protected by silicon rubber coatings) may be acceptable
4.3.2. Color of the insulator Brown or grey
4.3.3. The insulator shall be provided
with hydrophobic coating. The hydrophobic coating shall be suitable for the service
conditions mentioned above.
4.3.4. The insulator shall be of the alternate sheds type or normal
sheds type permitting easy access for cleaning to all
surfaces.
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 11B -
4. DESIGN AND CONSTRUCTION (cont.)
Name of Contractor: __________________________________________________
REQUIRED OFFERED
Item 1 Item 2 Item 3 Item 4
4.3.5. The insulator shall be only "wind formed" type, not drop shaped
type.
4.3.6. Indicate all relevant dimensions and details on the enclosed
drawings (pages B-14, B-15, B-16, B-17).
Manufacturer's insulator
drawing……………
4.3.7. The material used in attaching the flange to porcelain insulator
shall be such as to form a slanted circular zone at the upper part of the flange and
above it so as not to permit water accumulation (see
drawing on page B-16). Any change in shape with aging of material in that zone shall be
unacceptable. Manufacturer is required to send drawing and
to give details about type of materials used (bonding material, primer, final paint,
etc.)
4.3.8. Minimum phase to ground external creepage distance (25
mm/kV):
4250
4.3.9. Arcing distance not less than (mm) ……………
In case of lower values than 1550 mm the impulse and power frequency test reports for offered
insulators shall be provided to prove that the insulation
withstand conditions are fulfilled.
1550
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 12B -
4. DESIGN AND CONSTRUCTION (cont.)
Name of Contractor: __________________________________________________
REQUIRED OFFERED
Item 1 Item 2 Item 3 Item 4
4.4. Stresses on mounted equipment
4.4.1. Guaranteed mean value of
failing load (120% F) not less than (N) ………………………
8000
4.4.2. Service load (-40%F) (sum of
all loads occurring simultaneously in service: conductor pull, conductor
weight and wind, short-circuit excepted) in any direction in
space not less than: ( N ).........
In case this load value is not applicable in any direction in
space, please explain reason…………………….…..
2700
4.4.3. Short-time load (F*) (sum of all
loads occurring simultaneously in case of short-circuit) in any direction in space not less
than ( N ):
6700
4.4.4. Contractor shall indicate:
4.4.4.1. Torsional strength (Nm)
4.4.4.2. Testing load for 60 sec., applied to the midpoint of the
terminal, perpendicularly to the insulator axis (N)
4.4.4.3. Recommended rope pull ( N )
4.4.4.4. Wind load at wind velocity 44
m/sec
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 13B -
4. DESIGN AND CONSTRUCTION (cont.)
Name of Contractor: __________________________________________________
REQUIRED OFFERED
Item 1 Item 2 Item 3 Item 4
4.5. NAMEPLATE
4.5.1. Each LT shall be provide with
corrosion proof and clearly legible nameplate of suitable
material including the data indicated in IEC 60353-1 section four(4).
4.5.2. Each CC shall be provide with
corrosion proof and clearly legible nameplate of suitable
material including the data indicated in IEC 60358-1' cl.12.2 .
4.5.3. In addition the following data
shall be provided:
4.5.3.1. A diagram showing the use of each secondary winding
and its corresponding terminal marking
4.5.3.2. Date of manufacture………..
4.5.3.3. Name and number of
standard……
4.5.4. The nameplate shall be subject to Purchaser's approval…………………………
4.6. DIMENSIONS AND WEIGHTS
4.6.1. Number of attached dimensions drawing………
4.6.2. Net weight of complete
equipment (kg)……..
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 14B -
ALTERNATE-SHEDS TYPE INSULATOR
REQUIRED
ITEM 5
OFFERED
ITEM 5 S-S1 > S1 S-S1 =
P1-P2 ≥ 15 mm P1-P2 =
S1/P1 ≥ 0.8 S1/P1 =
C = mm C =
a > 5° a =
P.F. > 0.7 P.F =
Kd = 1 Kd =
Dm < 300 mm Dm =
l = 25 mm/kV l =
L ITEM 5 = 4250 mm L ITEM 5 =
C.F. (L/A) ≤ 4 C.F.(L/A) =
ld1/ d1 ld1/ d1 =
ld2/ d2 ld2/ d2 =
Kd = Factor to increase the creepage distance
Dm = (De1+De2+2Di)/4
l = Minimum specific creepage distance per phase (related to highest
system voltage phase to phase)
L = Phase to ground external creepage distance
A = Arcing distance.
