34
Company History Organization Chart Capability & Technology Core Business Process Package Contracting Capability ( Products & Fabrication) International Engineering Partner Shop Location

PQ_SEC _2014

Embed Size (px)

Citation preview

Company History Organization Chart Capability & Technology Core Business Process Package Contracting Capability ( Products & Fabrication) International Engineering Partner Shop Location

Company Profile 1

Mission & Foreword

To serve oil and gas industry with reliable and competitive engineering services with integrated quality design and technology innovation, to be the prime choice of our valued customers.

Company History

Shinjin Engineering Co (SEC) is redefined on the basis of Interchem Process System Co Ltd, a reputed consulting team for oil/gas, petrochemical and chemical industries, which was established in 2004. With accumulated technology, engineering capabilities and experiences, SEC is moving forward to engineering service in Natural Gas Processing, produced water treatment systems, Plant Pipe system / Semi Skid, Offshore Pipe System, Power Plant HRSG, Tank terminal piping line, Flow line Equipment and High Pressure Manifold. With the above-mentioned all our past capabilities, SEC will steadily provide our valuable customers and partners with the excellent services in the near future.

Organization Chart 2

Auditor

Engineering

General Division

Accounting

Financing

Business / Sales

Cost Control

Exe. Vice

President

HR

General Affairs/

Labor Control

Quality Control

Management

Division

Detail & Product

Design

Commissioning

Marine & Utility

System

Overseas

Business

Division /

Supervisor

Total Customer

Service, Material

Supply Service

Quality Control

Personnel

Procurement

Comm. Procedure

Operation Manual

Schedule Control

USA

Kuwait

UAE. Qatar

Upgrade /

Conversion

Construction Control Local Total

Customer Service

for Owner &

Vendor

Field Prod.

Specialists

Inspection

Safety Control

TBD, Mgr ASIA

TBD, Mgr EMEA

Bid / Contract,

Purchase

President Management

Division

General

Manager QA/QC

Description Staff No. Experience

Process specialist 2 > 30 years

Mechanical specialist 2 > 25 years

Process engineer 3 3 – 10 years

Mechanical engineer 3 3 – 15 years

Piping engineer 9 2 – 10 years

E & I engineer 3 3 – 10 years

Structural engineer 2 5 – 10 years

Project engineer 2 2 – 8 years

Field Pipe Welder 100 5 – 10 years

Our Professionals

• Gas Sweetening: > 10 Units

• Gas Dehydration: > 20 Units

• Produced Water Treatment: > 20 Years

• Separators: > 20 Years

• Piping / Valve Line : > 20 Years

Professional Experiences

Project Reference

P R O J E C T YEAR OF BUILT Customer

EXXON MOBIL OIL PIPE SPOOL (EASTAREA) TOTAL PIPE SPOOL

2009 Samsung Heavy Industries

Philippine NAGA Power plant 2010 SHILOH International

POSCO Power INI ISM Power Plant External Piping 2011 POSCO

EMAL Phase II CCPP External Piping #32, #41, #51, #52 2012 SAMSUNG C&T

SAUDI ARMCO 2013 ARAMCO

[Power Generation] [Pipe Rack] [Seawater Treatment] [Oil Separation]

