Planning and Scheduling Challenges for Process industry • Products with maturation time and limited shelf life • Complex relationship between different operations • Constraints regarding flow of product through plant based on physical abilities to connect resources • Sequence dependent Setup and cleanout cost • Tank or Storage Resource Constraint

PPDS for Process Industry

Embed Size (px)

Citation preview

Page 1: PPDS for Process Industry

Planning and Scheduling Challenges for Process industry

• Products with maturation time and limited shelf life

• Complex relationship between different operations

• Constraints regarding flow of product through plant based on physical abilities to connect resources

• Sequence dependent Setup and cleanout cost• Tank or Storage Resource Constraint

Page 2: PPDS for Process Industry

Shelf Life Planning

• In Process industry generally products have definite maturation time before products can be used for further processing.

• Products also have specific expiry date beyond which products cannot be used.

• PPDS heuristic is capable of taking care of these things

Page 3: PPDS for Process Industry

Phase level Scheduling

. Process industry will have more complex relationship between operation than start-start and end-start. Operations may have overlap for certain time duration.

. PPDS Detail scheduling strategies and Optimizer can schedule order considering above constraint.

Page 4: PPDS for Process Industry

Resource Network Planning

• Resource Network is new functionality available in SCM 7.0 which takes care of Constraints regarding flow of product through plant based on physical abilities to connect resources

Page 5: PPDS for Process Industry

Sequence dependent Setup and cleanout cost

• In Process industry setup and clean out cost are dependent on the sequence in which orders are executed.

• Generally if orders of products with similar characteristics are grouped and executed sequentially setup and clean out cost will be minimized but this can have adverse impact on time delivery.

• In PPDS Campaign Planning and Block Planning functionalities can be used to optimize schedule based on different parameters like setup cost, delay cost.

Page 6: PPDS for Process Industry

Container Resource/Tank Planning

• Storage constraint like maximum storage capacity is considered by PPDS Optimizer (SCM7.0) to generate finite schedule

• New alerts are available in SCM 7.0 for violation of storage capacity constraint . This enables exception based planning.