P.F. = Profile factor (2P1+2P2+S)ld2
C.F. = Creepage factor (L/A)
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 15B -
NORMAL-SHEDS TYPE INSULATOR
REQUIRED ITEM 5
OFFERED
ITEM 5 S/P ≥ 0.8 S/P =
C = mm C =
a > 5° a =
P.F > 0.7 P.F =
Kd = 1 Kd =
Dm < 300 mm Dm =
l = 25 mm/kV l =
L ITEM 5 = 4250 mm L ITEM 5 =
C.F. (L/A) ≤ 4 C.F.(L/A) =
ld/ d ld/ d =
Kd = Factor to increase the creepage distance
Dm = (De +Di)/2
l = Minimum specific creepage distance per phase (related to highest system voltage phase to phase)
L = Phase to ground external creepage distance
A = Arcing distance.
P.F. = Profile factor (2P+S)ld
C.F. = Creepage factor (L/A)
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 16B -
No MATERIALS DETAILS
1. BONDING MATERIAL
2. PRIMER
3. FINAL PROTECTIVE PAINT
4. FLANGE MATERIAL
5. OTHER MATERIALS
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 17B -
COMPOSITE INSULATOR
REQUIRED
ITEM 5
OFFERED
ITEM 5 S/P > 0.75 – 0.8 S/P =
C = mm C =
a 12° a =
Kd = 1 Kd =
Dm < 300 mm Dm =
l = 25 mm/kV l =
L ITEM 5 = 4250 mm L ITEM 5 =
L/A < 4 L/A =
ld/ d ld/ d =
Dti mm Dti =
Dte mm Dte =
Di mm Di =
De mm De =
Kd = Factor to increase the creepage distance
Dm = (De +Di)/2; for 300mm < Dm < 500mm, kd=1.1
l = Minimum specific creepage distance per phase (related to highest system voltage phase to phase)
L = Phase to ground external creepage distance
A = Arcing distance
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 18B -
5. TESTS
Manufacturer's offered data and parameters should be filled in against Purchaser's
required values – as well as in the absence thereof under all relevant paragraphs in
the free columns on the right hand side.
A definite answer (yes or no) or appropriate comments shall be given to all other
requirements.
Name of Contractor: __________________________________________________
REQUIRED OFFERED
Item 1 Item 2 Item 3 Item 4
5.1. TESTS - GENERAL
5.1.1. Contractor shall perform Production Tests to check the
quality and uniformity of the workmanship and materials used in the manufacture of the
CE.
©
5.1.2. Tests shall be carried out according to requirements
further specified and 8 (eight) copies of the relevant test reports for the proposed type of
equipment shall be submitted to Purchaser with the proposal.
5.1.3. 8 (eight) weeks prior to the
execution of the routine tests (also special tests) the Contractor shall notify the
Purchaser of the exact date of performing the
test……………………………….
5.1.4. The Contractor shall submit test data to prove that the design has the capability to
meet all the ratings as specified in Annexure "B" as
well as relevant test reports.…
5.1.5. The Contractor shall prepare and submit an acceptance test
plan according to this Specification at least 8 (eight) weeks before the testing………
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 19B -
5. TESTS (cont.)
Name of Contractor: __________________________________________________
REQUIRED OFFERED
Item 1 Item 2 Item 3 Item 4
5.1.6. The Purchaser can require carrying out the tests in the
presence of the Purchaser representatives.…
5.1.7. The Contractor shall submit a
list of all tests to be performed on site, after mounting of the equipment and during
operation………………………
5.1.8. The Contractor shall indicate permissible tolerance for each
test value………………………
5.1.9. Contractor shall submit with the test reports a list of all
measuring instruments including their accuracy class and type, test equipment and
test circuits, calibration certificate from authorized
laboratory ………………………
5.1.10. The equipment can be delivered only after Purchaser's approval of all
relevant routine test reports.......................................
