    REQUIREMENT 1

    System development life cycle

    a set of recommended steps or phases

    is designed to be a guideline.

  • 8/3/2019 PP Accounting System Analysis & Design

    3/13

    REQUIREMENT 1

    The phases that can be found in a typical SDLC.

    1. SYSTEM PLANNING

    requires the individual or groups, to conduct an initial

    investigation (preliminary investigation).

    help to define the problem to be overcame and sets

    the guideline for the whole systems project

    Refer to PBL Session 1;

    Encik Kurniadi Muhtar has to define the problems faced by

    Pahang Electronic Sdn. Bhd which are:

    The difficulties in determining the available stock in hand

    The current system cannot cope with the semi manual and

    computerized stock update

  • 8/3/2019 PP Accounting System Analysis & Design

    4/13

    REQUIREMENT 1

    The phases that can be found in a typical SDLC

    2. SYSTEM ANALYSIS

    requires to make further understanding towards

    the problem.

    identify whether the project can be done or not

    with the available resources.

    Refer to PBL Session 1;

    Encik Kurniadi Muhtar should analyze whether Pahang

    Electronic Sdn. Bhd.s fund is enough or not to develop

    the new system to update its stock.

  • 8/3/2019 PP Accounting System Analysis & Design

    5/13

    REQUIREMENT 1

    The phases that can be found in a typical SDLC

    3. SYSTEM DESIGN

    requires the individual or groups to plan thesystem to be the solution of the problem

    Refer to the PBL Session 1;

    Encik Kurniadi Muhtar may include the software to be

    used for this phase in developing the system required byPahang Electronics Sdn. Bhd.

  • 8/3/2019 PP Accounting System Analysis & Design

    6/13

    REQUIREMENT 1

    The phases that can be found in a typical SDLC

    4. SYSTEM CONSTRUCTION AND IMPLEMENTATION

    involves the real construction of the new system.

    new system and any changes of the existing system are

    tested.

    system that is constructed will be put into operational

    use for implementation.

    Refer to PBL Session 1;

    Encik Kurniadi Muhtar will construct the Point-of-Sales

    system required by Sales Department of Pahang Electronics

    Sdn. Bhd. and put the system into operational use of Pahang

    Electronic Sdn. Bhd.s Sales Department.

  • 8/3/2019 PP Accounting System Analysis & Design

    7/13

  • 8/3/2019 PP Accounting System Analysis & Design

    8/13

    REQUIREMENT 2

    The aim of the preliminary investigation phase

    dig in depth about the problem exist and the existing

    system

    to link the existing system with the company

    objective of building up the system

    Refer to PBL Session 1;

    Encik Kurniadi Muhtar will know that the existing semi

    manual and computerized stock update system of

    Pahang Electronics Sdn. Bhd. is not met the company

    objective.

  • 8/3/2019 PP Accounting System Analysis & Design

    9/13

    REQUIREMENT 2 The steps that must be done during the preliminary

    investigation phase

    1. UNDERSTAND THE PROBLEMS

    analyzy the problem, identify the affected groups of

    the problem; understand the existing system and

    its interaction with other systems.

    In this PBL Session 1;

    the problem is regarding to the Pahang Electronics Sdn.

    Bhd.s stock update system and the affected group is

    Sales Department of Pahang Electronic Sdn. Bhd.

  • 8/3/2019 PP Accounting System Analysis & Design

    10/13

  • 8/3/2019 PP Accounting System Analysis & Design

    11/13

    REQUIREMENT 2 The steps that must be done during the preliminary

    investigation phase

    3. DETERMINE FEASIBILITY

    determines whether to proceed or not the new system

    development.

    In this PBL Session 1;

    If Encik Kurniadi Muhtar finds the system that is being

    developed is not capable to reach the objective of Pahang

    Electronics Sdn. Bhd. Sales Department objective, he should

    discuss with the representative of Pahang Electronicss Sales

    Department whether to continue the system development or

    not.

  • 8/3/2019 PP Accounting System Analysis & Design

    12/13

    REQUIREMENT 2 The steps that must be done during the preliminary

    investigation phase

    4. ESTIMATE TIME AND COST TO CONTINUE DEVELOPMENT

    involves a complete system development cost

    and time estimate.

    System analyst should provide an estimate cost

    for the overall project

    In this PBL Session 1;

    Encik Kurniadi Muhtar has to determine the total

    cost and time needed for the new system project

  • 8/3/2019 PP Accounting System Analysis & Design

    13/13

    REQUIREMENT 2 The steps that must be done during the preliminary

    investigation phase

    5. PRESENT RESULTS AND RECOMMENDATIONS TO THEMANAGEMENT

    This will be in the form of a formal document called

    Preliminary Investigation Report. It may include:

    Project Roles:

    Lists the people who will participate in the project, and

    describes each persons role

    Time & cost estimates:

    This will describe the cost of acquiring and installing the

    new system