Capacity & Technology 3

Phase Separation

Water Treatment

Gas Treatment

Deoiler Cyclone

Discharge

Desander Cyclone

Filtration Gas Flotation

WATER TREATMENT

Solids Management

Solids Discharge

Gas Oil Water

Reinjection

3-Phase Separation

Gas Sweetening Dew Point Control

Compression

Gas Dehydration

GAS PROCESSING

Pipeline

OIL TREATMENT

Pipeline

Capacity & Technology 4

Consulting & Engineering

Process Package

Contracting

Site Services

Core Business 5

Process Study

Basic Design

Detailed Design

Process

Piping

Mechanical

Structural

E & I

Valve Skid

Processing Package Contracting 6

Engineering

Procurement

Project Management

Quality Control

Site Service

Capability (PHASE SEPARATION) 7

Gas Scrubber

Oil/Water Separator

3-Phase Separator

Capability (WATER TREATMENT) 8

Conceptual Design

and FEED

Coalescing Oil-Water Separator

CPI

Hydrocyclone

Gas Flotation

Media Filters

Capability (GAS TREATMENT) 9

Gas Sweetening with Amine

Gas Dehydration TEG & Molecular Sieve

LPG Extraction

Fuel Gas Treatment

Capability (Oil Drilling Equipment & Tool) 9

Tubing Elevator

Safety Clamps

Drill Pipe elevator

Casing Slip

Drill Collar Slip

Drill Pipe Slip

Power Tongue

Rotary Table

Elevator Link

Draw Work

Mud Pump

API 7K & 8C certified

Capability (Flow Line Equipment) 9

Manifold

Plug Valve

Choke Valve

Integral Fittings

Adapter

Swivel Joint

Cementing & Circulating Hose

Pup Joint

Hammer Union

Frac Adapter

Ball Valve

API 6A, 6C, 6D certified up to 15,000 psi working pressure

Capability (High Pressure Manifold) 9

Standpipe Manifolds

Cement Manifolds

Riser Manifolds

Discharge Manifolds

Circulating Manifolds

Test Manifolds

Choke and Kill Manifolds

Mud Gas Separator

Mud Standpipe Manifold

up to 15,000 psi working pressure

Capability (Fabrication Shop) 9

Shop Layout

Capability (Fabrication Shop) 9

Shop Layout

1st Fabrication Bay : 30M (W) x 20M (L) x 12M (H) Crane 10 ton and 5 ton t

2nd Fabrication Bay : 30M (W) x 20M (L) x 12M (H) Crane 10 ton and 5 ton 1st

4th Fabrication Bay 30M (W) x 20M (L) x 12M (H) Crane 20 ton and 5 ton

3rd Fabrication Bay 30M (W) x 20M (L) x 12M (H) Crane 10 ton and 5 ton 1st

5th Fabrication Bay 30M (W) x 20M (L) x 12M (H) Crane 20 ton and 5 ton

1st Painting Moving Shelter 20M (W) x 20M (L) x 12M (H)

2nd Painting Moving Shelter 20M (W) x 20M (L) x 12M (H)

Shot Blasting shop 20M (W) x 20M (L) x 12M (H)

[FIT-UP] [PAINTING] [WELDING]

[Pressure Vessel] [Power Plant Package]

Fabricated Products 9

SHINJIN – KANFA

PARTNERSHIP ADVANTAGE

• KIP ( Kanfa Ingenium Process AS) has extensive expe

rience in oil/gas system design and EPC projects

• SEC ( ShinJin Engineering Co) has good capability in

detail engineering and procurement management

• KIP and SEC together will provide clients with reliabl

e process technology and cost effective professional

engineering services

10 • International Engineering Partner

SHINJIN – KANFA

PROJECT INTERFACE

• KIP provides basic process design

• SEC carries out detail and workshop design

• KIP reviews SEC design documents

• KIP and SEC will involve in FAT and site commissioning

10 • International Engineering Partner

INTERNATIONSAL PARTNERS

KANFA - SHINJIN

Who We Are

KANFA is an independent offshore project execution and process specialist within Oil & Gas and LNG.

We deliver topside process EPC contracts, equipment, FEED studies and offshore services such as troubleshooting, revamp as well as optimisation studies.

23

Our History

2001 2002 2003 2005 2006 2007

Key

contract

s O

rganisation

2000 2009 2011

SOLD FOUNDED

Topside contract with

Fred.Olsen Producti

on (FPSO Knock Tag

gart)

Topside contract

with ConocoPhilli

ps

(FSU CoroCoro)

Topside contracts with:

− Sevan Marine (FPSO Piranema)

,

− BW Offshore (FPSO Yùum K'ak'

náab)

− Sevan Marine (FPSO Humming

bird)

Topside contract

with Fred.Olsen

Production

(FPSO Knock All

an)

Topside contract

with Sevan Mari

ne

(FPSO Voyageur)

FLNG Topside

contract with SHI

(Flex LNG Producer

1)

Topside contract wit

h Fred.Olsen Produ

ction (Borgin Dolph

in )

FEED study-Pert

h

FEED study FRA

M

AQUISITIO

N

FOUNDED

2012

Three major FEE

D studies on-goi

ng.