5.2. TYPE TESTS
5.2.1. Type tests from a neutral
Laboratory authorized in accordance with ISO 17025 (e.g. KEMA) performed for the
offered type of the equipment according to the provisions of
the latest relevant issue of IEC Recommendations shall be submitted to Purchaser in 8
(eight) copies with the proposal (tender)………………………
5.2.2. Purchaser can require from
Contractor to perform again type tests that are not
performed according to the requirements in this Specification……………
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 20B -
5. TESTS (cont.)
Name of Contractor: __________________________________________________
REQUIRED OFFERED
Item 1 Item 2 Item 3 Item 4
5.2.3. Type tests shall be performed for all Items as defined in Appendix №1…
5.3. ROUTINE TESTS
5.3.1. Contractor shall perform routine tests for all offered Items
according to provisions of the latest relevant issue of IEC
Recommendations and submit all relevant test reports as defined in Appendix №1…
©
5.3.2. Contractor shall submit the routine tests reports to Purchaser for approval in 8
(eight) copies one month prior to delivery………………………
5.3.3. The equipment can be
delivered only after approval of all routine test reports…
5.4. SPECIAL TESTS
5.4.1. Contractor shall perform
special tests for all offered Items and submit all relevant test reports as defined in
Appendix №1
5.4.2. The equipment can be delivered only after approval of
all special test reports…
5.5. ACCEPTANCE TESTS
5.5.1. In addition to the tests mentioned above Manufacturer
shall perform the acceptance tests (if applicable) and supply test reports accordingly ….
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 21B -
6. EQUIPMENT QUALIFICATION TO PROVE SEISMIC WITHSTAND
Manufacturer's offered data and parameters should be filled in against Purchaser's
required values – as well as in the absence thereof under all relevant paragraphs in
the free columns on the right hand side.
A definite answer (yes or no) or appropriate comments shall be given to all other
requirements.
Name of Contractor: __________________________________________________
REQUIRED OFFERED
6.1. The offered CE shall be analyzed to prove the seismic design. The equipment shall be qualified according to…
Required seismic qualification level…
IEEE Std 693
Moderate
Level
6.2. After performing the analysis the Contractor shall submit for approval the calculation that
demonstrate the anchorage requirements according to …
IEEE Std 693
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 22B -
7. DELIVERY, PACKING, SHIPMENT AND STORAGE
Manufacturer's offered data and parameters should be filled in against Purchaser's
required values – as well as in the absence thereof under all relevant paragraphs in
the free columns on the right hand side.
A definite answer (yes or no) or appropriate comments shall be given to all other
requirements.
Name of Contractor: __________________________________________________
REQUIRED OFFERED
7.1. With regard to the shipment and handling of all equipment to be provided by the Contractor to the Purchaser, Contractor shall be responsible for ensuring that shipment and handling
shall be wholly in the conformance with Article B of IECo General Conditions for Equipment and Material Purchases
attached to this Specification as Annexure "A"…
7.2. In addition to the provision of the General Conditions Annexure "A", Contractor shall package all shipment in such manner as required to prevent any damage to the equipment during
prolonged storage (2-3 years) under the climatic and environmental conditions described under clause 2…
7.3. Any components or accessories not included in the main
shipment shall be shipped by Air Mail, by Air Express or by Air Freight, at Contractor's expense.. …
7.4. Taking into account the specific climatic conditions described
under clause 14 the Contractor shall indicate:
7.4.1. The requirements for prolonged storage before erection…
7.4.2. The maximum allowed storage time not energized without equipment damage (months)…
7.5. All items should have their lifting, jacking and haulage points …
7.6. The spare parts and special tools shall be packed separately
and a detailed packing list shall be sent…………
7.7. All components or accessories shipped dismantled for field assembly shall be suitably tagged to show its identification. Tags shall be exceptionally durable and security tied to items
by wire or other approved methods…
7.8. Contractor shall include a Bill of Materials with a shipment to enable the Purchaser to determine if all disassembled items
have been received…
7.9. Contractor shall submit prior to erection a detailed tabulation of all field mounted items with at least the following information:
7.9.1. Contractor's shop order number (if any)…
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 23B -
7. DELIVERY, PACKING, SHIPMENT AND STORAGE (cont.)
Name of Contractor: __________________________________________________
REQUIRED OFFERED
7.9.2. Number of items…
7.9.3. Manufacturer and/or Supplier (if other than Contractor)…
7.9.4. Type or catalog number, if listed………………………………
7.9.5. Short description including service and on what device it is mounted…
7.9.6. Shipping date…
7.9.7. Shipping details…
7.10. A three direction shock indicator calibrated for 10g acceleration non-resettable type shall be provided in each crate...
