Design Design Design Design Design Design Construction Construction Construction Construction Construction Procurement Procurement Procurement Installation Installation Installation Power systems’ development planning Power systems’ development planning Power systems’ development planning Energy efficiency Energy efficiency Energy efficiency Adjustment Adjustment Adjustment

Power systems’ development planning Construction Expert ...etsgp.ru/wp-content/uploads/Profil_4.3.2_ENG.pdf · Energy efficiency and energy audit ETS Group renders comprehensive

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Power systems’ development planning Construction Expert ...etsgp.ru/wp-content/uploads/Profil_4.3.2_ENG.pdf · Energy efficiency and energy audit ETS Group renders comprehensive

Design

Design

Design

Design

Design

Design

Design

Design

Construction

Construction

Construction

Construction

Construction Construction

Construction

Construction

Procurement

Procurement

Procurement

ProcurementProcurement

Installation

Installation

Installation

Installation

Installation Installation

Power systems’ development planning

Power systems’ development planning

Power systems’ development planning

Power systems’ development planning

Energy efficiency

Energy efficiency

Energy efficiency

Energy efficiency

Energy efficiency

Adjustment

Adjustment

Adjustment

Adjustment

Expert examination of industrial safety

Expert examination of industrial safety

Research and development

Research and development

Page 2: Power systems’ development planning Construction Expert ...etsgp.ru/wp-content/uploads/Profil_4.3.2_ENG.pdf · Energy efficiency and energy audit ETS Group renders comprehensive

32 www.etsgp.ru

Design

Installation

Development planning

Research and development

Expert examination of industrial safety and integrated survey

Energy efficiency and energy audit

ETS Group renders comprehensive engineering services in the power engineering sector. Each company of the group is highly competent in its field of activities. In addition to the main types of activities, our specialists have high expertise in the field of power plants’ operation and energy sales. All this enables us to provide our services in a comprehensive manner.

Our aim is a long-term cooperation with the client. ETS Group uses leading-edge technologies including in the field of project management. We have introduced quality management, occupational safety and environmental management systems and are constantly improving them. We use our own highly qualified personnel, most advanced instruments, equipment, software, certified laboratories and automate our production processes to the fullest extent.

ABOUT US

Construction

Adjustment

Page 3: Power systems’ development planning Construction Expert ...etsgp.ru/wp-content/uploads/Profil_4.3.2_ENG.pdf · Energy efficiency and energy audit ETS Group renders comprehensive

54 www.etsgp.ru

2007

2008

2010

2012

2012

Design of facilities up to 110 kV

Design of ultrahigh voltage facilities

Integrated surveys and expert examination of industrial safety

Consulting and research in power engineering

Construction and installation

HISTORY OF DEVELOPMENT

ETS Group was formed in the course of reforming “RAO “Unified Energy Systems of Russia”, OJSC based on ambitious and highly qualified personnel of Gorky Branch of Research, Design and Survey Institute “Energosetproekt” founded in 1962. The Group’s first line of business was design of power transmission lines and power substations of high and ultrahigh voltage, elaboration of power systems’ development plans for the European part of Russia, Ural and Siberia. In proportion to the development of new competencies, new companies were formed within ETS Group specializing in related types of services. It resulted in the promptness of decision making and closeness to the client with a considerable expansion of scope of works done and increase in the scale of business.

Later, such lines of business were formed as inspection of construction structures, expert examination of industrial safety of buildings and constructions, engineering services in the field of construction of power facilities including highly dangerous, unique and technically complex facilities.

The lines of cogeneration, information and analytic services, and consulting in power engineering are actively developing. Such lines of business as land and cadastral works, heat and gas supply, aerial photography and making orthophoto plans are successfully developed. A great scope of works is done in the field of R&D under orders of governments of regions and relevant ministries of the Russian Federation.

Page 4: Power systems’ development planning Construction Expert ...etsgp.ru/wp-content/uploads/Profil_4.3.2_ENG.pdf · Energy efficiency and energy audit ETS Group renders comprehensive

76 www.etsgp.ru

Each company of the Group has its own distinct area of works performed, while our joint capabilities enable us to accomplish all our clients’ potential tasks in the most comprehensive way.

The main line of ETS Group’s business is a comprehensive design and construction of power grid facilities of any complexity including unique, highly dangerous and technically complex, as well as the performance of research and development, design and survey, and engineering works.

