Briefing to the Transport Portfolio Committee
PFMA
2017/18
2
AGSA reputation promise
The Auditor-General of South Africa (AGSA) has a
constitutional mandate and, as the Supreme Audit Institution
(SAI) of South Africa, it exists to strengthen our country’s
democracy by enabling oversight, accountability and
governance in the public sector through auditing, thereby
building public confidence.
3
Audit outcomes for
the last three years
Transport Portfolio
• South African National Road Agency (SANRAL)
• Road Accident Fund (RAF)
• Cross Border Road Transport
Agency (CBRTA)
• Road Traffic Management
Corporation (RTMC)
• Road Traffic Infringement
Agency (RTIA)
• Driving License Card Account (DLCA)
• Passenger Rail Agency of South Africa (PRASA)
• Railway Safety Regulator (RSR)
• Autopax (Pty) Ltd (Autopax)
• Intersite Property Management Services (Pty) Ltd (Intersite)
* Section 4(3) entities (ACSA will be audited by the AGSA directly)from 14/15)
Department of Transport
Road
Rail Maritime
Air
• Air Traffic and Navigation Services (ATNS) * • Airports Company of South Africa (ACSA) • South African Civil Aviation Authority (SACAA)
• South African Maritime Safety Authority (SAMSA) • Independent Ports Regulator (PR)
4
To improve/maintain the overall audit outcomes, financial statements processes,
1 3 …. compliance with key legislation and….
2
Three year trend – Overall improvement in audit outcomes
…. performance planning and reporting must be improved by….
8% 8%
61% 77% 54%
31%
23%
38%
2015-16 2014-15 2013-14
5
Movement in audit outcomes over 3 years
2015-16 PFMA
The portfolio’s overall outcomes have improved due to a
CBRTA and RTMC improving their audit outcomes from
unqualified audit opinion with findings to unqualified audit
opinion with no findings. There was a regression in the
audit outcome of the RAF from unqualified audit opinion
with no findings to unqualified audit opinion with finding on
compliance with laws and regulations. DoT regressed from
unqualified audit opinion to a qualified opinion. The rest of
the portfolio maintained their audit outcomes of the
previous year.
There has been a slight improvement in the area of
compliance with laws and regulations. The key areas
of non compliance remain supply chain management
resulting in repeated incurrence of irregular
expenditure and material misstatements in the
financial statements submitted for audit which are
identified in the audit process and corrected by
management which lead to the portfolio, with the
exception of the department, achieving financially
unqualified audit opinions.
There has been a regression in the area of reliable performance
reporting.
Annual performance plans of PRASA, RSR, SAMSA and SANRAL
also contained targets that were not specific, time bound and
verifiable.
Achievements reported by PRASA, RSR, RTIA and SAMSA were
either incorrect or not supported by appropriate sufficient evidence
to confirm the accuracy and reliability thereof.
Three year trend –
Compliance with key legislation
77% 77% 69%
23% 23% 31%
2015-16 2014-15 2013-14
Three-year trend –
Quality of annual
performance plans
Three year trend –
Quality of submitted
annual performance reports
31%
8%
31%
69%
92%
69%
2015-16 2014-15 2013-14
31% 23%
31%
69% 77%
69%
2015-16 2014-15 2013-14
With no material findings
With material findings
Outstanding audits
No APR/ late submitted
Unqualified
with
no findings
Unqualified
with findings
Qualified
with findings
Adverse
with findings
Disclaimed
with finding
Audits
outstanding
----------------------------------------------------
5
6
Scope, process and
key considerations
in the review of the
17/18 Draft APP
•The interim review provides an early warning where concerns with
regards to the measurability and relevance of the indicators and
targets have been identified
•The interim review does not entail the performance of detail
procedures where underlying systems and supporting
documentation is inspected to give assurance on the verifiability of
indicators and targets
•The interim review is only performed on a selection of significant
programmes
7
Scope of the 2017/18 APP review
Draft APP review 2017/18 of the Department of Transport
Review process
• Assessed the process followed by departments to prepare and submit strategic plans and APPs.