7.11. Dimensions of the packing crate (LxWxH m)…
7.12. Recommended slings length for packing crate (m)…
7.13. Shipping weight of packing crate (ton)…
7.14. Shipping volume of packing crate (m³)…
7.15. Contractor shall supply 3 (three) months before the shipment of
the equipment 5 (five) sets of the complete Bill of Materials to enable checking and identifying of the equipment upon receipt
of the same
7.16. Each item shall be separately packed and the destination clearly marked........................................................................
7.17. Each packing crate shall have a packing list and in addition shall be marked with following information:
7.17.1. Descriptive name(s) of equipment or supplies contained…
7.17.2. Quantity packed in a crate……………………………………
7.17.3. Serial numbers, if any, of the equipment contained…………
7.17.4. Contract (order) number……………………………………….
7.17.5. Contractor's name and address (city, state, and country)..
7.17.6. Gross weight of container……………………………………..
7.17.7. Complete destination marking…………………………………
7.17.8. Indication in which position (horizontal or vertical) the equipment has to be transported……………......................
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 24B -
8. COMMISSIONING
Manufacturer's offered data and parameters should be filled in against Purchaser's
required values – as well as in the absence thereof under all relevant paragraphs in
the free columns on the right hand side.
A definite answer (yes or no) or appropriate comments shall be given to all other
requirements.
Name of Contractor: __________________________________________________
REQUIRED OFFERED
8.1. Contractor shall be responsible for the commissioning of all equipment covered under his contract in case it will be requested by Purchaser………………………………………………
8.2. Contractor shall prepare and submit three months prior to the
start of commissioning, a Commissioning Program for approval by Purchaser…………………………………………………
8.3. The Commissioning Program shall include indications for:
8.3.1. Commissioning inspection to detect faults which have occurred
during transportation, storing or assembly at its final location……………………………………………………………..
8.3.2. Preparation for use and procedures to describe the activities
required to prepare systems for testing and operation………………………………………………………………..
8.3.3. Checking of rated data, connection, loading etc. of the equipment and necessary interface with the equipment
supplied by others……………………………………………………...
8.3.4. Testing as detailed in tests on site program including:
the test objective…
test intent ..
required performance data…
prerequisites…
sequence of activities…
acceptance criteria…
8.3.5. Putting the equipment into service…
8.3.6. Final check…
8.3.7. The critical limits of each criteria for which the equipment should be drawn out from service..
8.4. Changes and modifications to the Commissioning Program
shall also be approved by Purchaser………………
8.5. Commissioning results shall be witnessed by the Purchaser and documented on forms to be agreed upon by the
Contractor. The record shall include other such as omissions or unsatisfactory test results……………………
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 25B -
8. COMMISSIONING (cont.)
Name of Contractor: __________________________________________________
REQUIRED OFFERED
8.6. The Contractor shall maintain an up to date record of all inspections and tests, which shall be handed over to Purchaser
at the completion of the site testing and commissioning……………………………………………………..
8.7. The Purchaser shall be responsible for connection and
disconnection of the equipment to and from system, including first energization, but with the advice and technical assistance of the Contractor (if required)………...
8.8. The Contractor shall be responsible for supplying
commissioning personnel with a good knowledge in all relevant operations prior and for commissioning and will be requested
to submit a list giving name, experience and proposed duration on site…………………………………….
8.9. The Contractor shall be responsible for safety of personnel, ours or his own, involved in commissioning and shall take all
possible precautions and be fully aware of dangers involved in testing. Contractor's personnel should also be ensured against
death, personal accident and health while in Israel and be covered by Employers Liability Insurance applicable in their country of origin…. …
8.10. Major failure or damage to equipment will require either its
return to the factory or assignment of a special crew to carry out repairs………………………………………………………..
8.11. Commissioning personnel shall repair minor failure ………
8.12. All expensive (including transport to factory and return) in
connection with damages and repairs as described above shall be paid by Contractor……………………………………….
