CIGRE 2017- Grid Of The Future
Huiying Huang, Xiaolan Zou
October 24, 20171
Implementation of Data-driven Visualizations
• Background:• Big data from power systems: digital relays, meters, equipment monitors,
communication systems, AMI, and many more across hundreds of substations and thousands of circuits
• New IT platforms are bringing new approaches to gather and view data• Implementation of new data-driven visualizations is necessary to manage this data
and monitor assets• Goal of the project
• Create data visualizations with new software applications that:• Display real-time grid data• Analyze historical grid data
Overview of Big Data in Power Systems
October 24, 20172
Overview of PI Data Historian
October 24, 20173
A new data historian for all transmission and distribution grid data
Operation Centers
SOC/ROC
PI Data Historian
Devices
• Relays and Meters• Asset monitors for
transformers, circuit breakers, etc.
Applications
• One-Line diagrams
• Equipment dashboards
PI Application: Substation One-line Diagrams
October 24, 20174
Automatic creation of one-line diagrams in PI
• Tools used to develop new visualizations• PI Data Historian:
• PI CoreSight: a website that delivers data to the users from PI• PI ProcessBook: a tool to display data in a graphical manner• PI Web API: an interface that gives client applications read and write access to PI
• CIMSpy:• Designed to provide data integration with power system models
• Web tools• Vue.js: An open-source JavaScript framework for building user interfaces
Project Implementation Details
October 24, 20175
Implementation of PI One-line Diagrams
October 24, 20176
Data Link
One-line Diagram
s
CIMSpy
Website
PI CoreSight
PI Data Model
Substation One-line Diagrams in PI CoreSight
October 24, 20177
• Clear layout without bending and overlapping
• Easy Adjustment• Flowing real-time data can
be displayed in the one-line diagram
• Benefits: • Unifies models and
graphics• Reduces human effort • Makes data access
easier
Substation One-line Diagrams in PI CoreSight
October 24, 20178
Data Link
Example of Trended Measurements
October 24, 20179
• There are thousands of electrical equipment devices across Dominion’s footprint
• Each piece of equipment has measurements (10s to 100s) in PI to monitor the assets
• New PI tools are being developed to help manage these assets and their data
The Challenge of Asset Management
October 24, 201710
• Implemented a visualization tool to manage a massive quantity of data from 200+ DFRs (Digital Fault Recorders)
• Benefits realized from the dashboard
• Easily see the real-time status of all the DFRs
• Quickly identify and troubleshoot problems, both at the device level and the data level
Success with a DFR Dashboard
October 24, 201711
• Tools used to develop new visualizations• PI Data Historian:
• PI CoreSight: a website that delivers data to the users from PI• PI ProcessBook: a tool to display data in a graphical manner• PI Web API: an interface that gives client applications read and write access to PI
• CIMSpy: • Designed to provide data integration with power system models
• Web tools• Vue.js: An open-source JavaScript framework for building user interfaces
Project Implementation Details
October 24, 201712
PI Application: Equipment Dashboards• Created a PI Dashboard platform to be used
for any type of equipment on our electric grid, such as:
• Capacitor/Reactor Banks• Transformers• Circuit Breakers
• Created a new approach to generate dashboards automatically, utilizing PI, JavaScript, and HTML5
• Reduced effort to build and maintain• Easy to modify or add new equipment• Many configuration/visual options available
October 24, 2017B13
Reactor Banks Dashboard
14
Reactor Banks Dashboard
October 24, 201715
Capacitor Banks Dashboard
October 24, 201716
Capacitor Banks Dashboard
October 24, 201717
Transformers Dashboard
October 24, 201718
Transformers Dashboard
October 24, 201719
• Unified models and graphics• Extended the user group• Provided easier data access • Achieved retrieving and displaying real-time and historical data • Reduced engineering time and cost • Help reduce human errors • Improved grid reliability, system efficiency and safe utilization of
critical equipment
Outcome of Project
October 24, 201720
Thank you. Questions?
October 24, 201721