More than 410 projects completed

20EMPLOYEES

120EMPLOYEES

338EMPLOYEES

CONSULTING

DESIGN LINE OF BUSINESS

CONSTRUCTION LINE OF BUSINESS

OUR CAPABILITIES

Page 5: Power systems’ development planning Construction Expert ...etsgp.ru/wp-content/uploads/Profil_4.3.2_ENG.pdf · Energy efficiency and energy audit ETS Group renders comprehensive

98 www.etsgp.ru

EFFICIENCY AND RESPONSIBILITY

Responsibility to customers:• Always determine customer’s needs

• We do not merely meet customers’ requirements but seek to exceed their expectations

• Quality is the main principle of our activities

Responsibility to employees:• We appreciate our employees

• We provide opportunities for professional development

• We provide opportunities for doing sports

• We provide supplementary medical insurance

• Our production processes are organized with account of modern occupational safety requirements

Responsibility to the society:• We partnered the relay athletic race dedicated to the 68th anniversary of

Victory in the Great Patriotic War and XXVII World Summer Student Games in Kazan in 2013

• We provide financial support to men’s volleyball team of Nizhny Novgorod State Technical University “VK NGTU”

• We provide sponsor support to Remedial School No. 56 for children having health limitations

High responsibility for the final outcome

Flexible approach to planning and perfor-mance of works

Strict observance of project budgets

Building effective and mutually beneficial relations with customers

Highly developed corpo-rate structure

Highly qualified personnel having vast practical experience

Efficiencyfactors

Corporate responsibility is an important component of ETS Group’s business strategy. It is formed under the commonly accepted ethic, legal and economic requirements.

We are constantly introducing advanced technologies in our activities and work on the development of team spirit and performance of our employees.

Page 6: Power systems’ development planning Construction Expert ...etsgp.ru/wp-content/uploads/Profil_4.3.2_ENG.pdf · Energy efficiency and energy audit ETS Group renders comprehensive

1110 www.etsgp.ru

QUALITY

ETS GROUP COMPANIES EMPLOY:

• Occupational health management system (OHSAS 18001)

• Quality management system (ISO 9001)

• Environmental management system (ISO 14001)

• Power management system (ISO 50001)

• Automated project management system based on Microsoft Project

OUR COMPANIES ARE MEMBERS OF THE FOLLOWING ORGANIZATIONS AND ASSOCIATIONS DIRECTLY OR THROUGH THEIR EMPLOYEES:

• International Council on Large Electric Systems – CIGRE (Conseil International des Grands Reseaux Electriques – CIGRE)

• Committee for the Reliability of Power Systems of President of the Russian Federation

• Industrial partner of Alekseev Nizhny Novgorod State Technical University in the priority line “Energy Efficiency, Power Supply and Nuclear Power Engineering” under the Federal Targeted Program “Research and Development in the Priority Areas of Development Lines of the Russian Scientific and Technological Complex in 2014-2020”

• Self-Regulating Organization Nonprofit Partnership “Inter - Regional Association of Special Construction Organizations”

• Self-Regulating Organization Nonprofit Partnership “Association of Design Engineers”

• Self-Regulating Organization Nonprofit Partnership “Association of Prospecting Engineers”

• Self-Regulating Organization Nonprofit Partnership “Association of Power Engineers”

• Self-Regulating Organization Nonprofit Partnership “Association of Construction Engineers”

• Self-Regulating Organization Nonprofit Partnership “Association of Organizations Conducting Expert Examination of Industrial Safety”

• Association “Nonprofit Partnership Market Council”

• Scientific and Methodological Council of Federal Service of State Statistics

Page 7: Power systems’ development planning Construction Expert ...etsgp.ru/wp-content/uploads/Profil_4.3.2_ENG.pdf · Energy efficiency and energy audit ETS Group renders comprehensive

1312 www.etsgp.ru

Design

FIELD OF ACTIVITIES

• Comprehensive engineering surveys and approvals

• Design of substations 6-10 kV, 35-750 kV

• Design of cable lines and overhead lines 6-10 kV, 35-750 kV

• Design of emergency control systems, automated process control systems and automated power consumption information and fiscal metering systems

• Development of cost estimate documents, designs of construction and disassembly

• Special sections of design documents

• Private expert examination of design estimate documents

• Preparation of procurement documents

Substation 500 kV “Enisey” with approach overhead lines 500 kV and 220 kV

Overhead line 500 kV Zagorskaya Pumped Storage Power Plant – Yartsevo with reconstruction of “Yartsevo” Substation 500 kV