8.13. Indicate if supervision of erection or commissioning by
Contractor is necessary………………………………………
8.14. Confirm validity of the warranty period also in case that the erection and commissioning will be performed by Purchaser
without Contractor supervision…………………
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 26B -
9. QUALITY CONTROL
Manufacturer's offered data and parameters should be filled in against Purchaser's
required values – as well as in the absence thereof under all relevant paragraphs in
the free columns on the right hand side.
A definite answer (yes or no) or appropriate comments shall be given to all other
requirements.
Name of Contractor: __________________________________________________
REQUIRED OFFERED
9.1. The Bidder shall submit with his proposal a preliminary Inspection and Test Plan (I&T Plan)….........................................
9.2. A mutually agreed I&T Plan, including witness and hold points, shall be agreed between Purchaser and Contractor. Any
subsequent alteration to his program shall require the Purchaser's agreement, prior to start to any work affected by
these alterations……………………………………………...
9.3. Tests and Inspection certificates as required in the Specification and the applicable standards, shall be submitted
immediately following their generation. The certificates shall be original, signed by Contractor and contain actual measured values…................................................
9.4. Any equipment non-conformance to drawings, Specification or
other purchase order requirements which are considered by the Contractor as "acceptable as is" or "for repair", shall be
submitted to the Purchaser for approval, with their recommended disposition. All such non-conformances shall be approved by Purchaser, shall be documented, and a copy of
the approval shall accompany each shipment…….
9.5. All materials used in the manufacture of the equipment shall conform to the Specification, approved drawings and accepted
standards……………………………………………...
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 27B -
10. OPERATION, MAINTENANCE AND INSPECTION
Manufacturer's offered data and parameters should be filled in against Purchaser's
required values – as well as in the absence thereof under all relevant paragraphs in
the free columns on the right hand side.
A definite answer (yes or no) or appropriate comments shall be given to all other
requirements.
Name of Contractor: __________________________________________________
REQUIRED OFFERED
10.1. Number of months between successive cleaning of insulators …………………………………………………..
10.2. Number of months between successive cleaning, painting and rust proofing of metal parts ………….
10.3. Time under service conditions before an overhaul is required (if
applicable) ………………………………..
10.4. Expected man-hours required for periodical inspection and maintenance (man-hours)……… ……
10.5. Expected life duration of the offered items (years)...
10.6. The CE shall be designed for live-washing (automatic and
manual) taking into account service conditions described under clause 2.1 and 2.2
10.7. A complete set of tools for maintenance and repair work (if
applicable) shall be provided together with relevant drawings or photos and full instructions for use in English………………………
10.8. Manufacturer shall ensure spare parts (if applicable) for the delivered equipment for a period of life duration
10.9. Manufacture shall ensure training course for IEC erection and operating people………………………
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 28B -
11. TECHNICAL DOCUMENTS TO ACCOMPANY THE PROPOSAL
Manufacturer's offered data and parameters should be filled in against Purchaser's required
values – as well as in the absence thereof under all relevant paragraphs in the free columns
on the right hand side.
A definite answer (yes or no) or appropriate comments shall be given to all other
requirements.
Name of Contractor: __________________________________________________
REQUIRED OFFERED
11.1. All data, nameplates and descriptive materials shall be in
English or Hebrew. Dimensions and weights shall be shown in metric units. Indicate for all requirements, number of drawing, catalogues or other documents………………………..
11.2. The proposal shall include, at least, the following documents:
11.2.1. Dimension drawings giving principal dimensions…………………
11.2.2. Description of the principles of operating of the CE under various operating conditions……………………………………..
11.2.3. Drawing of cross section of the CE…………
11.2.4. Description and drawing of insulator from Manufacturer………
11.2.5. Drawing of line and earth terminals……………………………...
11.2.6. Drawing of nameplate……………………………………………..
11.2.7. Construction, mode of operation, mounting, connection
arrangement and checking of the CE……………………………
11.2.8. Type and special tests reports (authority, number and date) for offered type of LT, including test circuit, instruments used and
description of method, calibration certificate………
11.2.9. Type and special tests reports (authority, number and date) for offered type of CC, including test circuit, instruments used and description of method……………………………
11.2.10. Example of routine test report for offered type of CE, including
test circuit, instruments used and description of method ……..