FOUNDED AQUISITIONS AQUISITION

We have extensive experience with executing FPSO topside EPC projects

24

What We Do

25

Complete process topsides

Equipment

Modules/ packages

Studies

Liquid processing Gas processing Process Improvemen

t

FEED EPC Process Optimization

Troubleshooting & Debottlenecking

Process Training & Courses

Independent engineering services

Oil train Water train Gas train Utilities LNG Carbon Capt

ure

KANFA Group is a complete oil and gas processing house and EPC project execution organistation

26

Modules & Packages

The KANFA Group applies multi-discipline expertise to provide solutions for complex module and package supply focusing on the following;

Process Systems/Packages

Gas Dehydration (TEG & Mol. Sieve)

Gas Compression (Screw, Reciprocati

ng & Centrifugal Solutions)

Chemical Injection

Metering

Separation (HP, LP & Test)

Produced Water Treatment

Vapour Recovery & VOC

Sand Treatment

Mercury Removal

Coalescers

Utility Systems/Packages

Heating / Cooling Medium

Air Compressors & Dryers

Inert Gas Generation (Nitrogen & Hydrocar

bon)

High Pressure Hot Water

27

Equipment

The KANFA Group also supplies solutions for individual items of equipment and mechanical bulk items:

Filters & Coalescers Process & Utility Pumps Pressure Vessels (incl. Internals - Gas Scrubber / Knock Out V

essels)

Shell & Tube Heat Exchangers The KANFA Group ensures:

Project Specification Compliance (including NORSOK)

Third Party Verifications Project Documentation Compliance (including NORSOK)

Inspection and Expediting Material Compliance including CRAs and Exotics (including NORSOK)

CE Marking & EU Directive Compliance

Our ability to fabricate at various locations globally ensures local content requirements are met.

Gas Dehydration

28

KANFA Group has delivered a Gas Dehydration Unit to the Knock Allan FPSO for Fred Olsen Production, comprising a glycol contactor and a regeneration unit.

The Contactor is a packed column with an integrated pre-scrubber. The rich glycol is sent to the regeneration unit where the water is boiled off.

Design Data: • TEG Contactor with integrated scrubber • Gas flow rate: 70,000 kg/h • Temperature: 45°C • Pressure: 80 barg • Water content outlet: 15 mg/Sm3

Regeneration system • TEG flow rate: 3.3 m3/h • Lean TEG concentration: 99.88 wt% • Stripping gas rate: 70 kg/h • Reboiler duty: 265 kW

Engineering standards: The design is based on KANFA in-house software, which is based on recognised engineering guidelines such as Shell DEP, NORSOK, GPSA Engineering Data Handbook, Campbell and Dow Chemicals.

Corrosion Treatment Systems

29

KANFA Group has delivered pump packages for use on the Troll Onshore Gas Treatment and Recompression Plant, which is located at Kollsnes on the West Coast of Norway. The plant is operated by Statoil.

3 off Rich MEG Centrifuge Feed Pumps • Type: Eccentric Screw Pump • Pumping Temp (PT): 27°C • Rated Capacity at PT: 20 m3/hr • Discharge Pressure: 8.3 / 2.01 barg • Suction Pressure: 1.36 / 0.2 barg • Differential Pressure: 7.0 / 1.8 barg

2 off Treated MEG Return Pumps • Type: Submerged Centrifugal Pumps • Pumping Temp (PT): 27°C • Rated Capacity at PT: 40 m3/hr • Discharge Pressure: 12.8 / 12.8 barg • Differential Pressure: 12.8 / 12.8 barg • Differential Head: 126 / 126 m