Reconstruction of outdoor switchgear 330 kV in Leningrad Nuclear Power Plant (metalclad substation)

Data Processing and Storage Support Center of “Concern Rosatom”, OJSC

Reconstruction of cable lines 220 kV of Thermal Power Plant-23 Elokhovskaya 1,2 and overhead lines 330 kV Tikhvin-Petrozavodksya

External power supply of construction base of Kursk Nuclear Power Plant-2. Preparatory stage. Substation 330/10 kV

Enhancing the reliability of waterfront’s power supply, Facility 931, Murmansk Region

PROJECTS

Page 8: Power systems’ development planning Construction Expert ...etsgp.ru/wp-content/uploads/Profil_4.3.2_ENG.pdf · Energy efficiency and energy audit ETS Group renders comprehensive

1514 www.etsgp.ru

FIELD OF ACTIVITIES

Consulting

• Development of information analysis reports on the operation of fuel and power complexes of regions of the Russian Federation

• Development of trade patterns of power plants’ operation

• Substantiation of investments in construction

• Development of programs for innovative development of power engineering sector’s companies

• Conduction of marketing research based on benchmarking and adaptation of best world practices of operating efficiency of power grid and power generating companies

• Optimization of spending by big consumers for procurement of power resources

• Monitoring and analysis of power markets’ operation

• Making retrospective and prospective fuel and power balance statements of constituent entities of the Russian Federation

PROJECTS

Analysis of operation and development prospects of fuel and power sector of Moscow

Development of trade pattern of “Tereshkovo” Gas-Turbine Thermal Power Plant

Expert examination of operating efficiency’s benchmarking of structural subdivisions of “Federal Grid Company of Unified Energy System”, OJSC

Design of power supply scheme of grids 110 kV and higher of Troitsky and Novomoskovsky Administrative Districts (TiNAO) of Moscow

Research of best practices for the provision of efficiency and reliability of power plants’ equipment operation. Development of indicators and criteria for the introduction of best operation of power plants’ equipment (benchmarking). Development of recommendations for the improvement of technical and economic parameters of power plants’ operation “INTER RAO”, PJSC

Page 9: Power systems’ development planning Construction Expert ...etsgp.ru/wp-content/uploads/Profil_4.3.2_ENG.pdf · Energy efficiency and energy audit ETS Group renders comprehensive

1716 www.etsgp.ru

Construction

FIELD OF ACTIVITIES

• Investment project management, organization of financing

• Formalization of initial permissive documents

• Providing construction sites with equipment and materials

• Electrical installation works related to substations, overhead lines (cable lines) 6-10 kV, 35-750 kV and cogeneration facilities

• General construction works

• Commissioning works

• Exercising the functions of a general contractor

• Technical supervision

• Putting facilities into operation

• New equipment training of customer personnel

• EPC-contracts

Central Power Distribution Station No. 7 of Catalytic Cracking Complex 2 of “Lukoil - Nizhegorodnefteorgsintez”, LLC

Comprehensive technical re-equipment and reconstruction of “Zarechnaya” Substation 220 kV

Retail electrical energy market accounting system for “Tula City Electrical Grids”, OJSC

Utility connection of facility “Storage Areas No. 1, 2, 3 of Troop Unit 11931” (codes 17/837-1, 2, 3) for “Volgo - Vyatsky” Branch of “Oboronenergo”, OJSC

Electrical installation and assembly works related to APCS, I&CE, software and hardware complexes and weak-current systems for the implementation of project “Construction of Power Unit – Combined Cycle Gas Turbine 800 MW of Perm Hydroelectric Power Plant”

Construction of pile foundations for a 45,000 capacity stadium in the city of Nizhny Novgorod, Betankur Street Quarter

Additional equipment of waterfront facilities, Facility 931, code 2/46-358 for the needs of “Kolsky” Branch of “Oboronenergo”, OJSC

Arrangement of Air Base 7054 in Chkalovsk Settlement of Kaliningrad Region, remote facilities – LOM-90,LOM-270 (code KOP/4-13/2) for “Kaliningradsky” Branch of “Oboronenergo”, OJSC

PROJECTS

Page 10: Power systems’ development planning Construction Expert ...etsgp.ru/wp-content/uploads/Profil_4.3.2_ENG.pdf · Energy efficiency and energy audit ETS Group renders comprehensive

1918 www.etsgp.ru

• Survey of building structures of industrial facilities including highly dangerous facilities and high-rise facilities