11.2.11. Reliability, availability, maintainability and safety (RAMS) report (Appendix № 3)…
11.2.12. Customer list for the last five years, with sum for each year
(type, rated voltage, rated discharge current, number of units, date of supply, Purchaser)………………………………………..
11.2.13. "Line trap impedance versus" frequency chart for each item.
11.2.14. A list of all items to be shipped separately for field assembly…
11.2.15. A list of recommended special tools and instruments necessary
for assembling of the CE…………………………….
11.2.16. A list of recommended spare parts (including total quantities) for the amount of CE indicated in this Specification………….
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 29B -
11. TECHNICAL DOCUMENTS TO ACCOMPANY THE PROPOSAL (cont.)
Name of Contractor: __________________________________________________
REQUIRED OFFERED
11.2.17. A list of all parts which could wear out after expiration of the warranty period, after 5 years and 10 years of operating
according to Manufacturer or users experience………………..
11.2.18. General instruction book for storage, erection, operating and maintaining…………………….…………………………………………
11.2.19. A list of Quality Assurance Standards and Quality Assurance
Manual………………………………………………………………
11.2.20. Certificate for approval of the Quality Assurance System according to ISO 9001 Standard given by an Authorized
Inspection Agency…………………………………………………………..
11.2.21. Quality plan during manufacture……………………………………
11.2.22. Acceptance test procedures for materials and sub-assembles
11.2.23. Inspection and test procedures…………………………………...
11.2.24. Non-conformance and corrective action procedures……………..
11.2.25. Design control procedures………………………………………...
11.2.26. Qualification of subcontractor's procedures……….......................
11.2.27. List of qualified suppliers of the most important parts and components…………………………………………………………
11.2.28. Recommendations for transport on roads and on site……………
11.2.29. Recommendations for prolonged (2-3 years) storage before erection, taking into consideration the specific conditions under clause 2.1 and 2.2 .........................................................
11.2.30. Details of shock indicator………………………………………….
11.3. All technical documents shall be submitted in four (4) copies,
and four (4) compact discs in pdf. (dwg. format for drawings).
11.4. A proposal not including the documents mentioned above can be rejected………………………………………………………………
11.5. Contractor may be required to send his representative to
discuss and/or explain parts of his proposal with IECo's representatives……………………………………………………………….
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 30B -
12. TECHNICAL DOCUMENTS AFTER NOTIFICATION OF AWARD
Manufacturer's offered data and parameters should be filled in against Purchaser's
required values – as well as in the absence thereof under all relevant paragraphs in
the free columns on the right hand side.
A definite answer (yes or no) or appropriate comments shall be given to all other
requirements.
Name of Contractor: __________________________________________________
REQUIRED OFFERED
12.1. All data, nameplates and descriptive materials shall be in English or Hebrew. Dimension and weights shall be shown in metric units. All descriptive materials (lists, instruction books,
etc.) should be numbered and dated for easy identification and reference purposes. Indicate for all requirements, number of
drawing, catalogues or other documents……………………
12.2. After notification of award, Contractor shall within 30 (thirty)days of date of award, submit to the Purchaser for approval four (4) sets of prints of drawings covering the
following information:
12.2.1. Outline drawing of CE including all necessary details for mounting such as fixing holes, size and material of primary
and earthing terminals, weight, permissible static and dynamic forces………………………………………………........
12.2.2. Line and earth terminals details (material, shape, cross-
section) …………………………………………………………….
12.2.3. Description and Manufacturer's insulator drawing ……………
12.2.4. Schematic and detailed wiring drawings .................................
12.2.5. Technical catalogs of CE…………………………………………..
12.2.6. Nameplate drawing with all data fulfilled………………………
12.2.7. Bill of materials……………………………………………………
12.2.8. Shipping assembly drawing with overall size and weight……
12.2.9. Final list of all subcontractors and sub suppliers including name, address and a copy of their Quality Assurance
Certificate……………………………………………………………………
12.2.10. Instructions manuals, technical directives, drawings and any other relevant descriptive materials which shall contain all
information required for the mounting, commissioning, operation, maintenance, periodic checking and repair of offered CE…………………………....................................................
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 31B -
12. TECHNICAL DOCUMENTS AFTER NOTIFICATION OF AWARD (cont.)
Name of Contractor: __________________________________________________
REQUIRED OFFERED
12.3. Purchaser reserves himself the right to require all necessary additional data, descriptions, drawings, etc. that may contribute
in completing information supplied by Manufacturer about the equipment………………………………………………………………………..
