13
Semi-annual Environmental Monitoring Report Project No. 42378- 016 June 2019 Power System Expansion and Efficiency Improvement Investment Program - Tranche 2 A-2: Increased Transmission Capacity

Power System Expansion and Efficiency Improvement ...€¦ · Construction of Dhamrai 132/33 kV GIS substation and Shyampur 230/132 kV GIS substation has already been completed. Physical

  • Upload
    others

  • View
    15

  • Download
    1

Embed Size (px)

Citation preview

  • Semi-annual Environmental Monitoring Report

    Project No. 42378- 016 June 2019

    Power System Expansion and Efficiency Improvement Investment Program - Tranche 2

    A-2: Increased Transmission Capacity

  • This Semi-annual Environmental Monitoring Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.

    In preparing any country program or strategy, financing any project, or by making any

    designation of or reference to a particular territory or geographic area in this document, the

    Asian Development Bank does not intend to make any judgments as to the legal or other status

    of any territory or area.

  • 1 Top Sheet- Minhaj (4)3087-BAN_EMR_ Jan-June, 2019