Power Plant Boiler Check List -CEHPSOP

Embed Size (px)

Citation preview

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    1/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    2/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    3/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    4/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    5/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    6/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    7/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    8/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    9/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    10/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    11/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    12/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    13/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    14/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    15/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    16/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    17/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    18/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    19/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    20/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    21/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    22/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    23/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    24/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    25/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    26/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    27/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    28/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    29/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    30/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    31/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    32/33

  • 8/11/2019 Power Plant Boiler Check List -CEHPSOP

    33/33

    Sr.No.

    Description Action by ActionConfirm

    Remarks

    PRE START CHECKS :

    1Confirm That All Maintenance Work Permit issued is Returned.

    After Verification. OK Clearance From CCR.CCR

    2 Check No One Working on Conveying System. FIELD OK

    3 Check Unwanted Material Should be Removed.OK/Not OK. FIELD OK

    4 Check Conveying System Outlet Valve Should be Open/Not Open. FIELD Open

    5Check Conveying System Vessel Inlet Valve Should be Open/NotOpen.

    FIELD Open

    6

    Check Conveying System Conveying Air Valve Should be Open/Not

    Open. FIELD Open

    7Check Conveying System Instrument Air Valve(Dome Valve inlet)Should be Open/Not Open.

    FIELD Open

    8Before Start Up Fly Ash Conveying System Check Following Points( Flags ) in DCS Console Should be in Normal Condition :

    1.Line Block Flag.OK/Not OK. OK

    2.Pressure Fault Flag.OK/Not OK. OK

    3.Vessel Pressure High Flag.OK/Not OK. OK

    4.Vessel Pressure Should be at 0.OK/Not OK. OK

    START-UP PROCEDURE :

    1 Start Conveying System. CCR

    2 Set it's Filling,Conveying and Wait Time as per Requirement. CCR

    POWERPLANT

    WORK INSTRUCTION AND CHECKLIST FORSTART-UP FLY ASH CONVEYING SYSTEM OF CEHP -1 AND 2 BOILER

    CCR