• Survey of building structures of power facilities

• Survey of building structures of oil and gas sector’s facilities

• Survey of antenna and mast structures

• Expert examination of industrial safety of industrial facilities

• Expert examination of industrial safety of power sector’s facilities

• Expert examination of industrial safety of oil and gas sector’s facilities

• Energy audit

Expert examination of industriala safety, integrated survey

FIELD OF ACTIVITIES

Technical examination of production premises and structures of

Branches of “Tyumenenergo”, OJSC: “Nizhnevartovsk Electrical

Grids”, “Uray Electrical Grids”, “Energocomplex”

Technical examination of buildings and constructions of

“Novobryanskaya” Substation 750 kV under the title:

“Replacement of Switches 750 kV at “Novobryanskaya”

Substation 750 kV of “Federal Grid Company of Unified Energy

System”, OJSC”

Expert examination of industrial safety of building for the

repair of diesel/electric trains and auxiliary shops of Kaliningrad

Direction of Multiple-Unit Rolling Stock – Branch of “Russian

Railways”, OJSC

Expert examination of industrial safety of buildings and

constructions of “Lukoil - Premnefteorgsintez”, LLC

PROJECTS

Page 11: Power systems’ development planning Construction Expert ...etsgp.ru/wp-content/uploads/Profil_4.3.2_ENG.pdf · Energy efficiency and energy audit ETS Group renders comprehensive

2120 www.etsgp.ru

Power systems’ development

FIELD OF ACTIVITIES

• Elaboration of regional power system’s development schemes and programs

• Elaboration of power plants’ power distribution schemes; elaboration of schemes for the connection of substations to power transmission lines and power systems

• Calculations of static and dynamic stability

• Electrical Grids’ Comprehensive Development Programs

Scheme and program for the development of power sector of Vologda Region in 2014-2018

Scheme and program for the development of power sector of Samara Region in 2014-2018

Scheme and program for the development of power sector of Nizhny Novgorod Region in 2013-2017 with a view to 2022

Scheme and program for the development of power sector of Moscow in 2017-2022

Scheme and program for the development of power sector of the Republic of Dagestan in 2017-2021

Development of design documents for systems of relay protection and automation and emergency control systems of Novokuibyshevskaya Thermal Power Plant 1 with the installation of a gas-turbine unit with the capacity of 200 MW

Master plan of power supply of Moscow until 2030

WORKS

Page 12: Power systems’ development planning Construction Expert ...etsgp.ru/wp-content/uploads/Profil_4.3.2_ENG.pdf · Energy efficiency and energy audit ETS Group renders comprehensive

2322 www.etsgp.ru

FIELD OF ACTIVITIES

• In-depth terrain analysis before the construction of structures and buildings

• Office elaboration of capital construction projects’ location options

• Formalization of land legal relations

• Development of planning and land marking projects

• Cadastral works

• Engineering and hydrometeorological surveys

• Engineering and geodetic surveys

• Engineering and geological surveys

• Engineering and ecological surveys

Survey of soil for the foundations of the existing overhead lines 500 kV Krasnoyarskaya Hydroelectric Power Plant –

Krasnoyarskaya Substation

Design and survey works under the title “Reconstruction of Overhead Lines 220 kV Nizhegorodskaya - Zarechnaya

and Overhead Lines 220 kV Luch – Nagornaya for the Connection of “Diesel” Substation 220 kV for the Needs

of Branch of “Federal Grid Company of Unified Energy System”, OJSC – Volga Bulk Electrical Grids

Engineering Surveys and Examination of structures of supports and portals under the title “Development of

Design Documents for the Reconstruction of Overhead Crossings 4-5T, 8-9T, 10T of Volzhskaya Hydroelectric

Power Plant.

Engineering topographic survey of underground utilities’ path located in direct vicinity to land plots owned by

“KhimIndustriya”, LLC

Land legal relations and engineering surveys

WORKS

Page 13: Power systems’ development planning Construction Expert ...etsgp.ru/wp-content/uploads/Profil_4.3.2_ENG.pdf · Energy efficiency and energy audit ETS Group renders comprehensive

2524 www.etsgp.ru

Heat and gas supply

FIELD OF ACTIVITIES

Development of design and cost estimate documents: from passing expert examination to new construction, reconstruction and technical re-equipment of the following facilities:

• Industrial and heating boiler houses

• Centralized and individual heating units

• Distribution gas supply systems, outdoors and indoors gas pipelines, gas consumption metering stations, gas equipment