• Assessed the measurability and relevance of the final draft indicators and targets planned for selected programmes
Reporting
• Findings from the review are communicated in the 2016-17 interim management report to enable changes to be made.
• Findings relevant to the interim review do not have an impact on the audit conclusion on usefulness or reliability of the selected programmes for the PFMA 2016-17 year end audit.
8
Scope of the 2017/18 APP review
Draft APP review 2017/18 of the Department of Transport
Does the APP align with MTSF?
Are indicators relevant and complete?
Is there a logical link between
objectives, indicators and
targets?
Are the targets realistic i.e.
SMART?
Are adequate resources (human
and financial) available to achieve
APPs?
How can the APP be achieved e.g.
Performance contracts/ monitoring
Review quarterly progress against
APP targets
Review annual achievement against
APP targets
Review and track changes to strategic
plans and annual performance reports.
9
Key considerations when reviewing the APP
Draft APP review 2017/18 of the Department of Transport
Measurability of indicators and targets
Indicators are well-defined
Indicators are verifiable
Targets are specific, measurable and time-
bound.
Relevance of indicators and targets
Indicators and targets are relevant to the
mandate and realisation of strategic goals and objectives
Well-defined =
clear,
unambiguous
definition so that
data will be
collected
consistently and
will be easy to
understand and
use.
Verifiable = it
must be possible
to validate the
processes and
systems.
Specific = the nature
and the required level
of performance can be
clearly identified
Measurable = the
required performance
can be measured
Time bound = the
time period or deadline
for delivery is specified
The performance measure/
indicator and target relates
logically and directly to an
aspect of the entity’s
mandate and the
realisation of its strategic
goals and objectives.
10
Criteria used to assess the draft APP
Draft APP review 2017/18 of the Department of Transport
11
Strategic Alignment
of Portfolio
Strategic alignment of portfolio ENTITY NDP MTSF Included in strategic plan
DoT Outcome 4:
Sub-outcome 1: Productive
investment is effectively crowded in
through the infrastructure build
programme
Outcome 6 Sub-Outcome 1: Regulation,
funding and investment improved
Develop a Private Sector
Participation (PSP) Framework for
ports and freight rail, removing
barriers to entry for private
investment
Sub-Outcome 3: Ensure
development and approval of the
Integrated Transport Plan
Improve public transport
Strengthen institutional
arrangements for public transport
Integrated National Transport Plan
developed and approved
Establish a Single Transport
Economic Regulator (STER) -
Cabinet and Parliamentary approval;
establishment and appointments
PSP Framework;
Rands private investment and market
share of private ownership of ports
and rail over MTSF
Integrated National Transport Plan
developed and approved
Improved public transport:
Implementation of approved plans
and initiatives; % increase in the use
of public transport
Yes
12
Strategic alignment of portfolio
(cont) ENTITY NDP MTSF Included in strategic plan
SANRAL Sub-Outcome 3
• Improve and preserve national,
provincial and local road
infrastructure
Sub-Outcome 6
• SIP 2: Durban- Free State–
Gauteng Logistics and Industrial
Corridor • SIP 3: South Eastern Node and
Corridor Development
Sub-Outcome 5
• Access Road Development Plan
for improving rural road
infrastructure implemented
• Development and
implementation of approved
plan including maintenance;
kms new, upgraded or
rehabilitated
• N2 De Beers Pass (Harrismith
Hub)
• New Project: N2 Wild Coast
Highway (subject to funding
secured), starting with bridge
structures
Yes
RTMC Sub-Outcome 3
• Strengthen road traffic
management
• Development and
implementation of approved
plan;
% reduction in accidents and
fatalities
Yes
13
Strategic alignment of portfolio
(cont) ENTITY NDP MTSF Included in strategic
plan
