2019 Energy Report
Mark Ferguson, P.E.Campus Operations & Plant Manager
Energy Use Averaged 80.0 kBtu per square foot per yearEnergy Cost Averaged $0.97 per square foot per year
Peer Institutions
Energy Intensity ASHEE Report
• Colby College 135 kBtu / SF 11/2018 data• Colgate University 129 kBtu / SF 08/2017 data• Middlebury College 177 kBtu / SF 06/2017 data• Pomona College 114 kBtu / SF 10/2015 data• University of Denver 104 kBtu / SF 02/2016 data• University of Colorado Boulder 90 kBtu / SF 03/2018 data• Williams College 122 kBtu / SF 05/2019 data
59% Reductions2008-2018
Site kWh Source Cummulative 2019 kWh Total7/1//2019 Tutt Library 244,166 Clean Energy Collective 244,1667/1//2019 Tutt Library 144,532 PV Solar Production 388,6987/1//2019 Tutt Library 228,420 SunShare 617,1187/1//2019 Palmer 0 SunShare 617,1187/1//2019 Cornerstone 137,403 PV Solar Production 754,5217/1//2019 El Pomar 200,800 PV Solar Production 955,3217/1//2019 Synergy 6,958 PV Solar Production 962,2797/1//2019 Worner PV 46,679 PV Solar Production 1,008,9587/1//2019 Deans House 13,721 PV Solar Production 1,022,6797/1//2019 Edith Gaylord 35,947 PV Solar Production 1,058,6267/1//2019 Child Care Center 26,391 PV Solar Production 1,085,0177/1//2019 KRCC 1,300 PV Solar Production 1,086,3177/1//2019 Spencer 19,804 PV Solar Production 1,106,1217/1//2019 Outdoor Education 4,139 PV Solar Production 1,110,2607/1//2019 East Campus Bldg 1 19,494 PV Solar Production 1,129,7547/1//2019 East Campus Bldg 5 9,389 PV Solar Production 1,139,1437/1//2019 East Campus Bldg 4 13,500 PV Solar Production 1,152,643
Off-Campus Solar 472,586On-Campus Solar 680,057
Total Campus Electricity 17,177,544
6.6%2.8%4.0%
% of Campus Electricity from Off-Campus Solar% of Campus Electricity from On-Campus Solar
CC 2019 PV Solar
% of Campus Electricity from Solar
• Campus LED Lighting Upgrades• Cutler Hall HVAC System Replacement Commissioning• Schlessman Pool Heat Exchanger Replacement• Fine Arts Center LED Lighting Upgrades• High Temperature Hot Water Service Replacement Phase 2• Robson Arena Design• Monthly Building Automation Review• Worner Center Kitchen Improvements
2018 Sustainability Projects
Packard Hall High Temperature Hot Water Service Replacement Phase 2
• Fine Arts Center Chiller Replacement• Campus LED Lighting Upgrades• Campus Control Upgrades
2019 Sustainability Projects
Fine Arts Center LED Lighting and Chiller Replacement