• Heat supply systems, heat pipelines, steam and hot water pipelines

• Water supply and water removal systems

• Heating systems utilizing gas infrared radiators and gas heat generators, process lines’ gas supply systems

• Heating and ventilation systems

Examination of technical conditions of grids of boiler house Oil Mine Directorate-2 under the project “Reconstruction

of Boiler House of Oil Mine No. 2 of Oil Mine Directorate “Yareganeft”

Development of specification and data sheets for steam boilers, gas burners, auxiliary equipment of steam boilers,

discharge smoke pipes, reinforcement bars for the framing of boilers under the project “Expansion of Boiler House of

Oil Mine No. 2 of Oil Mine Directorate “Yareganeft”

Development of working documents under the project “Expansion of Boiler House of Oil Mine No. 2 of Oil Mine

Directorate “Yareganeft”

Contract works for the development of design documents under the project “Reconstruction of Central Power

Distribution Station-3”

WORKS

Page 14: Power systems’ development planning Construction Expert ...etsgp.ru/wp-content/uploads/Profil_4.3.2_ENG.pdf · Energy efficiency and energy audit ETS Group renders comprehensive

2726 www.etsgp.ru

Aerial photography and orthophoto plans

FIELD OF ACTIVITIES

Package of field works for a horizontal and vertical survey and marking of ground reference points

Photographing a linear section of an overhead line with the subsequent processing and 3D modeling of wires and

supports

Making 3D models of cities based on georeferenced point clouds

Aerial monitoring with photographing and simultaneous transmission of HD video

Remote ground sounding to obtain current information on the consequences of industrial and natural disasters

WORKS

• Providing aerial photography services using the own fleet of unmanned aerial vehicles and ground-based land surveying equipment with subsequent office processing of materials received

• Aerial photography data processing and visualization technologies make it possible to generate and analyze orthophoto plans, digital terrain models and 3D objects within a short time and with centimeter - level accuracy

Page 15: Power systems’ development planning Construction Expert ...etsgp.ru/wp-content/uploads/Profil_4.3.2_ENG.pdf · Energy efficiency and energy audit ETS Group renders comprehensive

2928 www.etsgp.ru

OUR CUSTOMERS

ПРАВИТЕЛЬСТВОМОСКВЫ

энергия без границ

Page 16: Power systems’ development planning Construction Expert ...etsgp.ru/wp-content/uploads/Profil_4.3.2_ENG.pdf · Energy efficiency and energy audit ETS Group renders comprehensive

3130 www.etsgp.ru

CERTIFICATES

• Certificate of admission to a specific type or types of works influencing

the safety of capital construction projects No. C.055.52.9297.11.2016

dated 11/11/2016 issued by Nonprofit Partnership Self - Regulating

Organization “Association of Construction Engineers”

• Certificate of admission to a specific type or types of works influencing

the safety of capital construction projects No. И.005.21.1541.11.2016

dated 09/11/2016 issued by Nonprofit Partnership Self-Regulating

Organization “Association of Prospecting Engineers”

• Certificate of admission to a specific type or types of works influencing

the safety of capital construction projects No. П.037.21.4738.01.2017

dated 19/01/2017 issued by Nonprofit Partnership Self - Regulating

Organization “Association of Design Engineers”

• Quality management conformance certificate (GOST ISO 9001-2011)

No. А.СРТ.СС.150801.01-3859.04 dated 03/08/2015

• Environmental management conformance certificate GOST R ISO

14001-2007 (ISO 14001:2004) No. СДС.ПСС.СМ14.0734 dated

13/07/2016

Page 17: Power systems’ development planning Construction Expert ...etsgp.ru/wp-content/uploads/Profil_4.3.2_ENG.pdf · Energy efficiency and energy audit ETS Group renders comprehensive

Design

Design

Design

Design

Design

Design

Design

Design

Construction

Construction

Construction

Construction

Construction Construction

Construction

Construction

Procurement

Procurement

Procurement

ProcurementProcurement

Installation

Installation

Installation

Installation

Installation Installation

Power systems’ development planning

Power systems’ development planning

Power systems’ development planning

Power systems’ development planning

Energy efficiency

Energy efficiency

Energy efficiency

Energy efficiency

Energy efficiency

Adjustment

Adjustment

Adjustment

Adjustment

Expert examination of industrial safety

Expert examination of industrial safety

Research and development

Research and development

www.etsgp.ru