PRASA Sub-Outcome 6
• SIP 1: Unlocking the
Northern Mineral Belt
• SIP 2: Durban- Free State–
Gauteng Logistics and
Industrial Corridor
• SIP 3: South Eastern Node
and Corridor Development
Sub-Outcome 5
• Access Road Development
Plan for improving rural
road infrastructure
implemented
• Develop heavy haul rail
corridor to Waterberg
coalfield
• Number of mtpa expansion
of the rail network capacity
beyond
Yes
14
15
Outcome of review
of 17/18 draft APP
Programme
Total no. of
indicators
included in
the APP
Targets not specific
and measurable
(draft APP)- to be
corrected based on
recommendations
from the review
Targets not Time
bound
(draft APP) - to be
corrected based on
recommendations
from the review
Programme 2: Integrated
Transport Planning 7 2 (25%) 0
Programme 3: Rail
Transport 5 1 (17%) 0
Programme 4: Road
Transport 7 3 (20%) 0
Programme 7: Public
Transport
4 3 (25%) 0
16
Overview of Key findings on the review of the 2017-18 APP
Department of Transport
National Department of Transport
Outcome of preliminary review of 2017/18 APP
17
Targets not specific and measurable Programme Indicator Annual target APP
Q2, Q3 & Q4
Observation Amendments by
management
Programme 2:
Integrated
Transport
Planning
Roll-out of 10
NATMAP
2050
interventions
by March
2019
Implementation
of ten (10)
NATMAP 2050
Priority Pilot
Projects
monitored
Q2: Conduct
Performance
Monitoring on four
(4) prioritised
projects
Q3: Conduct
Performance
Monitoring on four
(4) prioritised
projects
Q4: Conduct
Performance
Monitoring on two
(2) prioritised
projects
Neither the APP nor
the TIDs defines the
priority projects that
will be rolled out
and
monitored. This
makes it impossible
to measure
achievement at the
end of any quarter
or at year end.
Yes
The Technical
Indicator
Description was
amended to
specify the
priority projects
to be
implemented in
each of the
quarters i.e. 2, 3
and 4.
Programme Indicator Annual
target
APP
Observation Amendments by
management
Programme 2:
Integrated
Transport
Planning
Regional
Transport
Market Access
Strategy
developed by
March 2018
Draft Regional
Transport
Market
Access
Strategy
developed
Q3: Conduct a
benchmarking
exercise
towards the
Draft Regional
Transport
Market Access
Strategy of SA
Target is not
specific as
information to be
used as the
benchmark is not
defined. It would
be difficult to
determine
whether the
target was
achieved if it is
not specific.
Yes
The Technical
Indicator
Description was
updated to
include the
method of
benchmarking,
criteria for
identifying
member states
for the
benchmarking
exercise and the
members states
identified.
6
Targets not specific and measurable (cont)
Programme Indicator Annual target APP
Observation Amendments
by
management
Programme 3:
Rail Transport
National Rail
Bill submitted
to the Cabinet
by March
2019
National Rail
Bill submitted to
the ESEID
Cluster
Q1 & Q2: Conduct
stakeholder
consultation on
the Draft National
Rail Bill
Targets are not
specific as
stakeholders to
be consulted are
not defined. It
would be
impossible to
measure
quarterly
achievements if
the targets are
not specific.
Yes
Stakeholders
have been
included in the
final Technical
Indicator
Descriptions,
making the
achievement of
the targets
measurable and
well defined
7
Targets not specific and measurable (cont)
Programme Indicator Annual target APP
Observation Amendments
by
management
Programme 4:
Road Transport
Access Road
Development
Plan submitted
to Cabinet by
March 2019
Comprehensive
stakeholder
consultations
conducted on the
draft Access
Road
Development
Plan
Conduct
stakeholder
consultations on
the draft Access
Road
Development
Plan
Q1: relevant
provincial
departments
Q2: relevant
municipalities
Q3: relevant
sector
departments
Targets are not
specific as
stakeholders to
be consulted are
not defined. The
targets are
therefore not
measurable as
the desired level
of achievement is
unknown
Yes
The final
Technical
Indicator
Descriptions
define the
stakeholders for
consultation in
all the quarters,
making the
target specific
and measurable.