Treated MEG Buffer Tank • Atmospheric Horizontal Tank • Code: NS 3472 and NORSOK • Total Volume: 33 m3 • Design Temperature: -22 / 59°C • Operating Temperature: 27°C • Length: 5000 mm • Width: 2000 mm • Heigth: 3300 mm • Material: SS316

1 off Settling Tank Return Pump • Type: Eccentric Screw Pump • Pumping Temp (PT): 27°C • Rated Capacity at PT: 4 m3/hr • Discharge Pressure: 3.0 / 1.54 barg • Suction Pressure: 0.9 / 0.3 barg • Differential Pressure: 2.7 / 0.7 barg

1 off Condensate Skimming Pump • Type: Eccentric Screw Pump • Pumping Temp (PT): 27°C • Rated Capacity at PT: 6.50 m3/hr • Discharge Pressure: 6.3 / 4.9 barg • Suction Pressure: 1.4 / 0.2 barg • Differential Pressure: 4.7 / 4.7 barg

Inert Gas Generation

30

KANFA has delivered a menbrane Nitrogen Generator for Modec including two Nitrogen Booster Compressors for use on the Tupi 2 FPSO operated by Petrobras.

Process Design Data • Pressure: 20 – 20.2 barg • Temp: 45°C

N2 Gas • Flow: 200 Nm3/hr • N2 content: 95-99%

Engineering Data • Design code: ASME, European Directive 97/

23/EC, • CE marked • Size: 2300mm x 5000mm • Weight: 4500 kg • Main materials: SS316

Equipment • Membranes • Filters (Particle, Activated Carbon, Dust) • N2 -compressor • Aftercooler • Package control (PLS)

Mechanical Design Data • Pressure: 25 barg • Temp: 260 °C

• Delivery time: 25 weeks

Separator - HP

31

KANFA Group has delivered a high pressure separator to Statoil’s K-Lab at Kårstø, as part of the subsea compression development project.

Design Data Fliud: HC Liquid / Gas / Water / MEG Operating Pressure: 64.7 – 102.2 barg Design Pressure: full vacuum / 140 barg Operating Temperature: 32 oC Design Temperature: -46/80oC

Water Flow: 15593 kg/h Specific Gravity: 1.08 oC Viscosity: 2.42 cP

Mechanical Parameters Inside Diameter: 2.1 m Length T/T: 8.1 m Volume: 33,000 L Design Code: EN13445 CE Marked PED Approved Weight: 58,236 kg

HC Liquid Flow: 133643 kg/h Specific Gravity: 0.64 oC Viscosity: 0.24 cP

Delivery time: 32 weeks

High Pressure Hot Water Systems

32

KANFA delivered a high pressure hot water package to HHI for use on the Goliat FPSO. Goliat is located in the cold Barents Sea on the North Coast of Norway. Goliat shall be operated by ENI. Start up in 2014.

Process Design Data • Pressure: 150 - 185 barg • Temp: 10 - 70°C

Water • Flow: 0 - 3 m3/hr • Density: 975 kg/ m3 • Viscosity: 0,4 cP at T&P

Engineering Data • Design code: NORSOK, API, PD5500 • CE marked • Size: 2645 x 1500 x1915 mm • Weight: 2250 kg • Material: Duplex (for wetted parts) Equipment

• High Pressure trpilex plunger Pump • Motor ready for VSD control • Accumulator • Noise hood • Cleaning/deicing spray guns

Mechanical Design Data • Pressure: 220 barg • Temp: 100 °C

• Delivery time: 30 weeks

Seoul Office #1716, 12, Mapo-daero, Mapo-gu, Seoul, 121-736, South Korea Tel :+82-2-704-5777 Fax :+82-2-704-5779

• Shop Location 11

Head Office/Factory #77, Sungju-Ro, Sungsan-Gu, Changwon Si, Gyeongnam, 642-090 Korea Tel: +82-55-714-8198 Fax: +82-55-714-8199

#77, Sungju-Ro, Sungsan-Gu, Changwon Si, Gyeongnam, 642-090 Korea Tel: +82-55-714-8198 Fax: +82-55-714-8199 Email : [email protected]