12.4. If the prints are returned by the Purchaser and stamped
"approved except as noted", Contractor shall make corrections per Purchaser's marking and shall resubmit required copies of the correct documents as stated above…………………………..
12.5. In addition to the drawing requirements, Contractor shall
furnish a comprehensive outline as to extent of field fabrication required, disassembling, reassembling, cleaning, checking,
inspection, painting, testing, etc. required to be done by the Erector………………………………………………………………..
12.6. After notification of award, Contractor shall within 60 (sixty)days of date of award, submit to the Purchaser 5 (five)
sets of prints of Quality Assurance Manual including a full description of Contractor's Quality Assurance program………….
12.7. Contractor shall furnish the following Quality Control
documentation:
12.7.1. Inspection and Test Plan included in Contractor's Quality plan
12.7.2. Quality Control Procedures…………………………………………
12.7.3. Testing procedures as per applicable standards…………..........
12.7.4. Non-conformance's procedures……………………………………
12.7.5. List of sub-suppliers of the most important parts and components ………………………………………………………….
12.7.6. Inspection and Test certificates……………………………………
12.8. Routine test reports shall be submitted for approval 1 (one) month before delivery, in four (4) copies…………………………
12.9. The shipment cannot be realized before test approval………….
12.10. Commissioning program shall be supplied for approval in four (4) copies, 3 (three) months before delivery………………….
12.11. Contractor is free to supply any additional information considered necessary for clarifying various aspects of erection, operation, maintaining, checking, etc……………………………..
12.12. All documents and drawings shall be provide with:
Purchaser name…………………………………………………….. Project name…………………………………………………………
Unit serial number…………………………………………………… Purchaser's order
number………………………………………….. Specification number………………………………………………..
Supplier's order number…………………………………………….
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 32B -
13. SPARE AND RENEWAL PARTS
Manufacturer's offered data and parameters should be filled in against Purchaser's
required values – as well as in the absence thereof under all relevant paragraphs in
the free columns on the right hand side.
A definite answer (yes or no) or appropriate comments shall be given to all other
requirements.
Name of Contractor: __________________________________________________
REQUIRED OFFERED
13.1. The Contractor shall indicate in the Proposal the life duration of the CE and the normal replacement cycle.
13.2. The Contractor shall include in its technical proposal a detailed list of spare parts, recommended for:
13.2.1. The short term: start-up, commissioning and until expiration of the warranty period.
13.2.2. The long term: spare parts for periods of 5 (five) and 10 (ten) years after the end of the warranty period.
13.3. The catalog and the lists shall include for each item:
13.3.3. Item description and item designation.
13.3.4. Likelihood that the part will be required for replacement during each relevant period (short term, long term).
13.3.5. Name of Contractor and Manufacturer.
13.3.6. Necessary catalogue data for separate order.
13.3.7. Optimal stocking level.
13.3.8. If the supply is from the stock or by manufacturing after order.
13.3.9. Lead time before supply (including transport time to Israel).
13.3.10. Price.
13.4. All Spare Parts shall be new and unused in all cases.
The Purchaser reserves the right to purchase said parts directly from the Manufacturer or from another subcontractor.
The Contractor warrants that spare and renewal parts shall be available for at least ten (10) years after supplying of the CE. The Contractor guarantees that all the Spare Parts features will
be according to its catalogue and that the catalogue is periodically updated.
The Contractor shall give hereunder tree lists of recommended spare parts.
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 33B -
13. SPARE AND RENEWAL PARTS (cont.)
Name of Contractor: __________________________________________________
13.5. Spare Part List
Spare Part Name & №
Manufac-turer's
Name
Spare Part Purpose
Probability Of Failure
Technical Data
Is It In Stock
(y/n)
Supply Time
After Ordering
13.5.1. For short term (start-up, commissioning and until expiration of the
warranty period).
13.5.2. For 5 (five) years after the end of warranty.
13.5.3. For 10 (ten) years after the end of warranty.
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377 ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR summary of data
- 34B -
14. SPECIAL TOOLS
Name of Contractor: __________________________________________________
Contractor shall give here a list of recommended special tools for assembly and
maintenance.