8
Targets not specific and measurable (cont)
Programme Indicator Annual target APP
Observation
Amendments
by
management
Programme 4:
Road Transport
Construction
and
maintenance of
provincial
roads
monitored in
line with the
approved
budget
Overall
implementation
of the SSP
monitored in line
with PRMG
budget
Q1, Q2, Q3 & Q4:
Monitor
implementation of
the SSP through
the site
inspections,
bilateral
consultations and
compile progress
report
In all four
quarters, the
TID does not
define the
parties involved
in the bilateral
consultations.
Further there is
no indication of
which sites will
be visited. It
would be
impossible to
measure
quarterly
achievements if
the targets are
not specific.
Yes
The final
Technical
Indicator
Descriptions
define the
stakeholders for
consultation in
all the quarters,
making the
target specific
and measurable
8
Targets not specific and measurable (cont)
Programme Indicator Annual target APP
Observation
Amendments
by
management
Programme 4:
Road Transport
Draft Bill for
Founding
legislations of
road entities
submitted to
Cabinet by
March 2020
Review founding
legislations of
road entities
conducted
Q1: Conduct
status qou
analysis of
founding
legislations of
road entities
Target is not
specific as road
entities to be
consulted are
not defined.
The target is
therefore not
measurable as
the desired level
of achievement
is unknown
It is not clear
whether the
consultations
will take place
with all road
entities.
Yes
The final
Technical
Indicator
Descriptions
define the road
entities that will
be consulted,
making the
target specific
and
measurable.
8
Targets not specific and measurable (cont)
Programme Indicator Annual target APP
Observation Amendments
by
management
Programme 7:
Public Transport
Implementation
of the National
Land Transport
Amendment Act
monitored
Develop draft
regulations for
the Land
Transport
Amendment Act
Q3: Conduct
public
consultations of
the draft
Regulations
through the
Gazette process
Target is not
specific as it is
not defined who
the consultations
will be
conducted with.
Removed from
the APP
Removal of this
indicator may
result in the
Department not
meeting its
mandatory
requirements.
Transport Appeal
Tribunal (TAT)
Amendment Bill
submitted to
Cabinet by
March 2019
Develop draft
Transport Appeal
Tribunal (TAT)
Amendment Bill
Q3: Conduct
public
consultations of
the draft TAT
Amendment Bill
through the
Gazette process
Target is not
specific as it is
not defined who
the consultations
will be
conducted with.
Yes
The final
Technical
Indicator
Descriptions
define the
stakeholders that
will be consulted,
making the
target specific
and measurable
9
Targets not specific and measurable (cont)
Programme Indicator Annual target APP
Observation Amendments
by
management
Programme 7:
Public Transport
Implementation
of the integrated
public transport
turnaround plan.
Framework for
implementation
of the integrated
Public Transport
Turnaround plan
developed.
Q1: Conduct
stakeholders
engagement on
the programme
of action for the
integrated Public
Transport
Turnaround Plan
Included in the
definitions of
stakeholders to
be conducted is
"Industry" -
concept of who
constitutes
industry is not
well defined
especially taking
into account that
Provincial
Department and
Municipalities
are already
identified as
stakeholders
Yes
The final
Technical
Indicator
Descriptions
define the
stakeholders that
will be consulted,
making the
target specific
and measurable
9
Targets not specific and measurable (cont)
Questions
www.agsa.co.za
Auditor-General of South Africa
Follow the AGSA on Twitter: https://twitter.com/AuditorGen_SA